RailTel: a Reliable Partner for Digital NCR
Allahabad - 26th April 2016
Ashutosh Vasant
Regional General Manager/Northern [email protected]+91-9717644077
About RailTel – Present Network Infrastructure
PRESENT NETWORK
• OFC Network – 47,000 RKM
• Points of Presence – 4500+ stations
• DWDM Network
• STM-64/16 Network (600+cities)
• MPLS & NGN Network (80 cities Core)
• Network Operating Center (4 cities)
• Total network mapped on GIS
National Long
Distance
TELCOS
ENTERPRISE
ISPs
GOVT/PSUs
INSTITUTES
UNIVERSITY
BANKS
SMEs
INTERNETSERVICE
PROVIDER
MANAGED LEASE LINE
NLD VOICE CARRIAGE
IP-1
TOWER COLOCATION
RACK & SPACE COLOCATION
TELCOS
ISPs
MSOs
DARK FIBER
DEDICATED INTERNET
MPLS-IP VPN, VAS (DC, TP, etc)
About RailTel – Service Portfolio
ICT PROJECTS (National/International)
About RailTel – Major Customers
RBI
INDIAN ARMY
SBI
IGNOU
DRDO
Major Govt. Projects -National Knowledge Network
• Lead Creator of NKN• No of links:
• 89 Core links (10G each),• 600 Distribution links (2.5G each)• 1500 institutions (1G/100M)
• Implementation by NIC, BSNL, RailTel &PGCIL
• RailTel’s Scope: 26 Core, 128 distribution& 378 access links
• PO Value – Rs. 1056 Cr. over 10 yr period• Advance received Rs. 587 Cr.• 26 core, 114 distribution & 345 access
links implemented
Major Government Projects - USOF Project of North-East
• RailTel bagged the prestigious project forlaying of OFC in NE-I (Mizoram, Tripura,Meghalaya) & NE-II (Arunachal Pradesh,Manipur & Nagaland) connecting all DHQsand SDHQs on OFC based STM-16/64network totaling 600 locations within 2 years.
• RailTel took up project as a business strategyto serve this unserved area and has firstmover advantage.
• Survey of all States completed. WorkAwarded for 2 States & rest 4 States underprocess.
• Total Project Subsidy
=Rs. 388 Cr.
• Total Project cost
= Rs. 450 Cr.
National Optic Fiber Network – Panchayat Broadband
• Cabinet approved NOFN project in Oct 2011 to connect 2.5 lakh panchayats onoptic fiber network within 2 years.(Total Cost of Rs. 20,000 Crs)
• Salient features of the project
• Bharat Broadband Network Limited (BBNL) created for implementation
• BSNL, RailTel and PGCIL to execute NOFN. Agreement signed on 23rd May2013.
• 5 lakh kms incremental OFC to be laid by 3 CPSUs. E- Gov services to be runapart from supporting TSP/DSP/ISPs.
• 36,000 panchayats (worth Rs. 2500 Cr.) in 11 States/UTs( Tamil Nadu, Gujarat,Tripura, Meghalaya, Mizoram, Nagaland, Manipur, Arunachal Pradesh, Puducherry,Dadar & Nagar Haveli and Daman & Diu) given to RailTel. Survey completed.
• Pilot at 14 GPs completed in Panisagar block at Tripura
NOFN – Panisagar Pilot
E-education Classroom Tele-Medicine
E-Agriculture Veterinary Sub-Centre
Central NOC & Regional Office at Shastri Park
• Central SDH NOC
• Central MPLS NOC
• PAN India Billing centre
• NGN NOC
• IP DSLAM NOC
• Launched across India
• Broadband to the Common Man.
• Citizen Centric Services.
• Open to 3rd party applications.
• Health, Education, Work@Home
applications.
• Ready for IPTV, VoD.
• Ready For Web 2.0, HD
Video(25Mbps).
• 70000+ RailWire subscribers in the
States of Karnataka, Tamil Nadu
,Kerala,UP,Haryana,Mah,Guj.
RailWire – BroadBand Delivery
Digital Kerala & Digital Sabarkantha
• Post deliberations with various operators, RailTel chosen for “Digital Kerala” pilot.
Pilot done at 30 locations in Thrissur dist. (15 village offices + 15 Akshaya
centers).Connected in 15 days .
• Awarded 416 locations in Oct’13 for connecting village offices. All completed in
3 months. Now connecting 12000 schools on same RailWire platform
• Signed Zilla Panchayat and Gram Panchayats as partners to RailWire on 16th Aug
2015 in presence of Hon.CM Gujarat for Digital Sabarkantha .
• Rolled out WiFi in 55 villages in 30 days on collaboration .
Tele-presence as a Service (TPaaS)
• Launch of Tele-presence as a service.• TP is a HD based Video conferencing facility.• Ideal for meetings across Time zones, e-learning facility, R&D centers.• Also helps in monetizing the MPLS network due to high capacity
requirement.
What’s special with TPaaS ??
• Resolves procurement problem of Govt.
• A managed service , a bundled offering , spanning hardware ( codec , motorised
HD camera, cloud hosted redundant class 5 Video switch) , last mile ,24x7x365
concierge service, O&M, AMC , overcomes obsolescence as 7 years repair and
upgrade is part of the offering .
• Offers recording and retrieval
• Allows secured participation from laptop , tablet, mobile to join the HD VC and
thus allows site based monitoring
RailTel Google WiFi : Experiential difference
• A thumbs up for RailTel & Railways to have managed a company with brand
value of $174B to consider RailTel as the right partner to showcase access
technologies.
• World class RAN marrying the self healing high capacity backbone to produce
unmatched customer experience
• Bringing access to information and knowledge to the lowest rung of society , the
real masses , giving India the leg up on exploiting its highly capable and fertile
Human Potential .”Ideas to monetization” coming to grass roots .
• 100 stations by Dec 16 and then next phase taking that to 400 by Dec 18
RailWay Display Network : RDN
• Creating the world’s biggest mass addressing platform with 100000 networked
screens across 2000 Railway stations with individual addressability.
• Giving Railways the power for a REAL CONNECT with its customers to serve
them as they deserve and expect.
• Real time train information pulled from NTES and PRS in customer friendly GUI
• Statistics on train running / weather enroute / transport/ accommodation/ utilities/
tourist information/ health/ real time man made or natural calamity sensitization
only to the coach/ train / platform / route/ city/ state/
Railway Display Network ( Contd)
• Information on route diversion / stations not touched / safety drills/ new rules &
facilities / social messaging/ reservation status / live feeds
• Social network integration ( Tweeter/ Facebook/ Instagram/ Telegram etc ) for a
360 degree feedback
• All this and many more possibilities , all controllable from a central NOC as well
as from authorised users including station master / RPF/ TTE with record logs
• POC on ALD-Manikpur* and Mumbai-Ahmedabad
Railway Display Network ( Contd)
• Adding value to the station ambience and outlook
• All this at NO COST to Railways
• No disturbance to the existing advertisement revenue stream of Railways
• Instead adding untapped revenue potential , bringing on board the world’s biggest
Advertisement platform, creating a new medium integrating the advantages of TV
and OOH , with transparent real time auction engine , promising self sustainability
to Railways need for PIDS and additional significant revenue stream
Ways to move ahead with
Digital NCR
SKB
Kashganj
Etawah
Bhimsen
Orai
Utratia
Unchchar
Dariapur
Sultanpur
SPN
Bareily
Tanakpur
Dudwa
Jaunpur
Varanasi
Nautanwa
Anandagar Jn. Valmikinagar
Towards Patna/ER
Thawe
1. OPTIC FIBRE CABLE COMMISSIONED
2. OPTIC FIBRE CABLE UNLIT
3. OPTIC FIBRE CABLE WORK IN PROGRESS
4. OPTIC FIBRE CABLE SANCTIONED
5.OPTIC FIBRE CABLE FUTURE WORKS
Legends
Pilibhit
Allahabad
Gonda
Manikpur
Jhansi
Towards
Moradabad/NR
Balamau
CNB
LKO
Sitapur
Burhwal
Barabanki
Ayodhya
Dalmau
Phaphamu
Chunnar
Chhapra
Motihari
Kaptanganj
Bhatni
Indra Jn.Mau
Towards
Katni/WR Towards Gaya/ER
Banda
Roja
Pandrauna
Bina/WR
Lalitpur
Dholpur
AGC
Palwal
MathuraTundla
Aligarh
Ghaziabad
Kosi
NR
FTP
BRE
Chitrakoot
PHD
Moth
Igdah
Bayana
Siwan
To ECR/ER
Gwalior
Hamirpur
RailTel OFC Network in NCR Allahabad Division
1 Ghaziabad-Aligarh-Tundla 184 Km
2
Shikohabad-Tundla-Agra 66 Km
3
Shikohabad-Rura-Panki-Kanpur 194 Km
4
Kanpur-Allahabad 192 Km
5
Allahabad-MGS 153 Km
6
Allahabad-Manikpur 95 Km
Total RKM 884 Km
Agra Division
1 Palwal-Mathura-Agra 138 Km
2 Idgah-Bayana 81 Km
Total RKM 219 Km
Jhansi Division
1 Agra-Gwalior 118 Km
2 Gwalior-Lalitpur-Bina 250 Km
3 Kanpur-Jhansi 220 Km
Total RKM 588 Km
Total RKM
1691
RLY OFC Project under
ProgressS
N
OFC Section RKM
1 JHS-Mahoba 138
2 Mahoba-Manikpur 154
3 Khairar/Banda-Bhimsen 120
Total RKM 412
Progress of NC Rly OFC Projects upto 22nd Apr 2016
SN Name of the ProjectTotal
RKM
Cumm. Progress
Target Remarks
T D B
1JHS-Mahoba: Optical
Fibre Cable138 80 80 13 Aug’16
JHS-Orchha Block
section completed.
Work is in progress
2
Mahoba-Manikpur: Optical Fiber Cable 154 Mar’17
TC Under
Finalization. LOA
issuance expected
by 10th May 2016
3
Khairar/Banda-
Bhimsen: Optical
Fibre Cable
120 55 55 0 Aug’16 Work in Progress
Total 412 135 135 13
Progress of Masonry Rooms Projects upto Apr’16
SNName of the
ProjectTotal
RoomsCumm.
ProgressTarget Remarks
1 JHS-Mahoba 12 6Aug
2016Work in Progress
2 Mahoba-Manikpur 14Dec
2016Drawings not yet approved by Rlys
3 Bhimsen - KhairarNo Bids received
in multiple rounds of tendering
Total 26 6
Note: Early approval of JHS division on site Drawings ofMahoba-Manikpur section is required for start of work
Masonry Rooms Project: NCR’s Assistance Solicited
• No bids received in multiple rounds of Tendering forBhimsen-Khairar Masonry Room work.
• As progress of OFC laying is substantial, Rooms areimmediately required for OFC termination & indoorequipments installation.
• If NC Rly agrees to provide indoor space forequipments, section may be commissioned early.
• RailTel, needs to refloat Tender/operate variation inexisting Tender if Telecom Room space is notarranged by NC Rly.
• Suitable decision on this aspect is required/solicited.
Status of Project ‘Nilgiri’Wi-Fi Service at NCR- A1 Stations
ALD CNB JHS GWL AGC MTJ
All works completed. Wi-Fi
facility rolled out on 18.04.2016. Awareness
campaign awaits permission of NCR
Preliminary survey in progress .Target for Service Rollout: Sept
2016.
SMS based monitoring and reporting
• Through a simple per user per month subscription based service , RailTel can offer
monitoring and incidence reporting of any sort and any type that NCR may want
by just the field person sending an sms .
• The report gets compiled for entire section / project as an excel sheet and gets
reported as per defined escalation matrix . Extremely useful for monitoring
progress of targeted works like CTR, destressing , through packing , ballast
cleaning , USFD , sleeper renewal, RUB/ROB etc . Name the requirement and the
application can be customised . No sms charges, as free in CUG. Application
charges as low as Rs.150 per month per user .
SMS based monitoring and reporting (continued)
• No hardware or software investments
• Any make or model of mobile can be used
• Requires no application download or software installation
• Just a simple sms string does the job
• Can even monitor attendance
• Can even generate actual TA bills based on movement
Connected Subordinate and field offices
• Passing on the contingency provisions of CTR/ Doubling/GC/RVNL/DFCCIL
estimates to RailTel, OFC connectivity can be established to every subordinate
office from the nearest OFC PoP at the station and VLANs created for different
uses like TMS, IPAS, ERP,FTS to name a few of the many useful applications
enhancing effectiveness and efficiency
• Once the backbone is available, the same can be used to provide TP services to the
field functional units saving huge cost in travel, time ,transportation enhancing
effectiveness
Connected Subordinate and field offices ( Continued)
• On line stock keeping , scrap monitoring, progress monitoring , incidence
monitoring, loading , releasing , invoicing ,TSR maintenance can change the way
the system functions
• A very powerful medium for conducting safety drills , counselling , mass
addressing , emergency alerts , special drives , coaching and motivation ,
addressing staff grievances
Continuous coverage along tracks for operational efficiency
• RailTel can pitch in to invest in towers along high traffic corridors at each station
with OFC backbone .
• These towers can host multiple cellular operators to ensure seamless coverage
along tracks. This helps ensure voice and data communication both for operational
and emergency requirements .
• In lieu of Railway providing 10m x 10m land and initial 20KW power connection
at no cost to RailTel, the MTRC antenna and equipment can be mounted on these
towers at no initial cost to Railways , a 70% saving on MTRC estimates , else can
pay IPF
High Speed superior contention ratio RailWire connection to Railway colonies and
schools
• RailTel through its RailWire program can help bring a paradigm shift in the level
of exposure and competence of Rly employees and their wards by providing
affordable , reliable , scalable , high speed Broadband services at special rates for
Railway employees in Railway colonies.
• NCR can opt for high speed internet plans for all Railway schools bringing a real
change in the understanding and appreciation of subjects by the students who can
enjoy the benefits of learning by seeing and interacting with feedback , using You
Tube Education content , Khan academy lectures and an array of content on the
internet
VOIP phones across NCR
• Using RailTel soft switch in the cloud , both voice and video phones can be
provided across NCR to any location which is available on RailTel IP network
without the need of a physical exchange
• This reduces maintenance , power , repair, replacement and obsolescence cost
• This can be done at the CAPEX of initial supply of phones , I&C and then a small
fee per subscriber per annum
Returns to NCR for patronizing and promoting RailTel
• RailTel pays 7% of its revenue share to Railways , which is actually in excess of
25% of its profit. This is in addition to the Dividend paid against equity .
• NCR can propose to Railway Board that this revenue share proportionate to the
business done in NCR by RailTel should come straight to NCR kitty with powers
to GM to use same for any efficiency / effectiveness enhancing activities in the
Zone.
To make Digital NCR a reality, request following supports
• RDN is highly capital intensive .We need to keep the partners motivated .As all
investments are steered by RailTel, to have real impact , NCR may seek Board’s
approval to allow pilot at ALD, CNB,JHS,AGC,MTJ instead of stations on ALD –
Manikpur where even safety of assets and power availability will be a big
challenge
• Request all Departments to OWN RailTel. May kindly route plans for all OFC
affecting works through local RailTel official who will ensure prompt marking of
OFC and ensure all cooperation. Only in cases where shifting is unavoidable ,
RailTel will request for estimate provision
Request for support (continued)
• The OFC on CNB-ALD and ALD –MGS is 16 years old and coming to EOL .
Request sanctioning work for replacement ( along with quad if due) .
• Request sanctioning of repair cost for defects identified in joint inspection of OFC
on AGC-Achnera –Bandikui so that this section can be repaired and put to use
• Bina-Lalitpur and NYN-MGS are sanctioned for 3rd line. Will require OFC shifting
. May kindly sanction this as part of estimate in time to shift OFC ahead of start of
work.
Request for support (continued)
• In CNB-TDL section , fiber swapping be permitted between OFC maintained by
RailTel and that for signalling .This will ensure higher uptimes .
• CNB MW Power feeder used for power supply to optical equipment requires
upgradation to overcome frequent outages and low voltage issues
• IRPMU is laying OFC between Panki station to MW and MW to Central station. In
the duct so laid, 48 F be blown instead of 24F so that 24F can be used by RailTel.
In lieu of 24 F cable given by IRPMU, RailTel can supply 48 F cable .
Request for support continued
• Request pending payment for STM4 charges from NCR for 01.04.2015 to
31.03.2016 amounting to Rs.1,00,92,162/- and past arrears of 4F maintenance from
01.04.2013 to 31.03.2016 of Rs.1,19,32,902/-
• Request release of VAT over project charges of Rs.6.9 lacs
• Request approval for WiFi awareness drive and signages at ALD station as per
details submitted on 21.04.2016
• Request to retain all MW towers as these are vital assets for access network
•
Request for support continued
• Request space for safe keeping of material for Railway OFC projects and allotment
of spare rooms for equipment PoPs in the three Divisions
• Request Engineering support for mobilising good contractors for Masonary
buildings on JHS-Mahoba and plan approvals for OFC PoPs against Railway
projects on KHS-Mahoba-Manikpur and
•
Thank you
Batasia Loop of Darjeeling Himalayan Railways – A Heritage Railway under UNESCO
Lets stride together towards greater heights.
SDH / Carrier Ethernet Ring
MPLS
MPLSPE Switch
BRAS
Radius
Billing
Subscriber
OSS /BSS/CRMHosted by RailTel
LCO Network
Concept of RailWire…..
Connectivity to Individual Offices on RailWire