railroad commission of texas uic completion reporting guidance jim moore, engineering specialist ii...

64
RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

Upload: harriet-louise-wilkins

Post on 15-Jan-2016

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

RAILROAD COMMISSION OF TEXAS

UIC Completion Reporting Guidance

Jim Moore, Engineering Specialist IIInjection-Storage Permits & Support

Page 2: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

2

PRESENTATION OVERVIEW

A few examples of RRC webpage research including UIC webpages then a step-by-step guidance for W-2/G-1 online completions for injection / disposal / storage / brine mining wells. Steps include log in, starting or updating a completion packet, entering data, additional forms, submitting, messaging, and problem resolution.

Please ask questions during the presentation.

Page 3: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

3

RRC HOMEPAGE

Data – Online Research Queries

Oil & Gas link or pull-down menu

RRC Online Log In

Page 4: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

4

RRC WEBPAGE

Oil & Gas Completion Query

Online Research Queries

Injection/Disposal Permit Query

Oil & Gas Imaged Records Menu

Page 5: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

5

RRC WEBPAGE

Oil & Gas Well RecordsGAU LettersDisposal Permits (W-14)Injection/Disposal Permits (H-1/H-1A)

Oil and Gas Imaged Records Query Menu

These are links to Neubus

Page 6: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

6

OVERVIEW INJECTION PERMIT TYPES

• H-1/H-1A – Enhanced Recovery– Oil and Gas Waste Disposal

• W-14– Oil and Gas Waste Disposal

• H-2– Brine Mining

• H-4– Underground Hydrocarbon Storage

Page 7: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

7

INJECTION/DISPOSAL PERMIT DETAIL

• Base of Usable Quality Water• Casing Record• Injection Interval• Tubing/Packer Depth• Formation Name(s)• Permit Special Conditions

Page 8: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

8

IMPORTANT PERMIT DATA

• Field Name & Field Number– Matches on Completion (Form W-2/G-1), Drilling Permit (Form W-1)

• Well Number– Can be changed/updated with Completion

Injection Disposal

Well

Drilling Permit

UIC Permit

Completion Report

Page 9: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

9

COMPLETION OVERVIEW

• Packet Data• Form W-2/G-1 Data• Complete Additional Forms– P-4, W-12, L-1

• Load Attachments– W-15, W-12, GAU Letter (formerly TCEQ ),

Log Header, others e.g. SWR13 Exception Letter• Submit

Page 10: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

10

ONLINE SYSTEM

Select Completions

Page 11: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

11

FILING OPTIONS & MESSAGES

File a New Completion or Update Existing Completion Packet

Check Messages for your User ID, orfind all Messages for this Operator

Page 12: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

12

UPDATE EXISTING PACKET

Packet Status:- Submitted

Packet Status:- Work In Progress- Pending Operator Update- Hard Copy

View By options

Page 13: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

13

FILE A NEW COMPLETION PACKET

Click Search

EnterDrilling Permit No. orAPI No.

Page 14: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

14

Multiple Field Names Allowed on Drilling Permit New Packet

FILE A NEW COMPLETION PACKET

Page 15: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

15

o Multiple Drilling Permits may be populated when searching with APIo Drilling Permit’s can have multiple field nameso Choosing the Correct Drilling Permit is very Important!

CHOOSE THE CORRECT DRILLING PERMIT

Page 16: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

16

PACKET DATA

Purpose of FilingType of CompletionWell TypeWellbore ProfilePacket Type

Definitions for Purpose of Filing

Recommended sequence

Page 17: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

17

PACKET DATA

Page 18: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

18

PACKET DATA

Page 19: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

19

PACKET DATA

(For WSW, Water Supply Wells)

Page 20: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

20

PACKET DATA

Wellbore Profile is auto-populated from Drilling Permit, Form W-1

Page 21: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

21

PACKET DATA

Page 22: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

22

PACKET DATA

Click Create Packet tab

Tracking Number gets assigned

Purpose of FilingType of CompletionWell TypeVertical ProfilePacket Type

Done1

2

3

Page 23: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

23

PACKET DATA

Fill in Well Data

Recompletion/Reclass Table

Save

Change Packet Description

Page 24: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

24

PACKET DATA

New data fields 01/2014

Enter Permit No. & Date

Prior Service TypeSearch for Field & Reservoir

Page 25: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

25

PACKET DATA

Search for Field & Reservoir

1 result

Select

Page 26: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

26

W-2/G-1 PAGE 1

Page 1: Potential Test Data

Save, Select Page #

Select W-2 to continue

Page 27: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

27

W-2/G-1 PAGE 2

Save

Fill In Well Data

System responds with red text warnings if critical data is missing on this page.

Page 28: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

28

W-2/G-1 PAGE 3

New data fields 01/2014

Page 29: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

29

W-2/G-1 PAGE 4

New data fields 01/2014

Type of Casing (pull-down)ConductorSurfaceIntermediateConventional ProductionTapered ProductionOther

Top of Cement Determined By (pull-down) CalculationTemperature SurveyCement Evaluation LogCirculated

Page 30: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

30

W-2/G-1 PAGE 4

Active UIC:Tubing & Packer SetPossible exceptions- Brine mining- Hydrocarbon storage- Permit exception

Page 31: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

31

Perforations and Packer Depth

Permitted Interval

Needs to be less than 100’ unless permitted packer depth allows it

Injection Interval

o Insure Packer, Perforations and Plug Back depth all agree

Page 32: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

32

Example Permit

o Permitted Interval: 5577-6468’

o Actual Packer depth: 5800’

Page 33: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

33

Example of Inaccurate Reporting

5577

6468

5800Actual

Perforations:6000-6150

o If the permitted interval is reported instead of the completed interval, there is an obvious discrepancy

Page 34: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

34

W-2/G-1 PAGE 5

This table is required for Well Type: Active UIC

Can be “Yes” for Shut-In UIC

Injection/Disposal Interval is within Permitted Interval

Page 35: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

35

W-2/G-1 PAGE 5

Process (pull-down)AcidFractureCement SqueezeCast Iron Bridge Plug*RetainerOther

New data fields 01/2014

List all Work Chronologically, attach Form W-15 for new CIBP, Cement Squeeze, Squeeze Perfs, etc.

Page 36: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

36

W-2/G-1 PAGE 5

When to mark “Encountered”, “Isolated”

New data fields 01/2014

Page 37: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

37

RRC WEBPAGE

Revised SWR 13 – Casing, Cementing, Drilling, Well Control, and Completion Requirements

Oil & Gas page

Compliance & Enforcement

Quick recommendation!!

Page 38: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

38

RRC WEBPAGE

Rule 13 – Geologic Formation Information

Compliance & Enforcement page

Page 39: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

39

EXAMPLE FORMATION TOPS

Page 40: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

40

W-2/G-1 PAGE 6

Certify (or Re-certify)

Electronic Signature

Red text warnings if critical data is missing on W-2/G-1.

Page 41: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

41

COMPLETE ADDITIONAL FORMS

Additional Forms

Attachments

Select P-4 Certificate of Compliance and Transportation Authority

Determine All Required Forms

Page 42: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

42

ADDITIONAL FORM: P-4

Service Well, Yes

Certify (or Re-certify)

Gatherers and/or Purchasers info left blank.*

RRC Gas ID or Oil Lease No. is blank/zero

Page 43: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

43

ADDITIONAL FORM: P-4

Certify (or Re-certify)

Electronic Signature

Page 44: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

44

ADDITIONAL FORM: W-12

Well Information

Shot Point Information

Certify (or Re-certify)Electronic Signature

Page 45: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

45

ADDITIONAL FORM: L-1

Certify (or Re-certify)Electronic Signature

Basic Electric Log Run

Option: ConfidentialityAttach Log Header

Option: Log AttachedMail Log to RRC AustinAttention: Proration or UIC

Page 46: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

46

LOAD ATTACHMENTS

Additional Forms

Attachments

Select W-15 Cementing Report

Determine All Required Forms

Page 47: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

47

LOAD ATTACHMENTS: W-15

Current Attachments

Browse to file location such as your Desktop

Upload

21 3

Formats: .pdf or .tif

Page 48: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

48

RRC WEBPAGE

Forms- Proposed Form Changes

Oil & Gas page

Quick recommendation!!

Page 49: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

49

RRC WEBPAGE

W-15 Cementing Report

Proposed Form Changes

Page 50: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

50

LOAD ATTACHMENTS: W-12

Current Attachments

Pick 1 of 2 ways to initiate the Upload Attachment step

Page 51: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

51

LOAD ATTACHMENTS: W-12

Select W-12

Pull-Down/Pull-Up Menu for Attachment Type

Page 52: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

52

COMPLETION OVERVIEW

• Packet Data• Form W-2/G-1 Data• Complete Additional Forms– P-4, W-12, L-1

• Load Attachments– W-15, W-12, GAU Letter (formerly TCEQ ),

Log Header, others e.g. SWR13 Exception Letter• Submit

Page 53: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

53

SUBMIT PACKET

Form Name

Attachments

Submit

Service Well, Yes

Page 54: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

54

SUBMIT PACKET

Submit

NoNo

Page 55: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

55

SUBMIT FORMS LACKING

• Submit with required forms missing or uncertified?: • Submit with required attachments missing?:

Answer 1 or both “Yes”

If RRC analysts give Final Approval to the Completion Packet with Forms Lacking, then the Operator will need to provide the missing forms or attachments as soon as possible. Warning letter will follow.

Page 56: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

56

SUBMIT PACKET

… submitted successfully message

Page 57: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

57

PROBLEM RESOLUTION

• Respond to RRC messages on packet• Provide additional data, forms, attachments• Electronic signature & re-certify all forms released• Re-submit packet if released• Problem resolution

– W-1 Drilling Permit Amendment– H-1/H-1A or W-14 Injection/Disposal Permit Amendment– UIC Certified Letter– UIC Severance Letter– Refer to SWR 16

Page 58: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

58

REQUIREMENTS

• W-1 Drilling Permit – refer to SWR 5 (512) 463-6751– New Well– Deepening– Re-enter– Plug Back / Re-Completion in a Different Field

• W-15 Cementing Report – check with RRC Districts– New Well– Cement (CS)/ Block Squeeze (CS), Squeeze Perfs, Bridge Plug (CIBP),

Plug Back– May relate to Injection/Disposal Permit Special Conditions

Page 59: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

59

REQUIREMENTS

• W-12 Inclination Report – refer to SWR 11– New Well, Total Depth > 2000 feet– Re-Enter requires new survey if one was not already filed

• exception for Enhanced Recovery– Deepening

• Directional Survey– New Drill if the Wellbore Profile is Directional or Horizontal– New Drill if the Wellbore Profile is Vertical

• and the W-12 violates 11(c)(1)(A)– Applicable to some Re-Entry, or Deepening– Directional Surveys filed/uploaded by the responsible service company– RRC Engineering Unit & Support (512) 463-1126

Page 60: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

60

TERMS & DEFINITIONS

• UIC : Underground Injection Control • UIC Number : 9 digit number assigned to Well• H-1 Number : Project number– Fluid Injection Permit No. (label on Packet Data)– F- followed by 5 digits

• W-14 Number : Permit number– O&G Waste Disposal Permit No. (label on Packet Data)– 5 digits

Page 61: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

61

TERMS & DEFINITIONS

• API Number : 10-digit number assigned to Well• Well Number : D or L D D D L L , D=digit L=letter• RRC District No.• RRC Oil Lease No. : 5 digit Number • RRC Gas ID : 6 digit Number• Plat : Lease Map, Survey Location

Page 62: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

62

TERMS & DEFINITIONS

• H-1 Field Name– correlative to injection/disposal Formation(s)– use deepest if more than one Formation– well is on current schedule in one of the proposed

Formations, then keep current Field Name• W-14 Field Name– correlative to disposal Formation(s) more than

2 miles away– or to Formation that is source of disposal fluids

Page 63: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

63

QUESTIONS

Page 64: RAILROAD COMMISSION OF TEXAS UIC Completion Reporting Guidance Jim Moore, Engineering Specialist II Injection-Storage Permits & Support

64

CONTACT INFORMATION

• Jim Moore– Injection / Disposal Permitting– UIC Completions

• 512-463-6443 (Direct)• 512-463-6792 (Main)• 512-463-6780 (Fax)• [email protected]