rail - ardeco rail presentation.pdf · the company ardeco was established by engineers with long...
TRANSCRIPT
consult ing engineers | rail experts
ar.DE.CO.arsenis design & construction
τεχνική
ar.D
E.C
O.
rail
rail
The Company
ARDECO was established by Engineers with long standing activity and experience in
engineering, construction and project management.
ARDECO’s field of expertise has expanded throughout the years and now covers a broad
spectrum of Public and Private Projects.
Main fields of expertise are shortly summarized below.
Design and Coordination of Track Works (Metro Projects):
• DFD-Walkways in tunnel design, Concreted Tracks, Tunnel invert filling concrete, Elevated
Boardwalks, Signs & Markers.
• Track Alignment (horiz. & vertical) incl. Offset proof (tunnel/stations/depot sections)
• Installation drawings (concrete-ballast)
• Embedded Networks Design (installation-routing)
• Tunnel drainage design
• Stray Current Grid Design
• Turnout installation Drawings
• Coordination of TW drawings
• Special Designs (Transition Slabs, Buffer stop supports, Stinger supports, level crossings)
• Floating Structures: Conceptual & Structural Analysis
• Depot Special tracks (ballasted, embedded, on beams etc)
• Specification for 3rd Rail
• Detailed 3rd rail Installation Design
• Work Instructions – Method Statements
• Bill of Quantities
• Trackwork monitoring
CIVIL WORKS for Power Plants
Coordination of Construction Works (CW)
CW Project Management
CW Construction Management
R&DofEngineeringSoftware
METRO PROJECTSTrackworks & Tunnel Facilities Engineering
1. Athens M etro, Base project (1995-2002, 18km, 19 Stations)
2. Athens Metro, Extensions to Eth.Amyna-Stavros, Dafni – lioupoli, Sepolia-
Agios Antonios, Monastiraki-Egaleo (2002-2007, 13.9km, 10 Stations)
3. Athens Metro, Extensions to Anthoupoli, Ag.Marina, Elliniko (2006-2012,
8.5km, 8 Stations)
4. Athens metro, Extension to Pireas (2012-Today, 8.5km, 6 Stations)
5. Athens Metro, Sepolia Depot (1995-2002)
6. Athens Metro, Eleonas Depot (2008-2010)
7. Monitoring of Tracks in Line 3 part of tunnel towards Doukissis Plakentias
station, in the area of future Agia Paraskevi Station. (2007-2008)
8. Thessaloniki Metro , Extension to Kalamaria (2013-Today, 4.8km, 5 Stations)ar.D
E.C
O.
PROJECT PRESENTATION GENERAL DESCRIPRION OF THE PROJECT
PROJECT TITLE ATHENS ΜΕΤΡΟ
PROJECT AREAATHENS – GREECE
PROJECT OWNER
ATTIKO METRO SA
TOTAL LENGTH
The total length of the Athens Metro network is currently 31km Double Track Tunnels and 34 Stations.
There are also four (4) Depots (Sepolia, Stavros, Elinikon and Eleonas).
PROJECT MAIN CONTRACTORS
SIEMENS A.G.,FCC Construccion S.A.,ALSTOM TRANSPORT S.A., VINCI Grand Projects, AKTOR S.A , J&P-AVAX S.A., TERNA S.A., C.I.Kalogritsas S.A., ALPINE Bau GmbH
OUR SCOPE OF WORKS All Track Works Studies
• DFD-Walkways in tunnel design
• DFD-Concreted Tracks
• DFD-Tunnel invert filling concrete
• DFD-Elevated Boardwalks
• DFD-Signs & Markers
• Track Alignment (horiz. & vertical)
• Offset proof (tunnel/stations/depot sections)
• Trackwork installation drawings (concrete-ballast)
• Embedded Networks Design (installation-routing)
• Tunnel drainage design
• Stray Current Grid Design
• Turnout installation Drawings
• Coordination drawings
• Special Designs (Transition Slabs, Buffer stop supports, Stinger supports, level crossings)
• Floating Structures: Conceptual & Structural Analysis
• Depot Special tracks (ballasted, embedded, on beams etc)
• Specification for 3rd Rail
• Detailed 3rd rail Installation Design
• Work Instructions – Method Statements
• Bill of Quantities
• Monitoring of Tracks’ behavior, in Line 3 between Ethniki Amyna Station and Doukissis Plakentias Station, in the area of the future Agia Paraskevi Station, during excavation works on the ground surface for the construction of Agia Paraskevi Station. When track movement exceeded certain limits, circulation was stopped for a period of 9 months until completion of works in the Station.
PROJECT TITLE THESSALONIKI ΜΕΤΡΟ – KALAMARIA EXTENSION
PROJECT AREA
THESSALONIKI – GREECE
PROJECT OWNER
ATTIKO METRO SA
PROJECT LENGTH
The length of Kalamaria extension is 9,6km Single Track Tunnels and 5 Stations.
PROJECT MAIN CONTRACTORS
AKTOR S.A.
Main ClientsClient References
SIEMENS A.G. (Germany)FCC Construccion S.A. (Spain) ALSTOM TRANSPORT S.A. (France) VINCI Construction Grands Project (France)AKTOR S.A. (Greece)J&P-AVAX S.A. (Greece)TERNA S.A. (Greece)C.I.KALOGRITSAS S.A. (Greece)ALPINE Bau GmbH (Austria)ELEMKA S.A. (Greece)DB International GmbH (Germany)DE Consult GmbH (Germany)ZIERL CONSULT ZT GmbH (Austria)D2S International GmbH (Belgium)
cons
ulti
ng e
ngin
eers
| r
ail
expe
rts
rail power build soft
ar.DE.CO.arsenis design & construction
τεχνική
ar.D
E.C
O.
rail
144, Marathonodromou str. | 15125 Maroussi - Athens | Greece | www.ardeco.grt. +30 210 6123452, +30 210 6143444 | f. +30 210 6123559 | e. [email protected]