Radiometric Level Measurement in Coke Chambers. Conditions in the coke chamber. Diameter of Coker approx 7m, height approx 20m Temperature up to 430 degrees Celsius Pressure up to 22 bar during cracking process and up to 300 bar water jet during dicharging process - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Radiometric Level Measurement in Coke Chambers

detect and identify

RadiometricLevel Measurementin Coke Chambers

Page 2: Radiometric Level Measurement in Coke Chambers

Process Control

2

Conditions in the coke chamber

Diameter of Coker approx 7m, height approx 20m

Temperature up to 430 degrees Celsius

Pressure up to 22 bar during cracking process and up to 300 bar water jet during dicharging process

Critical product properties of residues

Extraordinary mechanical strain during discharging process

Page 3: Radiometric Level Measurement in Coke Chambers

Process Control

3

Requirement on Level Measurement

Non contact measurement system

Reliable measurement system

Safe measurement system

Proven measurement system

Radiometric Level Measurement from Berthold Technologies is the solution

Page 4: Radiometric Level Measurement in Coke Chambers

Process Control

4

Process in the Coke Chamber

Hot residual is filled from the bottom

Coker is heated up to 430 degrees Celsius

Pressure drops from 22 bar to 4 bar

Heavy fuels are separated into low and high boiling components

Light components are drained off via a nozzle on the top

Page 5: Radiometric Level Measurement in Coke Chambers

Process Control

5

Process Requirement

Fast filling cycle of the Coker required for economical reasons

Filling process is restricted by foam formation

Optimization of filling and discharging process in coke chamber

Page 6: Radiometric Level Measurement in Coke Chambers

Process Control

6

Process Optimization

Optimization of filling and discharging process by continuous level measurement

Control of foam level by controlled injection of anti-foam agent

Additional safety feature by max level switch

Page 7: Radiometric Level Measurement in Coke Chambers

Process Control

7

Measuring Tasks

Continuous Level Measurement

Measurement of the total level coke/oil/foam-content with radiometric measurement system

Indirect measurement of the foam level by observing and analysing rising speed of the level

Detection of Maximum Level

Radiometric level switch below process gas stub pipe

Page 8: Radiometric Level Measurement in Coke Chambers

Process Control

8

0

10

20

30

40

50

60

70

80

90

100

0 100 200 300 400 500 600 700 800 900 1000

Time

Level in

%

The Filling Process Start of continuous level measurement

Page 9: Radiometric Level Measurement in Coke Chambers

Process Control

9

0

10

20

30

40

50

60

70

80

90

100

0 100 200 300 400 500 600 700 800 900 1000

Time

Level %

The Filling Process Foam level rises

Page 10: Radiometric Level Measurement in Coke Chambers

Process Control

10

0

10

20

30

40

50

60

70

80

90

100

0 100 200 300 400 500 600 700 800 900 1000

Time

Level %

The Filling Process Anti foam agent is added

Page 11: Radiometric Level Measurement in Coke Chambers

Process Control

11

0

10

20

30

40

50

60

70

80

90

100

0 100 200 300 400 500 600 700 800 900 1000

Time

Level %

The Filling Process Continuous level measurement

Page 12: Radiometric Level Measurement in Coke Chambers

Process Control

12

0

10

20

30

40

50

60

70

80

90

100

0 100 200 300 400 500 600 700 800 900 1000

Time

Level %

The Filling Process Foam level rises

Page 13: Radiometric Level Measurement in Coke Chambers

Process Control

13

0

10

20

30

40

50

60

70

80

90

100

0 100 200 300 400 500 600 700 800 900 1000

Time

Level %

The Filling Process Anti foam agent is added

Page 14: Radiometric Level Measurement in Coke Chambers

Process Control

14

0

10

20

30

40

50

60

70

80

90

100

0 100 200 300 400 500 600 700 800 900 1000

Time

Level %

The Filling Process Continuous level measurement

Page 15: Radiometric Level Measurement in Coke Chambers

Process Control

15

0

10

20

30

40

50

60

70

80

90

100

0 100 200 300 400 500 600 700 800 900 1000

Time

Level %

The Filling Process Foam level rises

Page 16: Radiometric Level Measurement in Coke Chambers

Process Control

16

0

10

20

30

40

50

60

70

80

90

100

0 100 200 300 400 500 600 700 800 900 1000

Time

Level %

The Filling Process Anti foam agent is added

Page 17: Radiometric Level Measurement in Coke Chambers

Process Control

17

0

10

20

30

40

50

60

70

80

90

100

0 100 200 300 400 500 600 700 800 900 1000

Time

Level %

The Filling Process Continuous level measurement

Page 18: Radiometric Level Measurement in Coke Chambers

Process Control

18

0

10

20

30

40

50

60

70

80

90

100

0 100 200 300 400 500 600 700 800 900 1000

Time

Level %

The Filling Process Foam level rises

Page 19: Radiometric Level Measurement in Coke Chambers

Process Control

19

0

10

20

30

40

50

60

70

80

90

100

0 100 200 300 400 500 600 700 800 900 1000

Time

Level %

The Filling Process Anti foam agent is added

Page 20: Radiometric Level Measurement in Coke Chambers

Process Control

20

0

10

20

30

40

50

60

70

80

90

100

0 100 200 300 400 500 600 700 800 900 1000

Time

Level %

The Filling Process Continuous level measurement

Page 21: Radiometric Level Measurement in Coke Chambers

Process Control

21

0

10

20

30

40

50

60

70

80

90

100

0 100 200 300 400 500 600 700 800 900 1000

Time

Level %

The Filling Process Foam level rises

Page 22: Radiometric Level Measurement in Coke Chambers

Process Control

22

0

10

20

30

40

50

60

70

80

90

100

0 100 200 300 400 500 600 700 800 900 1000

Time

Level %

The Filling Process Anti foam agent is added

Page 23: Radiometric Level Measurement in Coke Chambers

Process Control

23

0

10

20

30

40

50

60

70

80

90

100

0 100 200 300 400 500 600 700 800 900 1000

Time

Level %

The Filling Process Continuous level measurement

Page 24: Radiometric Level Measurement in Coke Chambers

Process Control

24

0

10

20

30

40

50

60

70

80

90

100

0 100 200 300 400 500 600 700 800 900 1000

Time

Level %

The Filling Process Foam level rises

Page 25: Radiometric Level Measurement in Coke Chambers

Process Control

25

0

10

20

30

40

50

60

70

80

90

100

0 100 200 300 400 500 600 700 800 900 1000

Time

Level %

The Filling Process Anti foam agent is added

Page 26: Radiometric Level Measurement in Coke Chambers

Process Control

26

0

10

20

30

40

50

60

70

80

90

100

0 100 200 300 400 500 600 700 800 900 1000

Time

Level %

The Filling Process Continuous level measurement

Page 27: Radiometric Level Measurement in Coke Chambers

Process Control

27

Measurement System for Level Measurement in Coke Chamber

Continuous level measurement

LB 440 control unit master and slave

Rod detectors LB4405 in cascade

Point source in shielding Typ 100/150/200

Level Switch

LB 441 control unit

Point source in shielding LB7440/7442/7444

Page 28: Radiometric Level Measurement in Coke Chambers

Process Control

28

Benefits

Filling and discharging process can be optimized by continuous level measurement

Safes money and time

Indirect determination of foam level is possible

Injection of anti-foam agent can be controlled, safes money

Overflow detection by max level switch

Safety of process