Radiocommunications Network Facilities -Street Furniture Use Cases
MCMC MTSFB TC G026:2020
Let’s collaborate @ MTSFB!
Key enablers to support and deliver street furniture to improve 4G capacity or future 5G technology
Improving governance and business process
State's effort to expedite digital infra rollout
Advocacy strategies and approach
• Standardization and simplificationof acquisition process and permitapproval for street furniture (Bundle application & blanketapproval)
• Develop and adopt the new Guideline & Technical Code forStreet furniture (revise guideline)
• Promote "open market" healthycompetition among the Industryplayers
• Allowing access to street furniture assets for Telecom fast rollout
• Collaboration - develop State ICT planand align with JENDELA program
• Establish SOPProtest @ Bantahan
• Public awareness aboutthe important of digitalinfrastructure
Input Output
LET’S COLLABORATE @ MTSFB!
Progressive policies to govern and speed up integrated street furniture
Draft State & LCs Guideline for Street
furniture
MCMC/MTFSB Technical Code- Street furniture
Simple Application process
Simple Checklist submission
1 2 3 4Actual
deployment
5 6Conduct Survey
Let’s collaborate @ MTSFB!
LET’S COLLABORATE @ MTSFB!
To maintain aesthetic that blends with surrounding is a real challenge as to balance with technical requirements and limitationsBoth designs solution require consideration to meet State and Local Council expectation
Smart street pole for 1W & 2W Smart street pole for 3W & 4W
Advantage:• Support multiple Telcos• Minimize physical poles count at a
specific location• Visible tiered CAS antennas/RRUs or
use a camouflaged enclosure• Roadside cabinets (size area per Telco
at 2.4m (L) X 1.2m (D) X 2.0m (H))• Height: 18/24mtr• Design: 5G ready• Each Telco flexible to plan their sectors
& tilt (improve coverage & quality).• Can attached Smart elements from LC
(optional)Disadvantage:• Required more roadside cabinets with
bigger compound area.
Advantage:• Support one or two Telcos maximum• Visible antennas/RRUs or use a
camouflaged enclosure• Zero footing cabinet (size pole
diameter area less than 600mm)• Height: 15/18/24mtr• Design: 5G ready • Each Telco flexible to plan their
sectors & tilt (improve coverage & quality).
• Can attached Smart elements from LC (optional)
Disadvantage:• Design does not support 3 or 4 sharers• Require more lampole at specific
location should more than 2 Telcosinterested. Let’s collaborate @ MTSFB!
LET’S COLLABORATE @ MTSFB!
Use Cases
Street Lighting Pole• New Installed Street Lighting Pole with cabinet (Type A1) in Kuala Lumpur
Let’s collaborate @ MTSFB!
LET’S COLLABORATE @ MTSFB!
Use Cases
• New Installed Street Lighting Pole Zero Footing (Type A2) in Penang
Let’s collaborate @ MTSFB!
LET’S COLLABORATE @ MTSFB!
Use Cases• Replacement of existing Street Lighting Pole Zero Footing (Type A2) in Cyberjaya
(Work in progress)
Let’s collaborate @ MTSFB!
LET’S COLLABORATE @ MTSFB!
Use Cases Overall CME installation will take around 30-45 days
Let’s collaborate @ MTSFB!
LET’S COLLABORATE @ MTSFB!
Use Cases• Challenges or lesson learned need to be addressed
ImplementationGovernance
• Difficulty in accessing Greenfield area (new township); the land/asset still belong to the developer. GPP-I need to be adopted.
• Each state / council have different set process and checklist requirement.
• Many State / PBTs have appointed “exclusive” partner. Deny telco accessing Street Furniture asset.
• Garis Panduan-KPKT (2002) yet to be revised and updated
• Safety concerns (work at the roadside)
• State / PBTs expectation “aesthetic/design Vs. technology limitation”
• Public protest “not in my backyard”.
• Support from other agencies e.g TNB and JKR to expediate the approval or power supply.
Let’s collaborate @ MTSFB!
LET’S COLLABORATE @ MTSFB!Let’s collaborate @ MTSFB!
LET’S COLLABORATE @ MTSFB!
FAQ
No Question Answer
1 Mohon nyatakan Kerajaan Negeri dan PBT yang telahmenjalankan kerjasama bagi pembinaan perabut jalan ini?
Setakat ini operator telah bekerjasama dengan Kerajaan Negeri PulauPinang dan telah mempunyai Proof of Concept (PoC) perabot jalan disana. PoC yang dijalankan di Pulau Pinang adalah dalam bentuklampu jalan.
2 Adakah perabot jalan ini support 5G sahaja atau akansupport teknologi masa hadapan seperti 6G
Ya, perabot jalan ini juga akan support 6G dan teknologi lain di masahadapan, bukan sahaja 5G.
3 Perbezaan antara street furniture dan low impact facility Street furniture atau perabut jalan adalah salah satu elemen di dalamlow impact facility atau kemudahan berimpak rendah. Ianyamerangkumi segala peralatan telekomunikasi yang dipasang dan struktur perabut jalan seperti perabut jalan yang sediada, penggantianpada perabut jalan yang sediada dan binaan perabut jalan yang baruseperti tiang lampu jalan yang berintegrasi bersama peralatantelekomunikasi dengan spesifikasi yang telah ditetapkan di dalam KodTeknikal.