radar of gainesville
DESCRIPTION
ZOX-01-12 Location Map. Radar of Gainesville. ZOX-01-12 Aerial Map. Radar of Gainesville, Inc. ZOX-01-12 Zoning. Radar of Gainesville. ZOX-01-12 Future Land Use. Radar of Gainesville. Photo of Phase I Site. Photo of Phase II Site. Photo of Access Road. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Radar of Gainesville](https://reader035.vdocuments.mx/reader035/viewer/2022062315/56815fab550346895dcea6dc/html5/thumbnails/1.jpg)
SITE
CITY OF GAINESVILLE
Activity Center-Williston Road/I-75
INTERSTATE 75
SW WILLISTON RD
SW 41 BLVD
SW 35 DR
SW 34 ST
SW 35 W
AY
SW 56 R
D SW 37 LN
SW 36
WAY
SW 37 DR
Radar of Gainesville
ZOX-01-12 Location Map
0 1000500
Feet ±
![Page 2: Radar of Gainesville](https://reader035.vdocuments.mx/reader035/viewer/2022062315/56815fab550346895dcea6dc/html5/thumbnails/2.jpg)
Radar of Gainesville, Inc.
ZOX-01-12 Aerial Map
![Page 3: Radar of Gainesville](https://reader035.vdocuments.mx/reader035/viewer/2022062315/56815fab550346895dcea6dc/html5/thumbnails/3.jpg)
7240-1-10
7240-44
7240
-1- 4
7245-4
7143-2
7240-51
7143-14
7240-34
7143
-6-15
7143-4
7240-300
7240-30
7240-54
7240-26
7245-5
7143
7240-1-17
7143-10
7240-54
7240-1-18
7240-31
7240-26
7240-154-LOT
7143
7240-32
7240-24
7143-9
7242
7242-1
7143-9
7240-43
7242
7143-6
City of Gainesville
City of Gainesville
SITE
S I-75N I-75
SW 41 BLVD
SW WILLISTON R
D
SW 35 DRSW
35 WAY
Zoning: Agricultural (A)
Zoning: Residential Single Family (R-1A)
Zoning: Manufacturing and Services Industrial (MS)
Zoning: Planned Development (PD)
Zoning: Highway Oriented Business (BH)
Zoning: Manufacturin
g and Processing Industria
l (MP)
Zoning: R-1B
Radar of Gainesville
ZOX-01-12 Zoning
±0 500250
Feet
![Page 4: Radar of Gainesville](https://reader035.vdocuments.mx/reader035/viewer/2022062315/56815fab550346895dcea6dc/html5/thumbnails/4.jpg)
7240-1-10
7240-44
7240
-1- 4
7245-4
7143-2
7240-51
7143-14
7240-34
7143
-6-15
7143-4
7240-300
7240-30
7240-54
7240-26
7245-5
7143
7240-1-17
7143-10
7240-54
7240-1-18
7240-31
7240-26
7240-154-LOT
7143
7240-32
7240-24
7143-9
7242
7242-1
7143-9
7240-43
7242
7143-6
City of Gainesville
City of Gainesville
SITE
S I-75N I-75
SW 41 BLVD
SW WILLISTON R
D
SW 35 DRSW
35 WAY
FLU: Heavy Industrial
FLU: Light Industrial
FLU: Heavy Industrial
FLU: Tourist/Entertainment
FLU: Residential Low Density (1-4du/acre)
Radar of Gainesville
ZOX-01-12 Future Land Use
±0 500250
Feet
![Page 5: Radar of Gainesville](https://reader035.vdocuments.mx/reader035/viewer/2022062315/56815fab550346895dcea6dc/html5/thumbnails/5.jpg)
Photo of Phase I Site
![Page 6: Radar of Gainesville](https://reader035.vdocuments.mx/reader035/viewer/2022062315/56815fab550346895dcea6dc/html5/thumbnails/6.jpg)
Photo of Phase II Site
![Page 7: Radar of Gainesville](https://reader035.vdocuments.mx/reader035/viewer/2022062315/56815fab550346895dcea6dc/html5/thumbnails/7.jpg)
Photo of Access Road
![Page 8: Radar of Gainesville](https://reader035.vdocuments.mx/reader035/viewer/2022062315/56815fab550346895dcea6dc/html5/thumbnails/8.jpg)
Hotel across SW 41st Blvd.
![Page 9: Radar of Gainesville](https://reader035.vdocuments.mx/reader035/viewer/2022062315/56815fab550346895dcea6dc/html5/thumbnails/9.jpg)
WCA Facility (right) and Watson Facility (left)
![Page 10: Radar of Gainesville](https://reader035.vdocuments.mx/reader035/viewer/2022062315/56815fab550346895dcea6dc/html5/thumbnails/10.jpg)
Applicant Request• Recycling of Construction and Demolition (C&D) and
Class III debris• C&D debris is classified as material considered not to be
water soluble and not hazardous in nature. This can include, but is not limited to: steel, glass, brick, concrete, asphalt, gypsum wall board and lumber.
• Class III waste is classified as yard trash, construction and demolition debris, processed tires, asbestos, carpet, cardboard, paper, glass, plastic or other materials that are not expected to produce leachate that poses a threat to public health or the environment.
![Page 11: Radar of Gainesville](https://reader035.vdocuments.mx/reader035/viewer/2022062315/56815fab550346895dcea6dc/html5/thumbnails/11.jpg)
Applicant Request
• Materials that are recyclable will be picked and removed from the waste stream and sorted by type into bins. These bins will be located on-site on a temporary basis until full, at which point they will be hauled off-site for reuse. All other materials will be removed from the site to an approved Class III/C&D disposal facility.
![Page 12: Radar of Gainesville](https://reader035.vdocuments.mx/reader035/viewer/2022062315/56815fab550346895dcea6dc/html5/thumbnails/12.jpg)
Staff Recommendation
• Staff finds the request consistent with the Comprehensive Plan and Code and specifically with the policies and portion of the Code noted in the staff report
• Staff recommends approval of the request with the conditions found in the staff report and the bases as noted therein.