322
TENAGA 1 Tukang kayu hari 30,000.00 2 Kepala tukang kayu hari 32,500.00 3 Tukang batu hari 27,500.00 4 Kepala tukang batu hari 30,000.00 5 Tukang besi hari 25,000.00 6 Kepala tukang besi hari 27,000.00 7 Tukang las hari 27,500.00 8 Kepala tukang las hari 29,000.00 9 Tukang cat hari 25,000.00 10 Kepala tukang cat hari 27,000.00 11 Tukang plitur hari 27,000.00 12 Kepala tukang plitur hari 29,000.00 13 Tukang bor hari 27,500.00 14 Kepala tukang bor hari 29,000.00 15 Tukang listrik hari 29,000.00 16 Tukanng pipa ledeng hari 27,900.00 17 Tukang kapur hari 22,500.00 18 Pekerja hari 20,000.00 19 Mandor hari 32,500.00 20 Pengawas / Ahli Teknik hari 37,200.00 21 Ahli ukur hari 116,300.00 22 Asisten ahli ukur hari 87,200.00 23 Sopir hari 26,000.00 24 Masinis hari 24,900.00 25 Kernet / pembantu sopir hari 22,000.00 26 Mekanik terlatih hari 29,000.00 27 Operator tak terlatih hari 24,000.00 28 Operator terlatih hari 29,000.00 29 Operator semi terlatih hari 25,000.00 30 Butuh terlatih hari 22,600.00 31 Buruh semi terlatih hari 21,200.00 32 Buruh tak terlatih hari 19,600.00 33 Tukang gali hari 34,900.00 34 Juru godog aspal hari 20,000.00 35 Penjaga hari 20,000.00 36 Penyemprot hari 17,500.00 37 Tukang Sungging hari 40,000.00 38 Kepala Tukang Sungging hari 45,000.00 39 Tukang Ukir hari 40,000.00 40 Kepala Tukang Ukir hari 45,000.00 41 Tukang Prodo hari 40,000.00 42 Kepala Tukang Prodo hari 45,000.00 43 Tukang Gambar hari 35,000.00 44 Tukang Grouting hari 30,000.00 45 Kepala tukang Grouting hari 32,500.00 46 Operator mesin sondir hari 75,000.00 47 Analis test sondir hari 120,000.00 CAT 1 Cat kayu se kualitas Patna kg 10,450.00 2 Cat kayu se kualitas Emco biasa kg 32,000.00 3 Cat kayu se kualitas Emco Bintang kg 42,000.00 4 Cat kayu se kualitas Par kg 29,000.00 5 Cat besi se kualitas Patna kg 10,450.00 6 Cat besi se kualitas Emco biasa kg 32,000.00 7 Cat besi se kualitas Emco Bintang kg 42,000.00 8 Cat kayu se kualitas Avian kg 24,750.00 9 Cat tembok/cat semen Maxilite kg 7,600.00 10 Cat tembok/cat emulsi dasar minyak Express kg 8,250.00 11 Cat tembok/cat polivynyl asetat Dulux kg 25,000.00 12 Cat tembok/cat kilap/cat acrilyc Dulux kg 35,000.00 13 Cat ICI Catylac kg 12,000.00 14 Cat tembok se kualitas Decolith kg 9,500.00 15 Cat Sintex kg 7,500.00 16 Cat dasar meni besi type A (cepat kering) Jago kg 12,000.00 17 Cat dasar meni besi type A (cepat kering) Par kg 22,500.00 18 Cat dasar meni kayu Jago kg 12,000.00 19 Cat duco kg 60,000.00 20 Cat genteng air ICI weathershield kg 42,000.00 21 Cat dasar undercoat / alkali resisiting primer kg 27,200.00 22 Cat dinding weathershield Dulux kg 50,000.00 23 Dempul kayu typa A (putih) Jago kg 10,000.00 24 Dempul lilin / kayu bj 9,000.00 25 Plamur Fuji kg 8,500.00 26 Plamur kayu Jago kg 12,000.00 27 Plamur tembok acrilyc kg 17,500.00 28 Plamur jenis sirlak kuning ltr 17,500.00 29 Sirlak putih batangan kg 65,000.00 30 Sirlak kuning serbuk kg 65,000.00 31 Oker kuning kg 12,000.00 DAFTAR SATUAN UPAH DAN BAHAN DI LINGKUNGAN PEMERINTAH KOTA YOGYAKARTA NO. SATUAN NAMA BARANG / BAHAN / TENAGA HARGA SATUAN (Rp.) Bahan - 1

Upload: henceincent

Post on 20-Jul-2016

124 views

Category:

Documents


17 download

DESCRIPTION

*******

TRANSCRIPT

Page 1: Rab Versi Sni Lengkap

TENAGA

1 Tukang kayu hari 30,000.00

2 Kepala tukang kayu hari 32,500.00

3 Tukang batu hari 27,500.00

4 Kepala tukang batu hari 30,000.00

5 Tukang besi hari 25,000.00

6 Kepala tukang besi hari 27,000.00

7 Tukang las hari 27,500.00

8 Kepala tukang las hari 29,000.00

9 Tukang cat hari 25,000.00

10 Kepala tukang cat hari 27,000.00

11 Tukang plitur hari 27,000.00

12 Kepala tukang plitur hari 29,000.00

13 Tukang bor hari 27,500.00

14 Kepala tukang bor hari 29,000.00

15 Tukang listrik hari 29,000.00

16 Tukanng pipa ledeng hari 27,900.00

17 Tukang kapur hari 22,500.00

18 Pekerja hari 20,000.00

19 Mandor hari 32,500.00

20 Pengawas / Ahli Teknik hari 37,200.00

21 Ahli ukur hari 116,300.00

22 Asisten ahli ukur hari 87,200.00

23 Sopir hari 26,000.00

24 Masinis hari 24,900.00

25 Kernet / pembantu sopir hari 22,000.00

26 Mekanik terlatih hari 29,000.00

27 Operator tak terlatih hari 24,000.00

28 Operator terlatih hari 29,000.00

29 Operator semi terlatih hari 25,000.00

30 Butuh terlatih hari 22,600.00

31 Buruh semi terlatih hari 21,200.00

32 Buruh tak terlatih hari 19,600.00

33 Tukang gali hari 34,900.00

34 Juru godog aspal hari 20,000.00

35 Penjaga hari 20,000.00

36 Penyemprot hari 17,500.00

37 Tukang Sungging hari 40,000.00

38 Kepala Tukang Sungging hari 45,000.00

39 Tukang Ukir hari 40,000.00

40 Kepala Tukang Ukir hari 45,000.00

41 Tukang Prodo hari 40,000.00

42 Kepala Tukang Prodo hari 45,000.00

43 Tukang Gambar hari 35,000.00

44 Tukang Grouting hari 30,000.00

45 Kepala tukang Grouting hari 32,500.00

46 Operator mesin sondir hari 75,000.00

47 Analis test sondir hari 120,000.00

CAT

1 Cat kayu se kualitas Patna kg 10,450.00

2 Cat kayu se kualitas Emco biasa kg 32,000.00

3 Cat kayu se kualitas Emco Bintang kg 42,000.00

4 Cat kayu se kualitas Par kg 29,000.00

5 Cat besi se kualitas Patna kg 10,450.00

6 Cat besi se kualitas Emco biasa kg 32,000.00

7 Cat besi se kualitas Emco Bintang kg 42,000.00

8 Cat kayu se kualitas Avian kg 24,750.00

9 Cat tembok/cat semen Maxilite kg 7,600.00

10 Cat tembok/cat emulsi dasar minyak Express kg 8,250.00

11 Cat tembok/cat polivynyl asetat Dulux kg 25,000.00

12 Cat tembok/cat kilap/cat acrilyc Dulux kg 35,000.00

13 Cat ICI Catylac kg 12,000.00

14 Cat tembok se kualitas Decolith kg 9,500.00

15 Cat Sintex kg 7,500.00

16 Cat dasar meni besi type A (cepat kering) Jago kg 12,000.00

17 Cat dasar meni besi type A (cepat kering) Par kg 22,500.00

18 Cat dasar meni kayu Jago kg 12,000.00

19 Cat duco kg 60,000.00

20 Cat genteng air ICI weathershield kg 42,000.00

21 Cat dasar undercoat / alkali resisiting primer kg 27,200.00

22 Cat dinding weathershield Dulux kg 50,000.00

23 Dempul kayu typa A (putih) Jago kg 10,000.00

24 Dempul lilin / kayu bj 9,000.00

25 Plamur Fuji kg 8,500.00

26 Plamur kayu Jago kg 12,000.00

27 Plamur tembok acrilyc kg 17,500.00

28 Plamur jenis sirlak kuning ltr 17,500.00

29 Sirlak putih batangan kg 65,000.00

30 Sirlak kuning serbuk kg 65,000.00

31 Oker kuning kg 12,000.00

DAFTAR SATUAN UPAH DAN BAHAN DI LINGKUNGAN PEMERINTAH KOTA YOGYAKARTA

NO. SATUANNAMA BARANG / BAHAN / TENAGA HARGA SATUAN (Rp.)

Bahan - 1

Page 2: Rab Versi Sni Lengkap

NO. SATUANNAMA BARANG / BAHAN / TENAGA HARGA SATUAN (Rp.)

32 Oker hitam kg 9,500.00

33 Oker pewarna politur merah / coklat bks 1,200.00

34 Kalkarium kg 5,000.00

35 Politur jadi ltr 20,000.00

36 Teak oil Fuji ltr 27,500.00

37 Pernis ltr 12,500.00

38 Glass bit ltr 12,000.00

39 Thermo plastik / cat marka kg 49,000.00

40 Cat rettar kg 49,000.00

41 Terpentin ltr 11,500.00

42 Minyak cat ltr 10,000.00

43 Thinner ltr 13,000.00

44 Spiritus ltr 6,500.00

45 Batu kambang kg 7,700.00

46 Kuas roll bh 8,500.00

47 Kuas ukuran 3,5" bh 8,000.00

48 Kuas ukuran 2,5" bh 5,000.00

49 Kuas ukuran kecil 1" bh 2,000.00

50 Soda api kg 15,000.00

51 Sabun deterjen kg 12,000.00

52 Amplas lbr 2,500.00

53 Prodo Mas m2

3,000,000.00

54 Kertas 100 x 100 cm lbr 2,000.00

55 Karbon lbr 3,500.00

BETON DAN BARANG DARI BETON

BATAKO

1 Batako pejal ( 40x20x10 ) bj 2,750.00

Batako beton berlubang ( 40x20x15 ) bh 2,500.00

2 Panel beton pracetak lbr 175,000.00

3 Kolom beton pracetak btg 250,000.00

PIPA

1 Pipa beton 20 x 30 0anjang 1 m m 28,000.00

2 Pipa beton tanpa tulangan dia. 20 cm panjang 1 m m 24,000.00

3 Pipa beton tanpa tulangan dia. 30 cm panjang 1 m m 25,000.00

4 Pipa beton tanpa tulangan dia. 60 cm panjang 0,5 m m 28,000.00

5 Pipa beton tanpa tulangan dia. 80 cm panjang 0,5 m m 32,000.00

6 Pipa beton tanpa tulangan 1/2 dia. 20 cm m 12,000.00

BUIS BETON / KERB

1 Buis beton 1/2 D 20 cm m1

12,000.00

2 Buis beton 1/2 D 25 cm m1

13,000.00

3 Buis beton bulat dia. 15 cm m1

22,000.00

4 Buis beton bulat dia. 20 cm m1

24,000.00

5 Buis beton bulat dia. 30 cm m1

30,000.00

6 Buis beton bulat dia. 40 cm m1

32,000.00

7 Buis beton bulat dia. 50 cm P=0,50 m bh 26,000.00

8 Buis beton bulat dia. 80 cm P=0,5 m bh 32,000.00

9 Buis beton oval dia. 20/30 panjang 1 m m1

30,000.00

10 Buis beton oval dia. 25/37,5 panjang 1 m m1

35,000.00

11 Buis beton oval dia. 30/40, 30/45 panjang 1 m m1

45,000.00

12 Buis beton oval dia. 35/52,5 panjang 1 m m1

65,000.00

13 Buis beton oval dia. 40/60 panjang 1 m m1

50,000.00

14 Buis beton oval dia. 50/75 panjang 0,5 m bh 35,000.00

15 Buis beton oval dia. 60/90 panjang 0,5 m bh 38,000.00

16 Buis beton oval dia. 70/105 panjang 0,5 m bh 47,000.00

17 Buis beton oval dia. 80/120 panjang 0,5 m bh 55,000.00

PERALATAN SANITASI

BAK MANDI

1 Bak mandi teraso uk. 50x50x50 cm bh 150,000.00

2 Bak mandi teraso uk. 60x60x60 cm bh 175,000.00

3 Bak mandi teraso uk. 90x80x80 cm bh 220,000.00

4 Bak mandi (bathtube) dengan shower lux bh 3,250,000.00

5 Bak mandi (bathtube) standar bh 2,475,000.00

6 Bak mandi fiber glass 0,30 m3 bh 275,000.00

7 Bak mandi fiber glass 0,50 m3 bh 825,000.00

KLOSET

1 Kloset jongkok porselin type CE7 standar bh 75,000.00

2 Kloset jongkok porselin type CE8 standar bh 85,000.00

3 Kloset jongkok putih INA bh 65,000.00

4 Kloset jongkok warna INA bh 75,000.00

5 Kloset duduk standar/porselin (dengan tangki KIA standart) "Lolo" bh 950,000.00

6 Kloset duduk porselin lux ( dengan tangki "Toto" ) bh 1,250,000.00

7 Kloset duduk putih dengan tangki "Toto" set 1,250,000.00

8 Kloset duduk warna dengan tangki "Toto" set 1,350,000.00

9 Kloset duduk putih dengan tangki "KIA" set 700,000.00

10 Kloset duduk warna dengan tangki "KIA" set 925,000.00

11 Kloset jongkok standar / keramik bh 55,600.00

12 Kloset jongkok teraso bh 25,000.00

WASTAFEL

1 Wastafel standar INA bh 255,000.00

2 Wastafel lux INA bh 265,000.00

3 Wastafel putih (KIA) set 139,150.00

4 Wastafel warna (KIA) set 271,340.00

5 Badkip bh 150,000.00

6 Bak cuci stainless steel bh 500,000.00

Bahan - 2

Page 3: Rab Versi Sni Lengkap

NO. SATUANNAMA BARANG / BAHAN / TENAGA HARGA SATUAN (Rp.)

7 Water drain + asesories set 75,000.00

URINOIR

1 Urinoir standar TOTO U 57 set 785,000.00

2 Urinoir putih set 1,050,000.00

4 Urinoir warna (KIA) set 379,500.00

5 Meja cuci dapur 125 x 50 cm bh 175,000.00

6 Tempat sabun tunggal bh 22,500.00

7 Kran air diameter 3/4" atau 1/2" bh 25,000.00

8 Seal tape bh 2,500.00

9 Floordrain bh 55,000.00

BATA HALAMAN / PAVING BLOCK

1 WARNA NATURAL / ABU-ABU

2 Tipe segi empat, uni, segi 6 tebal = 8 cm K 400 m2

55,000.00

3 Tipe uni dan segi empat tebal = 8 cm K 300 m2

50,400.00

4 Tipe segi empat tebal = 6 cm K 200 m2

38,250.00

5 Tipe segi empat tebal = 8 cm K 200 m2

46,700.00

6 Tipe segi enam tebal = 6 cm K 200 m2

38,100.00

7 Tipe segi enam tebal = 8 cm K 200 m2

46,700.00

8 Tipe uni / tikar tebal = 6 cm K200 m2

38,200.00

9 Tipe uni / tikar tebal = 8 cm K 200 m2

46,800.00

10 Tipe trihex / sarang lebah tebal = 6 cm K 200 m2

38,200.00

11 Tipe lampion tebal = 8 cm K 200 m2

46,800.00

12 Tipe beteng kecil tebal = 6 cm K 200 m2

38,200.00

13 Tipe beteng kecil tebal = 8 cm K 200 m2

46,700.00

14 Tipe kipas tebal = 8 cm K 200 m2

46,800.00

WARNA MERAH / HITAM

1 Tipe segi empat, uni, segi 8 tebal = 8 cm warna K 400 m2

61,700.00

2 Tipe uni dan segi empat tebal = 8 cm warna K 300 m2

56,700.00

3 Tipe segi empat tebal = 6 cm warna K 200 m2

43,500.00

4 Tipe segi empat tebal = 8 cm warna K 200 m2

52,000.00

5 Tipe segi enam tebal = 6 cm warna K 200 m2

43,500.00

6 Tipe segi enam tebal = 8 cm warna K 200 m2

52,000.00

7 Tipe uni / tikar tebal = 6 cm warna K200 m2

43,500.00

8 Tipe uni / tikar tebal = 8 cm warna K 200 m2

52,000.00

9 Tipe trihex / sarang lebah tebal = 6 cm warna K 200 m2

43,500.00

10 Tipe lampion tebal = 8 cm warna K 200 m2

52,000.00

11 Tipe beteng kecil tebal = 6 cm warna K 200 m2

43,500.00

12 Tipe beteng kecil tebal = 8 cm warna K 200 m2

52,000.00

13 Tipe kipas tebal = 8 cm warna K 200 m2

52,000.00

14 Tipe grass blok bulat tebal = 10 cm m2

41,400.00

15 Tipe grass blok tebal = 10 cm m2

41,400.00

ASBES

1 Asbes plat ( 100 x 100 x 0,3 ) lbr 10,000.00

2 Asbes plat ( 200 x 100 x 0,3 ) lbr 19,000.00

3 Asbes plat ( 100 x 100 x 0,6 ) lbr 17,500.00

4 Asbes plat ( 100 x 100 x 0,5 ) lbr 15,000.00

5 Asbes plat ( 100 x 100 x 0,4 ) lbr 12,500.00

6 Asbes plat ( 100 x 100 x 0,35 ) lbr 11,000.00

7 Asbes plat ( 100 x 100 x 0,32 ) lbr 10,000.00

8 Asbes gelombang besar ( 300 x 110 x 0,5 ) lbr 90,275.00

9 Asbes gelombang besar ( 200 x 110 x 0,5 ) lbr 74,900.00

10 Asbes gelombang besar ( 180 x 110 x 0,5 ) lbr 57,354.00

11 Asbes gelombang besar ( 150 x 110 x 0,5 ) lbr 45,650.00

12 Asbes gelombang besar ( 300 x 92 x 0,5 ) lbr 75,495.00

13 Asbes gelombang besar ( 250 x 92 x 0,5 ) lbr 62,960.00

14 Asbes gelombang besar ( 225 x 92 x 0,5 ) lbr 56,620.00

15 Asbes gelombang besar ( 200 x 92 x 0,5 ) lbr 50,330.00

16 Asbes gelombang besar ( 180 x 92 x 0,5 ) lbr 45,290.00

17 Asbes gelombang besar ( 300 x 108 x 0,6 ) lbr 112,830.00

18 Asbes gelombang besar ( 270 x 108 x 0,6 ) lbr 101,500.00

19 Asbes gelombang besar ( 240 x 108 x 0,6 ) lbr 90,265.00

20 Asbes gelombang besar ( 210 x 108 x 0,6 ) lbr 78,980.00

21 Asbes gelombang besar ( 180 x 108 x 0,6 ) lbr 67,690.00

22 Asbes gelombang kecil ( 300 x 105 x 0,4 ) lbr 71,350.00

23 Asbes gelombang kecil ( 270 x 105 x 0,4 ) lbr 69,250.00

24 Asbes gelombang kecil ( 210 x 105 x 0,4 ) lbr 57,500.00

25 Asbes gelombang kecil ( 180 x 105 x 0,4 ) lbr 42,850.00

26 Asbes gelombang kecil ( 150 x 105 x 0,4 ) lbr 35,950.00

27 Asbes gelombang kecil ( 240 x 105 x 0,4 ) lbr 61,000.00

28 Asbes nok gelombang besar lbr 29,000.00

29 Asbes nok gelombang kecil lbr 23,000.00

30 Nok paten lbr 50,000.00

31 Nok stel rata lbr 25,000.00

GENTENG & KERAMIK

1 Genteng beton besar natural 1m 9 biji bh 2,750.00

2 Genteng beton besar warna 1m 9 biji bh 4,420.00

3 Genteng beton kecil natural 1m 11 biji bh 2,350.00

4 Genteng beton kecil warna 1m 11 biji bh 3,950.00

5 Genteng beton kecil natural 1m 20 biji bh 2,000.00

6 Genteng beton kecil warna 1m 20 biji bh 2,640.00

7 Genteng bubungan beton bh 2,460.00

8 Genteng Wuwung warna bh 4,260.00

9 Nok press beton bh 37,000.00

GENTENG & NOK

Bahan - 3

Page 4: Rab Versi Sni Lengkap

NO. SATUANNAMA BARANG / BAHAN / TENAGA HARGA SATUAN (Rp.)

1 Genteng keramik lengkung cekung / vlaams bh 600.00

2 Genteng keramik lengkung rata bh 450.00

3 Genteng keramik rata / kodok bh 1,500.00

4 Genteng keramik berglasir KIA, Kanmuri Natural bh 4,500.00

5 Genteng monier bh 2,000.00

6 Genteng paris bh 600.00

7 Nok genteng vlaams tanah liat bh 4,000.00

8 Nok genteng kodok bh 3,000.00

9 Nok genteng kodok berglasir bh 6,050.00

10 Nok genteng vlaams berglasir bh 6,050.00

11 Nok genteng paris bh 1,650.00

12 Nok genteng keramik berglasir KIA, Kanmuri Natural bh 13,500.00

ATAP GENTENG METAL

1 Genteng metal Zinc Alume type Prima Roof m2

95,400.00

2 Genteng metal Zinc Alume type Prima Colour m2

77,760.00

3 Genteng metal Zinc Alume type Super Colour m2

54,000.00

4 Atap metal gelombang t 0,35 mm m2

60,000.00

5 Nok atas (U) type Prima Roof ( 110 x 5 x 6 ) cm bh 35,000.00

6 Nok atas (U) type Prima Colour ( 110 x 5 x 6 ) cm bh 25,000.00

7 Nok atas (U) type Super Colour ( 110 x 5 x 6 ) cm bh 22,000.00

8 Nok atas bulat (C) type Prima Roof, P = 40 cm bh 25,000.00

9 Nok atas bulat (C) type Prima Colour, P = 40 cm bh 20,000.00

10 Nok atlas bulat (C) type Super Colour, P = 40 cm bh 20,000.00

11 Nok pinggir (P) type Prima Roof ( 110 x 7 x 10 ) cm bh 40,000.00

12 Nok pinggir (P) type Prima Colour ( 110 x 7 x 10 ) cm bh 38,000.00

13 Nok pinggir (P) type Super Colour ( 110 x 7 x 10 ) cm bh 28,000.00

14 Wall Flashing type Prima Roof, P = 110 cm, L = 10 cm bh 38,000.00

15 Wall Flashing type Prima Colour, P = 110 cm, L = 10 cm bh 32,000.00

16 Wall Flashing type Super Colour, P = 110 cm, L = 10 cm bh 27,000.00

17 Paku anti karat kg 20,000.00

18 Atap polykarbonat m2

225,000.00

19 Paku skrup anti karat atap metal/polykarbonat bh 1,200.00

KERAMIK BERMOTIF

1 Tegel keramik Roman Bella (25 x 25) dos 47,500.00

2 Tegel keramik Roman Bella (10 x 25) dos 38,000.00

3 Tegel keramik Roman Alice (20 x 20) dos 38,500.00

4 Tegel keramik Roman Latanza (20 x 25) dos 38,000.00

5 Tegel keramik Roman Latanza (8 x 20) bj 20,000.00

6 Tegel keramik Roman Tulip (20 x 25) dos 37,500.00

7 Tegel keramik Roman Tulip (8 x 20) bj 14,000.00

8 Tegel keramik Roman Milano (20 x 25) dos 38,000.00

9 Tegel keramik Roman Milano (8 x 20) bj 20,000.00

ISOLATOR

1 Isolator keramik bentuk rol bh 6,600.00

2 Isolator keramik bentuk T - I bh 1,650.00

3 Isolator keramik bentuk sungkup bh 1,650.00

TEGEL / KERAMIK

1 Tegel teraso 30/30 m2

32,000.00

2 Tegel abu-abu 20/20 m2

20,000.00

3 Tegel warna 20/20 m2

26,000.00

4 Tegel abu-abu 30/30 m2

28,000.00

5 Plint tegel abu-abu 15/20 bh 525.00

6 Tegel warna 20/20 m2

26,000.00

7 Tegel warna 30/30 m2

37,600.00

8 Plint tegel abu-abu 10/20 bh 350.00

9 Plint tegel abu-abu 10/30 bh 750.00

10 Plint tegel warna 10/20 bh 400.00

11 Plint tegel warna 10/30 bh 825.00

12 Tegel porselin 11/11 m2

40,500.00

13 Tegel keramik 10/20 berglasir m2

30,000.00

14 Tegel keramik 20/20 berglasir m2

32,000.00

15 Tegel keramik 30/30 berglasir m2

32,500.00

16 Tegel keramik 40/40 berglasir m2

40,000.00

17 Tegel keramik standar ( MULIA) 20/20 dan 30/30 m2

42,500.00

18 Tegel keramik mosaik m2

52,500.00

19 Stepnosing granito bh 9,350.00

20 List keramik dinding motif 5/20 bh 5,000.00

21 Plint keramik 10 x 30 bh 1,500.00

22 Keramik dinding 20/25 m2

37,500.00

KERB TAMAN

1 Devider Mutiara m 66,000.00

2 Devider /kans teen tebal 30 Mutiara m 22,000.00

3 Devider /kans teen tebal 25 Mutiara m 18,800.00

4 Devider /kans teen tebal 20 Mutiara bh 15,300.00

5 Devider /kans teen tebal 15 Mutiara bh 11,250.00

6 Ramp ( terpasang ) bh 26,000.00

7 Devider terpasang bh 30,000.00

8 Kerb terpasang bh 28,000.00

KAYU

1 KAYU JATI

2 Kayu jati balok 8/12 ( klas plitur ) m3

20,000,000

3 Kayu jati papan m3

22,000,000

4 Balok kayu kelas I ukuran 8/12 m1

192,000.00

5 Balok kayu kelas I ukuran 8/10 m1

160,000.00

Bahan - 4

Page 5: Rab Versi Sni Lengkap

NO. SATUANNAMA BARANG / BAHAN / TENAGA HARGA SATUAN (Rp.)

6 Balok kayu kelas I ukuran 6/12 m1

144,000.00

7 Balok kayu kelas I ukuran 6/10 m1

120,000.00

8 Balok kayu kelas I ukuran 6/8 m1

96,000.00

9 Bingkai kayu kelas I ukuran 5/7 m1

70,000.00

10 Bingkai kayu kelas I ukuran 4/6 m1

48,000.00

11 Bingkai kayu kelas I ukuran 3/4, 3/5 m1

24,000.00

12 Bingkai kayu kelas I ukuran 2/3 m1

12,000.00

13 Papan kayu kelas I ukuran 3/20 m1

132,000.00

14 Papan kayu kelas I ukuran 3/18 m1

118,800.00

15 Papan kayu kelas I ukuran 2/25 m1

110,000.00

16 Papan kayu kelas I ukuran 2/20 m1

88,000.00

17 Papan kayu kelas I ukuran 2/15 m1

66,000.00

18 Lis Dan jalusi kayu kelas I ukuran 2/6 m1

24,000.00

19 Lis Dan jalusi kayu kelas I ukuran 2/4 m1

16,000.00

20 Lis Dan jalusi kayu kelas I ukuran 1/5 m1

10,000.00

21 Lis Dan jalusi kayu kelas I ukuran 1/3 m1

6,000.00

22 Kayu jati balok 8/12 (lokal) m3

8,000,000

23 Kayu jati papan (lokal) m3

8,200,000

24 Kaui jati lokal ukuran 5/7 m1

28,000.00

25 Kayu jati lokal ukuran 2/3 m1

4,800.00

26 Kayu jati lokal ukuran 3/4 m1

9,600.00

KAYU KAMPER

1 Kayu kamper balok m3

4,750,000

2 Kayu kamper papan m3

5,500,000

3 Balok kayu kelas I ukuran 8/12 m1

45,600.00

4 Balok kayu kelas I ukuran 8/10 m1

38,000.00

5 Balok kayu kelas I ukuran 6/12 m1

34,200.00

6 Balok kayu kelas I ukuran 6/10 m1

28,500.00

7 Balok kayu kelas I ukuran 6/8 m1

22,800.00

8 Bingkai reng & kaso kayu kelas I ukuran 5/7 m1

16,625.00

9 Bingkai reng & kaso kayu kelas I ukuran 4/6 m1

11,400.00

10 Bingkai reng & kaso kayu kelas I ukuran 3/4 m1

5,700.00

11 Bingkai reng & kaso kayu kelas I ukuran 2/3 m1

2,850.00

12 Papan kayu kelas I ukuran 2/15 m1

16,500.00

13 Papan kayu kelas I ukuran 2/20 m1

22,000.00

14 Papan kayu kelas I ukuran 2/25 m1

27,500.00

15 Papan kayu kelas I ukuran 3/18 m1

29,700.00

16 Papan kayu kelas I ukuran 3/20 m1

33,000.00

17 Papan kayu kelas I ukuran 3/30 m1

49,500.00

18 Lis Dan jalusi kayu kelas I ukuran 1/3 m1

1,425.00

19 Lis Dan jalusi kayu kelas I ukuran 1/5 m1

2,375.00

20 Lis Dan jalusi kayu kelas I ukuran 2/4 m1

2,850.00

KAYU BENGKIRAI

1 Kayu bengkirai balok m3

5,750,000

2 Kayu bengkirai papan m3

6,000,000

3 Balok kayu kelas I ukuran 8/12 m1

55,200.00

4 Balok kayu kelas I ukuran 8/10 m1

46,000.00

5 Balok kayu kelas I ukuran 6/12 m1

41,400.00

6 Balok kayu kelas I ukuran 6/10 m1

34,500.00

7 Balok kayu kelas I ukuran 6/8 m1

27,600.00

8 Bingkai reng & kaso kayu kelas I ukuran 5/7 m1

20,125.00

9 Bingkai reng & kaso kayu kelas I ukuran 4/6 m1

13,800.00

10 Bingkai reng & kaso kayu kelas I ukuran 3/4 m1

6,900.00

11 Bingkai reng & kaso kayu kelas I ukuran 2/3 m1

3,450.00

12 Papan kayu kelas I ukuran 2/15 m1

18,000.00

13 Papan kayu kelas I ukuran 2/20 m1

24,000.00

14 Papan kayu kelas I ukuran 2/25 m1

30,000.00

15 Papan kayu kelas I ukuran 3/18 m1

32,400.00

16 Papan kayu kelas I ukuran 3/20 m1

36,000.00

17 Papan kayu kelas I ukuran 3/30 m1

54,000.00

18 Lis Dan jalusi kayu kelas I ukuran 1/3 m1

1,725.00

19 Lis Dan jalusi kayu kelas I ukuran 1/5 m1

2,875.00

20 Lis Dan jalusi kayu kelas I ukuran 2/4 m1

4,600.00

KAYU KRUING

1 Kayu kruing balok m3

4,350,000

2 Kayu kruing papan m3

4,750,000

3 Balok kayu kelas I ukuran 8/12 m1

41,760.00

4 Balok kayu kelas I ukuran 8/10 m1

34,800.00

5 Balok kayu kelas I ukuran 6/12 m1

31,320.00

6 Balok kayu kelas I ukuran 6/10 m1

26,100.00

7 Balok kayu kelas I ukuran 6/8 m1

20,880.00

8 Bingkai reng & kaso kayu kelas I ukuran 5/7 m1

15,225.00

9 Bingkai reng & kaso kayu kelas I ukuran 4/6 m1

10,440.00

10 Bingkai reng & kaso kayu kelas I ukuran 3/4 m1

5,220.00

11 Bingkai reng & kaso kayu kelas I ukuran 2/3 m1

2,610.00

12 Papan kayu kelas I ukuran 2/15 m1

14,250.00

13 Papan kayu kelas I ukuran 2/20 m1

19,000.00

14 Papan kayu kelas I ukuran 2/25 m1

23,750.00

15 Papan kayu kelas I ukuran 2/30 m1

28,500.00

16 Papan kayu kelas I ukuran 3/18 m1

25,650.00

17 Papan kayu kelas I ukuran 3/20 m1

28,500.00

18 Papan kayu kelas I ukuran 3/25 m1

35,625.00

19 Papan kayu kelas I ukuran 3/30 m1

42,750.00

20 Lis Dan jalusi kayu kelas I ukuran 1/3 m1

1,305.00

Bahan - 5

Page 6: Rab Versi Sni Lengkap

NO. SATUANNAMA BARANG / BAHAN / TENAGA HARGA SATUAN (Rp.)

21 Lis Dan jalusi kayu kelas I ukuran 1/5 m1

2,175.00

22 Lis Dan jalusi kayu kelas I ukuran 2/4 m1

3,480.00

LIST KAYU PROFIL

1 List kayu profil m1

5,500.00

2 Kayu plepet eternit 1/5 cm m1

2,000.00

KAYU GLUGU, DOLKEN DAN BEGESTENG

1 Kayu glugu balok m3

1,458,000.00

2 Kayu glugu ukuran 5/7 m1

6,300.00

3 Kayu meranti m3

1,678,000.00

4 Papan cetakan / begesteng m3

1,000,000.00

5 Kayu dolken m3

1,000,000.00

6 Kayu dolken Ø 8 - 10/400 cm btg 10,000.00

7 Kayu bakar m3

90,000.00

KAYU LAPIS

1 Kayu lapis mutu I AA 3 lapis uk. 122x244x0,3 cm lbr 31,900.00

2 Kayu lapis mutu I AA 3 lapis uk. 122x244x0,4 cm lbr 41,250.00

3 Kayu lapis mutu I AA 3 lapis uk. 122x244x0,9 cm lbr 90,000.00

4 Kayu lapis mutu I AA 3 lapis uk. 122x244x1,2 cm lbr 101,750.00

5 Akustik soft board 60 x 120 lbr 125,000.00

6 Akustik soft board 40 x 60 lbr 73,000.00

7 Akustik soft board 30 x 60 lbr 55,000.00

8 Melamin wood 90 x 120 cm lbr 50,000.00

9 Melamin wood 120 x 240 cm lbr 65,000.00

10 Formika 4" x 8" x 0,3 cm lbr 65,000.00

11 Teak wood ( 90 x 240 ) lbr 69,500.00

BAHAN TUMBUHAN

1 Bambu petung btg 48,500.00

2 Bambu wulung btg 9,500.00

3 Bambu apus btg 7,000.00

4 Gedek bambu kulit m2

65,000.00

5 Gedek bambu daging m2

27,000.00

6 Ijuk m3

75,000.00

7 Ijuk kg 9,000.00

8 Alang-alang ikat 500.00

LISTRIK

1 Tusuk kontak 2 kutup tanpa pembumian/arde buah 3,900.00

2 Tusuk kontak 2 kutup dengan pembumian/arde buah 6,500.00

3 Tusuk kontak 2 kutup tanpa pembumian (timbul) buah 6,175.00

4 Tusuk kontak 2 kutup dengan pembumian (timbul) buah 6,500.00

5 Tusuk kontak 2 kutup tanpa pembumian (tanam) buah 7,800.00

6 Tusuk kontak 2 kutup dengan pembumian (tanam) buah 12,000.00

7 Fitting duduk buah 5,000.00

8 Pasang instalasi / titik titik 85,000.00

9 Lampu pijar 5 watt "Phillips" buah 2,275.00

10 Lampu pijar 10 watt "Phillips" buah 3,705.00

11 Lampu pijar 25 watt/ 40 watt "Phillips" buah 3,900.00

12 Lampu pijar 60 watt / 75 watt "Phillips" buah 4,550.00

13 Lampu pijar 100 watt "Phillips" buah 5,200.00

14 Lampu softone 100 watt "Phillips" buah 6,500.00

15 Lampu pijar 150 watt "Phillips" buah 10,400.00

16 Lampu pijar 200 watt "Phillips" buah 11,700.00

17 Lampu TL 10 watt "Phillips" buah 7,150.00

18 Lampu TL 15 watt "Phillips" buah 7,500.00

19 Lampu TL 18 watt "Phillips" buah 11,050.00

20 Lampu TL 36 watt "Phillips" buah 13,650.00

21 Lampu SLE 11 watt "Phillips" buah 71,500.00

22 Lampu SLE 15 watt "Phillips" buah 71,500.00

23 Lampu SLE 20 watt "Phillips" buah 74,750.00

24 Lampu Slang 2 jalur (sekualitas sinyoku) roll 2,400,000.00

25 Lampu Slang 3 jalur (sekualitas sinyoku) roll 2,795,000.00

26 Lampu Rice Light isi 100 "Phillips" pcs 60,000.00

27 Lampu Rice Light isi 140 "Phillips" pcs 72,000.00

28 Lampu Capsul isi 100 "Phillips" pcs 210,000.00

29 Lampu Capsul isi 140 "Phillips" pcs 222,000.00

30 Lampu Anggur isi 100 "Phillips" pcs 65,000.00

31 Lampu Anggur isi 140 "Phillips" pcs 78,000.00

32 Lampu Natal isi 50 "Phillips" pcs 23,000.00

33 Lampu Natal isi 100 "Phillips" pcs 103,500.00

34 Lampu Jenis H.PIT 400 watt "Phillips" buah 1,023,750.00

35 Lampu Jenis H.PIT 250 watt "Phillips" buah 700,000.00

36 Bolam Mercury 80 watt "Phillips" buah 45,500.00

37 Bolam Mercury 125 watt "Phillips" buah 96,000.00

38 Bolam Mercury 250 watt "Phillips" buah 97,500.00

39 Bolam Mercury 400 watt "Phillips" buah 123,500.00

40 Bolam Natrium 250 watt "Phillips" buah 208,000.00

41 Bolam Natrium 400 watt "Phillips" buah 221,000.00

42 Bolam SON 250 watt buah 227,500.00

43 Bolam SON 150 watt buah 215,800.00

44 Bolam SON 70 watt buah 137,150.00

45 Bolam SON-T 250 watt buah 241,000.00

46 Bolam SON-T 150 watt buah 155,000.00

47 Bolam SON-T 70 watt buah 96,000.00

48 Bolam Halogin 500 watt buah 39,000.00

49 Bolam Halogin 1000 watt buah 65,000.00

Bahan - 6

Page 7: Rab Versi Sni Lengkap

NO. SATUANNAMA BARANG / BAHAN / TENAGA HARGA SATUAN (Rp.)

50 Bolam HPIT 150 watt buah 260,000.00

51 Bolam HPIT 250 watt buah 292,500.00

52 Bolam HPIT 400 watt buah 296,500.00

53 Bolam Metal Halide 70 watt buah 149,500.00

54 Bolam Metal Halide 100 watt buah 188,548.00

55 Bolam Metal Halide 150 watt buah 156,000.00

56 Bolam Metal Halide 250 watt buah 344,500.00

57 Photo Cell 3 Ampere buah 65,000.00

58 Photo Cell 6 Ampere buah 78,000.00

59 Photo Cell 10 Ampere buah 104,000.00

60 Starter TL 20/40 watt buah 4,550.00

61 Travo TL 10 watt buah 24,050.00

62 Travo TL 20 watt buah 26,000.00

63 Travo TL 40 watt buah 29,250.00

64 Balast Mercury 80 watt buah 96,000.00

65 Balast Mercury 125 watt buah 104,000.00

66 Balast Mercury 250 watt buah 162,500.00

67 Balast Mercury 400 watt buah 195,000.00

68 Balast Natrium 250 watt buah 162,500.00

69 Balast Natrium 400 watt buah 150,000.00

70 Balast SON 250 watt buah 221,000.00

71 Balast SON 150 watt buah 172,500.00

72 Balast SON 70 watt buah 127,000.00

73 Balast Metal Halide 70 watt buah 131,000.00

74 Balast Metal Halide 100 watt buah 256,939.00

75 Balast Metal Halide 150 watt buah 180,000.00

76 Magnetik Kontaktor SK-12 Kw 1 (SN-12) buah 210,000.00

77 Magnetik Kontaktor SK-12 Kw 2 buah 48,000.00

78 Magnetik Kontaktor SK-20 Kw 1 (SN-20) buah 240,000.00

79 Magnetik Kontaktor SK-20 Kw 2 buah 66,000.00

80 Fitting Goliath E.27 Gantung buah 19,500.00

81 Fitting Goliath E.40 Gantung buah 26,000.00

82 Fitting WD E.27 Tegak buah 4,550.00

83 Fitting WD E.40 Tegak buah 16,250.00

84 Fitting Kecil Lampu 2,5 Watt buah 325.00

85 Fitting Plastik Hitam buah 1,300.00

86 Fitting Gantung plastik gantung buah 1,000.00

87 Kap Alumunium E.27 buah 19,500.00

88 Kap Alumunium E.40 buah 19,500.00

89 Kabel Snoor 2 x 0,23 "Supreme" roll 72,000.00

90 Kabel NYA 2,5 sqmm "Supreme" roll 150,000.00

91 Kabel NYA 1,5 sqmm "Supreme" roll 95,000.00

92 Kabel NYA 2,5 sqmm "Supreme" m' 2,475.00

93 Kabel NYA 1,5 sqmm "Supreme" m' 1,650.00

94 Kabel NYM 2 x 1,5 sqmm "Supreme" m1

7,216.00

95 Kabel NYM 2 x 2,5 sqmm "Supreme" m1

10,633.00

96 Kabel NYM 2 x 4 sqmm "Supreme" m1

14,256.00

97 Kabel NYM 3 x 1,5 sqmm "Supreme" m1

9,257.00

98 Kabel NYM 3 x 2,5 sqmm "Supreme" m1

13,200.00

99 Kabel NYM 3 x 4 sqmm "Supreme" m1

19,096.00

100 Kabel NYY 3 x 6 sqmm "Supreme" m1

30,553.00

101 Kabel NYY 3 x 1,5 sqmm "Supreme" m1

12,584.00

102 Kabel NYY 3 x 2,5 sqmm "Supreme" m1

16,896.00

103 Kabel NYY 3 x 4 sqmm "Supreme" m1

23,056.00

104 Kabel NYY 3 x 6 sqmm "Supreme" m1

30,553.00

105 Kabel NYY 3 x 10 sqmm "Supreme" m1

45,408.00

106 Kabel NYY 4 x 10 sqmm "Supreme" m1

61,600.00

107 Kabel NYFGBY 3 x 10 sqmm "Supreme" m1

88,000.00

108 Kabel DX 2 x 10 sqmm "Supreme" m1

5,500.00

109 Kabel DX 2 x 16 sqmm "Supreme" m1

6,600.00

110 Kabel DX 2 x 25 sqmm "Supreme" m1

16,500.00

111 Kabel Ties 15 cm "Supreme" m1

11,050.00

112 Kabel Tis 10 cm "Supreme" m1

6,500.00

113 Ignitor 150 watt - 250 watt buah 45,000.00

114 Ignitor Metal Halide 70 watt buah 68,250.00

115 Ignitor Metal Halide 100 watt buah 50,000.00

116 Ignitor Metal Halide 150 watt buah 73,710.00

117 Firework lamp (DC-001) 8 meter Pcs 17,192,500.00

118 Firework lamp (DC-001) 6 meter Pcs 15,323,750.00

119 NT Fuse kaki besar buah 140,400.00

120 NT Fuse kaki kecil buah 52,000.00

121 Flassther Lampu Hias Buterfly buah 3,071,250.00

122 Flassther Lampu Hias Kembang Api Besar buah 3,071,250.00

123 Flassther Lampu Hias Kembang Api Kecil buah 3,071,250.00

124 Flassther Lampu Hias Kipas buah 3,071,250.00

125 Skaklar seri OB "Broco" buah 17,550.00

126 Skaklar seri IB "Broco" buah 17,550.00

127 Skaklar engkel OB "Broco" buah 13,000.00

128 Skaklar engkel IB "Broco" buah 13,000.00

129 Stop kontak IB "Broco" buah 13,650.00

130 Stop kontak OB "Broco" buah 13,650.00

131 Kapasitor 25 F buah 52,000.00

132 Kapasitor 20 F buah 48,750.00

133 Kapasitor 12,5 uF buah 26,000.00

Bahan - 7

Page 8: Rab Versi Sni Lengkap

NO. SATUANNAMA BARANG / BAHAN / TENAGA HARGA SATUAN (Rp.)

134 Kapasitor 8 mF buah 22,750.00

135 Kapasitor Metal Halide 70 watt buah 61,450.00

136 Kapasitor Metal Halide 100 watt buah 115,842.00

137 Kapasitor Metal Halide 150 watt buah 71,650.00

138 MCB 25 Ampere / 16 Ampere "MG" buah 36,000.00

139 MCB 40 Ampere "MG" buah 57,330.00

140 MCB 63 Ampere "MG" buah 108,000.00

141 MCB 10 Ampere + box "MG" buah 42,000.00

142 MCB 6 Ampere "MG" buah 42,000.00

143 Cover MCB "MG" buah 5,200.00

144 Box Kwh Meter 25 x 35 x 20 buah 448,500.00

145 Box panel 30 x 40 x 20 buah 169,000.00

146 Box 25 x 25 x 20 buah 97,500.00

147 Box 20 x 40 x 50 buah 312,000.00

148 UZ 25 buah 6,500.00

149 UZ 63 buah 19,500.00

150 Armatur IP 65 Komplit (sekualitas SRP 822 SON 150 watt) unit 2,834,000.00

151 Armatur IP 65 Komplit (sekualitas SRP 822 SON 250 watt) unit 2,954,000.00

152 Armatur IP 65 Komplit (sekualitas SRP 328 SON 150 watt) unit 3,315,000.00

153 Armatur IP 65 Komplit (sekualitas SRP 328 SON 250 watt) unit 3,445,000.00

154 Armatur IP 65 Komplit (sekualitas SRP 810 SON 70 watt) unit 2,275,000.00

155 Armatur Ekorola Komplit / TLD 18 watt unit 471,900.00

156 Armatur Simbat 40 watt unit 70,200.00

157 Armatur HPIT 100 watt (DVP 311) unit 4,231,500.00

158 Armatur Kota Sorot (Kosong) unit 1,495,000.00

159 Timer Switch TB 388 buah 540,000.00

160 Timer Theben (pakai baterai) buah 660,000.00

161 Timer Heger (pakai baterai) buah 513,000.00

162 Timer Delay H3-BA (omron) buah 110,500.00

163 Timer Delay H3-CR-8 (omron) buah 175,500.00

164 Timer Digital Theben buah 1,033,500.00

165 Tiang Galvanit cb,1, h=9m, base plate unit 3,783,000.00

166 Tiang Galvanit cb,2, h=9m, base plate unit 3,055,500.00

167 Tiang Galvanit cb,2, h=6m, base plate unit 2,665,000.00

168 Tiang Galvanit cb,1, h=7m, base plate unit 2,783,000.00

169 Tiang Galvanit cb,1, h=5m, type tanam dia 2" unit 812,500.00

170 Tiang lampu Highment cb 4, h=20m, hidrolik unit 140,692,000.00

171 Tiang lampu Highment cb 2, h=20m, hidrolik unit 140,692,000.00

172 Tiang GIP cb 1. 2", 3", 4", 5", h = 9m, tanam unit 2,535,000.00

173 Tiang GIP cb 1. 2", 3", 4", h = 7m, tanam unit 2,275,000.00

174 Tiang GIP cb 1. 3", 4", 5", h = 9m, tanam unit 2,340,000.00

175 Slang Ornamenr GIP dia 1", L = 3m unit 162,825.00

176 Slang Ornamenr GIP dia 2", L = 2m unit 193,050.00

177 Slang Ornamenr GIP dia 2", L = 3m unit 210,600.00

178 Slang Ornamenr GIP dia 2", L = 4m unit 222,300.00

179 Slang Ornamenr GIP dia 2", L = 6m unit 305,500.00

180 Pilot Lamp buah 6,850.00

181 Seplendiel lamp (DC-002) Pcs 17,267,000.00

182 Windmill lamp (DC-003) Pcs 16,875,000.00

183 Cottonrose lamp (DC-004) Pcs 16,875,000.00

184 Lucky lamp (DC-005) Pcs 12,950,000.00

185 Fountain lamp Ball (DC-005) Pcs 14,284,000.00

186 Star Flower lamp (DC-007) Pcs 16,090,000.00

187 Chritmas lamp (DC-009) Pcs 14,127,000.00

188 Butterfly lamp (DC-009) Pcs 18,052,000.00

189 No. 1 lamp (DC-010) Pcs 16,482,000.00

190 Hepta lamp (DC-011) Pcs 16,089,000.00

191 Dragon Phonix lamp (DC-013) Pcs 16,089,000.00

192 Fountain lamp (DC-014) Pcs 16,089,000.00

193 Redbud Flower lamp (DC-015) Pcs 16,089,000.00

194 Dragon Flying lamp (DC-016) Pcs 14,520,000.00

195 Floor lamp (DC-017) Pcs 10,988,000.00

196 Octopus lamp (DC-018) Pcs 16,089,000.00

197 Double Plied Fountain lamp (DC-019) Pcs 16,877,000.00

198 Flower Pot lamp (DC-020) Pcs 17,267,000.00

199 Patron Sekering buah 2,050.00

200 Kop sekering buah 3,450.00

201 Isolasi besar buah 6,825.00

202 Spot + F.MP buah 75,075.00

203 Sabuk Pengaman buah 2,730,000.00

204 Tang Kombinasi buah 34,125.00

205 Obeng +/- buah 23,750.00

206 GZ 30 A buah 40,950.00

207 Multitester buah 116,000.00

208 Sekering buah 2,100.00

209 Bandet buah 4,750.00

210 Wadge Type buah 4,750.00

211 Servis link dan clem buah 4,750.00

212 Stenlist stell 20 x 0,70 roll 614,000.00

213 Stopyng bukie buah 2,100.00

214 BC 6 mm buah 4,750.00

215 Ground Rood buah / batang 30,750.00

216 Terminal Nol buah 23,850.00

217 Mata lampu pijar 25 W -75 W buah 4,350.00

Bahan - 8

Page 9: Rab Versi Sni Lengkap

NO. SATUANNAMA BARANG / BAHAN / TENAGA HARGA SATUAN (Rp.)

218 Stabilizer 300 A unit 2,934,000.00

219 Tutup panel 30 x 30 buah / ls 28,750.00

220 Pasang panel kontrol unit / ls 86,250.00

221 Penyambungan beban unit 17,250.00

222 Penyetelan dan penyalaan titik 7,000.00

223 Biaya angkutan jam 7,143.00

224 Alat bantu set 86,250.00

225 Retur material existing unit 100,000.00

BAHAN LOGAM BESI/BAJA TULANGAN/BESI BETON

BESI BETON

1 Besi beton polos kg 7,900.00

2 Besi beton ulir kg 8,000.00

3 Besi baja profil kg 8,800.00

4 Besi tuang / cor kg 8,200.00

5 Besi strip kg 7,500.00

6 Besi baja cor ( ring ) 150 kg unit 825,000.00

7 Besi baja cor ( ring ) 80 kg unit 440,000.00

8 Besi baja cor ( ring ) 40 kg unit 220,000.00

9 Besi penutup mahkota assainering unit 57,000.00

10 Besi penutup inlet cor/tuang ( ring + tutup) unit 85,000.00

KAWAT

1 Kawat beton / bindrat kg 9,400.00

2 Kawat ayakan m2

10,000.00

3 Kawat bronjong kg 30,250.00

4 Kawat nyamuk m2

8,250.00

5 Kawat las kg 6,500.00

6 Kawat galvanis kg 7,755.00

7 Kawat duri kg 9,500.00

8 Besi jaring kawat baja kg 9,500.00

9 Kawat seng polos kg 9,500.00

10 Kawat kassa m2

10,000.00

11 Kawat burung m2

15,000.00

12 Kawat jaring lbr 35,000.00

13 Kawat harmonika m2

25,000.00

14 Kawat penggantung rangka hollow m1

500.00

15 Profil Alumunium "T" m1

20,000.00

16 Ramset / dina bolt bh 2,500.00

17 Pipa galvanis dia. 1/2" m1

15,000.00

18 Pipa galvanis dia. 3/4" m1

25,000.00

19 Pipa galvanis dia. 1" m1

37,500.00

20 Pipa galvanis dia. 1 1/2" m1

50,000.00

21 Pipa galvanis dia. 3" m1

85,000.00

22 Pipa galvanis dia. 4" m1

90,000.00

23 Pipa hollow 4 x 4 cm tebal 1.2 mm m1

9,500.00

24 Kusen alumunium uk 2"x4" tebal 1.2 mm sekualitas YKK putih m1

55,000.00

25 Jendela nako bh 20,000.00

26 Pintu besi baja m2

750,000.00

27 Jendela besi baja m2

750,000.00

28 Jendela besi tahan api m2

1,500,000.00

29 Pintu gulung besi m2

250,000.00

30 Pintu lipat besi m2

500,000.00

31 Sunscreen alumunium m2

250,000.00

32 Roll door m2

200,000.00

33 Pintu alumunium m2

400,000.00

34 Vertikal blind m2

250,000.00

35 Wall paper m2

40,000.00

SENG BJLS

1 Seng BJLS 0,20 gelombang P = 180 cm lbr 38,500.00

2 Seng BJLS 0,20 gelombang P = 200 cm (merk Fumira) lbr 42,000.00

3 Seng BJLS 0,20 gelombang P = 240 cm lbr 60,000.00

4 Seng BJLS 0,20 gelombang P = 300 cm lbr 70,000.00

5 Seng BJLS 0,28 lembaran 40 cm lebar m1

12,500.00

6 Seng BJLS 0,28 lembaran 50 cm lebar m1

16,000.00

7 Seng BJLS 0,20 lembaran 90 cm lebar m1

25,000.00

8 Seng BJLS 0,30 lembaran 40 cm lebar m1

20,000.00

9 Seng BJLS 0,30 lembaran 50 cm lebar m1

18,000.00

10 Seng BJLS 0,30 lembaran 60 cm lebar m1

20,000.00

11 Seng BJLS 0,30 lembaran 90 cm lebar m1

28,000.00

12 Seng plat 3" x 6" BJLS 28 lbr 44,000.00

13 Seng plat 3" x 6" BJLS 24 lbr 38,500.00

14 Seng gelombang 2" - 5" BJLS 24 lbr 25,000.00

15 Alumunium gelombang tebal 0,55 m2

75,000.00

16 Alumunium foil m2

25,000.00

17 Nok alumunium standar 40 cm 18 SWG 22 m1

25,000.00

PAKU

1 Paku gording 125 x 5,1 mm kg 8,000.00

2 Paku gording 100 x 4,2 mm kg 8,000.00

3 Paku usuk 80 x 3,8 mm kg 8,000.00

4 Paku reng 55 x 3,1 mm kg 8,000.00

5 Paku plepet 40 x 2,1 mm kg 10,000.00

6 Paku eternit 20 x 1,5 mm kg 11,500.00

7 Angkur / baut bh 10,000.00

8 Paku kait bh 8,500.00

9 Paku pancing bh 500.00

Bahan - 9

Page 10: Rab Versi Sni Lengkap

NO. SATUANNAMA BARANG / BAHAN / TENAGA HARGA SATUAN (Rp.)

10 Paku pancing kg 9,350.00

11 Paku asbes bh 400.00

12 Paku sumbat bh 400.00

13 Paku sekrup 3.5" bh 750.00

14 Paku skrup kg 10,000.00

15 Paku gypsum kg 20,000.00

16 Paku hak panjang 15 cm kg 9,500.00

PENGGANTUNG / PENGUNCI

1 Engsel pintu bh 11,000.00

2 Engsel jendela bh 7,500.00

3 Grendel bh 2,500.00

4 Hak angin bh 5,500.00

5 Selot pintu Union kecil bh 37,500.00

6 Selot pintu Union besar bh 47,500.00

7 Engsel angin bh 3,000.00

8 Kait angin bh 3,000.00

9 Door holder bh 15,000.00

10 Door stop bh 15,000.00

11 Penggantung + rel pintu dorong bh 200,000.00

12 Kunci tanam bh 35,000.00

13 Kunci tanam antik bh 250,000.00

14 Kunci tanam biasa bh 125,000.00

15 Kunci kamar mandi bh 50,000.00

16 Kunci selot bh 50,000.00

17 Kunci silinder bh 75,000.00

18 Kunci lemari bh 12,000.00

19 Spring knip bh 7,500.00

20 Door closer bh 150,000.00

ASPAL

1 Aspal curah kg 9,500.00

2 Aspal drum kg 10,650.00

3 Aspal modifer / asphalt joint kg 60,000.00

4 Drum aspal bekas bh 8,250.00

5 Rubber Filler m1

9,000.00

6 Mata Kucing bh 215,000.00

7 Filler kg 750.00

BATU ALAM / AGREGAT / BAHAN TUMBUHAN

BATU ALAM

1 Batu kali m3

130,000.00

2 Batu hias tempel m2

60,000.00

3 Batu hias bulat putih m3

147,500.00

4 Ubin marmer ( 40 x 40 x 2 ) Baitik/Citatah m2

100,000.00

5 Ubin marmer ( 40 x 60 x 2 ) Baitik m2

450,000.00

6 Ubin marmer ( 15 x 30 x 2 ) Baitik m2

150,000.00

AGREGAT

1 Agregat hakus/pasir klas A ( Uk. butir 5 mm ) m3

79,750.00

2 Agregat kasar/krikil/pasir klas B ( Uk. 20 - 40 ) m3

126,500.00

3 Agregat kasar/krikil/pasir klas B ( Uk. 4½ - 19 ) m3

132,000.00

4 Batu pecah 2/3 ( split ) m3

138,000.00

5 Batu pecah 3/4 m3

130,000.00

6 Batu pecah 4/6 m3

126,500.00

7 Batu pecah 5/7 m3

132,000.00

8 Batu pecah 1/2 m3

190,000.00

9 Batu belah hitam m3

80,000.00

10 Batu belah putih m3

70,000.00

11 Sirtu Klas A lewat ayakan 1" m3

66,000.00

12 Sirtu klas B lewat ayakan 2½" m3

66,000.00

13 Pasir urug darat m3

55,000.00

14 Pasir pasang ( progo ) m3

73,000.00

15 Pasir pasang ( krasak ) m3

76,000.00

16 Krikil beton m3

78,650.00

17 Kerikil tidak tersaring m3

55,000.00

18 Split D 30 - 40 mm m3

120,000.00

19 Split D 10 - 20 mm m3

120,000.00

20 Split D 1 - 2 cm m3

125,000.00

21 Batu merah ( 5x11x23 ) bj 350.00

22 Batu merah ( 4x9x19 ) bj 250.00

23 Krokos 0,2/0,4 m3

70,000.00

24 Tanah urug m3

35,000.00

25 Sirtu m3

66,000.00

26 Batako bh 1,500.00

27 Roster 25/25 bh 2,000.00

BAHAN PEREKAT HIDROLIS & ORGANIK

1 Portland Cement (PC) Gresik 50 kg 38,200.00

40 kg 31,000.00

2 Portland Cement (PC) Nusantara 50 kg 38,200.00

40 kg 31,000.00

3 Portland Cement (PC) Tiga Roda 40 kg 31,000.00

4 Semen putih 40 kg 52,500.00

5 Semen warna kg 6,000.00

6 Lem kayu (putih) Fox kg 11,000.00

7 Lem plastik Acrylic kg 60,000.00

8 Lem plastik Vinyl kg 19,500.00

9 Lem Aica Aibon kg 27,500.00

Bahan - 10

Page 11: Rab Versi Sni Lengkap

NO. SATUANNAMA BARANG / BAHAN / TENAGA HARGA SATUAN (Rp.)

KAPUR & GIPS

1 Kapur pasang m3

72,500.00

2 Kapur sirih m3

138,000.00

3 Kapur sirih kg 500.00

4 Semen batu bata m3

80,000.00

5 Tepung Gypsum kg 3,500.00

6 Alkasit kg 300,000.00

7 Gypsum board lbr 42,000.00

8 Kasa gypsum roll 10,000.00

9 List profil gypsum lebar sampai 5 cm m1

4,000.00

10 List profil gypsum lebar sampai 6 - 10 cm m1

8,000.00

11 List profil gypsum lebar lebih 10 cm m1

15,000.00

12 Kalsiboard ( 122 x 244 x 0,35 ) cm lbr 46,200.00

13 Kalsiboard ( 122 x 244 x 0,60 ) cm lbr 60,500.00

BAHAN PELARUT, PELUMAS

1 Oli SAE 30 ltr 21,000.00

2 Minyak bakar / kerosene ltr 1,000.00

3 Bensin premium ltr 4,500.00

4 Solar ltr 4,300.00

5 Minyak pelumas ltr 14,000.00

6 Vet kg 13,000.00

7 Gas Elpiji kg 4,500.00

8 Minyak bekisting ltr 5,000.00

BAHAN KIMIA PEMBANTU UNTUK BETON

1 Bahan kimia B (kuat ikat cepat ) kg 35,000.00

2 Bahan kimia E (kuat ikat cepat ) kg 30,000.00

BAHAN PENGAWET DANBITUMEN

1 Teer kayu box 8,000.00

2 Residu ltr 3,500.00

3 Flincoat ltr 35,000.00

BAHAN KACA

1 Genteng kaca lengkung cekung 3 mm bh 5,500.00

2 Genteng kaca lengkung cekung 5 mm bh 7,000.00

3 Genteng kaca lengkung rata 3 mm bh 5,500.00

4 Genteng kaca lengkung rata 5 mm bh 6,850.00

5 Genteng kaca 3 mm bh 4,000.00

6 Genteng kaca 5 mm bh 6,850.00

7 Kaca buram/kaca es 3 mm m2

53,900.00

8 Kaca buram/kaca es 5 mm m2

66,000.00

9 Kaca bening 3 mm m2

49,500.00

10 Kaca bening 5 mm m2

60,500.00

11 Kaca riben 3 mm m2

57,500.00

12 Kaca riben 5 mm m2

70,000.00

13 Kaca cermin 3 mm m2

75,000.00

14 Kaca cermin 5 mm m2

120,000.00

15 Kaca patri m2

300,000.00

16 Fiber glass lbr 28,000.00

BAHAN PLASTIK

1 Pipa PVC abu-abu dia. 1/2" Wavin btg 12,650.00

2 Pipa PVC abu-abu dia. 3/4" Wavin btg 17,000.00

3 Pipa PVC abu-abu dia. 1" Wavin btg 20,500.00

4 Pipa PVC abu-abu dia. 1 1/2" Wavin btg 45,000.00

5 Pipa PVC abu-abu dia. 2" Wavin btg 60,000.00

6 Pipa PVC abu-abu dia. 2 1/2" Wavin btg 82,000.00

7 Pipa PVC abu-abu dia. 3" Wavin btg 82,000.00

8 Pipa PVC abu-abu dia. 4" Wavin btg 135,000.00

9 Pipa PVC putih dia. 1/2" Wavin btg 12,000.00

10 Pipa PVC putih dia. 3/4" Wavin btg 15,000.00

11 Pipa PVC putih dia. 1" Wavin btg 21,000.00

12 Pipa PVC putih medium dia. 3" Wavin btg 48,000.00

13 Pipa PVC putih tebal dia. 3" Wavin btg 80,000.00

14 Pipa PVC putih medium dia. 4" Wavin btg 135,000.00

15 Pipa PVC putih tebal dia. 4" Wavin btg 157,000.00

16 Atap plastik gelombang PVC lbr 67,500.00

TANAMAN HIAS / PERINDANG

TANAMAN PERINDANG

1 Angsana, tinggi +/- 2m dia 5 cm batang 75,000.00

2 Asem jawa, tinggi +/- 1,5 m dia 2 cm batang 20,000.00

3 Bauhmis (Orchid tree), tinggi +/- 2 m dia 2 cm batang 17,500.00

4 Beringin, tinggi +/- 1 m dia 2 cm putih batang 50,000.00

5 Beringin, tinggi +/- 2 m dia 3 cm putih batang 125,000.00

6 Biola cantik, tinggi +/- 3 m dia 5 cm batang 300,000.00

7 Biola cantik, tinggi +/- 1,5 m ia 3 cm batang 75,000.00

8 Filisium, tinggi +/- 1,5 m dia 2 cm batang 20,000.00

9 Gayam, tinggi +/- 1,5 m dia 2 cm batang 20,000.00

10 Gidogan Biasa, tinggi +/- 1 m dia 1,5 cm batang 20,000.00

11 Kenari, tinggi +/- 1,5 m dia 2 cm batang 16,000.00

12 Kepel, tinggi +/- 1,5 m dia 3 cm batang 40,000.00

13 Ketepang, tinggi +/- 1,5 m dia 2 cm batang 17,500.00

14 Mahoni, tinggi +/- 1,5 m dia 2 cm batang 25,000.00

15 Sawo Kecik, tinggi +/- 1,5 m dia 2 cm batang 17,500.00

16 Sentul, tinggi +/- 1,5 m dia 2 cm batang 20,000.00

17 Tanjung, tinggi +/- 1 m dia 2 cm batang 25,000.00

Bahan - 11

Page 12: Rab Versi Sni Lengkap

NO. SATUANNAMA BARANG / BAHAN / TENAGA HARGA SATUAN (Rp.)

18 Tanjung, tinggi +/- 3 m dia 3 cm batang 75,000.00

19 Beringin , tinggi +/- 2-3 m batang 150,000.00

20 Beringin, tinggi +/- 3 m dia 4 cm batang 300,000.00

TANAMAN HIAS

RUMPUT

1 Rumput Gajah (tanam) m2

12,000.00

2 Rumput Gajah (gebalan) m2

15,000.00

3 Rumput Manila (gebalan) m2

10,000.00

4 Rumput golf m2

11,000.00

5 Rumput gebalan m2

5,000.00

PERDU

1 Bougenville, tinggi +/- 0, 5 m batang 40,000.00

2 Bougenville, tinggi +/- 0, 7 m batang 70,000.00

3 Bougenville, tinggi +/- 1, 0 m batang 100,000.00

4 Bougenville varigata, tinggi +/- 0, 8 m batang 150,000.00

5 Classia planisicua, tinggi +/- 0,5 m batang 15,000.00

6 Kembang Sepatu (Bangkok), tinggi +/- 0,2 m batang 10,000.00

7 Kembang Sepatu (lokal), tinggi +/- 0,4 m batang 5,000.00

8 Mawar, tinggi +/- 0,25 m batang 7,500.00

9 Palem botol, tinggi +/- 0,8 m kecil 15 cm rumpun 150,000.00

10 Palem kuning, tinggi +/- 0,6 m rumpun 12,500.00

11 Palem kuning, tinggi +/- 1 m rumpun 20,000.00

12 Palem kuning, tinggi +/- 1,5 - 2 m rumpun 125,000.00

13 Palem kuning, tinggi +/- 2 - 3 m rumpun 175,000.00

14 Palem merah, tinggi +/- 2 - 3 m rumpun 150,000.00

15 Palem wregu, tinggi +/- 0,6 m rumpun 15,000.00

16 Palem putri, tinggi +/- 1 m rumpun 75,000.00

17 Soka pagar, 0,3 m batang 5,000.00

18 Serut, tinggi +/- 1 - 1,5 m batang 450,000.00

19 Puring bangkok, tinggi +/- 0,6 m batang 12,500.00

20 Phonik, tinggi +/- 1 m batang 150,000.00

21 Batavia / Jatropa, tinggi +/- 0,5 m batang 15,000.00

22 Serut, tinggi +/- 1,5 m batang 750,000.00

POHON

1 Cemara kipas, tinggi +/- 0,5 m batang 20,000.00

2 Cemara kipas, tinggi +/- 1,5 m batang 75,000.00

3 Cemara lilin, tinggi +/- 1,5 m batang 40,000.00

4 Cemara rantes, tinggi +/- 1 m batang 40,000.00

5 Cemara udang, tinggi +/- 1 - 1,5 m batang 600,000.00

6 Cemara norvox, tinggi +/- 0,6 m batang 50,000.00

7 Cemara norvox, tinggi +/- 1,5 m batang 80,000.00

8 Cempokok mulyo, tinggi +/- 0,5 m batang 15,000.00

9 Cempokok mulyo, tinggi +/- 1 m batang 40,000.00

10 Ceplok Piring, tinggi +/- 0,5 m batang 7,500.00

11 Ceplok Piring, tinggi +/- 1 m batang 20,000.00

12 Glodogan Pecut, tinggi +/- 1 m batang 14,000.00

13 Glodogan Pecut, tinggi +/- 2 m batang 25,000.00

14 Kelapa gading, tinggi +/- 3 m batang 200,000.00

15 Nusa indah, tinggi +/- 0,5 m batang 10,000.00

16 Nusa indah, tinggi +/- 1 m batang 30,000.00

17 Palem ekor tupai, tinggi +/- 1 m batang 75,000.00

18 Palem ekor tupai, tinggi +/- 2 m batang 150,000.00

19 Palem jepang, tinggi +/- 1 m rumpun 50,000.00

20 Palem jepang, tinggi +/- 2 m rumpun 100,000.00

21 Palem raja, tinggi +/- 4 m batang 150,000.00

22 Palem raja, tinggi +/- 6 m batang 250,000.00

23 Palem raja, tinggi +/- 7 m batang 1,500,000.00

SEMAK

1 Alamanda, tinggi +/- 0,2 m rumpun 5,000.00

2 Canna holland, tinggi +/- 0,3 m rumpun 15,000.00

3 Canna lokal, tinggi +/- 0,5 m rumpun 7,500.00

4 Cendrawasih, tinggi +/- 0,2 m batang 5,000.00

5 Cantik manis, tinggi +/- 0,2 m batang 3,000.00

6 Dieffenbachia, tinggi +/- 0,2 m batang 10,000.00

7 Dieffenbachia, tinggi +/- 0,5 m batang 20,000.00

8 Hanjuang, tinggi +/- 0,3 m batang 3,000.00

9 Helogenia, tinggi +/- 0,4 m rumpun 4,000.00

10 Kayu besi, tinggi +/- 0,5 m batang 7,500.00

11 Kuping gajah, tinggi +/- 0,3 m rumpun 7,500.00

12 Lantana, tinggi +/- 0,2 m rumpun 4,000.00

13 Lantana, tinggi +/- 0,3 m rumpun 5,000.00

14 Yuliana rumpun 5,000.00

15 Iler rumpun 5,000.00

16 Yuca, tinggi +/- 0,4 m batang 30,000.00

17 Yuca, tinggi +/- 0,75 m batang 70,000.00

18 Melati, tinggi +/- 0,2 m batang 10,000.00

19 Phylodendron, tinggi +/- 0,4 m rumpun 7,500.00

20 Phylodendron, tinggi +/- 0,7 m rumpun 15,000.00

21 Sansiswa rumpun 7,500.00

22 Sirig gading, tinggi +/- 0,3 m rumpun 3,000.00

23 Soka bangkok, tinggi +/- 0,2 m batang 7,500.00

24 Soka jepang, tinggi +/- 0,2 m batang 3,000.00

25 Stevanut, tinggi +/- 0,3 m batang 12,500.00

26 Taiwan beauty, tinggi +/- 0,2 m rumpun 3,000.00

Bahan - 12

Page 13: Rab Versi Sni Lengkap

NO. SATUANNAMA BARANG / BAHAN / TENAGA HARGA SATUAN (Rp.)

27 Teh-tehan hijau bulat, tinggi +/- 0,3 m batang 5,000.00

28 Teh-tehan hijau bulat, tinggi +/- 0,5 m batang 20,000.00

29 Teh-tehan hijau bulat (pagar), tinggi +/- 0,4 m batang 3,000.00

30 Teh-tehan hijau bulat (pagar), tinggi +/- 0,3 m batang 1,000.00

31 Teh-tehan kuning, tinggi +/- 0,2 m batang 500.00

32 Teh-tehan kuning bulat, tinggi +/- 0,3 m batang 5,000.00

33 Tri colour, tinggi +/- 0,3 m batang 12,500.00

34 Dracaena, tinggi +/- 0,8 m rumpun 15,000.00

35 Bambu pangkas, tinggi +/- 0,2 m batang 12,000.00

36 Patah tulang, tinggi +/- 0,3 m rumpun 3,000.00

37 Kuncira, tinggi +/- 0,3 m rumpun 3,000.00

38 Varent, tinggi +/- 0,3 m rumpun 4,000.00

39 Anthurium tinggi +/- 0,3 m rumpun 20,000.00

40 Bakung tinggi +/- 0,3 m rumpun 4,000.00

41 Nanas merah tinggi +/- 0,2 m rumpun 25,000.00

42 Nanas kuning tinggi +/- 0,2 m rumpun 15,000.00

43 Krisdoren tinggi +/- 0,2 m rumpun 20,000.00

TANAMAN PENUTUP TANAH

1 Adam eva kecil tinggi +/- 0,1 m rumpun 1,500.00

2 Adam eva besar tinggi +/- 0,2 m rumpun 4,000.00

3 Agave, tinggi +/- 0,4 m rumpun 50,000.00

4 Agave, tinggi +/- 0,2 m rumpun 20,000.00

5 Andong, tinggi +/- 0,3 m batang 2,000.00

6 Andong, tinggi +/- 0,2 m batang 1,500.00

7 Aponika, tinggi +/- 0,2 m rumpun 500.00

8 Portulaka rendah/pendek rumpun 2,000.00

9 Portulaka bangkok rumpun 4,000.00

10 Lili paris rumpun 1,500.00

11 Mega mendung, tinggi +/- 0,3 m batang 7,500.00

12 Modogras, tinggi +/- 0,2 m rumpun 800.00

13 Suplier, tinggi +/- 0,4 m rumpun 20,000.00

14 Terang bulan, tinggi +/- 0,4 m rumpun 8,000.00

15 Lili paris brasil tinggi +/- 0,3 m rumpun 4,500.00

16 Pupuk kandang kg 500.00

17 Tanah untuk media tanam m3

60,000.00

PERALATAN KEBERSIHAN

1 Sapu lidi bh 3,000.00

2 Tangkai Sapu bh 5,000.00

3 Tomblok bh 3,500.00

4 Hareg bh 3,000.00

5 Kerug bh 5,000.00

6 Seragam bh 75,000.00

7 Sarung tangan bh 7,500.00

8 Masker bh 7,500.00

9 Gerobak (alat baru) bh 1,500,000.00

10 Gerobak (sewa) bh 1,500.00

11 Serok bh 5,000.00

12 Gunting pangkas bh 35,000.00

13 Mesin potong rumput bh 3,000,000.00

14 Gathul bh 10,000.00

15 Garpu tanah bh 15,000.00

16 Arit bh 20,000.00

17 Gerobak celeng bh 400,000.00

18 Sepatu ps 75,000.00

19 Ember bh 5,000.00

20 Bagor bh 600.00

21 Irus bh 10,000.00

22 Cetok bh 10,000.00

23 Linggis bh 35,000.00

24 Martil bh 10,000.00

25 Betel bh 12,000.00

26 Pacul bh 30,000.00

27 Sewa kendaraan untuk membuang lumpur hr 118,000.00

28 Gas oksigen 5 kg tb 15,000.00

29 Nipel bh 10,000.00

30 Pipa dia. 3/8" - 15 cm bh 1,500.00

31 Nitobond EC kg 100,000.00

32 Conbextra EP kg 200,000.00

33 Cebex 100 kg 150,000.00

34 Sewa Compressor untuk pekerjaan grouting hr 250,000.00

35 Sewa Mesin Grouting hr 150,000.00

36 Sewa mesin gerinda untuk pekerjaan grouting hr 100,000.00

37 Sewa mixer ubtuk pekerjaan grouting hr 6,000.00

38 Alat bantu pekerjaan grouting ls 5,000.00

39 Alat bantu pekerjaan pekerjaan marka ls 130,000.00

40 Alat bantu pekerjaan pekerjaan expantion joint ls 130,000.00

41 Pelapisan kedap air lantai dengan coating ( terpasang ) m2

40,000.00

42 Pelapisan kedap air lantai dengan membran ( terpasang ) m2

60,000.00

LAIN-LAIN

1 Tiang bendera

-Pondasi umpak buah 31,000.00

-Ompak ornamen buah 65,800.00

-Tiang galvanis 3" m' 23,375.00

-Bendera 120 x 180 buah 39,825.00

Bahan - 13

Page 14: Rab Versi Sni Lengkap

NO. SATUANNAMA BARANG / BAHAN / TENAGA HARGA SATUAN (Rp.)

2 Rambu lalu lintas (terpasang) buah 150,000.00

3 Papan nama jalan (terpasang) buah 250,000.00

4 Sumur peresapan 5 m buah 495,000.00

3 Minyak Flux liter 12,000.00

4 Asbuton kg 2,350.00

5 Tumpuan konstruksi m 66,700.00

4 Kerikil sungai - royalty m3 5,750.00

5 Batu gunung - royalty m3 5,750.00

6 Uji test besi ( 3 sampel tiap jenis diameter benda uji ) set 150,000.00

5 Uji test aspal ttk 100,000.00

6 Sewa alat sondir hr 100,000.00

7 Sewa Scaffolding unit 20,000.00

6 Benda uji silinder beton bh 3,000.00

7 Biaya tes beton per benda uji bh 5,000.00

8 Biaya analisis tes beton perbeda uji bh 15,000.00

Bahan - 14

Page 15: Rab Versi Sni Lengkap

HARGA ALAT UNTUK PEKERJAAN ANALISA - E

NO. SATUAN HARGA

1 Mesin penyampur aspal (AMP) E01 Unit 7,500,000,000.00

2 Aspahlt Finisher E02 Unit 715,000,000.00

3 Mesin penyemprot aspal 800 liter (Asphlt Sprayer) E03 Unit 145,000,000.00

4 Buldozer 100 - 150 HP E04 Unit 700,000,000.00

5 Compressor 4000 - 6500 L/M E05 Unit 175,000,000.00

6 Concrette Mixer 0,3 - 0,6 m3 E06 Unit 45,000,000.00

7 Crane 10 - 15 Ton E07 Unit 300,000,000.00

8 Dump Truck 3 - 4 M3 E08 Unit 100,000,000.00

9 Dump Truck 8 ton 125 HP E09 Unit 145,000,000.00

10 Excavator 80 - 140 HP E10 Unit 250,000,000.00

11 Flat Bed Truck (Truk Bak Terbuka) 3 - 4 m3 E11 Unit 250,000,000.00

12 Genset 125 KVA E12 Unit 440,000,000.00

13 Motor Grader > 100 HP E13 Unit 880,000,000.00

14 Track Loader 75 - 100 HP E14 Unit 300,000,000.00

15 Wheel Loader 105 HP E15 Unit 840,000,000.00

16 Mesin Gilas 3 Roda 8 - 10 ton (Three Wheel Roller) E16 Unit 125,000,000.00

17 Mesin Gilas Tandem 6 - 8 ton (Tandem Roller) E17 Unit 460,000,000.00

18 Mesin Roda Karet 8 - 10 ton (Pneumatic Tyre Roller) E18 Unit 510,000,000.00

19 Mesin Gilas getar otomatis 5 - 8 T E19 Unit 500,000,000.00

20 Alat penggetar beton 4 HP (Concrette Vibrator) E20 Unit 12,000,000.00

21 Pemecah batu 220 HP (Stone Crusher) E21 Unit 491,500,000.00

22 Water Pump / Pompa Air 70 - 100 mm E22 Unit 5,000,000.00

23 Truk tangki air 100 HP 4000 L (Water Tank Truck ) E23 Unit 50,000,000.00

24 Stamper 5 HP E25 Unit 3,000,000.00

25 Jack Hammer E26 Unit 3,500,000.00

26 Fulvi Mixer E27 Unit 100,000,000.00

27 Mesin penyaring 8 HP jam 50,000.00

28 Chip Spreader jam 50,000.00

29 Mesin penghampar 1820 MM 30 HP jam 181,000.00

30 Thriller gandeng 1 ton jam 184,000.00

31 Dump Truck 3,5 ton 44 HP jam 118,000.00

32 Pompa air (D 5 cm) 30 m3 / jam jam 11,000.00

33 Thriller 1ton jam 15,000.00

34 Traktor jam 15,000.00

35 Alat Bor jam 150,000.00

36 Alat Ukur jam 75,000.00

37 Beton Molen jam 25,000.00

38 Mata Cutter bh 1,000,000.00

39 Mesin Cutter jam 60,000.00

40 Motor Walls jam 20,000.00

41 Peralatan Las jam 75,000.00

42 Sprayer jam 48,000.00

43 Alat bantu untuk pekerjaan analisa - E ls 500.00

MACAM ALAT

Page 16: Rab Versi Sni Lengkap

KETERANGAN

Alat Baru

Alat Baru

Alat Baru

Alat Baru

Alat Baru

Alat Baru

Alat Baru

Alat Baru

Alat Baru

Alat Baru

Alat Baru

Alat Baru

Alat Baru

Alat Baru

Alat Baru

Alat Baru

Alat Baru

Alat Baru

Alat Baru

Alat Baru

Alat Baru

Alat Baru

Alat Baru

Alat Baru

Alat Baru

Alat Baru

Sewa

Sewa

Sewa

Sewa

Sewa

Sewa

Sewa

Sewa

Sewa

Sewa

Sewa

baru

Sewa

Sewa

Sewa

Sewa

Page 17: Rab Versi Sni Lengkap

No. Upah

(1) (3)

PEKERJAAN PERSIAPAN

AK 100.00 m 2Pekerjaan Pengukuran Gedung

8.0000 org Pekerja @ Rp. 20,000.00 160,000.00

2.0000 org Mandor @ Rp. 32,500.00 65,000.00

0.5000 org Pengawas @ Rp. 37,200.00 18,600.00

2.0000 org Asisten Ahli Ukur @ Rp. 87,200.00 174,400.00

1.0000 hr Sewa alat ukur @ Rp. 75,000.00 75,000.00

JUMLAH ( BELUM PPN ) 493,000.00

JASA 10 % 49,300.00

JUMLAH 542,300.00

DIBULATKAN 542,300.00

1.0000 m 2Pekerjaan Pengukuran

0.01 x 542,300.00 5,423.00

SNI 1.0000 m 1Pengukuran dan pemasangan bouwplank untuk gedung dan saluran

6.4 0.0120 m3Kayu meranti 5/7 @ Rp. 1,678,000.00

03-2835-2002 0.0200 kg Paku reng @ Rp. 8,000.00

0.0070 m3Kayu meranti papan 3/20 @ Rp. 1,678,000.00

Macam Pekerjaan

(2)

ANALISA SATUAN PEKERJAAN

Page 18: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00

0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

0.0050 org Mandor @ Rp. 32,500.00 162.50

JUMLAH ( BELUM PPN ) 5,487.50

JASA 10 % 548.75

JUMLAH 6,036.25

DIBULATKAN 6,036.00

SNI 1.0000 m 2Membersihkan lapangan dan perataan

6.8 0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

03-2835-2002 0.0500 org Mandor @ Rp. 32,500.00 1,625.00

JUMLAH ( BELUM PPN ) 3,625.00

JASA 10 % 362.50

JUMLAH 3,987.50

DIBULATKAN 3,987.00

A4 1.0000 bh Membuat Papan Nama Proyek 80x120 cm

0.0350 m3Kayu meranti @ Rp. 1,678,000.00

1.4000 m1Seng plat lebar 90 cm @ Rp. 25,000.00

0.6000 kg Paku @ Rp. 10,000.00

1.5000 kg Cat kayu @ Rp. 32,000.00

16.8000 kg PC @ Rp. 764.00

0.0270 m3Pasir beton @ Rp. 73,000.00

0.0405 m3Kerikil beton @ Rp. 78,650.00

0.0175 org Tukang batu @ Rp. 27,500.00 481.25

1.0000 org Tukang kayu @ Rp. 30,000.00 30,000.00

1.0000 org Tukang cat @ Rp. 25,000.00 25,000.00

2.1000 org Pekerja @ Rp. 20,000.00 42,000.00

1.0050 org Mandor @ Rp. 32,500.00 32,662.50

JUMLAH ( BELUM PPN ) 130,143.75

JASA 10 % 13,014.38

JUMLAH 143,158.13

DIBULATKAN 143,158.00

SNI 1.0000 m 2Pembuatan jalan sementara, tebal 25 cm

6.16 0.2750 m3Batu belah @ Rp. 80,000.00

0.0300 m3Kerikil @ Rp. 78,650.00

0.0500 m3Pasir @ Rp. 76,000.00

1.0000 org Pekerja @ Rp. 20,000.00 20,000.00

0.1000 org Mandor @ Rp. 32,500.00 3,250.00

JUMLAH ( BELUM PPN ) 23,250.00

JASA 10 % 2,325.00

JUMLAH 25,575.00

DIBULATKAN 25,575.00

Page 19: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 2Pembuatan kantor sementara, dengan lantai plesteran

6.5 1.2500 btg Dolken kayu Ø 8 - 10/400 cm @ Rp. 10,000.00

03-2835-2002 0.1800 m3Kayu meranti @ Rp. 1,678,000.00

0.8500 kg Paku biasa @ Rp. 8,000.00

1.1000 kg Baja strip @ Rp. 8,800.00

35.0000 kg PC @ Rp. 764.00

0.1500 m3Pasir pasang @ Rp. 76,000.00

0.1000 m3Pasir beton @ Rp. 73,000.00

0.1500 m3Kerikil beton @ Rp. 78,650.00

30.0000 bh Bata merah @ Rp. 350.00

0.2500 lbr Seng plat 3" x 6 " @ Rp. 38,500.00

2.0000 bh Jendela nako @ Rp. 20,000.00

0.0800 m2Kaca polos @ Rp. 60,500.00

0.1500 bh Kunci tanam @ Rp. 35,000.00

0.0600 lbr Plywood 4 mm @ Rp. 41,250.00

2.0000 org Tukang kayu @ Rp. 30,000.00 60,000.00

1.0000 org Tukang batu @ Rp. 27,500.00 27,500.00

0.3000 org Kepala tukang @ Rp. 32,500.00 9,750.00

2.0000 org Pekerja @ Rp. 20,000.00 40,000.00

0.0500 org Mandor @ Rp. 32,500.00 1,625.00

JUMLAH ( BELUM PPN ) 138,875.00

JASA 10 % 13,887.50

JUMLAH 152,762.50

DIBULATKAN 152,762.00

SNI 1.0000 m 1Pembuatan pagar sementara dari seng gelombang tinggi 2 meter

6.2 1.2500 btg Dolken kayu Ø 8 - 10/400 cm @ Rp. 10,000.00

03-2835-2002 2.5000 kg PC @ Rp. 764.00

1.2000 lbr Seng gelombang 2"-5" BJLS 24 @ Rp. 25,000.00

0.0050 m3Pasir beton @ Rp. 73,000.00

0.0090 m3Kerikil beton @ Rp. 78,650.00

0.0250 m3Kaso 5/7 kayu meranti @ Rp. 1,678,000.00

0.0600 kg Paku biasa 2" - 5" @ Rp. 8,000.00

0.4000 kg Meni besi @ Rp. 12,000.00

0.2000 org Tukang kayu @ Rp. 30,000.00 6,000.00

0.0200 org Kepala tukang kayu @ Rp. 32,500.00 650.00

0.4000 org Pekerja @ Rp. 20,000.00 8,000.00

0.0200 org Mandor @ Rp. 32,500.00 650.00

JUMLAH ( BELUM PPN ) 15,300.00

JASA 10 % 1,530.00

JUMLAH 16,830.00

DIBULATKAN 16,830.00

PEKERJAAN TANAH

SNI 1.0000 m 3Galian tanah biasa sedalam sampai 1 meter

6.1 0.4000 org Pekerja @ Rp. 20,000.00 8,000.00

0.0400 org Mandor @ Rp. 32,500.00 1,300.00

JUMLAH ( BELUM PPN ) 9,300.00

JASA 10 % 930.00

JUMLAH 10,230.00

DIBULATKAN 10,230.00

SNI 1.0000 m 3Galian tanah biasa sedalam 1 - 2 meter

6.2 0.5260 org Pekerja @ Rp. 20,000.00 10,520.00

0.0526 org Mandor @ Rp. 32,500.00 1,709.50

JUMLAH ( BELUM PPN ) 12,229.50

JASA 10 % 1,222.95

JUMLAH 13,452.45

DIBULATKAN 13,452.00

SNI 1.0000 m 3Galian tanah biasa sedalam 2 - 3 meter

6.3 0.7350 org Pekerja @ Rp. 20,000.00 14,700.00

0.0735 org Mandor @ Rp. 32,500.00 2,388.75

Page 20: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

JUMLAH ( BELUM PPN ) 17,088.75

JASA 10 % 1,708.88

JUMLAH 18,797.63

DIBULATKAN 18,797.00

Page 21: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 3Galian tanah keras sedalam sampai 1 meter

6.4 0.6250 org Pekerja @ Rp. 20,000.00 12,500.00

0.0620 org Mandor @ Rp. 32,500.00 2,015.00

JUMLAH ( BELUM PPN ) 14,515.00

JASA 10 % 1,451.50

JUMLAH 15,966.50

DIBULATKAN 15,966.00

SNI 1.0000 m 3Galian tanah cadas sedalam sampai 1 meter

6.5 1.2500 org Pekerja @ Rp. 20,000.00 25,000.00

0.1250 org Mandor @ Rp. 32,500.00 4,062.50

JUMLAH ( BELUM PPN ) 29,062.50

JASA 10 % 2,906.25

JUMLAH 31,968.75

DIBULATKAN 31,968.00

SNI 1.0000 m 3Galian tanah lumpur sedalam 1 meter

6.6 0.8230 org Pekerja @ Rp. 20,000.00 16,460.00

0.0830 org Mandor @ Rp. 32,500.00 2,697.50

JUMLAH ( BELUM PPN ) 19,157.50

JASA 10 % 1,915.75

JUMLAH 21,073.25

DIBULATKAN 21,073.00

Mod. SNI 6.3 1.0000 m 1Membuat sumur

2.0000 bh Buis beton D. 80 cm @ Rp. 32,000.00

1.0000 org Tukang gali sumur @ Rp. 34,900.00 34,900.00

0.7350 org Pekerja @ Rp. 20,000.00 14,700.00

0.0735 org Mandor @ Rp. 32,500.00 2,388.75

JUMLAH ( BELUM PPN ) 51,988.75

JASA 10 % 5,198.88

JUMLAH 57,187.63

DIBULATKAN 57,187.00

A6 1.0000 m 3Mengangkut tanah sejauh 30 meter

0.3300 org Pekerja @ Rp. 20,000.00 6,600.00

0.0100 org Mandor @ Rp. 32,500.00 325.00

JUMLAH ( BELUM PPN ) 6,925.00

JASA 10 % 692.50

JUMLAH 7,617.50

DIBULATKAN 7,617.00

SNI 1.0000 m 3Pembuangan tanah sejauh 150 meter

6.8 0.5160 org Pekerja @ Rp. 20,000.00 10,320.00

0.0500 org Mandor @ Rp. 32,500.00 1,625.00

JUMLAH ( BELUM PPN ) 11,945.00

JASA 10 % 1,194.50

JUMLAH 13,139.50

DIBULATKAN 13,139.00

A14 1.0000 m 3Membuang tanah dengan menghampar

0.2500 org Pekerja @ Rp. 20,000.00 5,000.00

0.0100 org Mandor @ Rp. 32,500.00 325.00

JUMLAH ( BELUM PPN ) 5,325.00

JASA 10 % 532.50

JUMLAH 5,857.50

DIBULATKAN 5,857.00

SNI 1.0000 m 3Urug kembali bekas galian

6.9 0.1920 org Pekerja @ Rp. 20,000.00 3,840.00

0.0190 org Mandor @ Rp. 32,500.00 617.50

JUMLAH ( BELUM PPN ) 4,457.50

JASA 10 % 445.75

JUMLAH 4,903.25

Page 22: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

DIBULATKAN 4,903.00

Page 23: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

1.0000 m 2Meratakan tanah ditumbuk halus

0.2500 org Pekerja @ Rp. 20,000.00 5,000.00

0.0100 org Mandor @ Rp. 32,500.00 325.00

JUMLAH ( BELUM PPN ) 5,325.00

JASA 10 % 532.50

JUMLAH 5,857.50

DIBULATKAN 5,857.00

A18 1.0000 m 3Urug pasir

1.2000 m3Pasir urug @ Rp. 55,000.00

0.3000 org Pekerja @ Rp. 20,000.00 6,000.00

0.0100 org Mandor @ Rp. 32,500.00 325.00

JUMLAH ( BELUM PPN ) 6,325.00

JASA 10 % 632.50

JUMLAH 6,957.50

DIBULATKAN 6,957.00

MOD 1.0000 m 3Urug tanah mendatangkan

A18 1.2000 m3Tanah urug @ Rp. 35,000.00

0.3000 org Pekerja @ Rp. 20,000.00 6,000.00

0.0100 org Mandor @ Rp. 32,500.00 325.00

JUMLAH ( BELUM PPN ) 6,325.00

JASA 10 % 632.50

JUMLAH 6,957.50

DIBULATKAN 6,957.00

SNI 1.0000 m 3Urugan sirtu

6.15 1.2000 m3Sirtu @ Rp. 66,000.00

0.2500 org Pekerja @ Rp. 20,000.00 5,000.00

0.0250 org Mandor @ Rp. 32,500.00 812.50

JUMLAH ( BELUM PPN ) 5,812.50

JASA 10 % 581.25

JUMLAH 6,393.75

DIBULATKAN 6,393.00

SNI 1.0000 m 3Pemasangan lapisan ijuk

6.14 1.2000 m3Ijuk @ Rp. 75,000.00

0.1500 org Pekerja @ Rp. 20,000.00 3,000.00

0.0150 org Mandor @ Rp. 32,500.00 487.50

JUMLAH ( BELUM PPN ) 3,487.50

JASA 10 % 348.75

JUMLAH 3,836.25

DIBULATKAN 3,836.00

MOD 1.0000 m 2Gebalan rumput

B3 0.2000 btg Bambu @ Rp. 7,000.00

1.0000 m2Gebalan rumput @ Rp. 5,000.00

0.5000 org Pekerja @ Rp. 20,000.00 10,000.00

0.0250 org Mandor @ Rp. 32,500.00 812.50

JUMLAH ( BELUM PPN ) 10,812.50

JASA 10 % 1,081.25

JUMLAH 11,893.75

DIBULATKAN 11,893.00

Page 24: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

PEKERJAAN PASANGAN

SNI 1.0000 m 3Pasangan pondasi batu kosong

6.14 1.2000 m3Batu belah 15/20 cm @ Rp. 80,000.00

03-2836-2002 0.3000 m3Pasir urug @ Rp. 55,000.00

0.3900 org Tukang batu @ Rp. 27,500.00 10,725.00

0.0390 org Kepala tukang batu @ Rp. 30,000.00 1,170.00

0.7800 org Pekerja @ Rp. 20,000.00 15,600.00

0.0390 org Mandor @ Rp. 32,500.00 1,267.50

JUMLAH ( BELUM PPN ) 28,762.50

JASA 10 % 2,876.25

JUMLAH 31,638.75

DIBULATKAN 31,638.00

SNI 1.0000 m 3Pasangan pondasi 1 Kp : 1 Sm : 1 Ps

6.9 1.1000 m3Batu belah (hitam) 15/20 cm @ Rp. 80,000.00

03-2836-2002 0.2290 m3Kapurr pasang @ Rp. 72,500.00

0.2290 m3Semen merah @ Rp. 80,000.00

0.5440 m3Pasir pasang @ Rp. 76,000.00

0.6000 org Tukang batu @ Rp. 27,500.00 16,500.00

0.0600 org Kepala tukang batu @ Rp. 30,000.00 1,800.00

1.5000 org Pekerja @ Rp. 20,000.00 30,000.00

0.0750 org Mandor @ Rp. 32,500.00 2,437.50

JUMLAH ( BELUM PPN ) 50,737.50

JASA 10 % 5,073.75

JUMLAH 55,811.25

DIBULATKAN 55,811.00

1.0000 m 3Pasangan pondasi 1 Pc : 3 Kp : 5 Ps

1.2000 m3Batu belah (hitam) 15/20 cm @ Rp. 80,000.00

95.4200 kg PC @ Rp. 764.00

0.2290 m3Kapurr pasang @ Rp. 72,500.00

0.3820 m3Pasir pasang @ Rp. 76,000.00

0.6000 org Tukang batu @ Rp. 27,500.00 16,500.00

0.0600 org Kepala tukang batu @ Rp. 30,000.00 1,800.00

1.5000 org Pekerja @ Rp. 20,000.00 30,000.00

0.0750 org Mandor @ Rp. 32,500.00 2,437.50

JUMLAH ( BELUM PPN ) 50,737.50

JASA 10 % 5,073.75

JUMLAH 55,811.25

DIBULATKAN 55,811.00

SNI 1.0000 m 3Pasangan pondasi 1 Pc : 3 Kp : 10 Ps

6.12 1.1000 m3Batu belah (hitam) 15/20 cm @ Rp. 80,000.00

03-2835-2002 61.0000 kg PC @ Rp. 764.00

0.1470 m3Kapurr pasang @ Rp. 72,500.00

0.4920 m3Pasir pasang @ Rp. 76,000.00

0.6000 org Tukang batu @ Rp. 27,500.00 16,500.00

0.0600 org Kepala tukang batu @ Rp. 30,000.00 1,800.00

1.5000 org Pekerja @ Rp. 20,000.00 30,000.00

0.0750 org Mandor @ Rp. 32,500.00 2,437.50

JUMLAH ( BELUM PPN ) 50,737.50

JASA 10 % 5,073.75

JUMLAH 55,811.25

DIBULATKAN 55,811.00

SNI 1.0000 m 3Pasangan pondasi 1 Pc : 4 Ps

6.5 1.1000 m3Batu belah 15/20 cm @ Rp. 80,000.00

03-2836-2002 163.0000 kg PC @ Rp. 764.00

0.5200 m3Pasir pasang @ Rp. 76,000.00

0.6000 org Tukang batu @ Rp. 27,500.00 16,500.00

0.0600 org Kepala tukang batu @ Rp. 30,000.00 1,800.00

Page 25: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

1.5000 org Pekerja @ Rp. 20,000.00 30,000.00

0.0750 org Mandor @ Rp. 32,500.00 2,437.50

JUMLAH ( BELUM PPN ) 50,737.50

JASA 10 % 5,073.75

JUMLAH 55,811.25

DIBULATKAN 55,811.00

Page 26: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 2Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps

6.15 70.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 350.00

03-2837-2002 4.5000 kg PC @ Rp. 764.00

0.0150 m3Kapur pasang @ Rp. 72,500.00

0.0500 m3Pasir pasang @ Rp. 76,000.00

0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00

0.0100 org Kepala tukang batu @ Rp. 30,000.00 300.00

0.3200 org Pekerja @ Rp. 20,000.00 6,400.00

0.0150 org Mandor @ Rp. 32,500.00 487.50

JUMLAH ( BELUM PPN ) 9,937.50

JASA 10 % 993.75

JUMLAH 10,931.25

DIBULATKAN 10,931.00

SNI 1.0000 m 2Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps

6.11 70.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 350.00

03-2837-2002 11.5000 kg PC @ Rp. 764.00

0.0430 m3Pasir pasang @ Rp. 76,000.00

0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00

0.0100 org Kepala tukang batu @ Rp. 30,000.00 300.00

0.3200 org Pekerja @ Rp. 20,000.00 6,400.00

0.0150 org Mandor @ Rp. 32,500.00 487.50

JUMLAH ( BELUM PPN ) 9,937.50

JASA 10 % 993.75

JUMLAH 10,931.25

DIBULATKAN 10,931.00

SNI 1.0000 m 2Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps

6.7 140.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 350.00

03-2837-2002 10.0800 kg PC @ Rp. 764.00

0.0275 m3Kapur pasang @ Rp. 72,500.00

0.0925 m3Pasir pasang @ Rp. 76,000.00

0.2000 org Tukang batu @ Rp. 27,500.00 5,500.00

0.0200 org Kepala tukang batu @ Rp. 30,000.00 600.00

0.6500 org Pekerja @ Rp. 20,000.00 13,000.00

0.0300 org Mandor @ Rp. 32,500.00 975.00

JUMLAH ( BELUM PPN ) 20,075.00

JASA 10 % 2,007.50

JUMLAH 22,082.50

DIBULATKAN 22,082.00

SNI 1.0000 m 2Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps

6.4 140.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 350.00

03-2837-2002 26.4500 kg PC @ Rp. 764.00

0.0980 m3Pasir pasang @ Rp. 76,000.00

0.2000 org Tukang batu @ Rp. 27,500.00 5,500.00

0.0200 org Kepala tukang batu @ Rp. 30,000.00 600.00

0.6500 org Pekerja @ Rp. 20,000.00 13,000.00

0.0300 org Mandor @ Rp. 32,500.00 975.00

JUMLAH ( BELUM PPN ) 20,075.00

JASA 10 % 2,007.50

JUMLAH 22,082.50

DIBULATKAN 22,082.00

SNI 1.0000 m 2Pasangan dinding bataco

6.18 12.5000 bh Bataco @ Rp. 1,500.00

12.5000 kg PC @ Rp. 764.00

0.0400 m3Pasir pasang @ Rp. 76,000.00

0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00

0.0100 org Kepala tukang batu @ Rp. 30,000.00 300.00

0.5000 org Pekerja @ Rp. 20,000.00 10,000.00

0.0250 org Mandor @ Rp. 32,500.00 812.50

Page 27: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

JUMLAH ( BELUM PPN ) 13,862.50

JASA 10 % 1,386.25

JUMLAH 15,248.75

DIBULATKAN 15,248.00

Page 28: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 2Pasangan roster 25/25 cm

6.19 16.0000 bh Roster 25/25 cm @ Rp. 2,000.00

12.5000 kg PC @ Rp. 764.00

0.0400 m3Pasir pasang @ Rp. 76,000.00

0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00

0.0100 org Kepala tukang batu @ Rp. 30,000.00 300.00

0.5000 org Pekerja @ Rp. 20,000.00 10,000.00

0.0250 org Mandor @ Rp. 32,500.00 812.50

JUMLAH ( BELUM PPN ) 13,862.50

JASA 10 % 1,386.25

JUMLAH 15,248.75

DIBULATKAN 15,248.00

PEKERJAAN BETON

SNI 1.0000 m 3Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr

6.13 336.0000 kg PC @ Rp. 764.00

0.5400 m3Pasir beton @ Rp. 73,000.00

0.8100 m3Kerikil beton @ Rp. 78,650.00

0.3500 org Tukang batu @ Rp. 27,500.00 9,625.00

0.0350 org Kepala tukang batu @ Rp. 30,000.00 1,050.00

2.0000 org Pekerja @ Rp. 20,000.00 40,000.00

0.1000 org Mandor @ Rp. 32,500.00 3,250.00

JUMLAH ( BELUM PPN ) 53,925.00

JASA 10 % 5,392.50

JUMLAH 59,317.50

DIBULATKAN 59,317.00

SNI 1.0000 m 3Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr

6.1 218.0000 kg PC @ Rp. 764.00

0.5200 m3Pasir beton @ Rp. 73,000.00

0.8700 m3Kerikil beton @ Rp. 78,650.00

0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00

0.0250 org Kepala tukang batu @ Rp. 30,000.00 750.00

1.6500 org Pekerja @ Rp. 20,000.00 33,000.00

0.0800 org Mandor @ Rp. 32,500.00 2,600.00

JUMLAH ( BELUM PPN ) 43,225.00

JASA 10 % 4,322.50

JUMLAH 47,547.50

DIBULATKAN 47,547.00

AK 1.0000 m 3Beton cyclope 1pc:3ps:5kr

0.7000 m3Batu kali (hitam) @ Rp. 80,000.00

61.2500 kg PC @ Rp. 764.00

0.4000 m3Pasir pasang @ Rp. 76,000.00

0.6500 m3Kerikil beton @ Rp. 78,650.00

1.0000 org Tukang batu @ Rp. 27,500.00 27,500.00

0.1000 org Kep. Tk. Batu @ Rp. 30,000.00 3,000.00

6.0000 org Pekerja @ Rp. 20,000.00 120,000.00

0.3000 org Mandor @ Rp. 32,500.00 9,750.00

JUMLAH ( BELUM PPN ) 160,250.00

JASA 10 % 16,025.00

JUMLAH 176,275.00

DIBULATKAN 176,275.00

Page 29: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 3Membuat beton bertulang, 1 Pc : 1,5 Ps : 2,5 Kr

6.16 400.0000 kg PC @ Rp. 764.00

0.4800 m3Pasir beton @ Rp. 73,000.00

0.8000 m3Kerikil beton @ Rp. 78,650.00

0.3500 org Tukang batu @ Rp. 27,500.00 9,625.00

0.0350 org Kepala tukang batu @ Rp. 30,000.00 1,050.00

2.0000 org Pekerja @ Rp. 20,000.00 40,000.00

1.0000 org Mandor @ Rp. 32,500.00 32,500.00

JUMLAH ( BELUM PPN ) 83,175.00

JASA 10 % 8,317.50

JUMLAH 91,492.50

DIBULATKAN 91,492.00

SNI 1.0000 m 3Membuat beton dengan mutu K 225

6.35 388.0000 kg PC @ Rp. 764.00

0.6500 m3Pasir beton @ Rp. 73,000.00

0.6500 m3Kerikil beton @ Rp. 78,650.00

1.0000 org Tukang batu @ Rp. 27,500.00 27,500.00

0.1000 org Kepala tukang batu @ Rp. 30,000.00 3,000.00

6.0000 org Pekerja @ Rp. 20,000.00 120,000.00

0.3000 org Mandor @ Rp. 32,500.00 9,750.00

JUMLAH ( BELUM PPN ) 160,250.00

JASA 10 % 16,025.00

JUMLAH 176,275.00

DIBULATKAN 176,275.00

SNI 1.0000 m 3Membuat beton dengan mutu K 275

6.36 400.0000 kg PC @ Rp. 764.00

0.4000 m3Pasir beton @ Rp. 73,000.00

0.8200 m3Kerikil beton @ Rp. 78,650.00

1.0000 org Tukang batu @ Rp. 27,500.00 27,500.00

0.1000 org Kepala tukang batu @ Rp. 30,000.00 3,000.00

6.0000 org Pekerja @ Rp. 20,000.00 120,000.00

0.3000 org Mandor @ Rp. 32,500.00 9,750.00

JUMLAH ( BELUM PPN ) 160,250.00

JASA 10 % 16,025.00

JUMLAH 176,275.00

DIBULATKAN 176,275.00

1.0000 m 3Membuat beton dengan mutu K 300

430.0000 kg PC @ Rp. 764.00

0.5160 m3Pasir beton @ Rp. 73,000.00

0.6900 m3Kerikil beton @ Rp. 78,650.00

1.0000 org Tukang batu @ Rp. 27,500.00 27,500.00

0.1000 org Kepala tukang batu @ Rp. 30,000.00 3,000.00

6.0000 org Pekerja @ Rp. 20,000.00 120,000.00

0.3000 org Mandor @ Rp. 32,500.00 9,750.00

JUMLAH ( BELUM PPN ) 160,250.00

JASA 10 % 16,025.00

JUMLAH 176,275.00

DIBULATKAN 176,275.00

SNI 1.0000 kg Pembesian dengan besi polos

6.25 1.0500 kg Besi beton polos @ Rp. 7,900.00

0.0150 kg Kawat beton @ Rp. 9,400.00

0.0070 org Tukang besi @ Rp. 25,000.00 175.00

0.0007 org Kepala tukang besi @ Rp. 27,000.00 18.90

0.0070 org Pekerja @ Rp. 20,000.00 140.00

0.0003 org Mandor @ Rp. 32,500.00 9.75

JUMLAH ( BELUM PPN ) 343.65

JASA 10 % 34.37

JUMLAH 378.02

DIBULATKAN 378.00

Page 30: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 kg Pembesian dengan besi ulir

6.25 1.0500 kg Besi beton ulir @ Rp. 8,000.00

0.0150 kg Kawat beton @ Rp. 9,400.00

0.0070 org Tukang besi @ Rp. 25,000.00 175.00

0.0007 org Kepala tukang besi @ Rp. 27,000.00 18.90

0.0070 org Pekerja @ Rp. 20,000.00 140.00

0.0003 org Mandor @ Rp. 32,500.00 9.75

JUMLAH ( BELUM PPN ) 343.65

JASA 10 % 34.37

JUMLAH 378.02

DIBULATKAN 378.00

F.8 1.0000 m 2Cetakan beton / begisting memakai papan

0.0170 m3Usuk meranti @ Rp. 1,678,000.00

0.0240 m3Papan cetakan @ Rp. 1,000,000.00

0.4000 kg Paku @ Rp. 8,000.00

0.5000 org Tukang kayu @ Rp. 30,000.00 15,000.00

0.0500 org Kep. Tk. Kayu @ Rp. 32,500.00 1,625.00

0.2000 org Pekerja @ Rp. 20,000.00 4,000.00

0.0100 org Mandor @ Rp. 32,500.00 325.00

JUMLAH ( BELUM PPN ) 20,950.00

JASA 10 % 2,095.00

JUMLAH 23,045.00

DIBULATKAN 23,045.00

F.8 1.0000 m 2Cetakan beton / begisting memakai multiplek

0.0170 m3Usuk meranti @ Rp. 1,678,000.00

0.3470 lbr Multiplek @ Rp. 90,000.00

0.4000 kg Paku @ Rp. 8,000.00

0.5000 org Tukang kayu @ Rp. 30,000.00 15,000.00

0.0500 org Kep. Tk. Kayu @ Rp. 32,500.00 1,625.00

0.2000 org Pekerja @ Rp. 20,000.00 4,000.00

0.0100 org Mandor @ Rp. 32,500.00 325.00

JUMLAH ( BELUM PPN ) 20,950.00

JASA 10 % 2,095.00

JUMLAH 23,045.00

DIBULATKAN 23,045.00

F.V 1.0000 m 3Membongkar cetakan

4.0000 org Pekerja @ Rp. 20,000.00 80,000.00

JUMLAH ( BELUM PPN ) 80,000.00

JASA 10 % 8,000.00

JUMLAH 88,000.00

DIBULATKAN 88,000.00

Sup Stutwerk untuk 1 m 3 beton, tinggi 3 - 4 m ( memakai dolken )

muko2 0.7000 m3Perancah/dolken @ Rp. 1,000,000.00

hal 10.5000 org Tukang kayu @ Rp. 30,000.00 315,000.00

332 1.0500 org Kep. Tk. Kayu @ Rp. 32,500.00 34,125.00

3.5000 org Pekerja @ Rp. 20,000.00 70,000.00

0.1750 org Mandor @ Rp. 32,500.00 5,687.50

JUMLAH ( BELUM PPN ) 424,812.50

JASA 10 % 42,481.25

JUMLAH 467,293.75

DIBULATKAN 467,293.00

Page 31: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

Stutwerk untuk 1 m 3 beton, tinggi 3 - 4 m ( memakai scafolding )

32.0000 unit Scafolding @ Rp. 20,000.00

3.5000 org Tukang kayu @ Rp. 30,000.00 105,000.00

0.3500 org Kep. Tk. Kayu @ Rp. 32,500.00 11,375.00

2.2000 org Pekerja @ Rp. 20,000.00 44,000.00

0.1200 org Mandor @ Rp. 32,500.00 3,900.00

JUMLAH ( BELUM TERMASUK PPN ) 164,275.00

JASA 10 % 16,427.50

JUMLAH 180,702.50

DIBULATKAN 180,702.00

REKAPITULASI (CONTOH UNTUK 100 KG BESI)

Pek. Beton 1:2:3 tanpa dolken, 100 kg besi

A. Beton cor 1pc:2ps:3kr 59,317.50

B. Tulangan 100 kg 37,801.50

C. Cetakan memakai papan ( 10 m2 ) 230,450.00

D. Membongkar cetakan 88,000.00

JUMLAH 415,569.00

DIBULATKAN 415,569.00

REKAPITULASI (CONTOH UNTUK 125 KG BESI)

Pek. Beton 1:2:3 tanpa dolken, 125 kg besi

A. Beton cor 1pc:2ps:3kr 59,317.50

B. Tulangan 125 kg 47,251.88

C. Cetakan memakai papan ( 10 m2 ) 230,450.00

D. Membongkar cetakan 88,000.00

JUMLAH 425,019.38

DIBULATKAN 425,019.00

REKAPITULASI (CONTOH UNTUK 150 KG BESI)

Pek. Beton 1:2:3 tanpa dolken, 150 kg besi

A. Beton cor 1pc:2ps:3kr 59,317.50

B. Tulangan 150 kg 56,702.25

C. Cetakan memakai papan ( 10 m2 ) 230,450.00

E. Membongkar cetakan 88,000.00

JUMLAH 434,469.75

DIBULATKAN 434,469.00

REKAPITULASI (CONTOH UNTUK 175 KG BESI)

Pek. Beton 1:2:3 tanpa dolken, 175 kg besi

A. Beton cor 1pc:2ps:3kr 59,317.50

B. Tulangan 175 kg 66,152.63

C. Cetakan memakai papan ( 10 m2 ) 230,450.00

D. Membongkar cetakan 88,000.00

JUMLAH 443,920.13

DIBULATKAN 443,920.00

REKAPITULASI (CONTOH UNTUK 200 KG BESI)

Pek. Beton 1:2:3 tanpa dolken, 200 kg besi

A. Beton cor 1pc:2ps:3kr 59,317.50

B. Tulangan 200 kg 75,603.00

C. Cetakan memakai papan ( 10 m2 ) 230,450.00

D. Membongkar cetakan 88,000.00

JUMLAH 453,370.50

DIBULATKAN 453,370.00

REKAPITULASI (CONTOH UNTUK 100 KG BESI)

Pek. Beton 1:2:3 dengan memakai dolken, 100 kg besi

Page 32: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

A. Beton cor 1pc:2ps:3kr 59,317.50

B. Tulangan 100 kg 37,801.50

C. Cetakan memakai papan ( 10 m2 ) 230,450.00

D. Stut werk / perancah 467,293.75

E. Membongkar cetakan 88,000.00

JUMLAH 882,862.75

DIBULATKAN 882,862.00

Page 33: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

REKAPITULASI (CONTOH UNTUK 125 KG BESI)

Pek. Beton 1:2:3 dengan memakai dolken, 125 kg besi

A. Beton cor 1pc:2ps:3kr 59,317.50

B. Tulangan 125 kg 47,251.88

C. Cetakan memakai papan ( 10 m2 ) 230,450.00

D. Stut werk / perancah 467,293.75

E. Membongkar cetakan 88,000.00

JUMLAH 892,313.13

DIBULATKAN 892,313.00

REKAPITULASI (CONTOH UNTUK 150 KG BESI)

Pek. Beton 1:2:3 dengan memakai dolken, 150 kg besi

A. Beton cor 1pc:2ps:3kr 59,317.50

B. Tulangan 150 kg 56,702.25

C. Cetakan memakai papan ( 10 m2 ) 230,450.00

D. Stut werk / perancah 467,293.75

E. Membongkar cetakan 88,000.00

JUMLAH 901,763.50

DIBULATKAN 901,763.00

REKAPITULASI (CONTOH UNTUK 175 KG BESI)

Pek. Beton 1:2:3 dengan memakai dolken, 175 kg besi

A. Beton cor 1pc:2ps:3kr 59,317.50

B. Tulangan 175 kg 66,152.63

C. Cetakan memakai papan ( 10 m2 ) 230,450.00

D. Stut werk / perancah 467,293.75

E. Membongkar cetakan 88,000.00

JUMLAH 911,213.88

DIBULATKAN 911,213.00

REKAPITULASI (CONTOH UNTUK 200 KG BESI)

Pek. Beton 1:2:3 dengan memakai dolken, 200 kg besi

A. Beton cor 1pc:2ps:3kr 59,317.50

B. Tulangan 200 kg 75,603.00

C. Cetakan memakai papan ( 10 m2 ) 230,450.00

D. Stut werk / perancah 467,293.75

E. Membongkar cetakan 88,000.00

JUMLAH 920,664.25

DIBULATKAN 920,664.00

REKAPITULASI (CONTOH UNTUK 100 KG BESI)

Pek. Beton 1:2:3 dengan memakai scaffolding, 100 kg besi

A. Beton cor 1pc:2ps:3kr 59,317.50

B. Tulangan 100 kg 37,801.50

C. Cetakan memakai papan ( 10 m2 ) 230,450.00

D. Scafolding / perancah 180,702.50

E. Membongkar cetakan 88,000.00

JUMLAH 596,271.50

DIBULATKAN 596,271.00

REKAPITULASI (CONTOH UNTUK 125 KG BESI)

Pek. Beton 1:2:3 dengan memakai scaffolding, 125 kg besi

A. Beton cor 1pc:2ps:3kr 59,317.50

B. Tulangan 125 kg 47,251.88

C. Cetakan memakai papan ( 10 m2 ) 230,450.00

D. Scafolding / perancah 180,702.50

E. Membongkar cetakan 88,000.00

JUMLAH 605,721.88

Page 34: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

DIBULATKAN 605,721.00

Page 35: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

REKAPITULASI (CONTOH UNTUK 150 KG BESI)

Pek. Beton 1:2:3 dengan memakai scaffolding, 150 kg besi

A. Beton cor 1pc:2ps:3kr 59,317.50

B. Tulangan 150 kg 56,702.25

C. Cetakan memakai papan ( 10 m2 ) 230,450.00

D. Scafolding / perancah 180,702.50

E. Membongkar cetakan 88,000.00

JUMLAH 615,172.25

DIBULATKAN 615,172.00

REKAPITULASI (CONTOH UNTUK 175 KG BESI)

Pek. Beton 1:2:3 dengan memakai scaffolding, 175 kg besi

A. Beton cor 1pc:2ps:3kr 59,317.50

B. Tulangan 175 kg 66,152.63

C. Cetakan memakai papan ( 10 m2 ) 230,450.00

D. Scafolding / perancah 180,702.50

E. Membongkar cetakan 88,000.00

JUMLAH 624,622.63

DIBULATKAN 624,622.00

REKAPITULASI (CONTOH UNTUK 200 KG BESI)

Pek. Beton 1:2:3 dengan memakai scaffolding, 200 kg besi

A. Beton cor 1pc:2ps:3kr 59,317.50

B. Tulangan 200 kg 75,603.00

C. Cetakan memakai papan ( 10 m2 ) 230,450.00

D. Scafolding / perancah 180,702.50

E. Membongkar cetakan 88,000.00

JUMLAH 634,073.00

DIBULATKAN 634,073.00

PEKERJAAN PELESTERAN

G.50.q 1.0000 m 2Plesteran batu kali 1pc:4ps

6.5110 kg PC @ Rp. 764.00

0.0209 m3Pasir pasang @ Rp. 76,000.00

0.2000 org Tukang batu @ Rp. 27,500.00 5,500.00

0.0200 org Kep. Tk. Batu @ Rp. 30,000.00 600.00

0.4000 org Pekerja @ Rp. 20,000.00 8,000.00

0.0200 org Mandor @ Rp. 32,500.00 650.00

JUMLAH ( BELUM PPN ) 14,750.00

JASA 10 % 1,475.00

JUMLAH 16,225.00

DIBULATKAN 16,225.00

Page 36: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 2Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm

6.9 1.8400 kg PC @ Rp. 764.00

03-2837-2002 0.0060 m3Kapurr pasang @ Rp. 72,500.00

0.0140 m3Pasir pasang @ Rp. 76,000.00

0.1500 org Tukang batu @ Rp. 27,500.00 4,125.00

0.0150 org Kepala tukang batu @ Rp. 30,000.00 450.00

0.2000 org Pekerja @ Rp. 20,000.00 4,000.00

0.0100 org Mandor @ Rp. 32,500.00 325.00

JUMLAH ( BELUM TERMASUK PPN ) 8,900.00

JASA 10 % 890.00

JUMLAH 9,790.00

DIBULATKAN 9,790.00

SNI 1.0000 m 2Plesteran 1 Pc : 4 Ps, tebal 15 mm

6.4 5.2000 kg PC @ Rp. 764.00

03-2837-2002 0.0200 m3Pasir pasang @ Rp. 76,000.00

0.1500 org Tukang batu @ Rp. 27,500.00 4,125.00

0.0150 org Kepala tukang batu @ Rp. 30,000.00 450.00

0.2000 org Pekerja @ Rp. 20,000.00 4,000.00

0.0100 org Mandor @ Rp. 32,500.00 325.00

JUMLAH ( BELUM PPN ) 8,900.00

JASA 10 % 890.00

JUMLAH 9,790.00

DIBULATKAN 9,790.00

SNI 1.0000 m 2Plesteran beton 1 Pc : 3 Ps, tebal 15 mm

6.30 7.0700 kg PC @ Rp. 764.00

03-2837-2002 0.0210 m3Pasir pasang @ Rp. 76,000.00

0.2000 org Tukang batu @ Rp. 27,500.00 5,500.00

0.0200 org Kepala tukang batu @ Rp. 30,000.00 600.00

0.2600 org Pekerja @ Rp. 20,000.00 5,200.00

0.0130 org Mandor @ Rp. 32,500.00 422.50

JUMLAH ( BELUM PPN ) 11,722.50

JASA 10 % 1,172.25

JUMLAH 12,894.75

DIBULATKAN 12,894.00

SNI 1.0000 m 1Plesteran skoneng 1 Pc : 2 Ps ( untuk gedung )

6.31 0.5000 kg PC @ Rp. 764.00

03-2837-2002 0.0020 m3Pasir pasang @ Rp. 76,000.00

0.0380 org Tukang batu @ Rp. 27,500.00 1,045.00

0.0380 org Kepala tukang batu @ Rp. 30,000.00 1,140.00

0.0570 org Pekerja @ Rp. 20,000.00 1,140.00

0.0020 org Mandor @ Rp. 32,500.00 65.00

JUMLAH ( BELUM PPN ) 3,390.00

JASA 10 % 339.00

JUMLAH 3,729.00

DIBULATKAN 3,729.00

SNI 1.0000 m 2Plesteran siar adukan 1 Pc : 2 Ps

6.35 4.3200 kg PC @ Rp. 764.00

03-2837-2002 0.0160 m3Pasir pasang @ Rp. 76,000.00

0.0700 org Tukang batu @ Rp. 27,500.00 1,925.00

0.0070 org Kepala tukang batu @ Rp. 30,000.00 210.00

0.1500 org Pekerja @ Rp. 20,000.00 3,000.00

0.0080 org Mandor @ Rp. 32,500.00 260.00

JUMLAH ( BELUM PPN ) 5,395.00

JASA 10 % 539.50

JUMLAH 5,934.50

DIBULATKAN 5,934.00

Page 37: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 2Plesteran Ciprat, 1 Pc : 2 Ps

6.34 4.3200 kg PC @ Rp. 764.00

0.0160 m3Pasir pasang @ Rp. 55,000.00

0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00

0.0100 org Kepala tukang batu @ Rp. 30,000.00 300.00

0.2500 org Pekerja @ Rp. 20,000.00 5,000.00

0.0150 org Mandor @ Rp. 32,500.00 487.50

JUMLAH ( BELUM PPN ) 8,537.50

JASA 10 % 853.75

JUMLAH 9,391.25

DIBULATKAN 9,391.00

Analisa ZAZ 1.0000 m 2Acian dinding bata

3.5000 kg PC @ Rp. 764.00

0.0330 org Tukang batu @ Rp. 27,500.00 907.50

0.0033 org Kep. Tk. Batu @ Rp. 30,000.00 99.00

0.0700 org Pekerja @ Rp. 20,000.00 1,400.00

0.0035 org Mandor @ Rp. 32,500.00 113.75

JUMLAH ( BELUM PPN ) 2,520.25

JASA 10 % 252.03

JUMLAH 2,772.28

DIBULATKAN 2,772.00

SNI 1.0000 m 2Pasang dinding batu hias tempel

6.74 1.0500 m2Batu tempel hitam @ Rp. 60,000.00

11.7500 kg PC @ Rp. 764.00

0.0350 m3Pasir pasang @ Rp. 76,000.00

0.3500 org Tukang batu @ Rp. 27,500.00 9,625.00

0.0350 org Kepala tukang batu @ Rp. 30,000.00 1,050.00

0.6500 org Pekerja @ Rp. 20,000.00 13,000.00

0.0300 org Mandor @ Rp. 32,500.00 975.00

JUMLAH ( BELUM TERMASUK PPN ) 24,650.00

JASA 10 % 2,465.00

JUMLAH 27,115.00

DIBULATKAN 27,115.00

PEKERJAAN PASANG TEGEL

AK 1.0000 m 2Pasang tegel abu-abu 30/30

1.0000 m2Tegel abu-abu uk. 30/30 @ Rp. 28,000.00

0.0160 m3Kapur pasang @ Rp. 72,500.00

0.0320 m3Pasir pasang @ Rp. 76,000.00

1.0000 kg PC @ Rp. 764.00

0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00

0.0250 org Kep. Tk. Batu @ Rp. 30,000.00 750.00

0.5000 org Pekerja @ Rp. 20,000.00 10,000.00

0.0250 org Mandor @ Rp. 32,500.00 812.50

JUMLAH ( BELUM PPN ) 18,437.50

JASA 10 % 1,843.75

JUMLAH 20,281.25

DIBULATKAN 20,281.00

Page 38: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

AK 1.0000 m 2Pasang tegel abu-abu 20/20

1.0000 m2Tegel abu-abu uk. 20/20 @ Rp. 20,000.00

0.0160 m3Kapur pasang @ Rp. 72,500.00

0.0320 m3Pasir pasang @ Rp. 76,000.00

1.0000 kg PC @ Rp. 764.00

0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00

0.0250 org Kep. Tk. Batu @ Rp. 30,000.00 750.00

0.5000 org Pekerja @ Rp. 20,000.00 10,000.00

0.0250 org Mandor @ Rp. 32,500.00 812.50

JUMLAH ( BELUM PPN ) 18,437.50

JASA 10 % 1,843.75

JUMLAH 20,281.25

DIBULATKAN 20,281.00

PEKERJAAN KERAMIK

An. 1.0000 m 2Pasang ubin porselin

G.69.c 1.0000 m2Tegel porselin @ Rp. 40,500.00

4.6800 kg PC @ Rp. 764.00

0.0090 m3Pasir pasang @ Rp. 76,000.00

1.0000 kg Semen putih @ Rp. 1,312.50

0.5000 org Tukang batu @ Rp. 27,500.00 13,750.00

0.0500 org Kep. Tk. Batu @ Rp. 30,000.00 1,500.00

0.2500 org Pekerja @ Rp. 20,000.00 5,000.00

0.0125 org Mandor @ Rp. 32,500.00 406.25

JUMLAH ( BELUM PPN ) 20,656.25

JASA 10 % 2,065.63

JUMLAH 22,721.88

DIBULATKAN 22,721.00

AK 1.0000 m 2Pasang tegel keramik 20/20 dan 30/30

1.0000 m2Tegel keramik (std) @ Rp. 42,500.00

4.0800 kg PC @ Rp. 764.00

0.0090 m3Pasir pasang @ Rp. 76,000.00

0.6000 kg Semen putih @ Rp. 1,312.50

0.5000 org Tukang batu @ Rp. 27,500.00 13,750.00

0.0500 org Kep. Tk. Batu @ Rp. 30,000.00 1,500.00

0.2500 org Pekerja @ Rp. 20,000.00 5,000.00

0.0125 org Mandor @ Rp. 32,500.00 406.25

JUMLAH ( BELUM PPN ) 20,656.25

JASA 10 % 2,065.63

JUMLAH 22,721.88

DIBULATKAN 22,721.00

AK 1.0000 m 2Pasang tegel keramik 10/20 berglasir

1.0000 m2Tegel keramik 10/20 @ Rp. 30,000.00

4.0800 kg PC @ Rp. 764.00

0.0090 m3Pasir pasang @ Rp. 76,000.00

0.6000 kg Semen putih @ Rp. 1,312.50

0.5000 org Tukang batu @ Rp. 27,500.00 13,750.00

0.0500 org Kep. Tk. Batu @ Rp. 30,000.00 1,500.00

0.2500 org Pekerja @ Rp. 20,000.00 5,000.00

0.0125 org Mandor @ Rp. 32,500.00 406.25

JUMLAH ( BELUM PPN ) 20,656.25

JASA 10 % 2,065.63

JUMLAH 22,721.88

DIBULATKAN 22,721.00

Page 39: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

AK 1.0000 m 2Pasang tegel keramik 20/20 berglasir

1.0000 m2Tegel keramik 20/20 @ Rp. 32,000.00

4.0800 kg PC @ Rp. 764.00

0.0090 m3Pasir pasang @ Rp. 76,000.00

0.6000 kg Semen putih @ Rp. 1,312.50

0.5000 org Tukang batu @ Rp. 27,500.00 13,750.00

0.0500 org Kep. Tk. Batu @ Rp. 30,000.00 1,500.00

0.2500 org Pekerja @ Rp. 20,000.00 5,000.00

0.0125 org Mandor @ Rp. 32,500.00 406.25

JUMLAH ( BELUM PPN ) 20,656.25

JASA 10 % 2,065.63

JUMLAH 22,721.88

DIBULATKAN 22,721.00

AK 1.0000 m 2Pasang tegel keramik 30/30 berglasir

1.0000 m2Tegel keramik 30/30 @ Rp. 32,500.00

4.0800 kg PC @ Rp. 764.00

0.0090 m3Pasir pasang @ Rp. 76,000.00

0.6000 kg Semen putih @ Rp. 1,312.50

0.5000 org Tukang batu @ Rp. 27,500.00 13,750.00

0.0500 org Kep. Tk. Batu @ Rp. 30,000.00 1,500.00

0.2500 org Pekerja @ Rp. 20,000.00 5,000.00

0.0125 org Mandor @ Rp. 32,500.00 406.25

JUMLAH ( BELUM PPN ) 20,656.25

JASA 10 % 2,065.63

JUMLAH 22,721.88

DIBULATKAN 22,721.00

SNI 1.0000 m 1Pasang plint keramik ukuran 10 x 40 cm

6.24 0.2300 m2Keramik 40/40 @ Rp. 40,000.00

1.2000 kg PC @ Rp. 764.00

0.0030 m3Pasir pasang @ Rp. 76,000.00

0.1000 kg Semen warna @ Rp. 6,000.00

0.0300 org Tukang batu @ Rp. 27,500.00 825.00

0.0030 org Kepala tukang batu @ Rp. 30,000.00 90.00

0.0600 org Pekerja @ Rp. 20,000.00 1,200.00

0.0030 org Mandor @ Rp. 32,500.00 97.50

JUMLAH ( BELUM TERMASUK PPN ) 2,212.50

JASA 10 % 221.25

JUMLAH 2,433.75

DIBULATKAN 2,433.00

Page 40: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 1Pasang plint keramik ukuran 10 x 30 cm

6.25 0.1800 m2Keramik 30/30 @ Rp. 32,500.00

1.6500 kg PC @ Rp. 764.00

0.0032 m3Pasir pasang @ Rp. 76,000.00

0.1000 kg Semen warna @ Rp. 6,000.00

0.0300 org Tukang batu @ Rp. 27,500.00 825.00

0.0030 org Kepala tukang batu @ Rp. 30,000.00 90.00

0.0600 org Pekerja @ Rp. 20,000.00 1,200.00

0.0030 org Mandor @ Rp. 32,500.00 97.50

JUMLAH ( BELUM TERMASUK PPN ) 2,212.50

JASA 10 % 221.25

JUMLAH 2,433.75

DIBULATKAN 2,433.00

1.0000 m 1Pasang keramik stepnosing granito 5/30

3.6000 bh Stepnosing granito @ Rp. 9,350.00

0.4080 kg PC @ Rp. 764.00

0.0009 m3Pasir @ Rp. 76,000.00

0.0600 kg Semen putih @ Rp. 1,312.50

0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00

0.0100 org Kep. Tk. Batu @ Rp. 30,000.00 300.00

0.0500 org Pekerja @ Rp. 20,000.00 1,000.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 4,131.25

JASA 10 % 413.13

JUMLAH 4,544.38

DIBULATKAN 4,544.00

1.0000 m 1Pasang list keramik dinding 5/20

5.0000 bh List keramik dinding motif @ Rp. 5,000.00

0.4080 kg PC @ Rp. 764.00

0.0009 m3Pasir @ Rp. 76,000.00

0.0600 kg Semen putih @ Rp. 1,312.50

0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00

0.0100 org Kep. Tk. Batu @ Rp. 30,000.00 300.00

0.0500 org Pekerja @ Rp. 20,000.00 1,000.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 4,131.25

JASA 10 % 413.13

JUMLAH 4,544.38

DIBULATKAN 4,544.00

1.0000 m 2Pasang keramik dinding 20/25

1.0000 m2Tegel keramik 20/25 @ Rp. 37,500.00

9.3000 kg PC @ Rp. 764.00

0.0180 m3Pasir pasang @ Rp. 76,000.00

1.5000 kg Semen putih @ Rp. 1,312.50

0.6500 org Tukang batu @ Rp. 27,500.00 17,875.00

0.0650 org Kep. Tk. Batu @ Rp. 30,000.00 1,950.00

0.3200 org Pekerja @ Rp. 20,000.00 6,400.00

0.0160 org Mandor @ Rp. 32,500.00 520.00

JUMLAH ( BELUM PPN ) 26,745.00

JASA 10 % 2,674.50

JUMLAH 29,419.50

DIBULATKAN 29,419.00

Page 41: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

PEKERJAAN CONBLOCK

AK 1.0000 m 2Pasang conblock tipe segi-empat abu-abu 6 cm, K-200

1.0000 m2Conblock @ Rp. 38,250.00

0.0500 m3Pasir urug @ Rp. 55,000.00

0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00

0.0250 org Kep. Tk. Batu @ Rp. 30,000.00 750.00

0.5000 org Pekerja @ Rp. 20,000.00 10,000.00

0.0250 org Mandor @ Rp. 32,500.00 812.50

JUMLAH ( BELUM PPN ) 18,437.50

JASA 10 % 1,843.75

JUMLAH 20,281.25

DIBULATKAN 20,281.00

AK 1.0000 m 2Pasang conblock tipe segi-empat abu-abu 8 cm, K-200

1.0000 m2Conblock @ Rp. 46,700.00

0.0500 m3Pasir urug @ Rp. 55,000.00

0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00

0.0250 org Kep. Tk. Batu @ Rp. 30,000.00 750.00

0.5000 org Pekerja @ Rp. 20,000.00 10,000.00

0.0250 org Mandor @ Rp. 32,500.00 812.50

JUMLAH ( BELUM PPN ) 18,437.50

JASA 10 % 1,843.75

JUMLAH 20,281.25

DIBULATKAN 20,281.00

AK 1.0000 m 2Pasang conblock tipe segi-enam abu-abu 6 cm, K-200

1.0000 m2Conblock @ Rp. 38,100.00

0.0500 m3Pasir urug @ Rp. 55,000.00

0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00

0.0250 org Kep. Tk. Batu @ Rp. 30,000.00 750.00

0.5000 org Pekerja @ Rp. 20,000.00 10,000.00

0.0250 org Mandor @ Rp. 32,500.00 812.50

JUMLAH ( BELUM PPN ) 18,437.50

JASA 10 % 1,843.75

JUMLAH 20,281.25

DIBULATKAN 20,281.00

AK 1.0000 m 2Pasang conblock tipe segi-enam abu-abu 8 cm, K-200

1.0000 m2Conblock @ Rp. 46,700.00

0.0500 m3Pasir urug @ Rp. 55,000.00

0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00

0.0250 org Kep. Tk. Batu @ Rp. 30,000.00 750.00

0.5000 org Pekerja @ Rp. 20,000.00 10,000.00

0.0250 org Mandor @ Rp. 32,500.00 812.50

JUMLAH ( BELUM PPN ) 18,437.50

JASA 10 % 1,843.75

JUMLAH 20,281.25

DIBULATKAN 20,281.00

Page 42: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

AK 1.0000 m 2Pasang conblock tipe segi-empat warna 6 cm, K-200

1.0000 m2Conblock @ Rp. 43,500.00

0.0500 m3Pasir urug @ Rp. 55,000.00

0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00

0.0250 org Kep. Tk. Batu @ Rp. 30,000.00 750.00

0.5000 org Pekerja @ Rp. 20,000.00 10,000.00

0.0250 org Mandor @ Rp. 32,500.00 812.50

JUMLAH ( BELUM PPN ) 18,437.50

JASA 10 % 1,843.75

JUMLAH 20,281.25

DIBULATKAN 20,281.00

AK 1.0000 m 2Pasang conblock tipe segi-empat warna 8 cm, K-200

1.0000 m2Conblock @ Rp. 52,000.00

0.0500 m3Pasir urug @ Rp. 55,000.00

0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00

0.0250 org Kep. Tk. Batu @ Rp. 30,000.00 750.00

0.5000 org Pekerja @ Rp. 20,000.00 10,000.00

0.0250 org Mandor @ Rp. 32,500.00 812.50

JUMLAH ( BELUM PPN ) 18,437.50

JASA 10 % 1,843.75

JUMLAH 20,281.25

DIBULATKAN 20,281.00

AK 1.0000 m 2Pasang conblock tipe segi-enam warna 6 cm, K-200

1.0000 m2Conblock @ Rp. 43,500.00

0.0500 m3Pasir urug @ Rp. 55,000.00

0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00

0.0250 org Kep. Tk. Batu @ Rp. 30,000.00 750.00

0.5000 org Pekerja @ Rp. 20,000.00 10,000.00

0.0250 org Mandor @ Rp. 32,500.00 812.50

JUMLAH ( BELUM PPN ) 18,437.50

JASA 10 % 1,843.75

JUMLAH 20,281.25

DIBULATKAN 20,281.00

AK 1.0000 m 2Pasang conblock tipe segi-enam warna 8 cm, K-200

1.0000 m2Conblock @ Rp. 52,000.00

0.0500 m3Pasir urug @ Rp. 55,000.00

0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00

0.0250 org Kep. Tk. Batu @ Rp. 30,000.00 750.00

0.5000 org Pekerja @ Rp. 20,000.00 10,000.00

0.0250 org Mandor @ Rp. 32,500.00 812.50

JUMLAH ( BELUM PPN ) 18,437.50

JASA 10 % 1,843.75

JUMLAH 20,281.25

DIBULATKAN 20,281.00

1.0000 m 2Pasang grassblock bulat tebal 10 cm

1.0000 m2Grassblock @ Rp. 41,400.00

0.0500 m3Pasir urug @ Rp. 55,000.00

0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00

0.0250 org Kep. Tk. Batu @ Rp. 30,000.00 750.00

0.5000 org Pekerja @ Rp. 20,000.00 10,000.00

0.0250 org Mandor @ Rp. 32,500.00 812.50

JUMLAH ( BELUM PPN ) 18,437.50

JASA 10 % 1,843.75

JUMLAH 20,281.25

DIBULATKAN 20,281.00

Page 43: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

1.0000 m 2Pasang grassblock tebal 10 cm

1.0000 m2Grassblock @ Rp. 41,400.00

0.0500 m3Pasir urug @ Rp. 55,000.00

0.2500 org Tukang batu @ Rp. 27,500.00 6,875.00

0.0250 org Kep. Tk. Batu @ Rp. 30,000.00 750.00

0.5000 org Pekerja @ Rp. 20,000.00 10,000.00

0.0250 org Mandor @ Rp. 32,500.00 812.50

JUMLAH ( BELUM PPN ) 18,437.50

JASA 10 % 1,843.75

JUMLAH 20,281.25

DIBULATKAN 20,281.00

AK 1.0000 bh Pasang buis beton dia. 80 cm

1.0000 bh Buis beton @ Rp. 32,000.00

0.1250 org Tukang batu @ Rp. 27,500.00 3,437.50

0.0125 org Kep. Tk. Batu @ Rp. 30,000.00 375.00

0.2500 org Pekerja @ Rp. 20,000.00 5,000.00

JUMLAH ( BELUM PPN ) 8,812.50

JASA 10 % 881.25

JUMLAH 9,693.75

DIBULATKAN 9,693.00

PEKERJAAN RANGKA ATAP

SNI 1.0000 m 3Membuat kuda-kuda kayu kamper

6.28 1.1000 m3Kayu kamper @ Rp. 4,750,000.00

03-3434-2002 15.0000 kg Besi strip @ Rp. 7,500.00

0.8000 kg Paku biasa 2" - 5" @ Rp. 8,000.00

12.0000 org Tukang kayu @ Rp. 30,000.00 360,000.00

1.2000 org Kepala tukang kayu @ Rp. 32,500.00 39,000.00

4.0000 org Pekerja @ Rp. 20,000.00 80,000.00

0.2000 org Mandor @ Rp. 32,500.00 6,500.00

JUMLAH ( BELUM PPN ) 485,500.00

JASA 10 % 48,550.00

JUMLAH 534,050.00

DIBULATKAN 534,050.00

SNI 1.0000 m 3Membuat kuda-kuda kayu kruing

6.30 1.1000 m3Kayu kruing @ Rp. 4,350,000.00

03-3434-2002 15.0000 kg Besi strip @ Rp. 7,500.00

0.8000 kg Paku biasa 2" - 5" @ Rp. 8,000.00

12.0000 org Tukang kayu @ Rp. 30,000.00 360,000.00

1.2000 org Kepala tukang kayu @ Rp. 32,500.00 39,000.00

4.0000 org Pekerja @ Rp. 20,000.00 80,000.00

0.2000 org Mandor @ Rp. 32,500.00 6,500.00

JUMLAH ( BELUM PPN ) 485,500.00

JASA 10 % 48,550.00

JUMLAH 534,050.00

DIBULATKAN 534,050.00

SNI 1.0000 m 3Membuat kuda-kuda kayu bengkirai

1.1000 m3Kayu bengkirai @ Rp. 5,750,000.00

03-3434-2002 15.0000 kg Besi strip @ Rp. 7,500.00

0.8000 kg Paku biasa 2" - 5" @ Rp. 8,000.00

12.0000 org Tukang kayu @ Rp. 30,000.00 360,000.00

1.2000 org Kepala tukang kayu @ Rp. 32,500.00 39,000.00

4.0000 org Pekerja @ Rp. 20,000.00 80,000.00

0.2000 org Mandor @ Rp. 32,500.00 6,500.00

JUMLAH ( BELUM PPN ) 485,500.00

JASA 10 % 48,550.00

JUMLAH 534,050.00

DIBULATKAN 534,050.00

Page 44: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 3Pasang kuda-kuda kayu lama

03-3434-2002 15.0000 kg Besi strip @ Rp. 7,500.00

0.8000 kg Paku biasa 2" - 5" @ Rp. 8,000.00

12.0000 org Tukang kayu @ Rp. 30,000.00 360,000.00

1.2000 org Kepala tukang kayu @ Rp. 32,500.00 39,000.00

4.0000 org Pekerja @ Rp. 20,000.00 80,000.00

0.2000 org Mandor @ Rp. 32,500.00 6,500.00

JUMLAH ( BELUM PPN ) 485,500.00

JASA 10 % 48,550.00

JUMLAH 534,050.00

DIBULATKAN 534,050.00

SNI 1.0000 m 3Pasang Nook,Goording dan Jurai kayu bengkirai

1.1000 m3Kayu bengkirai @ Rp. 5,750,000.00

0.8000 kg Paku biasa 2" - 5" @ Rp. 8,000.00

12.0000 org Tukang kayu @ Rp. 30,000.00 360,000.00

1.2000 org Kepala tukang kayu @ Rp. 32,500.00 39,000.00

4.0000 org Pekerja @ Rp. 20,000.00 80,000.00

0.2000 org Mandor @ Rp. 32,500.00 6,500.00

JUMLAH ( BELUM PPN ) 485,500.00

JASA 10 % 48,550.00

JUMLAH 534,050.00

DIBULATKAN 534,050.00

SNI 1.0000 m 3Pasang Goording Lama

0.8000 kg Paku biasa 2" - 5" @ Rp. 8,000.00

12.0000 org Tukang kayu @ Rp. 30,000.00 360,000.00

1.2000 org Kepala tukang kayu @ Rp. 32,500.00 39,000.00

4.0000 org Pekerja @ Rp. 20,000.00 80,000.00

0.2000 org Mandor @ Rp. 32,500.00 6,500.00

JUMLAH ( BELUM PPN ) 485,500.00

JASA 10 % 48,550.00

JUMLAH 534,050.00

DIBULATKAN 534,050.00

F.16 1.0000 m 2Pasang usuk 5/7, reng 2/3 lama

0.1500 kg Paku usuk @ Rp. 8,000.00

0.1000 kg Paku reng @ Rp. 8,000.00

0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00

0.0100 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 5,406.25

JASA 10 % 540.63

JUMLAH 5,946.88

DIBULATKAN 5,946.00

F.16 1.0000 m 2Pasang usuk 5/7, reng 2/3 kayu jati

2.2000 m1Usuk kayu jati 5/7 @ Rp. 70,000.00

5.0000 m1Reng jati 2/3 @ Rp. 12,000.00

0.1500 kg Paku usuk @ Rp. 8,000.00

0.1000 kg Paku reng @ Rp. 8,000.00

0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00

0.0100 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 5,406.25

JASA 10 % 540.63

JUMLAH 5,946.88

DIBULATKAN 5,946.00

Page 45: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

AK 1.0000 m 2Pasang usuk 5/7 kayu jati, reng 2/3 kayu bengkirai

2.2000 m1Usuk kayu jati 5/7 @ Rp. 70,000.00

5.0000 m1Reng kayu bengkirai 2/3 @ Rp. 3,450.00

0.1500 kg Paku usuk @ Rp. 8,000.00

0.1000 kg Paku reng @ Rp. 8,000.00

0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00

0.0100 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 5,406.25

JASA 10 % 540.63

JUMLAH 5,946.88

DIBULATKAN 5,946.00

AK 1.0000 m 2Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu jati

2.2000 m1Usuk kayu bengkirai 5/7 @ Rp. 20,125.00

5.0000 m1Reng jati 2/3 @ Rp. 12,000.00

0.1500 kg Paku usuk @ Rp. 8,000.00

0.1000 kg Paku reng @ Rp. 8,000.00

0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00

0.0100 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 5,406.25

JASA 10 % 540.63

JUMLAH 5,946.88

DIBULATKAN 5,946.00

AK 1.0000 m 2Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu bengkirai

2.2000 m1Usuk kayu bengkirai 5/7 @ Rp. 20,125.00

5.0000 m1Reng kayu bengkirai 2/3 @ Rp. 3,450.00

0.1500 kg Paku usuk @ Rp. 8,000.00

0.1000 kg Paku reng @ Rp. 8,000.00

0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00

0.0100 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 5,406.25

JASA 10 % 540.63

JUMLAH 5,946.88

DIBULATKAN 5,946.00

Page 46: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

F.16 1.0000 m 2Pasang usuk 5/7, reng 3/4 kayu jati

2.2000 m1Usuk kayu jati 5/7 @ Rp. 70,000.00

4.0000 m1Reng jati 3/4 @ Rp. 24,000.00

0.1500 kg Paku usuk @ Rp. 8,000.00

0.1000 kg Paku reng @ Rp. 8,000.00

0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00

0.0100 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 5,406.25

JASA 10 % 540.63

JUMLAH 5,946.88

DIBULATKAN 5,946.00

AK 1.0000 m 2Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu jati lokal

2.2000 m1Usuk kayu bengkirai 5/7 @ Rp. 20,125.00

4.0000 m1Reng kayu jati 3/4 lokal @ Rp. 9,600.00

0.1500 kg Paku usuk @ Rp. 8,000.00

0.1000 kg Paku reng @ Rp. 8,000.00

0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00

0.0100 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 5,406.25

JASA 10 % 540.63

JUMLAH 5,946.88

DIBULATKAN 5,946.00

AK 1.0000 m 2Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu bengkirai

2.2000 m1Usuk kayu bengkirai 5/7 @ Rp. 20,125.00

4.0000 m1Reng kayu bengkirai 3/4 @ Rp. 6,900.00

0.1500 kg Paku usuk @ Rp. 8,000.00

0.1000 kg Paku reng @ Rp. 8,000.00

0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00

0.0100 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 5,406.25

JASA 10 % 540.63

JUMLAH 5,946.88

DIBULATKAN 5,946.00

PEKERJAAN PINTU DAN JENDELA

SNI 1.0000 m 3Membuat kusen pintu / jendela kayu jati (klas plitur)

6.1 1.1000 m3Kayu jati (klas plitur) @ Rp. 20,000,000.00

03-3434-2002 20.0000 org Tukang kayu @ Rp. 30,000.00 600,000.00

2.0000 org Kepala tukang kayu @ Rp. 32,500.00 65,000.00

6.0000 org Pekerja @ Rp. 20,000.00 120,000.00

0.3000 org Mandor @ Rp. 32,500.00 9,750.00

JUMLAH ( BELUM PPN ) 794,750.00

JASA 10 % 79,475.00

JUMLAH 874,225.00

DIBULATKAN 874,225.00

SNI 1.0000 m 3Membuat kusen pintu / jendela kayu jati (lokal)

6.1 1.1000 m3Kayu jati (lokal) @ Rp. 8,000,000.00

03-3434-2002 20.0000 org Tukang kayu @ Rp. 30,000.00 600,000.00

2.0000 org Kepala tukang kayu @ Rp. 32,500.00 65,000.00

6.0000 org Pekerja @ Rp. 20,000.00 120,000.00

0.3000 org Mandor @ Rp. 32,500.00 9,750.00

JUMLAH ( BELUM PPN ) 794,750.00

JASA 10 % 79,475.00

JUMLAH 874,225.00

Page 47: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

DIBULATKAN 874,225.00

Page 48: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 3Membuat kusen pintu / jendela kayu kamper

6.2 1.2000 m3Kayu kamper @ Rp. 4,750,000.00

03-3434-2002 18.0000 org Tukang kayu @ Rp. 30,000.00 540,000.00

2.0000 org Kepala tukang kayu @ Rp. 32,500.00 65,000.00

6.0000 org Pekerja @ Rp. 20,000.00 120,000.00

0.3000 org Mandor @ Rp. 32,500.00 9,750.00

JUMLAH ( BELUM PPN ) 734,750.00

JASA 10 % 73,475.00

JUMLAH 808,225.00

DIBULATKAN 808,225.00

SNI 1.0000 m 3Membuat kusen pintu / jendela kayu kruing

1.2000 m3Kayu kruing @ Rp. 4,350,000.00

03-3434-2002 18.0000 org Tukang kayu @ Rp. 30,000.00 540,000.00

2.0000 org Kepala tukang kayu @ Rp. 32,500.00 65,000.00

6.0000 org Pekerja @ Rp. 20,000.00 120,000.00

0.3000 org Mandor @ Rp. 32,500.00 9,750.00

JUMLAH ( BELUM PPN ) 734,750.00

JASA 10 % 73,475.00

JUMLAH 808,225.00

DIBULATKAN 808,225.00

SNI 1.0000 m 3Membuat kusen pintu / jendela kayu bengkirai

1.2000 m3Kayu bengkirai @ Rp. 5,750,000.00

03-3434-2002 18.0000 org Tukang kayu @ Rp. 30,000.00 540,000.00

2.0000 org Kepala tukang kayu @ Rp. 32,500.00 65,000.00

6.0000 org Pekerja @ Rp. 20,000.00 120,000.00

0.3000 org Mandor @ Rp. 32,500.00 9,750.00

JUMLAH ( BELUM PPN ) 734,750.00

JASA 10 % 73,475.00

JUMLAH 808,225.00

DIBULATKAN 808,225.00

SNI 1.0000 m 2Pasang pintu teakwood rangkap, rangka kayu jati

6.19 0.0196 m3Papan kayu jati @ Rp. 22,000,000.00

03-3434-2002 0.0300 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00

0.3000 kg Lem kayu @ Rp. 11,000.00

1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00

2.0000 org Tukang kayu @ Rp. 30,000.00 60,000.00

0.2000 org Kepala tukang kayu @ Rp. 32,500.00 6,500.00

0.6000 org Pekerja @ Rp. 20,000.00 12,000.00

0.0300 org Mandor @ Rp. 32,500.00 975.00

JUMLAH ( BELUM PPN ) 79,475.00

JASA 10 % 7,947.50

JUMLAH 87,422.50

DIBULATKAN 87,422.00

SNI 1.0000 m 2Pasang pintu teakwood rangkap, rangka kayu jati lokal

6.19 0.0196 m3Papan kayu jati lokal @ Rp. 8,200,000.00

03-3434-2002 0.0300 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00

0.3000 kg Lem kayu @ Rp. 11,000.00

1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00

2.0000 org Tukang kayu @ Rp. 30,000.00 60,000.00

0.2000 org Kepala tukang kayu @ Rp. 32,500.00 6,500.00

0.6000 org Pekerja @ Rp. 20,000.00 12,000.00

0.0300 org Mandor @ Rp. 32,500.00 975.00

JUMLAH ( BELUM PPN ) 79,475.00

JASA 10 % 7,947.50

JUMLAH 87,422.50

DIBULATKAN 87,422.00

Page 49: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 2Pasang pintu teakwood rangkap, rangka kayu kamper

6.20 0.0196 m3Papan kayu kamper @ Rp. 5,500,000.00

03-3434-2002 0.0300 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00

0.3000 kg Lem kayu @ Rp. 11,000.00

1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00

2.0000 org Tukang kayu @ Rp. 30,000.00 60,000.00

0.2000 org Kepala tukang kayu @ Rp. 32,500.00 6,500.00

0.6000 org Pekerja @ Rp. 20,000.00 12,000.00

0.0300 org Mandor @ Rp. 32,500.00 975.00

JUMLAH ( BELUM PPN ) 79,475.00

JASA 10 % 7,947.50

JUMLAH 87,422.50

DIBULATKAN 87,422.00

SNI 1.0000 m 2Pasang pintu teakwood rangkap, rangka kayu kruing

0.0196 m3Papan kayu kruing @ Rp. 4,750,000.00

03-3434-2002 0.0300 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00

0.3000 kg Lem kayu @ Rp. 11,000.00

1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00

2.0000 org Tukang kayu @ Rp. 30,000.00 60,000.00

0.2000 org Kepala tukang kayu @ Rp. 32,500.00 6,500.00

0.6000 org Pekerja @ Rp. 20,000.00 12,000.00

0.0300 org Mandor @ Rp. 32,500.00 975.00

JUMLAH ( BELUM PPN ) 79,475.00

JASA 10 % 7,947.50

JUMLAH 87,422.50

DIBULATKAN 87,422.00

SNI 1.0000 m 2Pasang pintu teakwood rangkap, rangka kayu bengkirai

0.0196 m3Papan kayu bengkirai @ Rp. 6,000,000.00

03-3434-2002 0.0300 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00

0.3000 kg Lem kayu @ Rp. 11,000.00

1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00

2.0000 org Tukang kayu @ Rp. 30,000.00 60,000.00

0.2000 org Kepala tukang kayu @ Rp. 32,500.00 6,500.00

0.6000 org Pekerja @ Rp. 20,000.00 12,000.00

0.0300 org Mandor @ Rp. 32,500.00 975.00

JUMLAH ( BELUM PPN ) 79,475.00

JASA 10 % 7,947.50

JUMLAH 87,422.50

DIBULATKAN 87,422.00

SNI 1.0000 m 2Pasang pintu dan jendela kaca kayu jati

6.9 0.0350 m3Kayu jati papan @ Rp. 22,000,000.00

03-3434-2002 2.0000 org Tukang kayu @ Rp. 30,000.00 60,000.00

0.2000 org Kepala tukang kayu @ Rp. 32,500.00 6,500.00

0.8000 org Pekerja @ Rp. 20,000.00 16,000.00

0.0400 org Mandor @ Rp. 32,500.00 1,300.00

JUMLAH ( BELUM PPN ) 83,800.00

JASA 10 % 8,380.00

JUMLAH 92,180.00

DIBULATKAN 92,180.00

SNI 1.0000 m 2Pasang pintu dan jendela kaca kayu jati lokal

6.9 0.0350 m3Papan kayu jati lokal @ Rp. 8,200,000.00

03-3434-2002 2.0000 org Tukang kayu @ Rp. 30,000.00 60,000.00

0.2000 org Kepala tukang kayu @ Rp. 32,500.00 6,500.00

0.8000 org Pekerja @ Rp. 20,000.00 16,000.00

0.0400 org Mandor @ Rp. 32,500.00 1,300.00

JUMLAH ( BELUM PPN ) 83,800.00

JASA 10 % 8,380.00

JUMLAH 92,180.00

DIBULATKAN 92,180.00

Page 50: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 2Pasang pintu dan jendela kaca kayu kamper

610 0.0350 m3Papan kayu kamper @ Rp. 5,500,000.00

03-3434-2002 2.0000 org Tukang kayu @ Rp. 30,000.00 60,000.00

0.2000 org Kep. Tk. Kayu @ Rp. 32,500.00 6,500.00

0.8000 org Pekerja @ Rp. 20,000.00 16,000.00

0.0400 org Mandor @ Rp. 32,500.00 1,300.00

JUMLAH ( BELUM PPN ) 83,800.00

JASA 10 % 8,380.00

JUMLAH 92,180.00

DIBULATKAN 92,180.00

SNI 1.0000 m 2Pasang pintu dan jendela kaca kayu kruing

0.0350 m3Papan kayu kruing @ Rp. 4,750,000.00

03-3434-2002 2.0000 org Tukang kayu @ Rp. 30,000.00 60,000.00

0.2000 org Kep. Tk. Kayu @ Rp. 32,500.00 6,500.00

0.8000 org Pekerja @ Rp. 20,000.00 16,000.00

0.0400 org Mandor @ Rp. 32,500.00 1,300.00

JUMLAH ( BELUM PPN ) 83,800.00

JASA 10 % 8,380.00

JUMLAH 92,180.00

DIBULATKAN 92,180.00

SNI 1.0000 m 2Pasang pintu dan jendela kaca kayu bengkirai

0.0350 m3Papan kayu bengkirai @ Rp. 6,000,000.00

03-3434-2002 2.0000 org Tukang kayu @ Rp. 30,000.00 60,000.00

0.2000 org Kep. Tk. Kayu @ Rp. 32,500.00 6,500.00

0.8000 org Pekerja @ Rp. 20,000.00 16,000.00

0.0400 org Mandor @ Rp. 32,500.00 1,300.00

JUMLAH ( BELUM PPN ) 83,800.00

JASA 10 % 8,380.00

JUMLAH 92,180.00

DIBULATKAN 92,180.00

SNI 1.0000 m 2Mengerjakan daun pintu / jendela panil kayu jati

6.7 0.0400 m3Kayu jati papan @ Rp. 22,000,000.00

03-3434-2002 2.5000 org Tukang kayu @ Rp. 30,000.00 75,000.00

0.2500 org Kepala tukang kayu @ Rp. 32,500.00 8,125.00

1.0000 org Pekerja @ Rp. 20,000.00 20,000.00

0.0500 org Mandor @ Rp. 32,500.00 1,625.00

JUMLAH ( BELUM PPN ) 104,750.00

JASA 10 % 10,475.00

JUMLAH 115,225.00

DIBULATKAN 115,225.00

SNI 1.0000 m 2Mengerjakan daun pintu / jendela panil kayu jati lokal

6.7 0.0400 m3Kayu jati papan lokal @ Rp. 8,200,000.00

03-3434-2002 2.5000 org Tukang kayu @ Rp. 30,000.00 75,000.00

0.2500 org Kepala tukang kayu @ Rp. 32,500.00 8,125.00

1.0000 org Pekerja @ Rp. 20,000.00 20,000.00

0.0500 org Mandor @ Rp. 32,500.00 1,625.00

JUMLAH ( BELUM PPN ) 104,750.00

JASA 10 % 10,475.00

JUMLAH 115,225.00

DIBULATKAN 115,225.00

SNI 1.0000 m 2Mengerjakan daun pintu / jendela panil kayu kamper

6.8 0.0400 m3Kayu kamper papan @ Rp. 5,500,000.00

03-3434-2002 2.5000 org Tukang kayu @ Rp. 30,000.00 75,000.00

0.2500 org Kepala tukang kayu @ Rp. 32,500.00 8,125.00

1.0000 org Pekerja @ Rp. 20,000.00 20,000.00

0.0500 org Mandor @ Rp. 32,500.00 1,625.00

JUMLAH ( BELUM PPN ) 104,750.00

JASA 10 % 10,475.00

Page 51: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

JUMLAH 115,225.00

DIBULATKAN 115,225.00

Page 52: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 2Mengerjakan daun pintu / jendela panil kayu kruing

0.0400 m3Kayu kruing papan @ Rp. 4,750,000.00

03-3434-2002 2.5000 org Tukang kayu @ Rp. 30,000.00 75,000.00

0.2500 org Kepala tukang kayu @ Rp. 32,500.00 8,125.00

1.0000 org Pekerja @ Rp. 20,000.00 20,000.00

0.0500 org Mandor @ Rp. 32,500.00 1,625.00

JUMLAH ( BELUM PPN ) 104,750.00

JASA 10 % 10,475.00

JUMLAH 115,225.00

DIBULATKAN 115,225.00

SNI 1.0000 m 2Mengerjakan daun pintu / jendela panil kayu bengkirai

0.0400 m3Kayu bengkirai papan @ Rp. 6,000,000.00

03-3434-2002 2.5000 org Tukang kayu @ Rp. 30,000.00 75,000.00

0.2500 org Kepala tukang kayu @ Rp. 32,500.00 8,125.00

1.0000 org Pekerja @ Rp. 20,000.00 20,000.00

0.0500 org Mandor @ Rp. 32,500.00 1,625.00

JUMLAH ( BELUM PPN ) 104,750.00

JASA 10 % 10,475.00

JUMLAH 115,225.00

DIBULATKAN 115,225.00

SNI 1.0000 m 2Pasang pintu dan jendela jalusi kayu jati

6.12 0.0640 m3Kayu jati papan @ Rp. 22,000,000.00

03-3434-2002 3.0000 org Tukang kayu @ Rp. 30,000.00 90,000.00

0.3000 org Kepala tukang kayu @ Rp. 32,500.00 9,750.00

1.0000 org Pekerja @ Rp. 20,000.00 20,000.00

0.3000 org Mandor @ Rp. 32,500.00 9,750.00

JUMLAH ( BELUM PPN ) 129,500.00

JASA 10 % 12,950.00

JUMLAH 142,450.00

DIBULATKAN 142,450.00

SNI 1.0000 m 2Pasang pintu dan jendela jalusi kayu jati

6.12 0.0640 m3Kayu jati papan lokal @ Rp. 8,200,000.00

03-3434-2002 3.0000 org Tukang kayu @ Rp. 30,000.00 90,000.00

0.3000 org Kepala tukang kayu @ Rp. 32,500.00 9,750.00

1.0000 org Pekerja @ Rp. 20,000.00 20,000.00

0.3000 org Mandor @ Rp. 32,500.00 9,750.00

JUMLAH ( BELUM PPN ) 129,500.00

JASA 10 % 12,950.00

JUMLAH 142,450.00

DIBULATKAN 142,450.00

SNI 1.0000 m 2Pasang pintu dan jendela jalusi kayu kamper

6.13 0.0640 m3Kayu kamper papan @ Rp. 5,500,000.00

03-3434-2002 3.0000 org Tukang kayu @ Rp. 30,000.00 90,000.00

0.3000 org Kepala tukang kayu @ Rp. 32,500.00 9,750.00

1.0000 org Pekerja @ Rp. 20,000.00 20,000.00

0.0500 org Mandor @ Rp. 32,500.00 1,625.00

JUMLAH ( BELUM PPN ) 121,375.00

JASA 10 % 12,137.50

JUMLAH 133,512.50

DIBULATKAN 133,512.00

SNI 1.0000 m 2Pasang pintu dan jendela jalusi kayu kruing

0.0640 m3Kayu kruing papan @ Rp. 4,750,000.00

03-3434-2002 3.0000 org Tukang kayu @ Rp. 30,000.00 90,000.00

0.3000 org Kepala tukang kayu @ Rp. 32,500.00 9,750.00

1.0000 org Pekerja @ Rp. 20,000.00 20,000.00

0.0500 org Mandor @ Rp. 32,500.00 1,625.00

JUMLAH ( BELUM PPN ) 121,375.00

JASA 10 % 12,137.50

Page 53: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

JUMLAH 133,512.50

DIBULATKAN 133,512.00

Page 54: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 2Pasang pintu dan jendela jalusi kayu bengkirai

0.0640 m3Kayu bengkirai papan @ Rp. 6,000,000.00

03-3434-2002 3.0000 org Tukang kayu @ Rp. 30,000.00 90,000.00

0.3000 org Kepala tukang kayu @ Rp. 32,500.00 9,750.00

1.0000 org Pekerja @ Rp. 20,000.00 20,000.00

0.0500 org Mandor @ Rp. 32,500.00 1,625.00

JUMLAH ( BELUM PPN ) 121,375.00

JASA 10 % 12,137.50

JUMLAH 133,512.50

DIBULATKAN 133,512.00

PEKERJAAN PLAFOND

SNI 1.0000 m 2Pasang rangka langit-langit (1,00 x 1,00) m, kayu lama

03-3434-2002 0.1000 kg Paku biasa 2" - 5" @ Rp. 8,000.00

0.2500 org Tukang kayu @ Rp. 30,000.00 7,500.00

0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50

0.1500 org Pekerja @ Rp. 20,000.00 3,000.00

0.0075 org Mandor @ Rp. 32,500.00 243.75

JUMLAH ( BELUM PPN ) 11,556.25

JASA 10 % 1,155.63

JUMLAH 12,711.88

DIBULATKAN 12,711.00

SNI 1.0000 m 2Pasang rangka langit-langit (1,00 x 1,00) m, kayu kamper

6.39 0.0120 m3Kayu kamper balok @ Rp. 4,750,000.00

03-3434-2002 0.1000 kg Paku biasa 2" - 5" @ Rp. 8,000.00

0.2500 org Tukang kayu @ Rp. 30,000.00 7,500.00

0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50

0.1500 org Pekerja @ Rp. 20,000.00 3,000.00

0.0075 org Mandor @ Rp. 32,500.00 243.75

JUMLAH ( BELUM PPN ) 11,556.25

JASA 10 % 1,155.63

JUMLAH 12,711.88

DIBULATKAN 12,711.00

SNI 1.0000 m 2Pasang rangka langit-langit (1,00 x 1,00) m, kayu kruing

0.0120 m3Kayu kruing @ Rp. 4,350,000.00

03-3434-2002 0.1000 kg Paku biasa 2" - 5" @ Rp. 8,000.00

0.2500 org Tukang kayu @ Rp. 30,000.00 7,500.00

0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50

0.1500 org Pekerja @ Rp. 20,000.00 3,000.00

0.0075 org Mandor @ Rp. 32,500.00 243.75

JUMLAH ( BELUM PPN ) 11,556.25

JASA 10 % 1,155.63

JUMLAH 12,711.88

DIBULATKAN 12,711.00

SNI 1.0000 m 2Pasang rangka langit-langit (1,00 x 1,00) m, kayu bengkirai

0.0120 m3Kayu bengkirai @ Rp. 5,750,000.00

03-3434-2002 0.1000 kg Paku biasa 2" - 5" @ Rp. 8,000.00

0.2500 org Tukang kayu @ Rp. 30,000.00 7,500.00

0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50

0.1500 org Pekerja @ Rp. 20,000.00 3,000.00

0.0075 org Mandor @ Rp. 32,500.00 243.75

JUMLAH ( BELUM PPN ) 11,556.25

JASA 10 % 1,155.63

JUMLAH 12,711.88

DIBULATKAN 12,711.00

1.0000 m 2Pasang rangka langit-langit (60 x 120) m, kayu kamper

0.0130 m3Kayu kamper @ Rp. 4,750,000.00

Page 55: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

0.1200 kg Paku @ Rp. 8,000.00

0.2700 org Tukang kayu @ Rp. 30,000.00 8,100.00

0.0270 org Kepala tukang kayu @ Rp. 32,500.00 877.50

0.1700 org Pekerja @ Rp. 20,000.00 3,400.00

0.0085 org Mandor @ Rp. 32,500.00 276.25

JUMLAH ( BELUM PPN ) 12,653.75

JASA 10 % 1,265.38

JUMLAH 13,919.13

DIBULATKAN 13,919.00

Page 56: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

1.0000 m 2Pasang rangka langit-langit (60 x 120) m, kayu kruing

0.0130 m3Kayu kruing @ Rp. 4,350,000.00

0.1200 kg Paku @ Rp. 8,000.00

0.2700 org Tukang kayu @ Rp. 30,000.00 8,100.00

0.0270 org Kepala tukang kayu @ Rp. 32,500.00 877.50

0.1700 org Pekerja @ Rp. 20,000.00 3,400.00

0.0085 org Mandor @ Rp. 32,500.00 276.25

JUMLAH ( BELUM PPN ) 12,653.75

JASA 10 % 1,265.38

JUMLAH 13,919.13

DIBULATKAN 13,919.00

1.0000 m 2Pasang rangka langit-langit (60 x 120) m, kayu bengkirai

0.0130 m3Kayu bengkirai @ Rp. 5,750,000.00

0.1200 kg Paku @ Rp. 8,000.00

0.2700 org Tukang kayu @ Rp. 30,000.00 8,100.00

0.0270 org Kep. Tk. Kayu @ Rp. 32,500.00 877.50

0.1700 org Pekerja @ Rp. 20,000.00 3,400.00

0.0085 org Mandor @ Rp. 32,500.00 276.25

JUMLAH ( BELUM PPN ) 12,653.75

JASA 10 % 1,265.38

JUMLAH 13,919.13

DIBULATKAN 13,919.00

SNI 1.0000 m 2Langit-langit asbes (1,00 x 1,00) m tanpa plepet

6.1 1.1000 lbr Pelat asbes @ Rp. 10,000.00

03-2838-2002 0.0100 kg Paku eternit @ Rp. 11,500.00

0.0700 org Tukang kayu @ Rp. 30,000.00 2,100.00

0.0070 org Kepala tukang kayu @ Rp. 32,500.00 227.50

0.0300 org Pekerja @ Rp. 20,000.00 600.00

0.0015 org Mandor @ Rp. 32,500.00 48.75

JUMLAH ( BELUM PPN ) 2,976.25

JASA 10 % 297.63

JUMLAH 3,273.88

DIBULATKAN 3,273.00

1.0000 m 2Langit-langit asbes (1,00 x 1,00) m memakai plepet

1.1000 lbr Pelat asbes @ Rp. 10,000.00

2.6000 m1Plepet kayu @ Rp. 2,000.00

0.0100 kg Paku eternit @ Rp. 11,500.00

0.0100 kg Paku plepet @ Rp. 10,000.00

0.0700 org Tukang kayu @ Rp. 30,000.00 2,100.00

0.0070 org Kepala tukang kayu @ Rp. 32,500.00 227.50

0.0300 org Pekerja @ Rp. 20,000.00 600.00

0.0015 org Mandor @ Rp. 32,500.00 48.75

JUMLAH ( BELUM PPN ) 2,976.25

JASA 10 % 297.63

JUMLAH 3,273.88

DIBULATKAN 3,273.00

SNI 1.0000 m 2Langit2 asbes (1,00 x 1,00) m, rangka kamper tanpa plepet

0.0120 m3Kayu kamper balok @ Rp. 4,750,000.00

03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00

1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00

0.3200 org Tukang kayu @ Rp. 30,000.00 9,600.00

0.0320 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00

0.1800 org Pekerja @ Rp. 20,000.00 3,600.00

0.0090 org Mandor @ Rp. 32,500.00 292.50

JUMLAH ( BELUM PPN ) 14,532.50

JASA 10 % 1,453.25

JUMLAH 15,985.75

DIBULATKAN 15,985.00

Page 57: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 2Langit2 asbes (1,00 x 1,00) m, rangka kruing tanpa plepet

0.0120 m3Kayu kruing balok @ Rp. 4,350,000.00

03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00

1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00

0.3200 org Tukang kayu @ Rp. 30,000.00 9,600.00

0.0320 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00

0.1800 org Pekerja @ Rp. 20,000.00 3,600.00

0.0090 org Mandor @ Rp. 32,500.00 292.50

JUMLAH ( BELUM PPN ) 14,532.50

JASA 10 % 1,453.25

JUMLAH 15,985.75

DIBULATKAN 15,985.00

SNI 1.0000 m 2Langit2 asbes (1,00 x 1,00) m, rangka bengkirai tanpa plepet

0.0120 m3Kayu bengkirai balok @ Rp. 5,750,000.00

03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00

1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00

0.3200 org Tukang kayu @ Rp. 30,000.00 9,600.00

0.0320 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00

0.1800 org Pekerja @ Rp. 20,000.00 3,600.00

0.0090 org Mandor @ Rp. 32,500.00 292.50

JUMLAH ( BELUM PPN ) 14,532.50

JASA 10 % 1,453.25

JUMLAH 15,985.75

DIBULATKAN 15,985.00

SNI 1.0000 m 2Langit2 asbes (1,00 x 1,00) m, rangka kayu lama dg plepet

03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00

1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00

2.6000 m1Plepet kayu @ Rp. 2,000.00

0.0100 kg Paku eternit @ Rp. 11,500.00

0.0100 kg Paku plepet @ Rp. 10,000.00

0.3200 org Tukang kayu @ Rp. 30,000.00 9,600.00

0.0320 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00

0.1800 org Pekerja @ Rp. 20,000.00 3,600.00

0.0090 org Mandor @ Rp. 32,500.00 292.50

JUMLAH ( BELUM PPN ) 14,532.50

JASA 10 % 1,453.25

JUMLAH 15,985.75

DIBULATKAN 15,985.00

SNI 1.0000 m 2Langit2 asbes (1,00 x 1,00) m, rangka kayu kamper dg plepet

0.0120 m3Kayu kamper balok @ Rp. 4,750,000.00

03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00

1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00

2.6000 m1Plepet kayu @ Rp. 2,000.00

0.0100 kg Paku eternit @ Rp. 11,500.00

0.0100 kg Paku plepet @ Rp. 10,000.00

0.3200 org Tukang kayu @ Rp. 30,000.00 9,600.00

0.0320 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00

0.1800 org Pekerja @ Rp. 20,000.00 3,600.00

0.0090 org Mandor @ Rp. 32,500.00 292.50

JUMLAH ( BELUM PPN ) 14,532.50

JASA 10 % 1,453.25

JUMLAH 15,985.75

DIBULATKAN 15,985.00

SNI 1.0000 m 2Langit2 asbes (1,00 x 1,00) m, rangka kayu kruing dg plepet

0.0120 m3Kayu kruing balok @ Rp. 4,350,000.00

03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00

1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00

2.6000 m1Plepet kayu @ Rp. 2,000.00

0.0100 kg Paku eternit @ Rp. 11,500.00

0.0100 kg Paku plepet @ Rp. 10,000.00

Page 58: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

0.3200 org Tukang kayu @ Rp. 30,000.00 9,600.00

0.0320 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00

0.1800 org Pekerja @ Rp. 20,000.00 3,600.00

0.0090 org Mandor @ Rp. 32,500.00 292.50

JUMLAH ( BELUM PPN ) 14,532.50

JASA 10 % 1,453.25

JUMLAH 15,985.75

DIBULATKAN 15,985.00

Page 59: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 2Langit2 asbes (1,00 x 1,00) m, rangka ky bengkirai dg plepet

0.0120 m3Kayu bengkirai balok @ Rp. 5,750,000.00

03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00

1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00

2.6000 m1Plepet kayu @ Rp. 2,000.00

0.0100 kg Paku eternit @ Rp. 11,500.00

0.0100 kg Paku plepet @ Rp. 10,000.00

0.3200 org Tukang kayu @ Rp. 30,000.00 9,600.00

0.0320 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00

0.1800 org Pekerja @ Rp. 20,000.00 3,600.00

0.0090 org Mandor @ Rp. 32,500.00 292.50

JUMLAH ( BELUM PPN ) 14,532.50

JASA 10 % 1,453.25

JUMLAH 15,985.75

DIBULATKAN 15,985.00

6.13 1.0000 m 2Langit2 gypsum t; 9 mm, rangka 60 x 120 kayu kamper

0.0130 m3Kayu kamper @ Rp. 4,750,000.00

0.3600 lbr Gypsum board 9 mm @ Rp. 42,000.00

0.0500 roll Kasa gypsum @ Rp. 10,000.00

0.4500 kg Tepung gypsum @ Rp. 3,500.00

0.0030 kg Alkasit @ Rp. 300,000.00

0.0500 kg Paku gypsum @ Rp. 20,000.00

0.1200 kg Paku usuk @ Rp. 8,000.00

0.3700 org Tukang kayu @ Rp. 30,000.00 11,100.00

0.0370 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50

0.2400 org Pekerja @ Rp. 20,000.00 4,800.00

0.0120 org Mandor @ Rp. 32,500.00 390.00

JUMLAH ( BELUM PPN ) 17,492.50

JASA 10 % 1,749.25

JUMLAH 19,241.75

DIBULATKAN 19,241.00

6.13 1.0000 m 2Langit2 gypsum t;l 9 mm, rangka 60 x 120 kayu kruing

0.0130 m3Kayu kruing @ Rp. 4,350,000.00

0.3600 lbr Gypsum board 9 mm @ Rp. 42,000.00

0.0500 roll Kasa gypsum @ Rp. 10,000.00

0.4500 kg Tepung gypsum @ Rp. 3,500.00

0.0030 kg Alkasit @ Rp. 300,000.00

0.0500 kg Paku gypsum @ Rp. 20,000.00

0.1200 kg Paku usuk @ Rp. 8,000.00

0.3700 org Tukang kayu @ Rp. 30,000.00 11,100.00

0.0370 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50

0.2400 org Pekerja @ Rp. 20,000.00 4,800.00

0.0120 org Mandor @ Rp. 32,500.00 390.00

JUMLAH ( BELUM PPN ) 17,492.50

JASA 10 % 1,749.25

JUMLAH 19,241.75

DIBULATKAN 19,241.00

1.0000 m 2Langit2 gypsum t; 9 mm, rangka 60 x 120 ky bengkirai

0.0130 m3Kayu bengkirai @ Rp. 5,750,000.00

0.3600 lbr Gypsum board 9 mm @ Rp. 42,000.00

0.0500 roll Kasa gypsum @ Rp. 10,000.00

0.4500 kg Tepung gypsum @ Rp. 3,500.00

0.0030 kg Alkasit @ Rp. 300,000.00

0.0500 kg Paku gypsum @ Rp. 20,000.00

0.1200 kg Paku usuk @ Rp. 8,000.00

0.3700 org Tukang kayu @ Rp. 30,000.00 11,100.00

0.0370 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50

0.2400 org Pekerja @ Rp. 20,000.00 4,800.00

0.0120 org Mandor @ Rp. 32,500.00 390.00

JUMLAH ( BELUM PPN ) 17,492.50

JASA 10 % 1,749.25

Page 60: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

JUMLAH 19,241.75

DIBULATKAN 19,241.00

1.0000 m 2Langit-langit gypsum board tebal 9 mm, rangka hollow

4.5000 m1Rangka hollow 4x4 cm @ Rp. 9,500.00

0.3600 lbr Gypsum board 9 mm @ Rp. 42,000.00

0.0500 roll Kasa gypsum @ Rp. 10,000.00

0.4500 kg Tepung gypsum @ Rp. 3,500.00

0.0030 kg Alkasit @ Rp. 300,000.00

0.1500 kg Paku skrup @ Rp. 10,000.00

5.0000 m1Kawat penggantung @ Rp. 500.00

0.3700 org Tukang kayu @ Rp. 30,000.00 11,100.00

0.0370 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50

0.2400 org Pekerja @ Rp. 20,000.00 4,800.00

0.0120 org Mandor @ Rp. 32,500.00 390.00

JUMLAH ( BELUM PPN ) 17,492.50

JASA 10 % 1,749.25

JUMLAH 19,241.75

DIBULATKAN 19,241.00

Page 61: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

6.13 1.0000 m 2Langit2 kalsiboard t; 3.5 mm, rangka 60 x 120 ky kamper

0.0130 m3Kayu kamper @ Rp. 4,750,000.00

0.3600 lbr Kalsiboard 3.5 mm @ Rp. 46,200.00

0.0500 roll Kasa gypsum @ Rp. 10,000.00

0.4500 kg Tepung gypsum @ Rp. 3,500.00

0.0030 kg Alkasit @ Rp. 300,000.00

0.0500 kg Paku gypsum @ Rp. 20,000.00

0.1200 kg Paku usuk @ Rp. 8,000.00

0.3700 org Tukang kayu @ Rp. 30,000.00 11,100.00

0.0370 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50

0.2400 org Pekerja @ Rp. 20,000.00 4,800.00

0.0120 org Mandor @ Rp. 32,500.00 390.00

JUMLAH ( BELUM PPN ) 17,492.50

JASA 10 % 1,749.25

JUMLAH 19,241.75

DIBULATKAN 19,241.00

6.13 1.0000 m 2Langit2 kalsiboard t;l 3.5 mm, rangka 60 x 120 ky kruing

0.0130 m3Kayu kruing @ Rp. 4,350,000.00

0.3600 lbr Kalsiboard 3.5 mm @ Rp. 46,200.00

0.0500 roll Kasa gypsum @ Rp. 10,000.00

0.4500 kg Tepung gypsum @ Rp. 3,500.00

0.0030 kg Alkasit @ Rp. 300,000.00

0.0500 kg Paku gypsum @ Rp. 20,000.00

0.1200 kg Paku usuk @ Rp. 8,000.00

0.3700 org Tukang kayu @ Rp. 30,000.00 11,100.00

0.0370 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50

0.2400 org Pekerja @ Rp. 20,000.00 4,800.00

0.0120 org Mandor @ Rp. 32,500.00 390.00

JUMLAH ( BELUM PPN ) 17,492.50

JASA 10 % 1,749.25

JUMLAH 19,241.75

DIBULATKAN 19,241.00

1.0000 m 2Langit2 kalsiboard t; 3.5 mm, rangka 60 x 120 ky bengkirai

0.0130 m3Kayu bengkirai @ Rp. 5,750,000.00

0.3600 lbr Kalsiboard 3.5 mm @ Rp. 46,200.00

0.0500 roll Kasa gypsum @ Rp. 10,000.00

0.4500 kg Tepung gypsum @ Rp. 3,500.00

0.0030 kg Alkasit @ Rp. 300,000.00

0.0500 kg Paku gypsum @ Rp. 20,000.00

0.1200 kg Paku usuk @ Rp. 8,000.00

0.3700 org Tukang kayu @ Rp. 30,000.00 11,100.00

0.0370 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50

0.2400 org Pekerja @ Rp. 20,000.00 4,800.00

0.0120 org Mandor @ Rp. 32,500.00 390.00

JUMLAH ( BELUM PPN ) 17,492.50

JASA 10 % 1,749.25

JUMLAH 19,241.75

DIBULATKAN 19,241.00

1.0000 m 2Langit-langit kalsiboard tebal 3.5 mm, rangka hollow

4.5000 m1Rangka hollow 4x4 cm @ Rp. 9,500.00

0.3600 lbr Kalsiboard 3.5 mm @ Rp. 46,200.00

0.0500 roll Kasa gypsum @ Rp. 10,000.00

0.4500 kg Tepung gypsum @ Rp. 3,500.00

0.0030 kg Alkasit @ Rp. 300,000.00

0.1500 kg Paku skrup @ Rp. 10,000.00

5.0000 m1Kawat penggantung @ Rp. 500.00

0.3700 org Tukang kayu @ Rp. 30,000.00 11,100.00

0.0370 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50

0.2400 org Pekerja @ Rp. 20,000.00 4,800.00

0.0120 org Mandor @ Rp. 32,500.00 390.00

JUMLAH ( BELUM PPN ) 17,492.50

Page 62: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

JASA 10 % 1,749.25

JUMLAH 19,241.75

DIBULATKAN 19,241.00

Page 63: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 2Langit-langit akustik 60 x 120 cm + rangka alumunium

03-3438-2002 3.6000 m1Profil alumunium "T" @ Rp. 20,000.00

6.18 0.1500 kg Kawat seng polos @ Rp. 9,500.00

1.0000 bh Ramset / dina bolt @ Rp. 2,500.00

1.5000 lbr Akustic Armstrong 60 x 120 cm @ Rp. 125,000.00

0.5000 org Tukang kayu @ Rp. 30,000.00 15,000.00

0.0500 org Kepala tukang kayu @ Rp. 32,500.00 1,625.00

0.1500 org Pekerja @ Rp. 20,000.00 3,000.00

0.0075 org Mandor @ Rp. 32,500.00 243.75

JUMLAH ( BELUM PPN ) 19,868.75

JASA 10 % 1,986.88

JUMLAH 21,855.63

DIBULATKAN 21,855.00

1.0000 m 1Pasang list profil cornees gypsum lebar sampai 5 cm

1.1000 m1List profil cornees gypsum @ Rp. 4,000.00

0.7000 kg Tepung gypsum @ Rp. 3,500.00

0.0035 kg Alkasit @ Rp. 300,000.00

0.0375 org Tukang kayu @ Rp. 30,000.00 1,125.00

0.0037 org Kepala tukang kayu @ Rp. 32,500.00 120.25

0.1125 org Pekerja @ Rp. 20,000.00 2,250.00

0.0065 org Mandor @ Rp. 32,500.00 211.25

JUMLAH ( BELUM PPN ) 3,706.50

JASA 10 % 370.65

JUMLAH 4,077.15

DIBULATKAN 4,077.00

1.0000 m 1Pasang list profil cornees gypsum lebar 5 - 10 cm

1.1000 m1List profil cornees gypsum @ Rp. 8,000.00

0.8750 kg Tepung gypsum @ Rp. 3,500.00

0.0044 kg Alkasit @ Rp. 300,000.00

0.0375 org Tukang kayu @ Rp. 30,000.00 1,125.00

0.0037 org Kepala tukang kayu @ Rp. 32,500.00 120.25

0.1125 org Pekerja @ Rp. 20,000.00 2,250.00

0.0065 org Mandor @ Rp. 32,500.00 211.25

JUMLAH ( BELUM PPN ) 3,706.50

JASA 10 % 370.65

JUMLAH 4,077.15

DIBULATKAN 4,077.00

1.0000 m 1Pasang list profil cornees gypsum lebar lebih dari 10 cm

1.1000 m1List profil cornees gypsum @ Rp. 15,000.00

1.0500 kg Tepung gypsum @ Rp. 3,500.00

0.0053 kg Alkasit @ Rp. 300,000.00

0.0400 org Tukang kayu @ Rp. 30,000.00 1,200.00

0.0040 org Kepala tukang kayu @ Rp. 32,500.00 130.00

0.1125 org Pekerja @ Rp. 20,000.00 2,250.00

0.0065 org Mandor @ Rp. 32,500.00 211.25

JUMLAH ( BELUM PPN ) 3,791.25

JASA 10 % 379.13

JUMLAH 4,170.38

DIBULATKAN 4,170.00

SNI 1.0000 m 1List langit-langit kayu profil

6.19 1.1000 m1List kayu profil @ Rp. 5,500.00

03-2838-2002 0.0100 kg Paku @ Rp. 10,000.00

0.0500 org Tukang kayu @ Rp. 30,000.00 1,500.00

0.0050 org Kepala tukang kayu @ Rp. 32,500.00 162.50

0.0500 org Pekerja @ Rp. 20,000.00 1,000.00

0.0030 org Mandor @ Rp. 32,500.00 97.50

JUMLAH ( BELUM PPN ) 2,760.00

JASA 10 % 276.00

JUMLAH 3,036.00

DIBULATKAN 3,036.00

Page 64: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

PEKERJAAN LISPLANG

1.0000 m 1Pasang lisplank ukuran (2 x 20) cm, kayu jati

0.0048 m3Kayu jati papan @ Rp. 22,000,000.00

0.0600 kg Paku biasa 2" - 5" @ Rp. 8,000.00

0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00

0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

0.0050 org Mandor @ Rp. 32,500.00 162.50

JUMLAH ( BELUM PPN ) 5,487.50

JASA 10 % 548.75

JUMLAH 6,036.25

DIBULATKAN 6,036.00

SNI 1.0000 m 1Pasang lisplank ukuran 2 x (2 x 20) cm, kayu jati

0.0086 m3Kayu jati papan @ Rp. 22,000,000.00

03-3434-2002 0.0600 kg Paku biasa 2" - 5" @ Rp. 8,000.00

0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00

0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

0.0050 org Mandor @ Rp. 32,500.00 162.50

JUMLAH ( BELUM PPN ) 5,487.50

JASA 10 % 548.75

JUMLAH 6,036.25

DIBULATKAN 6,036.00

1.0000 m 1Pasang lisplank ukuran (2 x 20) cm, kayu jati lokal

0.0048 m3Papan kayu jati lokal @ Rp. 8,200,000.00

0.0600 kg Paku biasa 2" - 5" @ Rp. 8,000.00

0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00

0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

0.0050 org Mandor @ Rp. 32,500.00 162.50

JUMLAH ( BELUM PPN ) 5,487.50

JASA 10 % 548.75

JUMLAH 6,036.25

DIBULATKAN 6,036.00

1.0000 m 1Pasang lisplank ukuran (2 x 20) cm, kayu kamper

0.0048 m3Kayu kamper papan @ Rp. 5,500,000.00

0.0600 kg Paku biasa 2" - 5" @ Rp. 8,000.00

0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00

0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

0.0050 org Mandor @ Rp. 32,500.00 162.50

JUMLAH ( BELUM PPN ) 5,487.50

JASA 10 % 548.75

JUMLAH 6,036.25

DIBULATKAN 6,036.00

SNI 1.0000 m 1Pasang lisplank ukuran 2 x (2 x 20) cm, kayu kamper

6.52 0.0086 m3Kayu kamper papan @ Rp. 5,500,000.00

03-3434-2002 0.0600 kg Paku biasa 2" - 5" @ Rp. 8,000.00

0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00

0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

0.0050 org Mandor @ Rp. 32,500.00 162.50

JUMLAH ( BELUM PPN ) 5,487.50

JASA 10 % 548.75

JUMLAH 6,036.25

DIBULATKAN 6,036.00

1.0000 m 1Pasang lisplank ukuran (2 x 20) cm, kayu kruing

Page 65: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

0.0048 m3Kayu kruing papan @ Rp. 4,750,000.00

0.0600 kg Paku biasa 2" - 5" @ Rp. 8,000.00

0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00

0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

0.0050 org Mandor @ Rp. 32,500.00 162.50

JUMLAH ( BELUM PPN ) 5,487.50

JASA 10 % 548.75

JUMLAH 6,036.25

DIBULATKAN 6,036.00

Page 66: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 1Pasang lisplank ukuran 2 x (2 x 20) cm, kayu kruing

6.52 0.0086 m3Kayu kruing papan @ Rp. 4,750,000.00

03-3434-2002 0.0600 kg Paku biasa 2" - 5" @ Rp. 8,000.00

0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00

0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

0.0050 org Mandor @ Rp. 32,500.00 162.50

JUMLAH ( BELUM PPN ) 5,487.50

JASA 10 % 548.75

JUMLAH 6,036.25

DIBULATKAN 6,036.00

1.0000 m 1Pasang lisplank ukuran (2 x 20) cm, kayu bengkirai

0.0048 m3Kayu bengkirai papan @ Rp. 6,000,000.00

0.0600 kg Paku biasa 2" - 5" @ Rp. 8,000.00

0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00

0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

0.0050 org Mandor @ Rp. 32,500.00 162.50

JUMLAH ( BELUM PPN ) 5,487.50

JASA 10 % 548.75

JUMLAH 6,036.25

DIBULATKAN 6,036.00

SNI 1.0000 m 1Pasang lisplank ukuran 2 x (2 x 20) cm, kayu bengkirai

6.52 0.0086 m3Kayu bengkirai papan @ Rp. 6,000,000.00

03-3434-2002 0.0600 kg Paku biasa 2" - 5" @ Rp. 8,000.00

0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00

0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

0.0050 org Mandor @ Rp. 32,500.00 162.50

JUMLAH ( BELUM PPN ) 5,487.50

JASA 10 % 548.75

JUMLAH 6,036.25

DIBULATKAN 6,036.00

AK 1.0000 m 2Membuat listplank asbes plat ram kayu kamper

0.0250 m3Ram kayu kamper @ Rp. 4,750,000.00

1.0000 m2Asbes plat @ Rp. 10,000.00

0.3000 kg Paku reng @ Rp. 8,000.00

1.8000 org Tukang kayu @ Rp. 30,000.00 54,000.00

0.1800 org Kep. Tk. Kayu @ Rp. 32,500.00 5,850.00

0.6000 org Pekerja @ Rp. 20,000.00 12,000.00

0.0300 org Mandor @ Rp. 32,500.00 975.00

JUMLAH ( BELUM PPN ) 72,825.00

JASA 10 % 7,282.50

JUMLAH 80,107.50

DIBULATKAN 80,107.00

AK 1.0000 m 2Membuat listplank asbes plat ram kayu kruing

0.0250 m3Ram kayu kruing @ Rp. 4,350,000.00

1.0000 m2Asbes plat @ Rp. 10,000.00

0.3000 kg Paku reng @ Rp. 8,000.00

1.8000 org Tukang kayu @ Rp. 30,000.00 54,000.00

0.1800 org Kep. Tk. Kayu @ Rp. 32,500.00 5,850.00

0.6000 org Pekerja @ Rp. 20,000.00 12,000.00

0.0300 org Mandor @ Rp. 32,500.00 975.00

JUMLAH ( BELUM PPN ) 72,825.00

JASA 10 % 7,282.50

JUMLAH 80,107.50

DIBULATKAN 80,107.00

AK 1.0000 m 2Membuat listplank asbes plat ram kayu bengkirai

Page 67: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

0.0250 m3Ram kayu bengkirai @ Rp. 5,750,000.00

1.0000 m2Asbes plat @ Rp. 10,000.00

0.3000 kg Paku reng @ Rp. 8,000.00

1.8000 org Tukang kayu @ Rp. 30,000.00 54,000.00

0.1800 org Kep. Tk. Kayu @ Rp. 32,500.00 5,850.00

0.6000 org Pekerja @ Rp. 20,000.00 12,000.00

0.0300 org Mandor @ Rp. 32,500.00 975.00

JUMLAH ( BELUM PPN ) 72,825.00

JASA 10 % 7,282.50

JUMLAH 80,107.50

DIBULATKAN 80,107.00

Page 68: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

1.0000 m 1Mengerjakan papan ruiter kayu kamper 2/20

0.0040 m3Kayu kamper papan @ Rp. 5,500,000.00

0.0200 kg Paku biasa 2" - 5" @ Rp. 8,000.00

0.0800 org Tukang kayu @ Rp. 30,000.00 2,400.00

0.0080 org Kepala tukang kayu @ Rp. 32,500.00 260.00

0.0280 org Pekerja @ Rp. 20,000.00 560.00

0.0014 org Mandor @ Rp. 32,500.00 45.50

JUMLAH 3,265.50

JASA 10 % 326.55

JUMLAH 3,592.05

DIBULATKAN 3,592.00

1.0000 m 1Mengerjakan papan ruiter kayu kruing 2/20

0.0040 m3Kayu kruing papan @ Rp. 4,750,000.00

0.0200 kg Paku biasa 2" - 5" @ Rp. 8,000.00

0.0800 org Tukang kayu @ Rp. 30,000.00 2,400.00

0.0080 org Kepala tukang kayu @ Rp. 32,500.00 260.00

0.0280 org Pekerja @ Rp. 20,000.00 560.00

0.0014 org Mandor @ Rp. 32,500.00 45.50

JUMLAH 3,265.50

JASA 10 % 326.55

JUMLAH 3,592.05

DIBULATKAN 3,592.00

1.0000 m 1Mengerjakan papan ruiter kayu bengkirai 2/20

0.0040 m3Kayu bengkirai papan @ Rp. 6,000,000.00

0.0200 kg Paku biasa 2" - 5" @ Rp. 8,000.00

0.0800 org Tukang kayu @ Rp. 30,000.00 2,400.00

0.0080 org Kepala tukang kayu @ Rp. 32,500.00 260.00

0.0280 org Pekerja @ Rp. 20,000.00 560.00

0.0014 org Mandor @ Rp. 32,500.00 45.50

JUMLAH 3,265.50

JASA 10 % 326.55

JUMLAH 3,592.05

DIBULATKAN 3,592.00

PEKERJAAN TALANG

SNI 1.0000 m 1Pasang talang datar, seng BJLS 28, papan kayu kamper

6.18 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00

0.0150 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00

0.0096 m3Kayu kamper papan @ Rp. 5,500,000.00

0.2500 kg Flincoat @ Rp. 35,000.00

0.4000 org Tukang kayu @ Rp. 30,000.00 12,000.00

0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50

0.1500 org Pekerja @ Rp. 20,000.00 3,000.00

0.0013 org Mandor @ Rp. 32,500.00 40.63

JUMLAH ( BELUM PPN ) 15,853.13

JASA 10 % 1,585.31

JUMLAH 17,438.44

DIBULATKAN 17,438.00

SNI 1.0000 m 1Pasang talang datar, seng BJLS 28, papan kayu kruing

6.18 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00

0.0150 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00

0.0096 m3Kayu kruing papan @ Rp. 4,750,000.00

0.2500 kg Flincoat @ Rp. 35,000.00

0.4000 org Tukang kayu @ Rp. 30,000.00 12,000.00

0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50

0.1500 org Pekerja @ Rp. 20,000.00 3,000.00

0.0013 org Mandor @ Rp. 32,500.00 40.63

JUMLAH ( BELUM PPN ) 15,853.13

JASA 10 % 1,585.31

Page 69: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

JUMLAH 17,438.44

DIBULATKAN 17,438.00

Page 70: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 1Pasang talang datar, seng BJLS 28, papan kayu bengkirai

6.18 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00

0.0150 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00

0.0096 m3Kayui bengkirai papan @ Rp. 6,000,000.00

0.2500 kg Flincoat @ Rp. 35,000.00

0.4000 org Tukang kayu @ Rp. 30,000.00 12,000.00

0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50

0.1500 org Pekerja @ Rp. 20,000.00 3,000.00

0.0013 org Mandor @ Rp. 32,500.00 40.63

JUMLAH ( BELUM PPN ) 15,853.13

JASA 10 % 1,585.31

JUMLAH 17,438.44

DIBULATKAN 17,438.00

SNI 1.0000 m 1Pasang talang miring, seng BJLS 28, papan kayu kamper

6.19 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00

0.0150 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00

0.0190 m3Kayu kamper papan @ Rp. 5,500,000.00

0.2500 kg Flincoat @ Rp. 35,000.00

0.4000 org Tukang kayu @ Rp. 30,000.00 12,000.00

0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50

0.0400 org Pekerja @ Rp. 20,000.00 800.00

0.0013 org Mandor @ Rp. 32,500.00 40.63

JUMLAH ( BELUM PPN ) 13,653.13

JASA 10 % 1,365.31

JUMLAH 15,018.44

DIBULATKAN 15,018.00

SNI 1.0000 m 1Pasang talang miring, seng BJLS 28, papan kayu kruing

6.19 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00

0.0150 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00

0.0190 m3Kayu kruing papan @ Rp. 4,750,000.00

0.2500 kg Flincoat @ Rp. 35,000.00

0.4000 org Tukang kayu @ Rp. 30,000.00 12,000.00

0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50

0.0400 org Pekerja @ Rp. 20,000.00 800.00

0.0013 org Mandor @ Rp. 32,500.00 40.63

JUMLAH ( BELUM PPN ) 13,653.13

JASA 10 % 1,365.31

JUMLAH 15,018.44

DIBULATKAN 15,018.00

SNI 1.0000 m 1Pasang talang miring, seng BJLS 28, papan kayu bengkirai

6.19 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00

0.0150 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00

0.0190 m3Kayu bengkirai papan @ Rp. 6,000,000.00

0.2500 kg Flincoat @ Rp. 35,000.00

0.4000 org Tukang kayu @ Rp. 30,000.00 12,000.00

0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50

0.0400 org Pekerja @ Rp. 20,000.00 800.00

0.0013 org Mandor @ Rp. 32,500.00 40.63

JUMLAH ( BELUM PPN ) 13,653.13

JASA 10 % 1,365.31

JUMLAH 15,018.44

DIBULATKAN 15,018.00

H.18 10.0000 m 1Pasang talang torong

10.0000 m1Seng BJLS 0,30 ( 60 cm ) @ Rp. 20,000.00

225.0000 bh Paku sumbat @ Rp. 400.00

3.7500 org Tukang besi @ Rp. 25,000.00 93,750.00

0.3750 org Kep. Tk. Besi @ Rp. 27,000.00 10,125.00

2.2500 org Pekerja @ Rp. 20,000.00 45,000.00

0.1100 org Mandor @ Rp. 32,500.00 3,575.00

JUMLAH ( BELUM PPN ) 152,450.00

Page 71: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

TIAP 1M1 ( BELUM PPN ) 15,245.00

JASA 10 % 1,524.50

JUMLAH 16,769.50

DIBULATKAN 16,769.00

Page 72: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 1 Pasang talang ½ lingkaran D - 10 cm, seng BJLS 28

6.20 0.3000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00

0.1000 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00

0.0190 m3Kayu bengkirai papan @ Rp. 6,000,000.00

0.5000 kg Besi strip @ Rp. 8,800.00

0.2500 org Tukang kayu @ Rp. 30,000.00 7,500.00

0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50

0.1500 org Pekerja @ Rp. 20,000.00 3,000.00

0.0013 org Mandor @ Rp. 32,500.00 40.63

JUMLAH ( BELUM PPN ) 11,353.13

JASA 10 % 1,135.31

JUMLAH 12,488.44

DIBULATKAN 12,488.00

SNI 1.0000 m 2Pasang dinding pemisah teakwood rangkap, rangka kayu kamper

03-3434-2002 0.0195 m3Kayu kamper balok @ Rp. 4,750,000.00

6.56 0.0070 m3Kayu kamper papan @ Rp. 5,500,000.00

0.1000 kg Paku biasa 2" - 5" @ Rp. 8,000.00

0.5600 kg Lem kayu @ Rp. 11,000.00

1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00

0.4500 org Tukang kayu @ Rp. 30,000.00 13,500.00

0.0450 org Kepala tukang kayu @ Rp. 32,500.00 1,462.50

0.1500 org Pekerja @ Rp. 20,000.00 3,000.00

0.0750 org Mandor @ Rp. 32,500.00 2,437.50

JUMLAH ( BELUM PPN ) 20,400.00

JASA 10 % 2,040.00

JUMLAH 22,440.00

DIBULATKAN 22,440.00

SNI 1.0000 m 2Pas. dinding pemisah plywoodwood rangkap, rangka ky kamper

03-3434-2002 0.0195 m3Kayu kamper balok @ Rp. 4,750,000.00

6.57 0.0070 m3Kayu kamper papan @ Rp. 5,500,000.00

0.1000 kg Paku biasa 2" - 5" @ Rp. 8,000.00

0.5600 kg Lem kayu @ Rp. 11,000.00

1.0000 lbr Plywood 4' x 8' x 4 mm @ Rp. 41,250.00

0.6000 org Tukang kayu @ Rp. 30,000.00 18,000.00

0.0600 org Kepala tukang kayu @ Rp. 32,500.00 1,950.00

0.2000 org Pekerja @ Rp. 20,000.00 4,000.00

0.0100 org Mandor @ Rp. 32,500.00 325.00

JUMLAH ( BELUM PPN ) 24,275.00

JASA 10 % 2,427.50

JUMLAH 26,702.50

DIBULATKAN 26,702.00

SNI 1.0000 m 2Pasang plywood tebal 4 mm, untuk dinding

03-3434-2002 0.4000 lbr Plywood 4' x 8' x 4 mm @ Rp. 41,250.00

6.59 0.0500 kg Paku biasa 2" - 5" @ Rp. 8,000.00

0.0750 org Tukang kayu @ Rp. 30,000.00 2,250.00

0.0075 org Kepala tukang kayu @ Rp. 32,500.00 243.75

0.0250 org Pekerja @ Rp. 20,000.00 500.00

0.0013 org Mandor @ Rp. 32,500.00 42.25

JUMLAH ( BELUM PPN ) 3,036.00

JASA 10 % 303.60

JUMLAH 3,339.60

DIBULATKAN 3,339.00

Page 73: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

PEKERJAAN ATAP

1.0000 m 2Pasang genteng lama

0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00

0.0100 org Kep. Tk. Batu @ Rp. 30,000.00 300.00

0.2000 org Pekerja @ Rp. 20,000.00 4,000.00

0.0100 org Mandor @ Rp. 32,500.00 325.00

JUMLAH ( BELUM PPN ) 7,375.00

JASA 10 % 737.50

JUMLAH 8,112.50

DIBULATKAN 8,112.00

H.2 1.0000 m 2Pasang genteng paris

25.0000 bh Genteng paris @ Rp. 600.00

0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00

0.0100 org Kep. Tk. Batu @ Rp. 30,000.00 300.00

0.2000 org Pekerja @ Rp. 20,000.00 4,000.00

0.0100 org Mandor @ Rp. 32,500.00 325.00

JUMLAH ( BELUM PPN ) 7,375.00

JASA 10 % 737.50

JUMLAH 8,112.50

DIBULATKAN 8,112.00

H.2A 1.0000 m 2Pasang genteng paris untuk rumah tingkat

25.0000 bh Genteng paris @ Rp. 600.00

0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00

0.0100 org Kep. Tk. Batu @ Rp. 30,000.00 300.00

0.3000 org Pekerja @ Rp. 20,000.00 6,000.00

0.0150 org Mandor @ Rp. 32,500.00 487.50

JUMLAH ( BELUM PPN ) 9,537.50

JASA 10 % 953.75

JUMLAH 10,491.25

DIBULATKAN 10,491.00

H.2A 1.0000 m 2 Pasang genteng beton besar Natural ( isi 9 / m 2 )

9.0000 bh Genteng beton natural @ Rp. 2,750.00

0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00

0.0100 org Kep. Tk. Batu @ Rp. 30,000.00 300.00

0.2000 org Pekerja @ Rp. 20,000.00 4,000.00

0.0100 org Mandor @ Rp. 32,500.00 325.00

JUMLAH ( BELUM PPN ) 7,375.00

JASA 10 % 737.50

JUMLAH 8,112.50

DIBULATKAN 8,112.00

H.2A 1.0000 m 2 Pas. genteng beton besar Natural ( isi 9 / m 2 ) untuk r. tingkat

9.0000 bh Genteng beton natural @ Rp. 2,750.00

0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00

0.0100 org Kep. Tk. Batu @ Rp. 30,000.00 300.00

0.3000 org Pekerja @ Rp. 20,000.00 6,000.00

0.0150 org Mandor @ Rp. 32,500.00 487.50

JUMLAH ( BELUM PPN ) 9,537.50

JASA 10 % 953.75

JUMLAH 10,491.25

DIBULATKAN 10,491.00

Page 74: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

H.2A 1.0000 m 2 Pasang genteng beton besar Warna ( isi 9 / m 2 )

9.0000 bh Genteng beton Warna @ Rp. 4,420.00

0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00

0.0100 org Kep. Tk. Batu @ Rp. 30,000.00 300.00

0.2000 org Pekerja @ Rp. 20,000.00 4,000.00

0.0100 org Mandor @ Rp. 32,500.00 325.00

JUMLAH ( BELUM PPN ) 7,375.00

JASA 10 % 737.50

JUMLAH 8,112.50

DIBULATKAN 8,112.00

H.2A 1.0000 m 2 Pas. genteng beton besar Warna ( isi 9 / m 2 ) untuk r. tingkat

9.0000 bh Genteng beton Warna @ Rp. 4,420.00

0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00

0.0100 org Kep. Tk. Batu @ Rp. 30,000.00 300.00

0.3000 org Pekerja @ Rp. 20,000.00 6,000.00

0.0150 org Mandor @ Rp. 32,500.00 487.50

JUMLAH ( BELUM PPN ) 9,537.50

JASA 10 % 953.75

JUMLAH 10,491.25

DIBULATKAN 10,491.00

H.6 1.0000 m 1Pasang bubungan genteng paris

5.0000 bh Bubungan genteng paris @ Rp. 1,650.00

0.0152 m3Kapur pasang @ Rp. 72,500.00

0.0152 m3Pasir pasang @ Rp. 76,000.00

1.5240 kg PC @ Rp. 764.00

0.2000 org Tukang batu @ Rp. 27,500.00 5,500.00

0.0200 org Kep. Tk. Batu @ Rp. 30,000.00 600.00

0.4000 org Pekerja @ Rp. 20,000.00 8,000.00

0.0200 org Mandor @ Rp. 32,500.00 650.00

JUMLAH ( BELUM PPN ) 14,750.00

JASA 10 % 1,475.00

JUMLAH 16,225.00

DIBULATKAN 16,225.00

H.6 1.0000 m 1Pasang bubungan genteng beton Natural

5.0000 bh Bubungan genteng beton natural @ Rp. 2,460.00

0.0152 m3Kapur pasang @ Rp. 72,500.00

0.0152 m3Pasir pasang @ Rp. 76,000.00

1.5240 kg PC @ Rp. 764.00

0.2000 org Tukang batu @ Rp. 27,500.00 5,500.00

0.0200 org Kep. Tk. Batu @ Rp. 30,000.00 600.00

0.4000 org Pekerja @ Rp. 20,000.00 8,000.00

0.0200 org Mandor @ Rp. 32,500.00 650.00

JUMLAH ( BELUM PPN ) 14,750.00

JASA 10 % 1,475.00

JUMLAH 16,225.00

DIBULATKAN 16,225.00

Page 75: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

H.6 1.0000 m 1Pasang bubungan genteng beton Warna

4.0000 bh Bubungan genteng beton warna @ Rp. 4,260.00

0.0152 m3Kapur pasang @ Rp. 72,500.00

0.0152 m3Pasir pasang @ Rp. 76,000.00

1.5240 kg PC @ Rp. 764.00

0.2000 org Tukang batu @ Rp. 27,500.00 5,500.00

0.0200 org Kep. Tk. Batu @ Rp. 30,000.00 600.00

0.4000 org Pekerja @ Rp. 20,000.00 8,000.00

0.0200 org Mandor @ Rp. 32,500.00 650.00

JUMLAH ( BELUM PPN ) 14,750.00

JASA 10 % 1,475.00

JUMLAH 16,225.00

DIBULATKAN 16,225.00

1.0000 m 2Pasang atap asbes gelombang (2,5 x 0,92 m) x 5 mm

SNI 0.5000 lbr Asbes gelombang @ Rp. 62,960.00

6.8 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00

03-3436-2002 0.0750 org Tukang kayu @ Rp. 30,000.00 2,250.00

0.0080 org Kepala tukang kayu @ Rp. 32,500.00 260.00

0.1400 org Pekerja @ Rp. 20,000.00 2,800.00

0.0080 org Mandor @ Rp. 32,500.00 260.00

JUMLAH ( BELUM PPN ) 5,570.00

JASA 10 % 557.00

JUMLAH 6,127.00

DIBULATKAN 6,127.00

SNI 1.0000 m 2Pasang atap asbes gelombang (2,00 x 0,92 m) x 5 mm

6.10 0.6000 lbr Asbes gelombang @ Rp. 50,330.00

03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00

0.0700 org Tukang kayu @ Rp. 30,000.00 2,100.00

0.0070 org Kepala tukang kayu @ Rp. 32,500.00 227.50

0.1400 org Pekerja @ Rp. 20,000.00 2,800.00

0.0070 org Mandor @ Rp. 32,500.00 227.50

JUMLAH ( BELUM PPN ) 5,355.00

JASA 10 % 535.50

JUMLAH 5,890.50

DIBULATKAN 5,890.00

SNI 1.0000 m 2Pasang atap asbes gelombang (1,80 x 0,92 m) x 5 mm

6.11 0.7500 lbr Asbes gelombang @ Rp. 45,290.00

03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00

0.0700 org Tukang kayu @ Rp. 30,000.00 2,100.00

0.0070 org Kepala tukang kayu @ Rp. 32,500.00 227.50

0.1400 org Pekerja @ Rp. 20,000.00 2,800.00

0.0070 org Mandor @ Rp. 32,500.00 227.50

JUMLAH ( BELUM PPN ) 5,355.00

JASA 10 % 535.50

JUMLAH 5,890.50

DIBULATKAN 5,890.00

SNI 1.0000 m 2Pasang atap asbes gelombang (300 x 1,05 m) x 4 mm

6.12 0.3500 lbr Asbes gelombang @ Rp. 71,350.00

03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00

0.0700 org Tukang kayu @ Rp. 30,000.00 2,100.00

0.0070 org Kepala tukang kayu @ Rp. 32,500.00 227.50

0.1400 org Pekerja @ Rp. 20,000.00 2,800.00

0.0070 org Mandor @ Rp. 32,500.00 227.50

JUMLAH ( BELUM PPN ) 5,355.00

JASA 10 % 535.50

JUMLAH 5,890.50

DIBULATKAN 5,890.00

Page 76: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 2Pasang atap asbes gelombang (2,40 x 1,05 m) x 4 mm

6.14 0.4400 lbr Asbes gelombang @ Rp. 61,000.00

03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00

0.0670 org Tukang kayu @ Rp. 30,000.00 2,010.00

0.0070 org Kepala tukang kayu @ Rp. 32,500.00 227.50

0.1400 org Pekerja @ Rp. 20,000.00 2,800.00

0.0070 org Mandor @ Rp. 32,500.00 227.50

JUMLAH ( BELUM PPN ) 5,265.00

JASA 10 % 526.50

JUMLAH 5,791.50

DIBULATKAN 5,791.00

SNI 1.0000 m 2Pasang atap asbes gelombang (2,10 x 1,05 m) x 4 mm

6.15 0.5100 lbr Asbes gelombang @ Rp. 57,500.00

03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00

0.0670 org Tukang kayu @ Rp. 30,000.00 2,010.00

0.0070 org Kepala tukang kayu @ Rp. 32,500.00 227.50

0.1400 org Pekerja @ Rp. 20,000.00 2,800.00

0.0070 org Mandor @ Rp. 32,500.00 227.50

JUMLAH ( BELUM PPN ) 5,265.00

JASA 10 % 526.50

JUMLAH 5,791.50

DIBULATKAN 5,791.00

SNI 1.0000 m 2Pasang atap asbes gelombang (1,50 x 1,05 m) x 4 mm

6.16 0.8000 lbr Asbes gelombang @ Rp. 35,950.00

03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00

0.0670 org Tukang kayu @ Rp. 30,000.00 2,010.00

0.0070 org Kepala tukang kayu @ Rp. 32,500.00 227.50

0.1400 org Pekerja @ Rp. 20,000.00 2,800.00

0.0070 org Mandor @ Rp. 32,500.00 227.50

JUMLAH ( BELUM PPN ) 5,265.00

JASA 10 % 526.50

JUMLAH 5,791.50

DIBULATKAN 5,791.00

SNI 1.0000 m 2Pasang atap asbes gelombang (3,00 x 1,08 m) x 6 mm

6.17 0.3700 lbr Asbes gelombang @ Rp. 112,830.00

03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00

0.0670 org Tukang kayu @ Rp. 30,000.00 2,010.00

0.0070 org Kepala tukang kayu @ Rp. 32,500.00 227.50

0.1400 org Pekerja @ Rp. 20,000.00 2,800.00

0.0070 org Mandor @ Rp. 32,500.00 227.50

JUMLAH ( BELUM PPN ) 5,265.00

JASA 10 % 526.50

JUMLAH 5,791.50

DIBULATKAN 5,791.00

SNI 1.0000 m 2Pasang atap sbes gelombang (2,40 x 1,08 m) x 6 mm

6.19 0.4600 lbr Asbes gelombang @ Rp. 90,265.00

03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00

0.0670 org Tukang kayu @ Rp. 30,000.00 2,010.00

0.0070 org Kepala tukang kayu @ Rp. 32,500.00 227.50

0.1400 org Pekerja @ Rp. 20,000.00 2,800.00

0.0070 org Mandor @ Rp. 32,500.00 227.50

JUMLAH ( BELUM PPN ) 5,265.00

JASA 10 % 526.50

JUMLAH 5,791.50

DIBULATKAN 5,791.00

Page 77: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 2Pasang atap asbes gelombang (2,10 x 1,08 m) x 6 mm

6.20 0.4900 lbr Asbes gelombang @ Rp. 78,980.00

03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00

0.0670 org Tukang kayu @ Rp. 30,000.00 2,010.00

0.0070 org Kepala tukang kayu @ Rp. 32,500.00 227.50

0.1400 org Pekerja @ Rp. 20,000.00 2,800.00

0.0070 org Mandor @ Rp. 32,500.00 227.50

JUMLAH ( BELUM PPN ) 5,265.00

JASA 10 % 526.50

JUMLAH 5,791.50

DIBULATKAN 5,791.00

SNI 1.0000 m 2Pasang atap asbes gelombang (1,80 x 1,08 m) x 6 mm

6.21 0.5700 lbr Asbes gelombang @ Rp. 67,690.00

03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00

0.0670 org Tukang kayu @ Rp. 30,000.00 2,010.00

0.0070 org Kepala tukang kayu @ Rp. 32,500.00 227.50

0.1400 org Pekerja @ Rp. 20,000.00 2,800.00

0.0070 org Mandor @ Rp. 32,500.00 227.50

JUMLAH ( BELUM PPN ) 5,265.00

JASA 10 % 526.50

JUMLAH 5,791.50

DIBULATKAN 5,791.00

SNI 1.0000 m 1Pasang bubung stel gelombang 0,92 m

6.22 2.4000 lbr Bubung stel gelombang @ Rp. 29,000.00

03-3436-2002 6.0000 bh Paku sekrup 3,5" @ Rp. 750.00

0.1250 org Tukang kayu @ Rp. 30,000.00 3,750.00

0.0130 org Kepala tukang kayu @ Rp. 32,500.00 422.50

0.0840 org Pekerja @ Rp. 20,000.00 1,680.00

0.0040 org Mandor @ Rp. 32,500.00 130.00

JUMLAH ( BELUM PPN ) 5,982.50

JASA 10 % 598.25

JUMLAH 6,580.75

DIBULATKAN 6,580.00

SNI 1.0000 m 1Pasang nok stel gelombang 1,05 m

6.23 2.1000 lbr Nok stel gelombang @ Rp. 29,000.00

03-3436-2002 6.0000 bh Paku sekrup 3,5" @ Rp. 750.00

0.1250 org Tukang kayu @ Rp. 30,000.00 3,750.00

0.0130 org Kepala tukang kayu @ Rp. 32,500.00 422.50

0.0840 org Pekerja @ Rp. 20,000.00 1,680.00

0.0040 org Mandor @ Rp. 32,500.00 130.00

JUMLAH ( BELUM PPN ) 5,982.50

JASA 10 % 598.25

JUMLAH 6,580.75

DIBULATKAN 6,580.00

SNI 1.0000 m 1Pasang nok stel gelombang 1,08 m

6.24 2.0500 lbr Nok stel gelombang @ Rp. 29,000.00

03-3436-2002 6.0000 bh Paku sekrup 3,5" @ Rp. 750.00

0.1250 org Tukang kayu @ Rp. 30,000.00 3,750.00

0.0130 org Kepala tukang kayu @ Rp. 32,500.00 422.50

0.0840 org Pekerja @ Rp. 20,000.00 1,680.00

0.0040 org Mandor @ Rp. 32,500.00 130.00

JUMLAH ( BELUM PPN ) 5,982.50

JASA 10 % 598.25

JUMLAH 6,580.75

DIBULATKAN 6,580.00

Page 78: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 2Pasang atap genteng metal zinc alume type prima roof

03-3436-2002 1.0200 m2Genteng metal @ Rp. 95,400.00

6.32 0.2000 kg Paku anti karat @ Rp. 20,000.00

0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00

0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00

0.2000 org Pekerja @ Rp. 20,000.00 4,000.00

0.0010 org Mandor @ Rp. 32,500.00 32.50

JUMLAH ( BELUM PPN ) 7,357.50

JASA 10 % 735.75

JUMLAH 8,093.25

DIBULATKAN 8,093.00

Mod. SNI 1.0000 m 2Pasang atap metal gelombanmg

03-3436-2002 1.0200 m2Atap metal gelombang t 3,5 mm @ Rp. 60,000.00

6.32 4.0000 bh Paku/skrup atap anti karat @ Rp. 1,200.00

0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00

0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00

0.2000 org Pekerja @ Rp. 20,000.00 4,000.00

0.0010 org Mandor @ Rp. 32,500.00 32.50

JUMLAH ( BELUM PPN ) 7,357.50

JASA 10 % 735.75

JUMLAH 8,093.25

DIBULATKAN 8,093.00

SNI 1.0000 m 2Pasang alumunium foil / sisalation

03-3436-2002 1.0500 m2Sisalation / alumunium foil @ Rp. 25,000.00

6.42 0.0500 org Tukang kayu @ Rp. 30,000.00 1,500.00

0.0050 org Kepala tukang kayu @ Rp. 32,500.00 162.50

0.1500 org Pekerja @ Rp. 20,000.00 3,000.00

0.0080 org Mandor @ Rp. 32,500.00 260.00

JUMLAH ( BELUM PPN ) 4,922.50

JASA 10 % 492.25

JUMLAH 5,414.75

DIBULATKAN 5,414.00

Empiris 1.0000 m 2Pasang atap polikarbonat

1.0500 m2Plykarbhonat @ Rp. 225,000.00

7.0000 kg Besi rangka @ Rp. 8,800.00

9.0000 bh Paku sekrup @ Rp. 1,200.00

0.5000 org Tukang besi @ Rp. 25,000.00 12,500.00

0.0500 org Kepala tukang besi @ Rp. 27,000.00 1,350.00

0.5000 org Pekerja @ Rp. 20,000.00 10,000.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 23,931.25

JASA 10 % 2,393.13

JUMLAH 26,324.38

DIBULATKAN 26,324.00

Page 79: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

PEKERJAAN CAT-CATAN

SNI 1.0000 m 2Mengikis / mengerok permukaan cat tembok lama

6.1 0.0500 kg Soda api @ Rp. 15,000.00

0.1500 org Pekerja @ Rp. 20,000.00 3,000.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 3,081.25

JASA 10 % 308.13

JUMLAH 3,389.38

DIBULATKAN 3,389.00

SNI 1.0000 m 2Pengecatan bidang kayu lama

6.7 0.1500 kg Plamir @ Rp. 12,000.00

0.1700 kg Cat dasar @ Rp. 32,000.00

0.1700 kg Cat penutup @ Rp. 32,000.00

0.0750 org Tukang cat @ Rp. 25,000.00 1,875.00

0.0075 org Kepala tukang cat @ Rp. 27,000.00 202.50

0.0700 org Pekerja @ Rp. 20,000.00 1,400.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 3,558.75

JASA 10 % 355.88

JUMLAH 3,914.63

DIBULATKAN 3,914.00

SNI 1.0000 m 2Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup

6.8 0.2000 kg Cat meni @ Rp. 12,000.00

0.1500 kg Plamir @ Rp. 12,000.00

0.1700 kg Cat dasar @ Rp. 32,000.00

0.2600 kg Cat penutup @ Rp. 32,000.00

0.0900 org Tukang cat @ Rp. 25,000.00 2,250.00

0.0060 org Kepala tukang cat @ Rp. 27,000.00 162.00

0.0700 org Pekerja @ Rp. 20,000.00 1,400.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 3,893.25

JASA 10 % 389.33

JUMLAH 4,282.58

DIBULATKAN 4,282.00

Page 80: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 2Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup

6.9 0.2000 kg Cat meni @ Rp. 12,000.00

0.1500 kg Plamir @ Rp. 12,000.00

0.1700 kg Cat dasar @ Rp. 32,000.00

0.3500 kg Cat penutup @ Rp. 32,000.00

0.1050 org Tukang cat @ Rp. 25,000.00 2,625.00

0.0040 org Kepala tukang cat @ Rp. 27,000.00 108.00

0.0700 org Pekerja @ Rp. 20,000.00 1,400.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 4,214.25

JASA 10 % 421.43

JUMLAH 4,635.68

DIBULATKAN 4,635.00

SNI 1.0000 m 2Pelaburan bidang kayu dengan politur

6.11 0.1500 ltr Politur @ Rp. 20,000.00

0.3720 ltr Politur jadi @ Rp. 20,000.00

2.0000 lbr Amplas @ Rp. 2,500.00

0.0600 org Tukang cat @ Rp. 25,000.00 1,500.00

0.0160 org Kepala tukang cat @ Rp. 27,000.00 432.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 2,013.25

JASA 10 % 201.33

JUMLAH 2,214.58

DIBULATKAN 2,214.00

SNI 1.0000 m 2Pelaburan bidang kayu dengan vernis

6.13 0.1500 ltr Vernis @ Rp. 12,500.00

0.0500 kg Dempul @ Rp. 10,000.00

0.1000 lbr Amplas @ Rp. 2,500.00

0.0100 bh Kuas @ Rp. 8,000.00

0.1600 org Tukang cat @ Rp. 25,000.00 4,000.00

0.0160 org Kepala tukang cat @ Rp. 27,000.00 432.00

0.1600 org Pekerja @ Rp. 20,000.00 3,200.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 7,713.25

JASA 10 % 771.33

JUMLAH 8,484.58

DIBULATKAN 8,484.00

Page 81: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 2Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)

6.14 0.1000 kg Plamir tembok @ Rp. 8,500.00

0.1000 kg Cat dasar @ Rp. 9,500.00

0.2600 kg Cat penutup 2 x @ Rp. 9,500.00

0.0630 org Tukang cat @ Rp. 25,000.00 1,575.00

0.0063 org Kepala tukang cat @ Rp. 27,000.00 170.10

0.0200 org Pekerja @ Rp. 20,000.00 400.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 2,226.35

JASA 10 % 222.64

JUMLAH 2,448.99

DIBULATKAN 2,448.00

SNI 1.0000 m 2Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)

6.15 0.1200 kg Cat dasar @ Rp. 9,500.00

0.1800 kg Cat penutup 2 x @ Rp. 9,500.00

0.0420 org Tukang cat @ Rp. 25,000.00 1,050.00

0.0042 org Kepala tukang cat @ Rp. 27,000.00 113.40

0.0280 org Pekerja @ Rp. 20,000.00 560.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 1,804.65

JASA 10 % 180.47

JUMLAH 1,985.12

DIBULATKAN 1,985.00

SNI 1.0000 m 2Pengecatan tembok tidak terlindung dari panas dan hujan

6.14 0.1000 kg Cat alkali resisting primer @ Rp. 27,200.00

0.3600 kg Cat ICI Weathershield @ Rp. 50,000.00

0.0630 org Tukang cat @ Rp. 25,000.00 1,575.00

0.0063 org Kepala tukang cat @ Rp. 27,000.00 170.10

0.0200 org Pekerja @ Rp. 20,000.00 400.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 2,226.35

JASA 10 % 222.64

JUMLAH 2,448.99

DIBULATKAN 2,448.00

SNI 1.0000 m 2Melabur tembok dengan kapur sirih

6.17 0.1000 lbr Amplas @ Rp. 2,500.00

0.2500 ikat Alang-alang @ Rp. 500.00

0.0020 m3Perancah kayu @ Rp. 1,000,000.00

0.1500 kg Kapur sirih @ Rp. 500.00

0.0010 org Tukang cat @ Rp. 25,000.00 25.00

0.0001 org Kepala tukang cat @ Rp. 27,000.00 2.70

0.1500 org Pekerja @ Rp. 20,000.00 3,000.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 3,108.95

JASA 10 % 310.90

JUMLAH 3,419.85

DIBULATKAN 3,419.00

Page 82: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 2Melabur tembok lama dengan kapur sirih (untuk pemeliharaan)

6.18 0.0020 m3Perancah kayu @ Rp. 1,000,000.00

0.3000 kg Kapur sirih @ Rp. 500.00

0.0050 org Tukang cat @ Rp. 25,000.00 125.00

0.0005 org Kepala tukang cat @ Rp. 27,000.00 13.50

0.0400 org Pekerja @ Rp. 20,000.00 800.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 1,019.75

JASA 10 % 101.98

JUMLAH 1,121.73

DIBULATKAN 1,121.00

SNI 1.0000 m 2Pengecatan bidang besi ( 3 x )

6.9 0.1670 kg Cat meni besi @ Rp. 12,000.00

0.2000 kg Cat besi @ Rp. 32,000.00

0.1500 ltr Thinner @ Rp. 12,000.00

0.1050 org Tukang cat @ Rp. 25,000.00 2,625.00

0.0040 org Kepala tukang cat @ Rp. 27,000.00 108.00

0.0700 org Pekerja @ Rp. 20,000.00 1,400.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 4,214.25

JASA 10 % 421.43

JUMLAH 4,635.68

DIBULATKAN 4,635.00

SNI 1.0000 m 2Pengecacatan permukaan baja dengan meni besi

6.20 0.1000 kg Meni besi sinkromat @ Rp. 22,500.00

0.0100 bh Kuas @ Rp. 8,000.00

0.2000 org Tukang cat @ Rp. 25,000.00 5,000.00

0.0200 org Kepala tukang cat @ Rp. 27,000.00 540.00

0.0200 org Pekerja @ Rp. 20,000.00 400.00

0.0100 org Mandor @ Rp. 32,500.00 325.00

JUMLAH ( BELUM PPN ) 6,265.00

JASA 10 % 626.50

JUMLAH 6,891.50

DIBULATKAN 6,891.00

SNI 1.0000 m 2Pengecacatan permukaan baja dengan meni besi memakai perancah

6.21 0.1000 kg Meni besi sinkromat @ Rp. 22,500.00

0.0100 bh Kuas @ Rp. 8,000.00

0.0020 m3Perancah kayu @ Rp. 1,000,000.00

0.2250 org Tukang cat @ Rp. 25,000.00 5,625.00

0.0225 org Kepala tukang cat @ Rp. 27,000.00 607.50

0.2250 org Pekerja @ Rp. 20,000.00 4,500.00

0.0075 org Mandor @ Rp. 32,500.00 243.75

JUMLAH ( BELUM PPN ) 10,976.25

JASA 10 % 1,097.63

JUMLAH 12,073.88

DIBULATKAN 12,073.00

Page 83: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 2Pengetiran kayu ( 2 x )

0.3500 kg Tir @ Rp. 8,000.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

0.0050 org Mandor @ Rp. 32,500.00 162.50

JUMLAH ( BELUM PPN ) 2,162.50

JASA 10 % 216.25

JUMLAH 2,378.75

DIBULATKAN 2,378.00

Empiris 1.0000 m 2Pekerjaan cat duco 3 x

0.4250 kg Cat duco @ Rp. 60,000.00

0.0570 ltr Thinner @ Rp. 13,000.00

0.1000 lbr Amplas @ Rp. 2,500.00 250.00

0.3000 org Tukang cat @ Rp. 25,000.00 7,500.00

0.0300 org Kep. Tk. Cat @ Rp. 27,000.00 810.00

0.2000 org Pekerja @ Rp. 20,000.00 4,000.00

0.0100 org Mandor @ Rp. 32,500.00 325.00

JUMLAH ( BELUM PPN ) 12,885.00

JASA 10 % 1,288.50

JUMLAH 14,173.50

DIBULATKAN 14,173.00

Empiris 1.0000 m 2Mengerjakan Cat Sungging

Mengerjakan cat dasar

0.1200 kg Cat menie kayu @ Rp. 12,000.00

0.0400 org Tukang cat @ Rp. 25,000.00 1,000.00

0.0040 org Kep. Tk. Cat @ Rp. 27,000.00 108.00

0.0667 org Pekerja @ Rp. 20,000.00 1,334.00

0.0033 org Mandor @ Rp. 32,500.00 107.25

JUMLAH ( A ) 2,549.25

Mengecat dan membuat gradasi tutulan berkali-kali

0.4250 kg Cat kayu @ Rp. 32,000.00

0.1000 ltr Minyak cat @ Rp. 10,000.00

5.0000 org Tukang cat sungging @ Rp. 40,000.00 200,000.00

0.5000 org Kep. Tk. Cat sungging @ Rp. 45,000.00 22,500.00

0.2000 org Pekerja @ Rp. 20,000.00 4,000.00

0.0100 org Mandor @ Rp. 32,500.00 325.00

JUMLAH ( B ) 226,825.00

JUMLAH A + B ( BELUM PPN ) 229,374.25

JASA 10 % 22,937.43

JUMLAH 252,311.68

DIBULATKAN 252,311.00

31 1.0000 m 2Mengecat genteng

0.3600 kg Cat genteng air ICI Weathershield @ Rp. 42,000.00

0.0630 org Tukang cat @ Rp. 25,000.00 1,575.00

0.0063 org Kep. Tk. Cat @ Rp. 27,000.00 170.10

0.0200 org Pekerja @ Rp. 20,000.00 400.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH 2,226.35

JASA 10 % 222.64

JUMLAH 2,448.99

DIBULATKAN 2,448.00

PEKERJAAN BONGKARAN

AK 1.0000 m 3Membongkar pasangan batu kali

4.0000 org Tukang batu @ Rp. 27,500.00 110,000.00

0.4000 org Pekerja @ Rp. 20,000.00 8,000.00

JUMLAH ( BELUM PPN ) 118,000.00

JASA 10 % 11,800.00

JUMLAH 129,800.00

DIBULATKAN 129,800.00

Page 84: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

AK 1.0000 m 3Membongkar pasangan batu merah dan membersihkan

2.0000 org Tukang batu @ Rp. 27,500.00 55,000.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

JUMLAH ( BELUM PPN ) 57,000.00

JASA 10 % 5,700.00

JUMLAH 62,700.00

DIBULATKAN 62,700.00

AK 1.0000 m 3Membongkar beton bertulang dan membersihkan

0.2000 org Tukang batu @ Rp. 27,500.00 5,500.00

8.0000 org Pekerja @ Rp. 20,000.00 160,000.00

0.1000 org Mandor @ Rp. 32,500.00 3,250.00

JUMLAH ( BELUM PPN ) 168,750.00

JASA 10 % 16,875.00

JUMLAH 185,625.00

DIBULATKAN 185,625.00

Page 85: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

AK 10.0000 m 2Pekerjaan bongkar lantai tegel untuk dipergunakan lagi

2.0000 org Pekerja @ Rp. 20,000.00 40,000.00

0.1000 org Mandor @ Rp. 32,500.00 3,250.00

JUMLAH ( BELUM PPN ) 43,250.00

TIAP 1M2 ( BELUM PPN ) 4,325.00

JASA 10 % 432.50

JUMLAH 4,757.50

DIBULATKAN 4,757.00

I.6 10.0000 m 2Mengupas plesteran lama

1.2500 org Pekerja @ Rp. 20,000.00 25,000.00

0.1250 org Mandor @ Rp. 32,500.00 4,062.50

JUMLAH ( BELUM PPN ) 29,062.50

TIAP 1M2 ( BELUM PPN ) 2,906.25

JASA 10 % 290.63

JUMLAH 3,196.88

DIBULATKAN 3,196.00

I.7 10.0000 m 2Membongkar genteng / sirap untuk dipergunakan lagi

2.0000 org Pekerja @ Rp. 20,000.00 40,000.00

0.1000 org Mandor @ Rp. 32,500.00 3,250.00

JUMLAH ( BELUM PPN ) 43,250.00

TIAP 1M2 ( BELUM PPN ) 4,325.00

JASA 10 % 432.50

JUMLAH 4,757.50

DIBULATKAN 4,757.00

I.8 10.0000 m 2Membongkar atap seng

0.5000 org Tukang besi @ Rp. 25,000.00 12,500.00

1.0000 org Pekerja @ Rp. 20,000.00 20,000.00

JUMLAH ( BELUM PPN ) 32,500.00

TIAP 1M2 ( BELUM PPN ) 3,250.00

JASA 10 % 325.00

JUMLAH 3,575.00

DIBULATKAN 3,575.00

I.9 10.0000 m 2Membongkar usuk / reng dipakai lagi

0.6000 org Tukang kayu @ Rp. 30,000.00 18,000.00

0.0600 org Kep. Tk. Kayu @ Rp. 32,500.00 1,950.00

2.0000 org Pekerja @ Rp. 20,000.00 40,000.00

0.1000 org Mandor @ Rp. 32,500.00 3,250.00

JUMLAH ( BELUM PPN ) 63,200.00

TIAP 1M2 ( BELUM PPN ) 6,320.00

JASA 10 % 632.00

JUMLAH 6,952.00

DIBULATKAN 6,952.00

10.0000 m 2Membongkar usuk / reng tidak dipakai lagi

2.0000 org Pekerja @ Rp. 20,000.00 40,000.00

0.1000 org Mandor @ Rp. 32,500.00 3,250.00

JUMLAH ( BELUM PPN ) 43,250.00

TIAP 1M2 ( BELUM PPN ) 4,325.00

JASA 10 % 432.50

JUMLAH 4,757.50

DIBULATKAN 4,757.00

Page 86: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

L.12 1.0000 m 3Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk digunakan lagi

6.0000 org Tukang kayu @ Rp. 30,000.00 180,000.00

0.6000 org Kep. Tk. Kayu @ Rp. 32,500.00 19,500.00

4.0000 org Pekerja @ Rp. 20,000.00 80,000.00

0.2000 org Mandor @ Rp. 32,500.00 6,500.00

JUMLAH ( BELUM PPN ) 286,000.00

JASA 10 % 28,600.00

JUMLAH 314,600.00

DIBULATKAN 314,600.00

1.0000 m 3Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak digunakan lagi

1.0000 org Pekerja @ Rp. 20,000.00 20,000.00

0.2000 org Mandor @ Rp. 32,500.00 6,500.00

JUMLAH ( BELUM PPN ) 26,500.00

JASA 10 % 2,650.00

JUMLAH 29,150.00

DIBULATKAN 29,150.00

L.14 1.0000 m 3Mengerjakan kembali bangunan kayu yang telah dibongkar

12.0000 org Tukang kayu @ Rp. 30,000.00 360,000.00

1.2000 org Kep. Tk. Kayu @ Rp. 32,500.00 39,000.00

4.0000 org Pekerja @ Rp. 20,000.00 80,000.00

0.2000 org Mandor @ Rp. 32,500.00 6,500.00

JUMLAH ( BELUM PPN ) 485,500.00

JASA 10 % 48,550.00

JUMLAH 534,050.00

DIBULATKAN 534,050.00

ANALISA SUPLEMEN

3 1.0000 M Pengelasan Single ( las listrik )

3.0000 kg Kawat las @ Rp. 6,500.00

1.0000 hari Peralatan las @ Rp. 75,000.00

0.5000 org Tukang las @ Rp. 27,500.00 13,750.00

0.0500 org Kepala tukang las @ Rp. 29,000.00 1,450.00

1.0000 Org Pekerja @ Rp. 27,500.00 27,500.00

1.0000 Org Mandor @ Rp. 32,500.00 32,500.00

JUMLAH ( BELUM PPN ) 75,200.00

JASA 10 % 7,520.00

JUMLAH 82,720.00

DIBULATKAN 82,720.00

Page 87: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

PEKERJAAN SANITASI

SNI 1.0000 bh Memasang kloset duduk/monoblock

1.0000 bh Kloset duduk / monoblock @ Rp. 1,250,000.00

6.1 6% x Harga kloset (Perlengkapan) @ Rp. 1,250,000.00

1.1000 org Tukang batu @ Rp. 27,500.00 30,250.00

0.0010 org Kepala tukang batu @ Rp. 30,000.00 30.00

3.3000 org Pekerja @ Rp. 20,000.00 66,000.00

0.1600 org Mandor @ Rp. 32,500.00 5,200.00

JUMLAH ( BELUM PPN ) 101,480.00

JASA 10 % 10,148.00

JUMLAH 111,628.00

DIBULATKAN 111,628.00

SNI 1.0000 bh Memasang kloset jongkok porselen

1.0000 bh Kloset jongkok porselen @ Rp. 75,000.00

6.2 6.0000 kg PC @ Rp. 764.00

0.0100 m3Pasir pasang @ Rp. 76,000.00

1.5000 org Tukang batu @ Rp. 27,500.00 41,250.00

1.5000 org Kepala tukang batu @ Rp. 30,000.00 45,000.00

1.0000 org Pekerja @ Rp. 20,000.00 20,000.00

0.1600 org Mandor @ Rp. 32,500.00 5,200.00

JUMLAH ( BELUM PPN ) 111,450.00

JASA 10 % 11,145.00

JUMLAH 122,595.00

DIBULATKAN 122,595.00

SNI 1.0000 bh Memasang urinoir

1.0000 bh Urinoir @ Rp. 785,000.00

6.4 30% x Harga urinoir (Perlengkapan) @ Rp. 785,000.00

6.0000 kg PC @ Rp. 764.00

0.0100 m3Pasir pasang @ Rp. 76,000.00

1.0000 org Tukang batu @ Rp. 27,500.00 27,500.00

0.1000 org Kepala tukang batu @ Rp. 30,000.00 3,000.00

1.0000 org Pekerja @ Rp. 20,000.00 20,000.00

0.1000 org Mandor @ Rp. 32,500.00 3,250.00

JUMLAH ( BELUM PPN ) 53,750.00

JASA 10 % 5,375.00

JUMLAH 59,125.00

DIBULATKAN 59,125.00

SNI 1.0000 bh Memasang wastafel

1.0000 bh Wastafel @ Rp. 271,340.00

6.5 12% x Harga wastafel (Perlengkapan) @ Rp. 271,340.00

6.0000 kg PC @ Rp. 764.00

0.0100 m3Pasir pasang @ Rp. 76,000.00

1.4500 org Tukang batu @ Rp. 27,500.00 39,875.00

0.1500 org Kepala tukang batu @ Rp. 30,000.00 4,500.00

1.2000 org Pekerja @ Rp. 20,000.00 24,000.00

0.1000 org Mandor @ Rp. 32,500.00 3,250.00

JUMLAH ( BELUM PPN ) 71,625.00

JASA 10 % 7,162.50

JUMLAH 78,787.50

DIBULATKAN 78,787.00

Page 88: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 bh Memasang bak mandi fiberglass volume 0,30 m 3

1.0000 bh Bak fiberglass @ Rp. 275,000.00

6.7 18% x Harga bak(Perlengkapan) @ Rp. 275,000.00

2.7000 org Tukang batu @ Rp. 27,500.00 74,250.00

0.5400 org Kepala tukang batu @ Rp. 30,000.00 16,200.00

1.8000 org Pekerja @ Rp. 20,000.00 36,000.00

0.1100 org Mandor @ Rp. 32,500.00 3,575.00

JUMLAH ( BELUM PPN ) 130,025.00

JASA 10 % 13,002.50

JUMLAH 143,027.50

DIBULATKAN 143,027.00

SNI 1.0000 bh Memasang badkip porselen

1.0000 bh Badkip @ Rp. 150,000.00

6.9 20% x Harga badkip (Perlengkapan) @ Rp. 150,000.00

0.0750 org Tukang batu @ Rp. 27,500.00 2,062.50

0.7500 org Kepala tukang batu @ Rp. 30,000.00 22,500.00

org Pekerja @ Rp. 20,000.00 -

0.2500 org Mandor @ Rp. 32,500.00 8,125.00

JUMLAH ( BELUM PPN ) 32,687.50

JASA 10 % 3,268.75

JUMLAH 35,956.25

DIBULATKAN 35,956.00

SNI 1.0000 bh Memasang bak fiberglass volume 1 m 3 air

1.0000 bh Bak fiberglass @ Rp. 825,000.00

6.11 12% x Harga bak (Perlengkapan) @ Rp. 825,000.00

4.5000 org Tukang batu @ Rp. 27,500.00 123,750.00

0.9000 org Kepala tukang batu @ Rp. 30,000.00 27,000.00

3.0000 org Pekerja @ Rp. 20,000.00 60,000.00

0.9000 org Mandor @ Rp. 32,500.00 29,250.00

JUMLAH ( BELUM PPN ) 240,000.00

JASA 10 % 24,000.00

JUMLAH 264,000.00

DIBULATKAN 264,000.00

SNI 1.0000 m 1Memasang pipa beton, diameter 15 cm - 20 cm

1.1000 bh Pipa beton @ Rp. 24,000.00

6.14 16.0000 bh Batu bata @ Rp. 350.00

3.9200 kg PC @ Rp. 764.00

0.0560 m3Pasir pasang @ Rp. 76,000.00

0.0240 m3Pasir urug @ Rp. 55,000.00

0.0700 org Tukang batu @ Rp. 27,500.00 1,925.00

0.0070 org Kepala tukang batu @ Rp. 30,000.00 210.00

0.1400 org Pekerja @ Rp. 20,000.00 2,800.00

0.0070 org Mandor @ Rp. 32,500.00 227.50

JUMLAH ( BELUM PPN ) 5,162.50

JASA 10 % 516.25

JUMLAH 5,678.75

DIBULATKAN 5,678.00

SNI 1.0000 m 1Memasang pipa beton, diameter 30 cm - 100 cm

1.1000 bh Pipa beton @ Rp. 25,000.00

6.15 330.0000 bh Batu bata @ Rp. 350.00

10.3000 kg PC @ Rp. 764.00

0.0610 m3Pasir pasang @ Rp. 76,000.00

0.0690 m3Pasir urug @ Rp. 55,000.00

0.1900 org Tukang batu @ Rp. 27,500.00 5,225.00

0.0190 org Kepala tukang batu @ Rp. 30,000.00 570.00

0.3800 org Pekerja @ Rp. 20,000.00 7,600.00

0.0190 org Mandor @ Rp. 32,500.00 617.50

JUMLAH ( BELUM PPN ) 14,012.50

JASA 10 % 1,401.25

JUMLAH 15,413.75

Page 89: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

DIBULATKAN 15,413.00

SNI 1.0000 bh Memasang bak kontrol pas.bata (30 x 30) cm, tinggi 35 cm

87.0000 bh Batu bata @ Rp. 350.00

6.16 44.0000 kg PC @ Rp. 764.00

0.0700 m3Pasir pasang @ Rp. 76,000.00

0.0700 m3Batu kerikil @ Rp. 55,000.00

1.6000 kg Besi beton @ Rp. 7,900.00

0.0600 m3Pasir beton @ Rp. 73,000.00

1.0150 org Tukang batu @ Rp. 27,500.00 27,912.50

0.0015 org Kepala tukang batu @ Rp. 30,000.00 45.00

3.2000 org Pekerja @ Rp. 20,000.00 64,000.00

0.0160 org Mandor @ Rp. 32,500.00 520.00

JUMLAH ( BELUM PPN ) 92,477.50

JASA 10 % 9,247.75

JUMLAH 101,725.25

DIBULATKAN 101,725.00

Page 90: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 bh Memasang bak kontrol pas. bata (45 x 45) cm, tinggi 50 cm

150.0000 bh Batu bata @ Rp. 350.00

6.17 77.0000 kg PC @ Rp. 764.00

0.1300 m3Pasir pasang @ Rp. 76,000.00

0.0200 m3Batu kerikil @ Rp. 55,000.00

2.6000 kg Besi beton @ Rp. 7,900.00

0.0900 m3Pasir beton @ Rp. 73,000.00

0.4730 org Tukang batu @ Rp. 27,500.00 13,007.50

0.0470 org Kepala tukang batu @ Rp. 30,000.00 1,410.00

1.4200 org Pekerja @ Rp. 20,000.00 28,400.00

0.0710 org Mandor @ Rp. 32,500.00 2,307.50

JUMLAH ( BELUM PPN ) 45,125.00

JASA 10 % 4,512.50

JUMLAH 49,637.50

DIBULATKAN 49,637.00

SNI 1.0000 bh Memasang bak kontrol pas. bata (60 x 60) cm, tingg 65 cm

222.0000 bh Batu bata @ Rp. 350.00

6.18 114.0000 kg PC @ Rp. 764.00

0.1840 m3Pasir pasang @ Rp. 76,000.00

0.0330 m3Batu kerikil @ Rp. 55,000.00

4.8500 kg Besi beton @ Rp. 7,900.00

0.1200 m3Pasir beton @ Rp. 73,000.00

0.7200 org Tukang batu @ Rp. 27,500.00 19,800.00

0.0720 org Kepala tukang batu @ Rp. 30,000.00 2,160.00

2.1600 org Pekerja @ Rp. 20,000.00 43,200.00

0.1000 org Mandor @ Rp. 32,500.00 3,250.00

JUMLAH ( BELUM PPN ) 68,410.00

JASA 10 % 6,841.00

JUMLAH 75,251.00

DIBULATKAN 75,251.00

SNI 1.0000 m 1Memasang pipa galvanis diameter 1/2"

1.2000 m1Pipa galvanis @ Rp. 15,000.00

6.19 35% x Harga pipa (Perlengkapan) @ Rp. 15,000.00

0.0900 org Tukang batu @ Rp. 27,500.00 2,475.00

0.0090 org Kepala tukang batu @ Rp. 30,000.00 270.00

0.0540 org Pekerja @ Rp. 20,000.00 1,080.00

0.0270 org Mandor @ Rp. 32,500.00 877.50

JUMLAH ( BELUM PPN ) 4,702.50

JASA 10 % 470.25

JUMLAH 5,172.75

DIBULATKAN 5,172.00

SNI 1.0000 m 1Memasang pipa galvanis diameter 3/4"

1.2000 m1Pipa galvanis @ Rp. 25,000.00

6.20 35% x Harga pipa (Perlengkapan) @ Rp. 25,000.00

0.0900 org Tukang batu @ Rp. 27,500.00 2,475.00

0.0090 org Kepala tukang batu @ Rp. 30,000.00 270.00

0.0540 org Pekerja @ Rp. 20,000.00 1,080.00

0.0270 org Mandor @ Rp. 32,500.00 877.50

JUMLAH ( BELUM PPN ) 4,702.50

JASA 10 % 470.25

JUMLAH 5,172.75

DIBULATKAN 5,172.00

SNI 1.0000 m 1Memasang pipa galvanis diameter 1"

1.2000 m1Pipa galvanis @ Rp. 37,500.00

6.21 35% x Harga pipa (Perlengkapan) @ Rp. 37,500.00

0.0900 org Tukang batu @ Rp. 27,500.00 2,475.00

0.0090 org Kepala tukang batu @ Rp. 30,000.00 270.00

0.0540 org Pekerja @ Rp. 20,000.00 1,080.00

0.0270 org Mandor @ Rp. 32,500.00 877.50

Page 91: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

JUMLAH ( BELUM PPN ) 4,702.50

JASA 10 % 470.25

JUMLAH 5,172.75

DIBULATKAN 5,172.00

SNI 1.0000 m 1Memasang pipa galvanis diameter 1 1/2"

1.2000 m1Pipa galvanis @ Rp. 50,000.00

6.22 35% x Harga pipa (Perlengkapan) @ Rp. 50,000.00

0.1800 org Tukang batu @ Rp. 27,500.00 4,950.00

0.0180 org Kepala tukang batu @ Rp. 30,000.00 540.00

0.1080 org Pekerja @ Rp. 20,000.00 2,160.00

0.0054 org Mandor @ Rp. 32,500.00 175.50

JUMLAH ( BELUM PPN ) 7,825.50

JASA 10 % 782.55

JUMLAH 8,608.05

DIBULATKAN 8,608.00

Page 92: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 1Memasang pipa PVC tipe AW diameter 1/2"

1.2000 m1Pipa PVC @ Rp. 3,162.50

6.25 35% x Harga pipa (Perlengkapan) @ Rp. 3,162.50

0.0600 org Tukang batu @ Rp. 27,500.00 1,650.00

0.0060 org Kepala tukang batu @ Rp. 30,000.00 180.00

0.0360 org Pekerja @ Rp. 20,000.00 720.00

0.0018 org Mandor @ Rp. 32,500.00 58.50

JUMLAH ( BELUM PPN ) 2,608.50

JASA 10 % 260.85

JUMLAH 2,869.35

DIBULATKAN 2,869.00

SNI 1.0000 m 1Memasang pipa PVC tipe AW diameter 3/4"

1.2000 m1Pipa PVC @ Rp. 4,250.00

6.26 35% x Harga pipa (Perlengkapan) @ Rp. 4,250.00

0.0600 org Tukang batu @ Rp. 27,500.00 1,650.00

0.0060 org Kepala tukang batu @ Rp. 30,000.00 180.00

0.0360 org Pekerja @ Rp. 20,000.00 720.00

0.0018 org Mandor @ Rp. 32,500.00 58.50

JUMLAH ( BELUM PPN ) 2,608.50

JASA 10 % 260.85

JUMLAH 2,869.35

DIBULATKAN 2,869.00

SNI 1.0000 m 1Memasang pipa PVC tipe AW diameter 1"

1.2000 m1Pipa PVC @ Rp. 5,125.00

6.27 35% x Harga pipa (Perlengkapan) @ Rp. 5,125.00

0.0600 org Tukang batu @ Rp. 27,500.00 1,650.00

0.0060 org Kepala tukang batu @ Rp. 30,000.00 180.00

0.0360 org Pekerja @ Rp. 20,000.00 720.00

0.0018 org Mandor @ Rp. 32,500.00 58.50

JUMLAH ( BELUM PPN ) 2,608.50

JASA 10 % 260.85

JUMLAH 2,869.35

DIBULATKAN 2,869.00

SNI 1.0000 m 1Memasang pipa PVC tipe AW diameter 1 1/2"

1.2000 m1Pipa PVC @ Rp. 11,250.00

6.28 35% x Harga pipa (Perlengkapan) @ Rp. 11,250.00

0.0600 org Tukang batu @ Rp. 27,500.00 1,650.00

0.0060 org Kepala tukang batu @ Rp. 30,000.00 180.00

0.0360 org Pekerja @ Rp. 20,000.00 720.00

0.0018 org Mandor @ Rp. 32,500.00 58.50

JUMLAH ( BELUM PPN ) 2,608.50

JASA 10 % 260.85

JUMLAH 2,869.35

DIBULATKAN 2,869.00

Page 93: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 1Memasang pipa PVC tipe AW diameter 2"

1.2000 m1Pipa PVC @ Rp. 15,000.00

6.29 35% x Harga pipa (Perlengkapan) @ Rp. 15,000.00

0.0900 org Tukang batu @ Rp. 27,500.00 2,475.00

0.0090 org Kepala tukang batu @ Rp. 30,000.00 270.00

0.0544 org Pekerja @ Rp. 20,000.00 1,088.00

0.0027 org Mandor @ Rp. 32,500.00 87.75

JUMLAH ( BELUM PPN ) 3,920.75

JASA 10 % 392.08

JUMLAH 4,312.83

DIBULATKAN 4,312.00

SNI 1.0000 m 1Memasang pipa PVC tipe AW diameter 2 1/2"

1.2000 m1Pipa PVC @ Rp. 20,500.00

6.30 35% x Harga pipa (Perlengkapan) @ Rp. 20,500.00

0.0600 org Tukang batu @ Rp. 27,500.00 1,650.00

0.0060 org Kepala tukang batu @ Rp. 30,000.00 180.00

0.0360 org Pekerja @ Rp. 20,000.00 720.00

0.0018 org Mandor @ Rp. 32,500.00 58.50

JUMLAH ( BELUM PPN ) 2,608.50

JASA 10 % 260.85

JUMLAH 2,869.35

DIBULATKAN 2,869.00

SNI 1.0000 m 1Memasang pipa PVC tipe AW diameter 3"

1.2000 m1Pipa PVC @ Rp. 20,500.00

6.31 35% x Harga pipa (Perlengkapan) @ Rp. 20,500.00

0.1350 org Tukang batu @ Rp. 27,500.00 3,712.50

0.0135 org Kepala tukang batu @ Rp. 30,000.00 405.00

0.0810 org Pekerja @ Rp. 20,000.00 1,620.00

0.0410 org Mandor @ Rp. 32,500.00 1,332.50

JUMLAH ( BELUM PPN ) 7,070.00

JASA 10 % 707.00

JUMLAH 7,777.00

DIBULATKAN 7,777.00

SNI 1.0000 m 1Memasang pipa PVC tipe AW diameter 4"

1.2000 m1Pipa PVC @ Rp. 33,750.00

6.32 35% x Harga pipa (Perlengkapan) @ Rp. 33,750.00

0.1350 org Tukang batu @ Rp. 27,500.00 3,712.50

0.0135 org Kepala tukang batu @ Rp. 30,000.00 405.00

0.0810 org Pekerja @ Rp. 20,000.00 1,620.00

0.0410 org Mandor @ Rp. 32,500.00 1,332.50

JUMLAH ( BELUM PPN ) 7,070.00

JASA 10 % 707.00

JUMLAH 7,777.00

DIBULATKAN 7,777.00

Page 94: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 bh Memasang bak cuci piring stainless steel

1.0000 bh Bak cuci stainless steel @ Rp. 500,000.00

6.33 1.0000 set Water drain + asesories @ Rp. 75,000.00

0.3000 org Tukang batu @ Rp. 27,500.00 8,250.00

0.0300 org Kepala tukang batu @ Rp. 30,000.00 900.00

0.0300 org Pekerja @ Rp. 20,000.00 600.00

0.0015 org Mandor @ Rp. 32,500.00 48.75

JUMLAH ( BELUM PPN ) 9,798.75

JASA 10 % 979.88

JUMLAH 10,778.63

DIBULATKAN 10,778.00

SNI 1.0000 bh Memasang kran diameter 3/4" atau 1/2"

1.0000 bh Kran air @ Rp. 25,000.00

6.35 0.0250 bh Seal tape @ Rp. 2,500.00

0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00

0.0100 org Kepala tukang batu @ Rp. 30,000.00 300.00

0.0100 org Pekerja @ Rp. 20,000.00 200.00

0.0050 org Mandor @ Rp. 32,500.00 162.50

JUMLAH ( BELUM PPN ) 3,412.50

JASA 10 % 341.25

JUMLAH 3,753.75

DIBULATKAN 3,753.00

SNI 1.0000 bh Memasang floor drain

1.0000 bh Floor drain @ Rp. 55,000.00

6.35 0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00

0.0100 org Kepala tukang batu @ Rp. 30,000.00 300.00

0.0100 org Pekerja @ Rp. 20,000.00 200.00

0.0050 org Mandor @ Rp. 32,500.00 162.50

JUMLAH ( BELUM PPN ) 3,412.50

JASA 10 % 341.25

JUMLAH 3,753.75

DIBULATKAN 3,753.00

PEKERJAAN BESI DAN ALUMUNIUM

3 1.0000 M Pengelasan Single ( las listrik )

3.0000 kg Kawat las @ Rp. 6,500.00

1.0000 hari Peralatan las @ Rp. 75,000.00

0.5000 org Tukang las @ Rp. 27,500.00 13,750.00

0.0500 org Kepala tukang las @ Rp. 29,000.00 1,450.00

1.0000 Org Pekerja @ Rp. 27,500.00 27,500.00

1.0000 Org Mandor @ Rp. 32,500.00 32,500.00

JUMLAH ( BELUM PPN ) 75,200.00

JASA 10 % 7,520.00

JUMLAH 82,720.00

DIBULATKAN 82,720.00

SNI 1.0000 kg Pasang rangka atap baja

1.1000 kg Baja profil IWF @ Rp. 8,800.00

6.1 0.0800 kg Meni besi @ Rp. 22,500.00

0.0060 org Tukang besi @ Rp. 25,000.00 150.00

0.0060 org Kepala tukang besi @ Rp. 27,000.00 162.00

0.0600 org Pekerja @ Rp. 20,000.00 1,200.00

0.0003 org Mandor @ Rp. 32,500.00 9.75

JUMLAH ( BELUM PPN ) 1,521.75

JASA 10 % 152.18

JUMLAH 1,673.93

DIBULATKAN 1,673.00

Page 95: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 2Pasang pintu besi baja

1.0000 m2Pintu besi baja @ Rp. 750,000.00

6.2 0.6500 org Tukang besi konstruksi @ Rp. 25,000.00 16,250.00

0.0650 org Kepala tukang besi @ Rp. 27,000.00 1,755.00

0.6500 org Pekerja @ Rp. 20,000.00 13,000.00

0.0320 org Mandor @ Rp. 32,500.00 1,040.00

JUMLAH ( BELUM PPN ) 32,045.00

JASA 10 % 3,204.50

JUMLAH 35,249.50

DIBULATKAN 35,249.00

SNI 1.0000 m 2Pasang pintu gulung besi

1.0000 m2Pintu gulung besi @ Rp. 250,000.00

6.5 1.2000 org Tukang besi konstruksi @ Rp. 25,000.00 30,000.00

0.1200 org Kepala tukang besi @ Rp. 27,000.00 3,240.00

1.2000 org Pekerja @ Rp. 20,000.00 24,000.00

0.0060 org Mandor @ Rp. 32,500.00 195.00

JUMLAH ( BELUM PPN ) 57,435.00

JASA 10 % 5,743.50

JUMLAH 63,178.50

DIBULATKAN 63,178.00

SNI 1.0000 m 2Pasang pintu lipat

1.0000 m2Pintu lipat @ Rp. 500,000.00

6.6 1.0500 org Tukang besi konstruksi @ Rp. 25,000.00 26,250.00

0.1050 org Kepala tukang besi @ Rp. 27,000.00 2,835.00

1.0500 org Pekerja @ Rp. 20,000.00 21,000.00

0.0052 org Mandor @ Rp. 32,500.00 169.00

JUMLAH ( BELUM PPN ) 50,254.00

JASA 10 % 5,025.40

JUMLAH 55,279.40

DIBULATKAN 55,279.00

Page 96: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 2Pasang Rolling door

1.0000 m2Roll door @ Rp. 200,000.00

6.8 1.5000 org Tukang besi konstruksi @ Rp. 25,000.00 37,500.00

0.1050 org Kepala tukang besi @ Rp. 27,000.00 2,835.00

1.0500 org Pekerja @ Rp. 20,000.00 21,000.00

0.0052 org Mandor @ Rp. 32,500.00 169.00

JUMLAH ( BELUM PPN ) 61,504.00

JASA 10 % 6,150.40

JUMLAH 67,654.40

DIBULATKAN 67,654.00

SNI 1.0000 m 2Pasang pintu alumunium

1.0000 m2Pintu alumunium @ Rp. 400,000.00

6.9 1.0500 org Tukang besi konstruksi @ Rp. 25,000.00 26,250.00

0.1050 org Kepala tukang besi @ Rp. 27,000.00 2,835.00

1.0500 org Pekerja @ Rp. 20,000.00 21,000.00

0.0052 org Mandor @ Rp. 32,500.00 169.00

JUMLAH ( BELUM PPN ) 50,254.00

JASA 10 % 5,025.40

JUMLAH 55,279.40

DIBULATKAN 55,279.00

SNI 1.0000 m 2Pasang teralis besi

11.5000 m1Baja strip 2 x 3 @ Rp. 8,800.00

6.12 1.2000 org Tukang las @ Rp. 27,500.00 33,000.00

0.0120 org Kepala tukang las @ Rp. 29,000.00 348.00

1.2000 org Pekerja @ Rp. 20,000.00 24,000.00

0.0006 org Mandor @ Rp. 32,500.00 19.50

JUMLAH ( BELUM PPN ) 57,367.50

JASA 10 % 5,736.75

JUMLAH 63,104.25

DIBULATKAN 63,104.00

SNI 1.0000 m 2Pasang kawat harmonika

1.1000 m2Kawat harmonika @ Rp. 25,000.00

6.13 0.0200 kg Paku biasa 1/2" - 1" @ Rp. 10,000.00

0.0018 m3Kayu kamper papan @ Rp. 5,500,000.00

0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00

0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

0.0005 org Mandor @ Rp. 32,500.00 16.25

JUMLAH ( BELUM PPN ) 5,341.25

JASA 10 % 534.13

JUMLAH 5,875.38

DIBULATKAN 5,875.00

Page 97: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

SNI 1.0000 m 2Pasang kawat nyamuk

1.1000 m2Kawat nyamuk @ Rp. 8,250.00

6.14 0.0200 kg Paku biasa 1/2" - 1" @ Rp. 10,000.00

0.0018 m3Kayu kamper papan @ Rp. 5,500,000.00

0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00

0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

0.0005 org Mandor @ Rp. 32,500.00 16.25

JUMLAH ( BELUM PPN ) 5,341.25

JASA 10 % 534.13

JUMLAH 5,875.38

DIBULATKAN 5,875.00

SNI 1.0000 m 2Pasang kawat kassa

1.1000 m2Kawat kassa @ Rp. 10,000.00

6.15 0.0200 kg Paku biasa 1/2" - 1" @ Rp. 10,000.00

0.0018 m3Kayu kamper papan @ Rp. 5,500,000.00

0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00

0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

0.0005 org Mandor @ Rp. 32,500.00 16.25

JUMLAH ( BELUM PPN ) 5,341.25

JASA 10 % 534.13

JUMLAH 5,875.38

DIBULATKAN 5,875.00

SNI 1.0000 m 2Pasang jendela nako & tralis

1.1000 m2Jendela nako @ Rp. 20,000.00

6.17 0.0200 kg Paku skrup @ Rp. 10,000.00

0.0250 m2Besi strip @ Rp. 7,500.00

0.2000 org Tukang kayu @ Rp. 30,000.00 6,000.00

0.0200 org Kepala tukang kayu @ Rp. 32,500.00 650.00

0.2000 org Pekerja @ Rp. 20,000.00 4,000.00

0.0010 org Mandor @ Rp. 32,500.00 32.50

JUMLAH ( BELUM PPN ) 10,682.50

JASA 10 % 1,068.25

JUMLAH 11,750.75

DIBULATKAN 11,750.00

PEKERJAAN KUNCI DAN KACA

6.1 1.0000 bh Pasang kunci tanam antik

1.0000 bh Kunci tanam antik @ Rp. 250,000.00

0.6000 org Tukang kayu @ Rp. 30,000.00 18,000.00

0.0600 org Kepala tukang kayu @ Rp. 32,500.00 1,950.00

0.0600 org Pekerja @ Rp. 20,000.00 1,200.00

0.0030 org Mandor @ Rp. 32,500.00 97.50

JUMLAH ( BELUM PPN ) 21,247.50

JASA 10 % 2,124.75

JUMLAH 23,372.25

DIBULATKAN 23,372.00

Page 98: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

6.2 1.0000 bh Pasang kunci tanam biasa

1.0000 bh Kunci tanam biasa @ Rp. 125,000.00

0.5000 org Tukang kayu @ Rp. 30,000.00 15,000.00

0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00

0.0100 org Pekerja @ Rp. 20,000.00 200.00

0.0050 org Mandor @ Rp. 32,500.00 162.50

JUMLAH ( BELUM PPN ) 15,687.50

JASA 10 % 1,568.75

JUMLAH 17,256.25

DIBULATKAN 17,256.00

6.3 1.0000 bh Pasang kunci tanam kamar mandi

1.0000 bh Kunci tanam kamar mandi @ Rp. 50,000.00

0.5000 org Tukang kayu @ Rp. 30,000.00 15,000.00

0.0050 org Kepala tukang kayu @ Rp. 32,500.00 162.50

0.0050 org Pekerja @ Rp. 20,000.00 100.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 15,343.75

JASA 10 % 1,534.38

JUMLAH 16,878.13

DIBULATKAN 16,878.00

6.4 1.0000 bh Pasang kunci tanam silinder

1.0000 bh Kunci silinder @ Rp. 75,000.00

0.5000 org Tukang kayu @ Rp. 30,000.00 15,000.00

0.0050 org Kepala tukang kayu @ Rp. 32,500.00 162.50

0.0050 org Pekerja @ Rp. 20,000.00 100.00

0.0003 org Mandor @ Rp. 32,500.00 8.13

JUMLAH ( BELUM PPN ) 15,270.63

JASA 10 % 1,527.06

JUMLAH 16,797.69

DIBULATKAN 16,797.00

6.5 1.0000 bh Pasang engsel pintu

1.0000 bh Engsel pintu @ Rp. 11,000.00

0.1500 org Tukang kayu @ Rp. 30,000.00 4,500.00

0.0150 org Kepala tukang kayu @ Rp. 32,500.00 487.50

0.0150 org Pekerja @ Rp. 20,000.00 300.00

0.0008 org Mandor @ Rp. 32,500.00 24.38

JUMLAH ( BELUM PPN ) 5,311.88

JASA 10 % 531.19

JUMLAH 5,843.06

DIBULATKAN 5,843.00

6.6 1.0000 bh Pasang engsel jendela kupu-kupu

1.0000 bh Engsel jendela @ Rp. 7,500.00

0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00

0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00

0.0100 org Pekerja @ Rp. 20,000.00 200.00

0.0050 org Mandor @ Rp. 32,500.00 162.50

JUMLAH ( BELUM PPN ) 3,687.50

JASA 10 % 368.75

JUMLAH 4,056.25

DIBULATKAN 4,056.00

6.7 1.0000 bh Pasang engsel angin

1.0000 bh Engsel angin @ Rp. 3,000.00

0.2000 org Tukang kayu @ Rp. 30,000.00 6,000.00

0.0200 org Kepala tukang kayu @ Rp. 32,500.00 650.00

0.0200 org Pekerja @ Rp. 20,000.00 400.00

0.0100 org Mandor @ Rp. 32,500.00 325.00

JUMLAH ( BELUM PPN ) 7,375.00

JASA 10 % 737.50

JUMLAH 8,112.50

DIBULATKAN 8,112.00

Page 99: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

6.8 1.0000 bh Pasang spring knip

1.0000 bh Spring knip @ Rp. 7,500.00

0.1500 org Tukang kayu @ Rp. 30,000.00 4,500.00

0.0150 org Kepala tukang kayu @ Rp. 32,500.00 487.50

0.0150 org Pekerja @ Rp. 20,000.00 300.00

0.0008 org Mandor @ Rp. 32,500.00 24.38

JUMLAH ( BELUM PPN ) 5,311.88

JASA 10 % 531.19

JUMLAH 5,843.06

DIBULATKAN 5,843.00

6.9 1.0000 bh Pasang kait angin

1.0000 bh Kait angin @ Rp. 3,000.00

0.1500 org Tukang kayu @ Rp. 30,000.00 4,500.00

0.0150 org Kepala tukang kayu @ Rp. 32,500.00 487.50

0.0150 org Pekerja @ Rp. 20,000.00 300.00

0.0008 org Mandor @ Rp. 32,500.00 24.38

JUMLAH ( BELUM PPN ) 5,311.88

JASA 10 % 531.19

JUMLAH 5,843.06

DIBULATKAN 5,843.00

6.10 1.0000 bh Pasang door closer

1.0000 bh Door closer @ Rp. 150,000.00

0.5000 org Tukang kayu @ Rp. 30,000.00 15,000.00

0.0500 org Kepala tukang kayu @ Rp. 32,500.00 1,625.00

0.0500 org Pekerja @ Rp. 20,000.00 1,000.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 17,706.25

JASA 10 % 1,770.63

JUMLAH 19,476.88

DIBULATKAN 19,476.00

6.11 1.0000 bh Pasang kunci selot

1.0000 bh Kunci selot @ Rp. 50,000.00

0.2000 org Tukang kayu @ Rp. 30,000.00 6,000.00

0.0200 org Kepala tukang kayu @ Rp. 32,500.00 650.00

0.0200 org Pekerja @ Rp. 20,000.00 400.00

0.0010 org Mandor @ Rp. 32,500.00 32.50

JUMLAH ( BELUM PPN ) 7,082.50

JASA 10 % 708.25

JUMLAH 7,790.75

DIBULATKAN 7,790.00

6.12 1.0000 bh Pasang pegangan pintu / door holder

1.0000 bh Door holder @ Rp. 15,000.00

0.5000 org Tukang kayu @ Rp. 30,000.00 15,000.00

0.0500 org Kepala tukang kayu @ Rp. 32,500.00 1,625.00

0.0500 org Pekerja @ Rp. 20,000.00 1,000.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 17,706.25

JASA 10 % 1,770.63

JUMLAH 19,476.88

DIBULATKAN 19,476.00

6.13 1.0000 bh Pasang door stop

1.0000 bh Door stop @ Rp. 15,000.00

0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00

0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00

0.0100 org Pekerja @ Rp. 20,000.00 200.00

0.0005 org Mandor @ Rp. 32,500.00 16.25

JUMLAH ( BELUM PPN ) 3,541.25

JASA 10 % 354.13

JUMLAH 3,895.38

DIBULATKAN 3,895.00

Page 100: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

6.14 1.0000 bh Pasang rel pintu dorong

1.0000 bh Rel pintu dorong @ Rp. 200,000.00

0.6000 org Tukang kayu @ Rp. 30,000.00 18,000.00

0.0600 org Kepala tukang kayu @ Rp. 32,500.00 1,950.00

0.0600 org Pekerja @ Rp. 20,000.00 1,200.00

0.0030 org Mandor @ Rp. 32,500.00 97.50

JUMLAH ( BELUM PPN ) 21,247.50

JASA 10 % 2,124.75

JUMLAH 23,372.25

DIBULATKAN 23,372.00

6.15 1.0000 bh Pasang kunci lemari

1.0000 bh Kunci lemari @ Rp. 12,000.00

0.2500 org Tukang kayu @ Rp. 30,000.00 7,500.00

0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50

0.0250 org Pekerja @ Rp. 20,000.00 500.00

0.0013 org Mandor @ Rp. 32,500.00 40.63

JUMLAH ( BELUM PPN ) 8,853.13

JASA 10 % 885.31

JUMLAH 9,738.44

DIBULATKAN 9,738.00

6.16 1.0000 m 2Pasang kaca, tebal 3 mm

1.1000 m2Kaca polos @ Rp. 49,500.00

0.1500 org Tukang kayu @ Rp. 30,000.00 4,500.00

0.0150 org Kepala tukang kayu @ Rp. 32,500.00 487.50

0.0150 org Pekerja @ Rp. 20,000.00 300.00

0.0008 org Mandor @ Rp. 32,500.00 24.38

JUMLAH ( BELUM PPN ) 5,311.88

JASA 10 % 531.19

JUMLAH 5,843.06

DIBULATKAN 5,843.00

6.17 1.0000 m 2Pasang kaca, tebal 5 mm

1.1000 m2Kaca polos @ Rp. 60,500.00

0.1500 org Tukang kayu @ Rp. 30,000.00 4,500.00

0.0150 org Kepala tukang kayu @ Rp. 32,500.00 487.50

0.0150 org Pekerja @ Rp. 20,000.00 300.00

0.0008 org Mandor @ Rp. 32,500.00 24.38

JUMLAH ( BELUM PPN ) 5,311.88

JASA 10 % 531.19

JUMLAH 5,843.06

DIBULATKAN 5,843.00

6.20 1.0000 m 2Pasang kaca cermin, tebal 5 mm

1.1000 m2Kaca cermin @ Rp. 120,000.00

0.1500 org Tukang kayu @ Rp. 30,000.00 4,500.00

0.0150 org Kepala tukang kayu @ Rp. 32,500.00 487.50

0.0150 org Pekerja @ Rp. 20,000.00 300.00

0.0008 org Mandor @ Rp. 32,500.00 24.38

JUMLAH ( BELUM PPN ) 5,311.88

JASA 10 % 531.19

JUMLAH 5,843.06

DIBULATKAN 5,843.00

6.24 1.0000 m 2Pasang kaca patri, tebal 5 mm

1.1000 m2Kaca patri @ Rp. 300,000.00

0.1500 org Tukang kayu @ Rp. 30,000.00 4,500.00

0.0150 org Kepala tukang kayu @ Rp. 32,500.00 487.50

0.0150 org Pekerja @ Rp. 20,000.00 300.00

0.0008 org Mandor @ Rp. 32,500.00 24.38

JUMLAH ( BELUM PPN ) 5,311.88

JASA 10 % 531.19

JUMLAH 5,843.06

Page 101: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

DIBULATKAN 5,843.00

Page 102: Rab Versi Sni Lengkap

No. Upah

(1) (3)

Macam Pekerjaan

(2)

6.17 1.0000 m 1Pasang kusen alumunium

1.1000 m1Kusen alumunium @ Rp. 55,000.00

15% x Harga kusen (Perlengkapan) @ Rp. 55,000.00

0.1500 oh Tukang alumunium @ Rp. 25,000.00 3,750.00

0.0150 oh Kepala tukang @ Rp. 27,000.00 405.00

0.0150 oh Pekerja @ Rp. 20,000.00 300.00

0.0008 oh Mandor @ Rp. 32,500.00 24.38

JUMLAH ( BELUM PPN ) 4,479.38

JASA 10 % 447.94

JUMLAH 4,927.31

DIBULATKAN 4,927.00

Page 103: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

-

-

-

-

-

- 493,000.00

49,300.00

542,300.00

542,300.00

- 5,423.00

20,136.00

160.00

11,746.00

ANALISA SATUAN PEKERJAAN

Page 104: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

32,042.00 37,529.50

3,204.20 3,752.95

35,246.20 41,282.45

35,246.00 41,282.00

- 3,625.00

362.50

3,987.50

3,987.00

58,730.00

35,000.00

6,000.00

48,000.00

12,835.20

1,971.00

3,185.33

165,721.53 295,865.28

16,572.15 29,586.53

182,293.68 325,451.80

182,293.00 325,451.00

22,000.00

2,359.50

3,800.00

28,159.50 51,409.50

2,815.95 5,140.95

30,975.45 56,550.45

30,975.00 56,550.00

Page 105: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

12,500.00

302,040.00

6,800.00

9,680.00

26,740.00

11,400.00

7,300.00

11,797.50

10,500.00

9,625.00

40,000.00

4,840.00

5,250.00

2,475.00

460,947.50 599,822.50

46,094.75 59,982.25

507,042.25 659,804.75

507,042.00 659,804.00

12,500.00

1,910.00

30,000.00

365.00

707.85

41,950.00

480.00

4,800.00

92,712.85 108,012.85

9,271.29 10,801.29

101,984.14 118,814.14

101,984.00 118,814.00

- 9,300.00

930.00

10,230.00

10,230.00

- 12,229.50

1,222.95

13,452.45

13,452.00

Page 106: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

- 17,088.75

1,708.88

18,797.63

18,797.00

Page 107: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

- 14,515.00

1,451.50

15,966.50

15,966.00

- 29,062.50

2,906.25

31,968.75

31,968.00

- 19,157.50

1,915.75

21,073.25

21,073.00

64,000.00

64,000.00 115,988.75

6,400.00 11,598.88

70,400.00 127,587.63

70,400.00 127,587.00

6,925.00

692.50

7,617.50

7,617.00

- 11,945.00

1,194.50

13,139.50

13,139.00

5,325.00

532.50

5,857.50

5,857.00

4,457.50

445.75

4,903.25

Page 108: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

4,903.00

Page 109: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

5,325.00

532.50

5,857.50

5,857.00

66,000.00

66,000.00 72,325.00

6,600.00 7,232.50

72,600.00 79,557.50

72,600.00 79,557.00

42,000.00

42,000.00 48,325.00

4,200.00 4,832.50

46,200.00 53,157.50

46,200.00 53,157.00

79,200.00

79,200.00 85,012.50

7,920.00 8,501.25

87,120.00 93,513.75

87,120.00 93,513.00

90,000.00

90,000.00 93,487.50

9,000.00 9,348.75

99,000.00 102,836.25

99,000.00 102,836.00

1,400.00

5,000.00

6,400.00 17,212.50

640.00 1,721.25

7,040.00 18,933.75

7,040.00 18,933.00

Page 110: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

96,000.00

16,500.00

112,500.00 141,262.50

11,250.00 14,126.25

123,750.00 155,388.75

123,750.00 155,388.00

88,000.00

16,602.50

18,320.00

41,344.00

164,266.50 215,004.00

16,426.65 21,500.40

180,693.15 236,504.40

180,693.00 236,504.00

96,000.00

72,900.88

16,602.50

29,032.00

214,535.38 265,272.88

21,453.54 26,527.29

235,988.92 291,800.17

235,988.00 291,800.00

88,000.00

46,604.00

10,657.50

37,392.00

182,653.50 233,391.00

18,265.35 23,339.10

200,918.85 256,730.10

200,918.00 256,730.00

88,000.00

124,532.00

39,520.00

Page 111: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

252,052.00 302,789.50

25,205.20 30,278.95

277,257.20 333,068.45

277,257.00 333,068.00

Page 112: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

24,500.00

3,438.00

1,087.50

3,800.00

32,825.50 42,763.00

3,282.55 4,276.30

36,108.05 47,039.30

36,108.00 47,039.00

24,500.00

8,786.00

3,268.00

36,554.00 46,491.50

3,655.40 4,649.15

40,209.40 51,140.65

40,209.00 51,140.00

49,000.00

7,701.12

1,993.75

7,030.00

65,724.87 85,799.87

6,572.49 8,579.99

72,297.36 94,379.86

72,297.00 94,379.00

49,000.00

20,207.80

7,448.00

76,655.80 96,730.80

7,665.58 9,673.08

84,321.38 106,403.88

84,321.00 106,403.00

18,750.00

9,550.00

3,040.00

Page 113: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

31,340.00 45,202.50

3,134.00 4,520.25

34,474.00 49,722.75

34,474.00 49,722.00

Page 114: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

32,000.00

9,550.00

3,040.00

44,590.00 58,452.50

4,459.00 5,845.25

49,049.00 64,297.75

49,049.00 64,297.00

-

256,704.00

39,420.00

63,706.50

359,830.50 413,755.50

35,983.05 41,375.55

395,813.55 455,131.05

395,813.00 455,131.00

166,552.00

37,960.00

68,425.50

272,937.50 316,162.50

27,293.75 31,616.25

300,231.25 347,778.75

300,231.00 347,778.00

56,000.00

46,795.00

30,400.00

51,122.50

184,317.50 344,567.50

18,431.75 34,456.75

202,749.25 379,024.25

202,749.00 379,024.00

Page 115: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

305,600.00

35,040.00

62,920.00

403,560.00 486,735.00

40,356.00 48,673.50

443,916.00 535,408.50

443,916.00 535,408.00

296,432.00

47,450.00

51,122.50

395,004.50 555,254.50

39,500.45 55,525.45

434,504.95 610,779.95

434,504.00 610,779.00

305,600.00

29,200.00

64,493.00

399,293.00 559,543.00

39,929.30 55,954.30

439,222.30 615,497.30

439,222.00 615,497.00

328,520.00

37,668.00

54,268.50

420,456.50 580,706.50

42,045.65 58,070.65

462,502.15 638,777.15

462,502.00 638,777.00

8,295.00

141.00

8,436.00 8,779.65

843.60 877.97

9,279.60 9,657.62

9,279.00 9,657.00

Page 116: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

8,400.00

141.00

8,541.00 8,884.65

854.10 888.47

9,395.10 9,773.12

9,395.00 9,773.00

28,526.00

24,000.00

3,200.00

55,726.00 76,676.00

5,572.60 7,667.60

61,298.60 84,343.60

61,298.00 84,343.00

28,526.00

31,230.00

3,200.00

62,956.00 83,906.00

6,295.60 8,390.60

69,251.60 92,296.60

69,251.00 92,296.00

- 80,000.00

8,000.00

88,000.00

88,000.00

700,000.00

700,000.00 1,124,812.50

70,000.00 112,481.25

770,000.00 1,237,293.75

770,000.00 1,237,293.00

Page 117: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

640,000.00

640,000.00 804,275.00

64,000.00 80,427.50

704,000.00 884,702.50

704,000.00 884,702.00

395,813.55 455,131.05

927,960.00 965,761.50

612,986.00 843,436.00

- 88,000.00

1,936,759.55 2,352,328.55

1,936,759.00 2,352,328.00

395,813.55 455,131.05

1,159,950.00 1,207,201.88

612,986.00 843,436.00

- 88,000.00

2,168,749.55 2,593,768.93

2,168,749.00 2,593,768.00

395,813.55 455,131.05

1,391,940.00 1,448,642.25

612,986.00 843,436.00

- 88,000.00

2,400,739.55 2,835,209.30

2,400,739.00 2,835,209.00

395,813.55 455,131.05

1,623,930.00 1,690,082.63

612,986.00 843,436.00

- 88,000.00

2,632,729.55 3,076,649.68

2,632,729.00 3,076,649.00

395,813.55 455,131.05

1,855,920.00 1,931,523.00

612,986.00 843,436.00

- 88,000.00

2,864,719.55 3,318,090.05

2,864,719.00 3,318,090.00

Page 118: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

395,813.55 455,131.05

927,960.00 965,761.50

612,986.00 843,436.00

770,000.00 1,237,293.75

- 88,000.00

2,706,759.55 3,589,622.30

2,706,759.00 3,589,622.00

Page 119: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

395,813.55 455,131.05

1,159,950.00 1,207,201.88

612,986.00 843,436.00

770,000.00 1,237,293.75

- 88,000.00

2,938,749.55 3,831,062.68

2,938,749.00 3,831,062.00

395,813.55 455,131.05

1,391,940.00 1,448,642.25

612,986.00 843,436.00

770,000.00 1,237,293.75

- 88,000.00

3,170,739.55 4,072,503.05

3,170,739.00 4,072,503.00

395,813.55 455,131.05

1,623,930.00 1,690,082.63

612,986.00 843,436.00

770,000.00 1,237,293.75

- 88,000.00

3,402,729.55 4,313,943.43

3,402,729.00 4,313,943.00

395,813.55 455,131.05

1,855,920.00 1,931,523.00

612,986.00 843,436.00

770,000.00 1,237,293.75

- 88,000.00

3,634,719.55 4,555,383.80

3,634,719.00 4,555,383.00

395,813.55 455,131.05

927,960.00 965,761.50

612,986.00 843,436.00

704,000.00 884,702.50

- 88,000.00

2,640,759.55 3,237,031.05

2,640,759.00 3,237,031.00

395,813.55 455,131.05

1,159,950.00 1,207,201.88

612,986.00 843,436.00

704,000.00 884,702.50

- 88,000.00

2,872,749.55 3,478,471.43

Page 120: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

2,872,749.00 3,478,471.00

Page 121: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

395,813.55 455,131.05

1,391,940.00 1,448,642.25

612,986.00 843,436.00

704,000.00 884,702.50

- 88,000.00

3,104,739.55 3,719,911.80

3,104,739.00 3,719,911.00

395,813.55 455,131.05

1,623,930.00 1,690,082.63

612,986.00 843,436.00

704,000.00 884,702.50

- 88,000.00

3,336,729.55 3,961,352.18

3,336,729.00 3,961,352.00

395,813.55 455,131.05

1,855,920.00 1,931,523.00

612,986.00 843,436.00

704,000.00 884,702.50

- 88,000.00

3,568,719.55 4,202,792.55

3,568,719.00 4,202,792.00

4,974.40

1,588.40

6,562.80 21,312.80

656.28 2,131.28

7,219.08 23,444.08

7,219.00 23,444.00

Page 122: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

1,405.76

435.00

1,064.00

2,904.76 11,804.76

290.48 1,180.48

3,195.24 12,985.24

3,195.00 12,985.00

3,972.80

1,520.00

5,492.80 14,392.80

549.28 1,439.28

6,042.08 15,832.08

6,042.00 15,832.00

5,401.48

1,596.00

6,997.48 18,719.98

699.75 1,872.00

7,697.23 20,591.98

7,697.00 20,591.00

382.00

152.00

534.00 3,924.00

53.40 392.40

587.40 4,316.40

587.00 4,316.00

3,300.48

1,216.00

4,516.48 9,911.48

451.65 991.15

4,968.13 10,902.63

4,968.00 10,902.00

Page 123: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

3,300.48

880.00

4,180.48 12,717.98

418.05 1,271.80

4,598.53 13,989.78

4,598.00 13,989.00

2,674.00

2,674.00 5,194.25

267.40 519.43

2,941.40 5,713.68

2,941.00 5,713.00

63,000.00

8,977.00

2,660.00

74,637.00 99,287.00

7,463.70 9,928.70

82,100.70 109,215.70

82,100.00 109,215.00

28,000.00

1,160.00

2,432.00

764.00

32,356.00 50,793.50

3,235.60 5,079.35

35,591.60 55,872.85

35,591.00 55,872.00

Page 124: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

20,000.00

1,160.00

2,432.00

764.00

24,356.00 42,793.50

2,435.60 4,279.35

26,791.60 47,072.85

26,791.00 47,072.00

40,500.00

3,575.52

684.00

1,312.50

46,072.02 66,728.27

4,607.20 6,672.83

50,679.22 73,401.10

50,679.00 73,401.00

42,500.00

3,117.12

684.00

787.50

47,088.62 67,744.87

4,708.86 6,774.49

51,797.48 74,519.36

51,797.00 74,519.00

30,000.00

3,117.12

684.00

787.50

34,588.62 55,244.87

3,458.86 5,524.49

38,047.48 60,769.36

38,047.00 60,769.00

Page 125: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

32,000.00

3,117.12

684.00

787.50

36,588.62 57,244.87

3,658.86 5,724.49

40,247.48 62,969.36

40,247.00 62,969.00

32,500.00

3,117.12

684.00

787.50

37,088.62 57,744.87

3,708.86 5,774.49

40,797.48 63,519.36

40,797.00 63,519.00

9,200.00

916.80

228.00

600.00

10,944.80 13,157.30

1,094.48 1,315.73

12,039.28 14,473.03

12,039.00 14,473.00

Page 126: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

5,850.00

1,260.60

243.20

600.00

7,953.80 10,166.30

795.38 1,016.63

8,749.18 11,182.93

8,749.00 11,182.00

33,660.00

311.71

68.40

78.75

34,118.86 38,250.11

3,411.89 3,825.01

37,530.75 42,075.12

37,530.00 42,075.00

25,000.00

311.71

68.40

78.75

25,458.86 29,590.11

2,545.89 2,959.01

28,004.75 32,549.12

28,004.00 32,549.00

37,500.00

7,105.20

1,368.00

1,968.75

47,941.95 74,686.95

4,794.20 7,468.70

52,736.15 82,155.65

52,736.00 82,155.00

Page 127: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

38,250.00

2,750.00

41,000.00 59,437.50

4,100.00 5,943.75

45,100.00 65,381.25

45,100.00 65,381.00

46,700.00

2,750.00

49,450.00 67,887.50

4,945.00 6,788.75

54,395.00 74,676.25

54,395.00 74,676.00

38,100.00

2,750.00

40,850.00 59,287.50

4,085.00 5,928.75

44,935.00 65,216.25

44,935.00 65,216.00

46,700.00

2,750.00

49,450.00 67,887.50

4,945.00 6,788.75

54,395.00 74,676.25

54,395.00 74,676.00

Page 128: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

43,500.00

2,750.00

46,250.00 64,687.50

4,625.00 6,468.75

50,875.00 71,156.25

50,875.00 71,156.00

52,000.00

2,750.00

54,750.00 73,187.50

5,475.00 7,318.75

60,225.00 80,506.25

60,225.00 80,506.00

43,500.00

2,750.00

46,250.00 64,687.50

4,625.00 6,468.75

50,875.00 71,156.25

50,875.00 71,156.00

52,000.00

2,750.00

54,750.00 73,187.50

5,475.00 7,318.75

60,225.00 80,506.25

60,225.00 80,506.00

41,400.00

2,750.00

44,150.00 62,587.50

4,415.00 6,258.75

48,565.00 68,846.25

48,565.00 68,846.00

Page 129: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

41,400.00

2,750.00

44,150.00 62,587.50

4,415.00 6,258.75

48,565.00 68,846.25

48,565.00 68,846.00

32,000.00

32,000.00 40,812.50

3,200.00 4,081.25

35,200.00 44,893.75

35,200.00 44,893.00

5,225,000.00

112,500.00

6,400.00

5,343,900.00 5,829,400.00

534,390.00 582,940.00

5,878,290.00 6,412,340.00

5,878,290.00 6,412,340.00

4,785,000.00

112,500.00

6,400.00

4,903,900.00 5,389,400.00

490,390.00 538,940.00

5,394,290.00 5,928,340.00

5,394,290.00 5,928,340.00

6,325,000.00

112,500.00

6,400.00

6,443,900.00 6,929,400.00

644,390.00 692,940.00

7,088,290.00 7,622,340.00

7,088,290.00 7,622,340.00

Page 130: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

112,500.00

6,400.00

118,900.00 604,400.00

11,890.00 60,440.00

130,790.00 664,840.00

130,790.00 664,840.00

6,325,000.00

6,400.00

6,331,400.00 6,816,900.00

633,140.00 681,690.00

6,964,540.00 7,498,590.00

6,964,540.00 7,498,590.00

6,400.00

6,400.00 491,900.00

640.00 49,190.00

7,040.00 541,090.00

7,040.00 541,090.00

1,200.00

800.00

2,000.00 7,406.25

200.00 740.63

2,200.00 8,146.88

2,200.00 8,146.00

154,000.00

60,000.00

1,200.00

800.00

216,000.00 221,406.25

21,600.00 22,140.63

237,600.00 243,546.88

237,600.00 243,546.00

Page 131: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

154,000.00

17,250.00

1,200.00

800.00

173,250.00 178,656.25

17,325.00 17,865.63

190,575.00 196,521.88

190,575.00 196,521.00

44,275.00

60,000.00

1,200.00

800.00

106,275.00 111,681.25

10,627.50 11,168.13

116,902.50 122,849.38

116,902.00 122,849.00

44,275.00

17,250.00

1,200.00

800.00

63,525.00 68,931.25

6,352.50 6,893.13

69,877.50 75,824.38

69,877.00 75,824.00

Page 132: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

154,000.00

96,000.00

1,200.00

800.00

252,000.00 257,406.25

25,200.00 25,740.63

277,200.00 283,146.88

277,200.00 283,146.00

44,275.00

38,400.00

1,200.00

800.00

84,675.00 90,081.25

8,467.50 9,008.13

93,142.50 99,089.38

93,142.00 99,089.00

44,275.00

27,600.00

1,200.00

800.00

73,875.00 79,281.25

7,387.50 7,928.13

81,262.50 87,209.38

81,262.00 87,209.00

22,000,000.00

22,000,000.00 22,794,750.00

2,200,000.00 2,279,475.00

24,200,000.00 25,074,225.00

24,200,000.00 25,074,225.00

8,800,000.00

8,800,000.00 9,594,750.00

880,000.00 959,475.00

9,680,000.00 10,554,225.00

Page 133: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

9,680,000.00 10,554,225.00

Page 134: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

5,700,000.00

5,700,000.00 6,434,750.00

570,000.00 643,475.00

6,270,000.00 7,078,225.00

6,270,000.00 7,078,225.00

5,220,000.00

5,220,000.00 5,954,750.00

522,000.00 595,475.00

5,742,000.00 6,550,225.00

5,742,000.00 6,550,225.00

6,900,000.00

6,900,000.00 7,634,750.00

690,000.00 763,475.00

7,590,000.00 8,398,225.00

7,590,000.00 8,398,225.00

431,200.00

240.00

3,300.00

69,500.00

504,240.00 583,715.00

50,424.00 58,371.50

554,664.00 642,086.50

554,664.00 642,086.00

160,720.00

240.00

3,300.00

69,500.00

233,760.00 313,235.00

23,376.00 31,323.50

257,136.00 344,558.50

257,136.00 344,558.00

Page 135: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

107,800.00

240.00

3,300.00

69,500.00

180,840.00 260,315.00

18,084.00 26,031.50

198,924.00 286,346.50

198,924.00 286,346.00

93,100.00

240.00

3,300.00

69,500.00

166,140.00 245,615.00

16,614.00 24,561.50

182,754.00 270,176.50

182,754.00 270,176.00

117,600.00

240.00

3,300.00

69,500.00

190,640.00 270,115.00

19,064.00 27,011.50

209,704.00 297,126.50

209,704.00 297,126.00

770,000.00

770,000.00 853,800.00

77,000.00 85,380.00

847,000.00 939,180.00

847,000.00 939,180.00

287,000.00

287,000.00 370,800.00

28,700.00 37,080.00

315,700.00 407,880.00

315,700.00 407,880.00

Page 136: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

192,500.00

192,500.00 276,300.00

19,250.00 27,630.00

211,750.00 303,930.00

211,750.00 303,930.00

166,250.00

166,250.00 250,050.00

16,625.00 25,005.00

182,875.00 275,055.00

182,875.00 275,055.00

210,000.00

210,000.00 293,800.00

21,000.00 29,380.00

231,000.00 323,180.00

231,000.00 323,180.00

880,000.00

880,000.00 984,750.00

88,000.00 98,475.00

968,000.00 1,083,225.00

968,000.00 1,083,225.00

328,000.00

328,000.00 432,750.00

32,800.00 43,275.00

360,800.00 476,025.00

360,800.00 476,025.00

220,000.00

220,000.00 324,750.00

22,000.00 32,475.00

Page 137: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

242,000.00 357,225.00

242,000.00 357,225.00

Page 138: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

190,000.00

190,000.00 294,750.00

19,000.00 29,475.00

209,000.00 324,225.00

209,000.00 324,225.00

240,000.00

240,000.00 344,750.00

24,000.00 34,475.00

264,000.00 379,225.00

264,000.00 379,225.00

1,408,000.00

1,408,000.00 1,537,500.00

140,800.00 153,750.00

1,548,800.00 1,691,250.00

1,548,800.00 1,691,250.00

524,800.00

524,800.00 654,300.00

52,480.00 65,430.00

577,280.00 719,730.00

577,280.00 719,730.00

352,000.00

352,000.00 473,375.00

35,200.00 47,337.50

387,200.00 520,712.50

387,200.00 520,712.00

304,000.00

304,000.00 425,375.00

30,400.00 42,537.50

Page 139: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

334,400.00 467,912.50

334,400.00 467,912.00

Page 140: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

384,000.00

384,000.00 505,375.00

38,400.00 50,537.50

422,400.00 555,912.50

422,400.00 555,912.00

800.00

800.00 12,356.25

80.00 1,235.63

880.00 13,591.88

880.00 13,591.00

57,000.00

800.00

57,800.00 69,356.25

5,780.00 6,935.63

63,580.00 76,291.88

63,580.00 76,291.00

52,200.00

800.00

53,000.00 64,556.25

5,300.00 6,455.63

58,300.00 71,011.88

58,300.00 71,011.00

69,000.00

800.00

69,800.00 81,356.25

6,980.00 8,135.63

76,780.00 89,491.88

76,780.00 89,491.00

61,750.00

Page 141: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

960.00

62,710.00 75,363.75

6,271.00 7,536.38

68,981.00 82,900.13

68,981.00 82,900.00

Page 142: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

56,550.00

960.00

57,510.00 70,163.75

5,751.00 7,016.38

63,261.00 77,180.13

63,261.00 77,180.00

74,750.00

960.00

75,710.00 88,363.75

7,571.00 8,836.38

83,281.00 97,200.13

83,281.00 97,200.00

11,000.00

115.00

11,115.00 14,091.25

1,111.50 1,409.13

12,226.50 15,500.38

12,226.00 15,500.00

11,000.00

5,200.00

115.00

100.00

16,415.00 19,391.25

1,641.50 1,939.13

18,056.50 21,330.38

18,056.00 21,330.00

57,000.00

600.00

11,000.00

68,600.00 83,132.50

6,860.00 8,313.25

75,460.00 91,445.75

75,460.00 91,445.00

Page 143: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

52,200.00

600.00

11,000.00

63,800.00 78,332.50

6,380.00 7,833.25

70,180.00 86,165.75

70,180.00 86,165.00

69,000.00

600.00

11,000.00

80,600.00 95,132.50

8,060.00 9,513.25

88,660.00 104,645.75

88,660.00 104,645.00

600.00

11,000.00

5,200.00

115.00

100.00

17,015.00 31,547.50

1,701.50 3,154.75

18,716.50 34,702.25

18,716.00 34,702.00

57,000.00

600.00

11,000.00

5,200.00

115.00

100.00

74,015.00 88,547.50

7,401.50 8,854.75

81,416.50 97,402.25

81,416.00 97,402.00

52,200.00

600.00

11,000.00

5,200.00

115.00

100.00

Page 144: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

69,215.00 83,747.50

6,921.50 8,374.75

76,136.50 92,122.25

76,136.00 92,122.00

Page 145: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

69,000.00

600.00

11,000.00

5,200.00

115.00

100.00

86,015.00 100,547.50

8,601.50 10,054.75

94,616.50 110,602.25

94,616.00 110,602.00

61,750.00

15,120.00

500.00

1,575.00

900.00

1,000.00

960.00

81,805.00 99,297.50

8,180.50 9,929.75

89,985.50 109,227.25

89,985.00 109,227.00

56,550.00

15,120.00

500.00

1,575.00

900.00

1,000.00

960.00

76,605.00 94,097.50

7,660.50 9,409.75

84,265.50 103,507.25

84,265.00 103,507.00

74,750.00

15,120.00

500.00

1,575.00

900.00

1,000.00

960.00

94,805.00 112,297.50

9,480.50 11,229.75

Page 146: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

104,285.50 123,527.25

104,285.00 123,527.00

42,750.00

15,120.00

500.00

1,575.00

900.00

1,500.00

2,500.00

64,845.00 82,337.50

6,484.50 8,233.75

71,329.50 90,571.25

71,329.00 90,571.00

Page 147: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

61,750.00

16,632.00

500.00

1,575.00

900.00

1,000.00

960.00

83,317.00 100,809.50

8,331.70 10,080.95

91,648.70 110,890.45

91,648.00 110,890.00

56,550.00

16,632.00

500.00

1,575.00

900.00

1,000.00

960.00

78,117.00 95,609.50

7,811.70 9,560.95

85,928.70 105,170.45

85,928.00 105,170.00

74,750.00

16,632.00

500.00

1,575.00

900.00

1,000.00

960.00

96,317.00 113,809.50

9,631.70 11,380.95

105,948.70 125,190.45

105,948.00 125,190.00

42,750.00

16,632.00

500.00

1,575.00

900.00

1,500.00

2,500.00

66,357.00 83,849.50

Page 148: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

6,635.70 8,384.95

72,992.70 92,234.45

72,992.00 92,234.00

Page 149: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

72,000.00

1,425.00

2,500.00

187,500.00

263,425.00 283,293.75

26,342.50 28,329.38

289,767.50 311,623.13

289,767.00 311,623.00

4,400.00

2,450.00

1,050.00

7,900.00 11,606.50

790.00 1,160.65

8,690.00 12,767.15

8,690.00 12,767.00

8,800.00

3,062.50

1,320.00

13,182.50 16,889.00

1,318.25 1,688.90

14,500.75 18,577.90

14,500.00 18,577.00

16,500.00

3,675.00

1,590.00

21,765.00 25,556.25

2,176.50 2,555.63

23,941.50 28,111.88

23,941.00 28,111.00

6,050.00

100.00

6,150.00 8,910.00

615.00 891.00

6,765.00 9,801.00

6,765.00 9,801.00

Page 150: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

105,600.00

480.00

106,080.00 111,567.50

10,608.00 11,156.75

116,688.00 122,724.25

116,688.00 122,724.00

189,200.00

480.00

189,680.00 195,167.50

18,968.00 19,516.75

208,648.00 214,684.25

208,648.00 214,684.00

39,360.00

480.00

39,840.00 45,327.50

3,984.00 4,532.75

43,824.00 49,860.25

43,824.00 49,860.00

26,400.00

480.00

26,880.00 32,367.50

2,688.00 3,236.75

29,568.00 35,604.25

29,568.00 35,604.00

47,300.00

480.00

47,780.00 53,267.50

4,778.00 5,326.75

52,558.00 58,594.25

52,558.00 58,594.00

Page 151: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

22,800.00

480.00

23,280.00 28,767.50

2,328.00 2,876.75

25,608.00 31,644.25

25,608.00 31,644.00

Page 152: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

40,850.00

480.00

41,330.00 46,817.50

4,133.00 4,681.75

45,463.00 51,499.25

45,463.00 51,499.00

28,800.00

480.00

29,280.00 34,767.50

2,928.00 3,476.75

32,208.00 38,244.25

32,208.00 38,244.00

51,600.00

480.00

52,080.00 57,567.50

5,208.00 5,756.75

57,288.00 63,324.25

57,288.00 63,324.00

118,750.00

10,000.00

2,400.00

131,150.00 203,975.00

13,115.00 20,397.50

144,265.00 224,372.50

144,265.00 224,372.00

108,750.00

10,000.00

2,400.00

121,150.00 193,975.00

12,115.00 19,397.50

133,265.00 213,372.50

133,265.00 213,372.00

Page 153: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

143,750.00

10,000.00

2,400.00

156,150.00 228,975.00

15,615.00 22,897.50

171,765.00 251,872.50

171,765.00 251,872.00

Page 154: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

22,000.00

160.00

22,160.00 25,425.50

2,216.00 2,542.55

24,376.00 27,968.05

24,376.00 27,968.00

19,000.00

160.00

19,160.00 22,425.50

1,916.00 2,242.55

21,076.00 24,668.05

21,076.00 24,668.00

24,000.00

160.00

24,160.00 27,425.50

2,416.00 2,742.55

26,576.00 30,168.05

26,576.00 30,168.00

22,000.00

120.00

52,800.00

8,750.00

83,670.00 99,523.13

8,367.00 9,952.31

92,037.00 109,475.44

92,037.00 109,475.00

22,000.00

120.00

45,600.00

8,750.00

76,470.00 92,323.13

7,647.00 9,232.31

Page 155: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

84,117.00 101,555.44

84,117.00 101,555.00

Page 156: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

22,000.00

120.00

57,600.00

8,750.00

88,470.00 104,323.13

8,847.00 10,432.31

97,317.00 114,755.44

97,317.00 114,755.00

22,000.00

120.00

104,500.00

8,750.00

135,370.00 149,023.13

13,537.00 14,902.31

148,907.00 163,925.44

148,907.00 163,925.00

22,000.00

120.00

90,250.00

8,750.00

121,120.00 134,773.13

12,112.00 13,477.31

133,232.00 148,250.44

133,232.00 148,250.00

22,000.00

120.00

114,000.00

8,750.00

144,870.00 158,523.13

14,487.00 15,852.31

159,357.00 174,375.44

159,357.00 174,375.00

200,000.00

90,000.00

290,000.00 442,450.00

Page 157: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

29,000.00 44,245.00

2,900.00 4,424.50

31,900.00 48,669.50

31,900.00 48,669.00

Page 158: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

13,200.00

800.00

114,000.00

4,400.00

132,400.00 143,753.13

13,240.00 14,375.31

145,640.00 158,128.44

145,640.00 158,128.00

92,625.00

38,500.00

800.00

6,160.00

138,085.00 158,485.00

13,808.50 15,848.50

151,893.50 174,333.50

151,893.00 174,333.00

92,625.00

38,500.00

800.00

6,160.00

41,250.00

179,335.00 203,610.00

17,933.50 20,361.00

197,268.50 223,971.00

197,268.00 223,971.00

16,500.00

400.00

16,900.00 19,936.00

1,690.00 1,993.60

18,590.00 21,929.60

18,590.00 21,929.00

Page 159: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

- 7,375.00

- 737.50

- 8,112.50

- 8,112.00

15,000.00

15,000.00 22,375.00

1,500.00 2,237.50

16,500.00 24,612.50

16,500.00 24,612.00

15,000.00

15,000.00 24,537.50

1,500.00 2,453.75

16,500.00 26,991.25

16,500.00 26,991.00

24,750.00

24,750.00 32,125.00

2,475.00 3,212.50

27,225.00 35,337.50

27,225.00 35,337.00

24,750.00

24,750.00 34,287.50

2,475.00 3,428.75

27,225.00 37,716.25

27,225.00 37,716.00

Page 160: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

39,780.00

39,780.00 47,155.00

3,978.00 4,715.50

43,758.00 51,870.50

43,758.00 51,870.00

39,780.00

39,780.00 49,317.50

3,978.00 4,931.75

43,758.00 54,249.25

43,758.00 54,249.00

8,250.00

1,102.00

1,155.20

1,164.34

11,671.54 26,421.54

1,167.15 2,642.15

12,838.69 29,063.69

12,838.00 29,063.00

12,300.00

1,102.00

1,155.20

1,164.34

15,721.54 30,471.54

1,572.15 3,047.15

17,293.69 33,518.69

17,293.00 33,518.00

Page 161: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

17,040.00

1,102.00

1,155.20

1,164.34

20,461.54 35,211.54

2,046.15 3,521.15

22,507.69 38,732.69

22,507.00 38,732.00

31,480.00

1,122.00

32,602.00 38,172.00

3,260.20 3,817.20

35,862.20 41,989.20

35,862.00 41,989.00

30,198.00

1,122.00

31,320.00 36,675.00

3,132.00 3,667.50

34,452.00 40,342.50

34,452.00 40,342.00

33,967.50

1,122.00

35,089.50 40,444.50

3,508.95 4,044.45

38,598.45 44,488.95

38,598.00 44,488.00

24,972.50

1,122.00

26,094.50 31,449.50

2,609.45 3,144.95

28,703.95 34,594.45

28,703.00 34,594.00

Page 162: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

26,840.00

1,122.00

27,962.00 33,227.00

2,796.20 3,322.70

30,758.20 36,549.70

30,758.00 36,549.00

29,325.00

1,122.00

30,447.00 35,712.00

3,044.70 3,571.20

33,491.70 39,283.20

33,491.00 39,283.00

28,760.00

1,122.00

29,882.00 35,147.00

2,988.20 3,514.70

32,870.20 38,661.70

32,870.00 38,661.00

41,747.10

1,122.00

42,869.10 48,134.10

4,286.91 4,813.41

47,156.01 52,947.51

47,156.00 52,947.00

41,521.90

1,122.00

42,643.90 47,908.90

4,264.39 4,790.89

46,908.29 52,699.79

46,908.00 52,699.00

Page 163: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

38,700.20

1,122.00

39,822.20 45,087.20

3,982.22 4,508.72

43,804.42 49,595.92

43,804.00 49,595.00

38,583.30

1,122.00

39,705.30 44,970.30

3,970.53 4,497.03

43,675.83 49,467.33

43,675.00 49,467.00

69,600.00

4,500.00

74,100.00 80,082.50

7,410.00 8,008.25

81,510.00 88,090.75

81,510.00 88,090.00

60,900.00

4,500.00

65,400.00 71,382.50

6,540.00 7,138.25

71,940.00 78,520.75

71,940.00 78,520.00

59,450.00

4,500.00

63,950.00 69,932.50

6,395.00 6,993.25

70,345.00 76,925.75

70,345.00 76,925.00

Page 164: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

97,308.00

4,000.00

101,308.00 108,665.50

10,130.80 10,866.55

111,438.80 119,532.05

111,438.00 119,532.00

61,200.00

4,800.00

66,000.00 73,357.50

6,600.00 7,335.75

72,600.00 80,693.25

72,600.00 80,693.00

26,250.00

26,250.00 31,172.50

2,625.00 3,117.25

28,875.00 34,289.75

28,875.00 34,289.00

236,250.00

61,600.00

10,800.00

308,650.00 332,581.25

30,865.00 33,258.13

339,515.00 365,839.38

339,515.00 365,839.00

Page 165: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

750.00

750.00 3,831.25

75.00 383.13

825.00 4,214.38

825.00 4,214.00

1,800.00

5,440.00

5,440.00

12,680.00 16,238.75

1,268.00 1,623.88

13,948.00 17,862.63

13,948.00 17,862.00

2,400.00

1,800.00

5,440.00

8,320.00

17,960.00 21,853.25

1,796.00 2,185.33

19,756.00 24,038.58

19,756.00 24,038.00

Page 166: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

2,400.00

1,800.00

5,440.00

11,200.00

20,840.00 25,054.25

2,084.00 2,505.43

22,924.00 27,559.68

22,924.00 27,559.00

3,000.00

7,440.00

5,000.00

15,440.00 17,453.25

1,544.00 1,745.33

16,984.00 19,198.58

16,984.00 19,198.00

1,875.00

500.00

250.00

80.00

2,705.00 10,418.25

270.50 1,041.83

2,975.50 11,460.08

2,975.00 11,460.00

Page 167: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

850.00

950.00

2,470.00

4,270.00 6,496.35

427.00 649.64

4,697.00 7,145.99

4,697.00 7,145.00

1,140.00

1,710.00

2,850.00 4,654.65

285.00 465.47

3,135.00 5,120.12

3,135.00 5,120.00

2,720.00

18,000.00

20,720.00 22,946.35

2,072.00 2,294.64

22,792.00 25,240.99

22,792.00 25,240.00

250.00

125.00

2,000.00

75.00

2,450.00 5,558.95

245.00 555.90

2,695.00 6,114.85

2,695.00 6,114.00

Page 168: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

2,000.00

150.00

2,150.00 3,169.75

215.00 316.98

2,365.00 3,486.73

2,365.00 3,486.00

2,004.00

6,400.00

1,800.00

10,204.00 14,418.25

1,020.40 1,441.83

11,224.40 15,860.08

11,224.00 15,860.00

2,250.00

80.00

2,330.00 8,595.00

233.00 859.50

2,563.00 9,454.50

2,563.00 9,454.00

2,250.00

80.00

2,000.00

4,330.00 15,306.25

433.00 1,530.63

4,763.00 16,836.88

4,763.00 16,836.00

Page 169: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

2,800.00

2,800.00 4,962.50

280.00 496.25

3,080.00 5,458.75

3,080.00 5,458.00

25,500.00

741.00

26,241.00 39,126.00

2,624.10 3,912.60

28,865.10 43,038.60

28,865.00 43,038.00

1,440.00

1,440.00 3,989.25

13,600.00

1,000.00

14,600.00 241,425.00

16,040.00 245,414.25

1,604.00 24,541.43

17,644.00 269,955.68

17,644.00 269,955.00

15,120.00

15,120.00 17,346.35

1,512.00 1,734.64

16,632.00 19,080.99

16,632.00 19,080.00

- 118,000.00

- 11,800.00

- 129,800.00

- 129,800.00

Page 170: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

- 57,000.00

- 5,700.00

- 62,700.00

- 62,700.00

- 168,750.00

- 16,875.00

- 185,625.00

- 185,625.00

Page 171: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

- 43,250.00

- 4,325.00

- 432.50

- 4,757.50

- 4,757.00

- 29,062.50

- 2,906.25

- 290.63

- 3,196.88

- 3,196.00

- 43,250.00

- 4,325.00

- 432.50

- 4,757.50

- 4,757.00

- 32,500.00

- 3,250.00

- 325.00

- 3,575.00

- 3,575.00

- 63,200.00

- 6,320.00

- 632.00

- 6,952.00

- 6,952.00

- 43,250.00

- 4,325.00

- 432.50

- 4,757.50

- 4,757.00

Page 172: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk digunakan lagi

- 286,000.00

- 28,600.00

- 314,600.00

- 314,600.00

- 26,500.00

- 2,650.00

- 29,150.00

- 29,150.00

- 485,500.00

- 48,550.00

- 534,050.00

- 534,050.00

19,500.00

75,000.00

94,500.00 169,700.00

9,450.00 16,970.00

103,950.00 186,670.00

103,950.00 186,670.00

Page 173: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

1,250,000.00

75,000.00

1,325,000.00 1,426,480.00

132,500.00 142,648.00

1,457,500.00 1,569,128.00

1,457,500.00 1,569,128.00

75,000.00

4,584.00

760.00

80,344.00 191,794.00

8,034.40 19,179.40

88,378.40 210,973.40

88,378.00 210,973.00

785,000.00

235,500.00

4,584.00

760.00

1,025,844.00 1,079,594.00

102,584.40 107,959.40

1,128,428.40 1,187,553.40

1,128,428.00 1,187,553.00

271,340.00

32,560.80

4,584.00

760.00

309,244.80 380,869.80

30,924.48 38,086.98

340,169.28 418,956.78

340,169.00 418,956.00

Page 174: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

275,000.00

49,500.00

324,500.00 454,525.00

32,450.00 45,452.50

356,950.00 499,977.50

356,950.00 499,977.00

150,000.00

30,000.00

180,000.00 212,687.50

18,000.00 21,268.75

198,000.00 233,956.25

198,000.00 233,956.00

825,000.00

99,000.00

924,000.00 1,164,000.00

92,400.00 116,400.00

1,016,400.00 1,280,400.00

1,016,400.00 1,280,400.00

26,400.00

5,600.00

2,994.88

4,256.00

1,320.00

40,570.88 45,733.38

4,057.09 4,573.34

44,627.97 50,306.72

44,627.00 50,306.00

27,500.00

115,500.00

7,869.20

4,636.00

3,795.00

159,300.20 173,312.70

15,930.02 17,331.27

175,230.22 190,643.97

Page 175: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

175,230.00 190,643.00

30,450.00

33,616.00

5,320.00

3,850.00

12,640.00

4,380.00

90,256.00 182,733.50

9,025.60 18,273.35

99,281.60 201,006.85

99,281.00 201,006.00

Page 176: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

52,500.00

58,828.00

9,880.00

1,100.00

20,540.00

6,570.00

149,418.00 194,543.00

14,941.80 19,454.30

164,359.80 213,997.30

164,359.00 213,997.00

77,700.00

87,096.00

13,984.00

1,815.00

38,315.00

8,760.00

227,670.00 296,080.00

22,767.00 29,608.00

250,437.00 325,688.00

250,437.00 325,688.00

18,000.00

5,250.00

23,250.00 27,952.50

2,325.00 2,795.25

25,575.00 30,747.75

25,575.00 30,747.00

30,000.00

8,750.00

38,750.00 43,452.50

3,875.00 4,345.25

42,625.00 47,797.75

42,625.00 47,797.00

45,000.00

13,125.00

Page 177: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

58,125.00 62,827.50

5,812.50 6,282.75

63,937.50 69,110.25

63,937.00 69,110.00

60,000.00

17,500.00

77,500.00 85,325.50

7,750.00 8,532.55

85,250.00 93,858.05

85,250.00 93,858.00

Page 178: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

3,795.00

1,106.88

4,901.88 7,510.38

490.19 751.04

5,392.06 8,261.41

5,392.00 8,261.00

5,100.00

1,487.50

6,587.50 9,196.00

658.75 919.60

7,246.25 10,115.60

7,246.00 10,115.00

6,150.00

1,793.75

7,943.75 10,552.25

794.38 1,055.23

8,738.13 11,607.48

8,738.00 11,607.00

13,500.00

3,937.50

17,437.50 20,046.00

1,743.75 2,004.60

19,181.25 22,050.60

19,181.00 22,050.00

Page 179: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

18,000.00

5,250.00

23,250.00 27,170.75

2,325.00 2,717.08

25,575.00 29,887.83

25,575.00 29,887.00

24,600.00

7,175.00

31,775.00 34,383.50

3,177.50 3,438.35

34,952.50 37,821.85

34,952.00 37,821.00

24,600.00

7,175.00

31,775.00 38,845.00

3,177.50 3,884.50

34,952.50 42,729.50

34,952.00 42,729.00

40,500.00

11,812.50

52,312.50 59,382.50

5,231.25 5,938.25

57,543.75 65,320.75

57,543.00 65,320.00

Page 180: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

500,000.00

75,000.00

575,000.00 584,798.75

57,500.00 58,479.88

632,500.00 643,278.63

632,500.00 643,278.00

25,000.00

62.50

25,062.50 28,475.00

2,506.25 2,847.50

27,568.75 31,322.50

27,568.00 31,322.00

55,000.00

55,000.00 58,412.50

5,500.00 5,841.25

60,500.00 64,253.75

60,500.00 64,253.00

19,500.00

75,000.00

94,500.00 169,700.00

9,450.00 16,970.00

103,950.00 186,670.00

103,950.00 186,670.00

9,680.00

1,800.00

11,480.00 13,001.75

1,148.00 1,300.18

12,628.00 14,301.93

12,628.00 14,301.00

Page 181: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

750,000.00

750,000.00 782,045.00

75,000.00 78,204.50

825,000.00 860,249.50

825,000.00 860,249.00

250,000.00

250,000.00 307,435.00

25,000.00 30,743.50

275,000.00 338,178.50

275,000.00 338,178.00

500,000.00

500,000.00 550,254.00

50,000.00 55,025.40

550,000.00 605,279.40

550,000.00 605,279.00

Page 182: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

200,000.00

200,000.00 261,504.00

20,000.00 26,150.40

220,000.00 287,654.40

220,000.00 287,654.00

400,000.00

400,000.00 450,254.00

40,000.00 45,025.40

440,000.00 495,279.40

440,000.00 495,279.00

101,200.00

101,200.00 158,567.50

10,120.00 15,856.75

111,320.00 174,424.25

111,320.00 174,424.00

27,500.00

200.00

9,900.00

37,600.00 42,941.25

3,760.00 4,294.13

41,360.00 47,235.38

41,360.00 47,235.00

Page 183: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

9,075.00

200.00

9,900.00

19,175.00 24,516.25

1,917.50 2,451.63

21,092.50 26,967.88

21,092.00 26,967.00

11,000.00

200.00

9,900.00

21,100.00 26,441.25

2,110.00 2,644.13

23,210.00 29,085.38

23,210.00 29,085.00

22,000.00

200.00

187.50

22,387.50 33,070.00

2,238.75 3,307.00

24,626.25 36,377.00

24,626.00 36,377.00

250,000.00

250,000.00 271,247.50

25,000.00 27,124.75

275,000.00 298,372.25

275,000.00 298,372.00

Page 184: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

125,000.00

125,000.00 140,687.50

12,500.00 14,068.75

137,500.00 154,756.25

137,500.00 154,756.00

50,000.00

50,000.00 65,343.75

5,000.00 6,534.38

55,000.00 71,878.13

55,000.00 71,878.00

75,000.00

75,000.00 90,270.63

7,500.00 9,027.06

82,500.00 99,297.69

82,500.00 99,297.00

11,000.00

11,000.00 16,311.88

1,100.00 1,631.19

12,100.00 17,943.06

12,100.00 17,943.00

7,500.00

7,500.00 11,187.50

750.00 1,118.75

8,250.00 12,306.25

8,250.00 12,306.00

3,000.00

3,000.00 10,375.00

300.00 1,037.50

3,300.00 11,412.50

3,300.00 11,412.00

Page 185: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

7,500.00

7,500.00 12,811.88

750.00 1,281.19

8,250.00 14,093.06

8,250.00 14,093.00

3,000.00

3,000.00 8,311.88

300.00 831.19

3,300.00 9,143.06

3,300.00 9,143.00

150,000.00

150,000.00 167,706.25

15,000.00 16,770.63

165,000.00 184,476.88

165,000.00 184,476.00

50,000.00

50,000.00 57,082.50

5,000.00 5,708.25

55,000.00 62,790.75

55,000.00 62,790.00

15,000.00

15,000.00 32,706.25

1,500.00 3,270.63

16,500.00 35,976.88

16,500.00 35,976.00

15,000.00

15,000.00 18,541.25

1,500.00 1,854.13

16,500.00 20,395.38

16,500.00 20,395.00

Page 186: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

200,000.00

200,000.00 221,247.50

20,000.00 22,124.75

220,000.00 243,372.25

220,000.00 243,372.00

12,000.00

12,000.00 20,853.13

1,200.00 2,085.31

13,200.00 22,938.44

13,200.00 22,938.00

54,450.00

54,450.00 59,761.88

5,445.00 5,976.19

59,895.00 65,738.06

59,895.00 65,738.00

66,550.00

66,550.00 71,861.88

6,655.00 7,186.19

73,205.00 79,048.06

73,205.00 79,048.00

132,000.00

132,000.00 137,311.88

13,200.00 13,731.19

145,200.00 151,043.06

145,200.00 151,043.00

330,000.00

330,000.00 335,311.88

33,000.00 33,531.19

363,000.00 368,843.06

Page 187: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

363,000.00 368,843.00

Page 188: Rab Versi Sni Lengkap

Bahan Jumlah

(4) (5)

60,500.00

8,250.00

68,750.00 73,229.38

6,875.00 7,322.94

68,750.00 73,677.31

68,750.00 73,677.00

Page 189: Rab Versi Sni Lengkap

No. Upah Bahan

(1) (3) (4)

AN. 1.0000 m2

Menghampar dan mengisi bahan perkerasan

KPUT 1.5000 org Pekerja @ Rp. 20,000.00 30,000.00 -

AN. 0.0730 org Mandor @ Rp. 32,500.00 2,372.50 -

JUMLAH ( BELUM TERMASUK PPN ) 32,372.50 -

DIBULATKAN

1.0000 m3

Menyawur pasir

1.0000 org Pekerja @ Rp. 20,000.00 20,000.00

JUMLAH ( BELUM TERMASUK PPN ) 20,000.00 -

DIBULATKAN

KPUT 1.0000 hari Menggilas dengan motor walls

M.3 1.0000 org Masinis @ Rp. 24,900.00 24,900.00

1.0000 org Kenek @ Rp. 22,000.00 22,000.00

1.0000 org Penjaga @ Rp. 20,000.00 20,000.00

1.0000 org Pekerja @ Rp. 20,000.00 20,000.00

1.0000 ltr Olie @ Rp. 21,000.00 21,000.00

1.0000 ltr Olie SAE @ Rp. 21,000.00 21,000.00

0.7500 ltr Vet @ Rp. 13,000.00 9,750.00

16.0000 ltr Solar @ Rp. 4,300.00 68,800.00

JUMLAH ( BELUM TERMASUK PPN ) 86,900.00 120,550.00

DIBULATKAN

KPUT 100.0000 m2

Perkerasan lapis pondasi bawah (sub base) tebal 20 cm padat

10.8 5.0000 m3

Pasair pasang @ Rp. 76,000.00 380,000.00

23.0000 m3

Batu belah 15/20 @ Rp. 80,000.00 1,840,000.00

3.0000 m3

Batu pecah 5/7 cm @ Rp. 132,000.00 396,000.00

6.5000 m3

Pasir urug @ Rp. 55,000.00 357,500.00

26.0000 m3

Isi batu berkerasan @ Rp. 32,372.00 841,672.00

6.5000 Tng Menyawur pasir @ Rp. 20,000.00 130,000.00

JUMLAH ( BELUM TERMASUK PPN ) 971,672.00 2,973,500.00

DIBULATKAN

Tiap m2

1/100 x 971,672.00 + 2,973,500.00 9,716.72 29,735.00

Biaya menggilas

1/200 x 86,900.00 + 120,550.00 434.50 602.75

Sewa motor walls

1/200 x #REF! #REF!

JUMLAH ( BELUM TERMASUK PPN ) #REF! 30,337.75

JASA 10 %

JUMLAH

DIBULATKAN

100.0000 m2

Pembuatan lapis pondasi bawah (sub base) tebal 15 cm padat

5.0000 m3

Pasair urug @ Rp. 55,000.00 275,000.00

17.5000 m3

Batu belah 15/20 @ Rp. 80,000.00 1,400,000.00

3.0000 m3

Batu pecah 5/7 cm @ Rp. 126,500.00 379,500.00

6.5000 m3

Pasir urug (pengisi) @ Rp. 55,000.00 357,500.00

20.5000 m3

Isi batu berkerasan @ Rp. 32,372.00 663,626.00

5.0000 Tng Menyawur pasir @ Rp. 20,000.00 100,000.00

JUMLAH ( BELUM TERMASUK PPN ) 763,626.00 2,412,000.00

DIBULATKAN

Tiap m2

1/100 x 763,626.00 + 2,412,000.00 7,636.26 24,120.00

Biaya menggilas

1/200 x 86,900.00 + 120,550.00 434.50 602.75

Sewa motor walls

1/200 x #REF! #REF!

JUMLAH ( BELUM TERMASUK PPN ) #REF! 24,722.75

JASA 10 %

JUMLAH

DIBULATKAN

ANALISA KPUT

Macam Pekerjaan

(2)

Analisa KPUT - 189

Page 190: Rab Versi Sni Lengkap

No. Upah Bahan

(1) (3) (4)

Macam Pekerjaan

(2)

100.0000 m2

Pembuatan lapis pondasi atas (base) tebal 10 cm padat

10.0000 m3

Batu koral 5/7 cm @ Rp. 132,000.00 1,320,000.00

2.0000 m3

Batu koral 3/4 cm @ Rp. 130,000.00 260,000.00

1.0000 m3

Batu koral 2/3 cm @ Rp. 138,000.00 138,000.00

3.2500 m3

Pasir urug (pengisi) @ Rp. 55,000.00 178,750.00

13.0000 m3

Isi batu berkerasan @ Rp. 32,372.00 420,836.00

3.2500 Tng Menyawur pasir @ Rp. 20,000.00 65,000.00

JUMLAH ( BELUM TERMASUK PPN ) 485,836.00 1,896,750.00

DIBULATKAN

Tiap m2

1/100 x 485,836.00 + 1,896,750.00 4,858.36 18,967.50

Biaya menggilas

1/150 x 86,900.00 + 120,550.00 579.33 803.67

Sewa motor walls

1/150 x #REF! #REF!

JUMLAH ( BELUM TERMASUK PPN ) #REF! 19,771.17

JASA 10 %

JUMLAH

DIBULATKAN

Tiap m2

Pembuatan lapis pondasi atas (base) tebal 8 cm padat

8/10 x 4,858.36 + 18,967.50 3,886.69 15,174.00

Biaya menggilas

1/150 x 86,900.00 + 120,550.00 579.33 803.67

Sewa motor walls

1/150 x #REF! #REF!

JUMLAH ( BELUM TERMASUK PPN ) #REF! 15,977.67

JASA 10 %

JUMLAH

DIBULATKAN

Tiap m2

Pembuatan lapis pondasi atas (base) tebal 7 cm padat

7/10 x 4,858.36 + 18,967.50 3,400.85 13,277.25

Biaya menggilas

1/150 x 86,900.00 + 120,550.00 579.33 803.67

Sewa motor walls

1/150 x #REF! #REF!

JUMLAH ( BELUM TERMASUK PPN ) #REF! 14,080.92

JASA 10 %

JUMLAH

DIBULATKAN

100.0000 m2

Lapisan Penetrasi 4 cm padat

0.2400 m3

Krokos D 20 - 40 mm @ Rp. 70,000.00 16,800.00

0.4800 m3

Split D 10 mm @ Rp. 120,000.00 57,600.00

3.5000 m3

Split D 30 - 40 mm @ Rp. 120,000.00 420,000.00

1.2000 m3

Split D 10 - 20 mm @ Rp. 120,000.00 144,000.00

1.2500 m3

Kayu bakar @ Rp. 90,000.00 112,500.00

14.0000 org Pekerja @ Rp. 20,000.00 280,000.00

1.0000 org Mandor @ Rp. 32,500.00 32,500.00

1.5000 org Juru godog aspal @ Rp. 20,000.00 30,000.00

1.0000 org Masinis @ Rp. 24,900.00 24,900.00

1.0000 org Kenek @ Rp. 22,000.00 22,000.00

1.0000 org Penyemprot @ Rp. 17,500.00 17,500.00

400.0000 kg Aspal @ Rp. 10,650.00 4,260,000.00

80.0000 kg Aspal lem @ Rp. 10,650.00 852,000.00

1.0000 hr Sprayer (sewa) @ Rp. #REF! #REF!

JUMLAH ( BELUM TERMASUK PPN ) 406,900.00 #REF!

DIBULATKAN

Analisa KPUT - 190

Page 191: Rab Versi Sni Lengkap

No. Upah Bahan

(1) (3) (4)

Macam Pekerjaan

(2)

Tiap m2

1/100 x 406,900.00 + #REF! 4,069.00 #REF!

Biaya menggilas

4/12,5/200 x 86,900.00 + 120,550.00 139.04 192.88

Sewa motor walls

1/200 x #REF! #REF!

JUMLAH ( BELUM TERMASUK PPN ) #REF! #REF!

JASA 10 %

JUMLAH

DIBULATKAN

KPUT 100.0000 m2

Pengaspalan sand sheet (latasir), tebal 1 cm jereng

M.8 125.0000 kg Aspal 10,650.00 1,331,250.00

1.0000 m3

Pasair pasang @ Rp. 76,000.00 76,000.00

0.9000 m3

Kayu bakar @ Rp. 90,000.00 81,000.00

0.2500 org Juru godog aspal @ Rp. 20,000.00 5,000.00

8.1000 org Pekerja @ Rp. 20,000.00 162,000.00

0.4000 org Mandor @ Rp. 32,500.00 13,000.00

JUMLAH ( BELUM TERMASUK PPN ) 180,000.00 1,488,250.00

DIBULATKAN

Tiap m2

Aspal sand sheet 2 cm jereng (1 cm padat)

2/100 x 180,000.00 + 1,488,250.00 3,600.00 29,765.00

Biaya menggilas

1/500 x 86,900.00 + 120,550.00 173.80 241.10

Sewa motor walls

1/500 x #REF! #REF!

Aspal untuk lem 0,5 kg

0.5000 x 10,650.00 5,325.00

JUMLAH ( BELUM TERMASUK PPN ) #REF! 35,331.10

JASA 10 %

JUMLAH

DIBULATKAN

Tiap m2

Aspal sand sheet 3 cm jereng (2 cm padat)

3/100 x 180,000.00 + 1,488,250.00 5,400.00 44,647.50

Biaya menggilas

1/500 x 86,900.00 + 120,550.00 173.80 241.10

Sewa motor walls

1/500 x #REF! #REF!

Aspal untuk lem 0,5 kg

0.5000 x 10,650.00 5,325.00

JUMLAH ( BELUM TERMASUK PPN ) #REF! 50,213.60

JASA 10 %

JUMLAH

DIBULATKAN

KPUT 100.0000 m2

Pengaspalan sand sheet (latasir) tanpa aspal, tebal 1 cm jereng

M.8 - kg Aspal 10,650.00 -

1.0000 m3

Pasair pasang @ Rp. 76,000.00 76,000.00

0.9000 m3

Kayu bakar @ Rp. 90,000.00 81,000.00

0.2500 org Juru godog aspal @ Rp. 20,000.00 5,000.00

8.1000 org Pekerja @ Rp. 20,000.00 162,000.00

0.4000 org Mandor @ Rp. 32,500.00 13,000.00

JUMLAH ( BELUM TERMASUK PPN ) 180,000.00 157,000.00

DIBULATKAN

Analisa KPUT - 191

Page 192: Rab Versi Sni Lengkap

No. Upah Bahan

(1) (3) (4)

Macam Pekerjaan

(2)

Tiap m2

Aspal sand sheet 2 cm jereng (1 cm padat) tanpa aspal

2/100 x 180,000.00 + 157,000.00 3,600.00 3,140.00

Biaya menggilas

1/500 x 86,900.00 + 120,550.00 173.80 241.10

Sewa motor walls

1/500 x #REF! #REF!

Aspal untuk lem 0,5 kg

- x 10,650.00 -

JUMLAH ( BELUM TERMASUK PPN ) #REF! 3,381.10

JASA 10 %

JUMLAH

DIBULATKAN

Tiap m2

Aspal sand sheet 3 cm jereng (2 cm padat) tanpa aspal

3/100 x 180,000.00 + 157,000.00 5,400.00 4,710.00

Biaya menggilas

1/500 x 86,900.00 + 120,550.00 173.80 241.10

Sewa motor walls

1/500 x #REF! #REF!

Aspal untuk lem 0,5 kg

- x 10,650.00 -

JUMLAH ( BELUM TERMASUK PPN ) #REF! 4,951.10

JASA 10 %

JUMLAH

DIBULATKAN

10.0000 m2

Mengecat marka jalan dengan Rettar

4.2500 kg Cat rettar @ Rp. 49,000.00 208,250.00

0.5700 ltr Minyak cat @ Rp. 10,000.00 5,700.00

2.2500 org Tukang cat @ Rp. 25,000.00 56,250.00

0.2300 org Kepala tukang cat @ Rp. 27,000.00 6,210.00

2.0000 org Pekerja @ Rp. 20,000.00 40,000.00

JUMLAH ( BELUM TERMASUK PPN ) 102,460.00 213,950.00

DIBULATKAN

Tiap m2

Mengecat marka jalan dengan rettar

1/10 x 102,460.00 + 213,950.00 10,246.00 21,395.00

JUMLAH ( BELUM TERMASUK PPN ) 10,246.00 21,395.00

JASA 10 %

JUMLAH

DIBULATKAN

1.0000 m2

Mengecat marka jalan dengan Thermoplastic

1.6575 kg Cat marka @ Rp. 49,000.00 81,217.50

0.4500 kg Glasbit @ Rp. 12,000.00 5,400.00

1.0500 ltr Thinner @ Rp. 13,000.00 13,650.00

0.0750 jam Sewa Compressor @ Rp. #REF! #REF!

0.0750 jam Sewa Dumptruck @ Rp. #REF! #REF!

0.0100 ls Alat bantu @ Rp. 130,000.00 1,300.00

0.2250 org Tukang cat @ Rp. 25,000.00 5,625.00

0.6000 org Pekerja @ Rp. 20,000.00 12,000.00

0.0750 org Mandor @ Rp. 32,500.00 2,437.50

JUMLAH ( BELUM TERMASUK PPN ) 20,062.50 #REF!

JASA 10 %

JUMLAH

DIBULATKAN

Analisa KPUT - 192

Page 193: Rab Versi Sni Lengkap

No. Upah Bahan

(1) (3) (4)

Macam Pekerjaan

(2)

350.0000 m1

Pemotongan aspal dengan mesin potong (cutter), 2 sisi

2.0000 bh Cutter @ Rp. 1,000,000.00 2,000,000.00

2.0000 hr Sewa mesin cutter @ Rp. #REF! #REF!

15.0000 ltr Solar @ Rp. 4,300.00 64,500.00

2.0000 org Tk. Cutter / masinis @ Rp. 24,900.00 49,800.00

2.0000 org Pekerja @ Rp. 20,000.00 40,000.00

JUMLAH ( BELUM TERMASUK PPN ) 89,800.00 #REF!

DIBULATKAN

Tiap m1

Pemotongan aspal dengan mesin potong (cutter), 2 sisi

1/350 x 89,800.00 + #REF! 256.57 #REF!

JUMLAH ( BELUM TERMASUK PPN ) 256.57 #REF!

JASA 10 %

JUMLAH

DIBULATKAN

Tiap m1

Pemotongan aspal dengan mesin potong (cutter), 1 sisi

1/700 x 89,800.00 + #REF! 128.29 #REF!

JUMLAH ( BELUM TERMASUK PPN ) 128.29 #REF!

JASA 10 %

JUMLAH

DIBULATKAN

1.0000 m2

Pembongkaran aspal dengan Jack Hammer

0.6600 hari Sewa mesin Jack Hammer @ Rp. #REF! #REF!

1.3200 ltr Solar @ Rp. 4,300.00 5,676.00

0.0400 org Tk. Jack Hammer / masinis @ Rp. 24,900.00 996.00

0.2500 org Pekerja @ Rp. 20,000.00 5,000.00

0.0630 org Mandor @ Rp. 32,500.00 2,047.50

JUMLAH ( BELUM TERMASUK PPN ) 8,043.50 #REF!

JASA 10 %

JUMLAH

DIBULATKAN

No. Upah Bahan

(1) (3) (4)

1.0000 m1

Expantion joint

18.5000 kg Ashpaltic Joint @ Rp. 60,000.00 1,110,000.00

5.5000 kg Plate baja 5 mm @ Rp. 8,800.00 48,400.00

1.0000 m1

Joint Filler @ Rp. 9,000.00 9,000.00

0.0150 m3

Split 1/2 cm @ Rp. 190,000.00 2,850.00

6.5000 kg Gas Elpiji @ Rp. 4,500.00 29,250.00

0.1000 hr Sewa Jack Hammer @ Rp. #REF! #REF!

0.1000 hr Sewa Genset 2000 watt @ Rp. #REF! #REF!

0.1000 hr Sewa Compressor @ Rp. #REF! #REF!

0.1000 hr Sewa Stamper @ Rp. #REF! #REF!

0.1000 bh Mata cutter @ Rp. 1,000,000.00 100,000.00

0.1000 hr Sewa mesin cutter @ Rp. #REF! #REF!

1.0000 ls Alat bantu @ Rp. 130,000.00 130,000.00

1.0000 org Mekanik terlatih @ Rp. 29,000.00 29,000.00

4.5000 org Operator terlatih @ Rp. 29,000.00 130,500.00

0.1000 org Mandor @ Rp. 32,500.00 3,250.00

JUMLAH ( BELUM TERMASUK PPN ) 162,750.00 #REF!

JASA 10 %

JUMLAH

DIBULATKAN

ANALISA EXPANTION JOINT

Macam Pekerjaan

(2)

Analisa KPUT - 193

Page 194: Rab Versi Sni Lengkap

Jumlah

(5)

32,372.50

32,372.00

20,000.00

20,000.00

207,450.00

207,450.00

3,945,172.00

3,945,172.00

#REF!

#REF!

#REF!

#REF!

3,175,626.00

3,175,626.00

#REF!

#REF!

#REF!

#REF!

ANALISA KPUT

Analisa KPUT - 194

Page 195: Rab Versi Sni Lengkap

Jumlah

(5)

2,382,586.00

2,382,586.00

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

Analisa KPUT - 195

Page 196: Rab Versi Sni Lengkap

Jumlah

(5)

#REF!

#REF!

#REF!

#REF!

1,668,250.00

1,668,250.00

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

337,000.00

337,000.00

Analisa KPUT - 196

Page 197: Rab Versi Sni Lengkap

Jumlah

(5)

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

316,410.00

316,410.00

31,641.00

3,164.10

34,805.10

34,805.00

#REF!

#REF!

#REF!

#REF!

Analisa KPUT - 197

Page 198: Rab Versi Sni Lengkap

Jumlah

(5)

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

Jumlah

(5)

#REF!

#REF!

#REF!

#REF!

ANALISA EXPANTION JOINT

Analisa KPUT - 198

Page 199: Rab Versi Sni Lengkap

No. Upah Bahan Jumlah

(1) (3) (4) (5)

1. 1.0000 m1

Pasang Kabel NYY 3 x 6 sqmm

0.0050 org Tukang Listrik @ Rp. 29,000.00 145.00

0.0050 org Pekerja @ Rp. 20,000.00 100.00

0.0050 org Mandor @ Rp. 32,500.00 162.50

JUMLAH ( BELUM PPN ) 407.50 - 407.50

JASA 10 % 40.75

JUMLAH 448.25

DIBULATKAN 448.00

2. 1.0000 m1

Pasang Kabel NYY 3 x 4 sqmm

0.0050 org Tukang Listrik @ Rp. 29,000.00 145.00

0.0050 org Pekerja @ Rp. 20,000.00 100.00

0.0050 org Mandor @ Rp. 32,500.00 162.50

JUMLAH ( BELUM PPN ) 407.50 - 407.50

JASA 10 % 40.75

JUMLAH 448.25

DIBULATKAN 448.00

3. 1.0000 m1

Pasang Kabel NYM 2 x 2,5 sqmm

0.0050 org Tukang Listrik @ Rp. 29,000 145.00

0.0050 org Pekerja @ Rp. 20,000 100.00

0.0050 org Mandor @ Rp. 32,500 162.50

JUMLAH ( BELUM PPN ) 407.50 - 407.50

JASA 10 % 40.75

JUMLAH 448.25

DIBULATKAN 448.00

4. 1.0000 m1

Pasang Kabel NYM 2 x 1,5 sqmm

0.0050 org Tukang Listrik @ Rp. 29,000.00 145.00

0.0050 org Pekerja @ Rp. 20,000.00 100.00

0.0050 org Mandor @ Rp. 32,500.00 162.50

JUMLAH ( BELUM PPN ) 407.50 - 407.50

JASA 10 % 40.75

JUMLAH 448.25

DIBULATKAN 448.00

5. 1.0000 m1

Pasang Kabel NYA 1 x 2,5 sqmm

0.0025 org Tukang Listrik @ Rp. 29,000.00 72.50

0.0025 org Pekerja @ Rp. 20,000.00 50.00

0.0025 org Mandor @ Rp. 32,500.00 81.25

JUMLAH ( BELUM PPN ) 203.75 - 203.75

JASA 10 % 20.38

JUMLAH 224.13

DIBULATKAN 224.00

6. 50.0000 m1

Pasang Kabel DX 2x10 sqmm + Accessories (antar tiang / gawang)

50.0000 m1

Kabel DX 2x10 qmm + Accessories @ Rp. 6,875.00 343,750.00

0.1250 org Tenaga Ahli @ Rp. 37,200.00 4,650.00

0.5000 org Tukang Listrik @ Rp. 29,000.00 14,500.00

0.5000 org Pekerja @ Rp. 20,000.00 10,000.00

0.2500 org Mandor @ Rp. 32,500.00 8,125.00

1.0000 ls Penyambungan beban @ Rp. 17,250.00 17,250.00

JUMLAH ( BELUM PPN ) 54,525.00 343,750.00 398,275.00

JASA 10 % 39,827.50

JUMLAH 438,102.50

DIBULATKAN 438,102.00

Macam Pekerjaan

(2)

ANJALISA PEKERJAAN LISTRIK

Analisa Gedung - 199

Page 200: Rab Versi Sni Lengkap

(1) (3) (4) (5)(2)

7. 50.0000 m1

Pasang Kabel DX 2x16 sqmm + Accessories (antar tiang / gawang)

50.0000 m1

Kabel DX 2x16 qmm + Accessories @ Rp. 8,250.00 412,500.00

0.1250 org Tenaga Ahli @ Rp. 37,200.00 4,650.00

0.5000 org Tukang Listrik @ Rp. 29,000.00 14,500.00

0.5000 org Pekerja @ Rp. 20,000.00 10,000.00

0.2500 org Mandor @ Rp. 32,500.00 8,125.00

1.0000 ls Penyambungan beban @ Rp. 17,250.00 17,250.00

JUMLAH ( BELUM PPN ) 54,525.00 412,500.00 467,025.00

JASA 10 % 46,702.50

JUMLAH 513,727.50

DIBULATKAN 513,727.00

8. 1.0000 m1

Pasang Kabel NYY 3x10 sqmm

1.0000 m1

Kabel NYY 3x10 Sqmm @ Rp. 45,408.00 45,408.00

0.0050 org Tukang Listrik @ Rp. 29,000.00 145.00

0.0050 org Pekerja @ Rp. 20,000.00 100.00

0.0050 org Mandor @ Rp. 32,500.00 162.50

JUMLAH ( BELUM PPN ) 407.50 45,408.00 45,815.50

JASA 10 % 4,581.55

JUMLAH 50,397.05

DIBULATKAN 50,397.00

9. 1.0000 unit Pasang Box Panel dan Panel Kontrol 1 Unit

0.5000 org Tukang Listrik @ Rp. 29,000.00 14,500.00

0.7500 org Pekerja @ Rp. 20,000.00 15,000.00

0.2500 org Mandor @ Rp. 32,500.00 8,125.00

1.0000 unit Pasang panel kontrol @ Rp. 86,250.00 86,250.00

JUMLAH ( BELUM PPN ) 109,375.00 14,500.00 123,875.00

JASA 10 % 12,387.50

JUMLAH 136,262.50

DIBULATKAN 136,262.00

10. 1.0000 unit Pasang Box KWH dan Meter (1 Unit)

0.5000 org Tukang Listrik @ Rp. 29,000.00 14,500.00

0.7500 org Pekerja @ Rp. 20,000.00 15,000.00

0.2500 org Mandor @ Rp. 32,500.00 8,125.00

1.0000 unit Pasang panel kontrol @ Rp. 86,250.00 86,250.00

JUMLAH ( BELUM PPN ) 109,375.00 14,500.00 123,875.00

JASA 10 % 12,387.50

JUMLAH 136,262.50

DIBULATKAN 136,262.00

11. 1.0000 unit Pasang tiang lampu antik (b3)

0.6600 org Tukang batu @ Rp. 27,500.00 18,150.00

0.6600 org Tukang listrik @ Rp. 29,000.00 19,140.00

5.3300 org Pekerja @ Rp. 20,000.00 106,600.00

0.6660 org Mandor @ Rp. 32,500.00 21,645.00

0.6660 set Alat bantu @ Rp. 86,250.00 57,442.50

4.6000 jam Angkutan @ Rp. 7,143.00 32,857.80

JUMLAH ( BELUM PPN ) 165,535.00 90,300.30 255,835.30

JASA 10 % 25,583.53

JUMLAH 281,418.83

DIBULATKAN 281,418.00

12. 1.0000 unit Pasang tiang lampu antik (b3)

0.5000 org Tukang batu @ Rp. 27,500.00 13,750.00

0.5000 org Tukang listrik @ Rp. 29,000.00 14,500.00

4.0000 org Pekerja @ Rp. 20,000.00 80,000.00

0.5000 org Mandor @ Rp. 32,500.00 16,250.00

0.5000 set Alat bantu @ Rp. 86,250.00 43,125.00

3.5000 jam Angkutan @ Rp. 7,143.00 25,000.50

JUMLAH ( BELUM PPN ) 124,500.00 68,125.50 192,625.50

JASA 10 % 19,262.55

JUMLAH 211,888.05

DIBULATKAN 211,888.00

Analisa Gedung - 200

Page 201: Rab Versi Sni Lengkap

(1) (3) (4) (5)(2)

13. 1.0000 set Pemasangan armatur komplit

0.5000 org Tukang listrik @ Rp. 29,000.00 14,500.00

0.7500 org Pekerja @ Rp. 20,000.00 15,000.00

0.2500 org Mandor @ Rp. 32,500.00 8,125.00

1.0000 set Alat bantu @ Rp. 86,250.00 86,250.00

JUMLAH ( BELUM PPN ) 37,625.00 86,250.00 123,875.00

JASA 10 % 12,387.50

JUMLAH 136,262.50

DIBULATKAN 136,262.00

14. 1.0000 unit Pemasangan komponen + Box

0.6660 org Tukang listrik @ Rp. 29,000.00 19,314.00

1.0000 org Pekerja @ Rp. 20,000.00 20,000.00

0.3330 org Mandor @ Rp. 32,500.00 10,822.50

1.0000 set Alat bantu @ Rp. 86,250.00 86,250.00

JUMLAH ( BELUM PPN ) 50,136.50 86,250.00 136,386.50

JASA 10 % 13,638.65

JUMLAH 150,025.15

DIBULATKAN 150,025.00

15. 1.0000 set Bongkar komponen

0.4000 org Tukang listrik @ Rp. 29,000.00 11,600.00

0.6000 org Pekerja @ Rp. 20,000.00 12,000.00

0.2000 org Mandor @ Rp. 32,500.00 6,500.00

1.0000 set Alat bantu @ Rp. 86,250.00 86,250.00

JUMLAH ( BELUM PPN ) 30,100.00 86,250.00 116,350.00

JASA 10 % 11,635.00

JUMLAH 127,985.00

DIBULATKAN 127,985.00

16. 1.0000 unit Bongkar Armatur

0.3300 org Tukang Listrik @ Rp. 29,000.00 9,570.00

0.5000 org Pekerja @ Rp. 20,000.00 10,000.00

0.1666 org Mandor @ Rp. 32,500.00 5,414.50

1.0000 jam Angkutan @ Rp. 7,143.00 7,143.00

JUMLAH ( BELUM PPN ) 24,984.50 7,143.00 32,127.50

JASA 10 % 3,212.75

JUMLAH 35,340.25

DIBULATKAN 35,340.00

17. 1.0000 set Bongkar Tiang Lampu Antik (b.1)

0.5000 org Tukang batu @ Rp. 27,500.00 13,750.00

0.5000 org Tukang Listrik @ Rp. 29,000.00 14,500.00

4.0000 org Pekerja @ Rp. 20,000.00 80,000.00

0.5000 org Mandor @ Rp. 32,500.00 16,250.00

0.5000 set Alat bantu @ Rp. 86,250.00 43,125.00

3.5000 jam Angkutan @ Rp. 7,143.00 25,000.50

JUMLAH ( BELUM PPN ) 124,500.00 68,125.50 192,625.50

JASA 10 % 19,262.55

JUMLAH 211,888.05

DIBULATKAN 211,888.00

18. 1.0000 set Bongkar Tiang Lampu Antik (b.1)

0.6600 org Tukang batu @ Rp. 27,500.00 18,150.00

0.6600 org Tukang Listrik @ Rp. 29,000.00 19,140.00

5.3330 org Pekerja @ Rp. 20,000.00 106,660.00

0.6660 org Mandor @ Rp. 32,500.00 21,645.00

0.6660 set Alat bantu @ Rp. 86,250.00 57,442.50

4.6000 jam Angkutan @ Rp. 7,143.00 32,857.80

JUMLAH ( BELUM PPN ) 165,595.00 90,300.30 255,895.30

JASA 10 % 25,589.53

JUMLAH 281,484.83

DIBULATKAN 281,484.00

Analisa Gedung - 201

Page 202: Rab Versi Sni Lengkap

(1) (3) (4) (5)(2)

19. 1.0000 m1

Pasang Kabel NYM 2x2,5 sqmm

1.0000 m1

Kabel NYM 2 x 2,5 qmm @ Rp. 10,633.00 10,633.00

0.2500 org Tukang Listrik @ Rp. 29,000.00 7,250.00

0.0100 org Pekerja @ Rp. 20,000.00 200.00

0.0050 org Mandor @ Rp. 32,500.00 162.50

JUMLAH ( BELUM PPN ) 7,612.50 10,633.00 18,245.50

JASA 10 % 1,824.55

JUMLAH 20,070.05

DIBULATKAN 20,070.00

20. 1.0000 m1

Pasang Kabel NYA 2,5 sqmm

1.0000 m1

Kabel NYA 2,5 qmm @ Rp. 150,000.00 150,000.00

0.2500 org Tukang Listrik @ Rp. 29,000.00 7,250.00

0.0100 org Pekerja @ Rp. 20,000.00 200.00

0.0050 org Mandor @ Rp. 32,500.00 162.50

JUMLAH ( BELUM PPN ) 7,612.50 150,000.00 157,612.50

JASA 10 % 15,761.25

JUMLAH 173,373.75

DIBULATKAN 173,373.00

21. 1.0000 m1

Pasang Pralon 3" Kabel NYY 3x6 sqmm

1.0000 m1

Pipa pralon 3" @ Rp. 20,500.00 20,500.00

0.0100 org Pekerja @ Rp. 20,000.00 200.00

0.0050 org Mandor @ Rp. 32,500.00 162.50

JUMLAH ( BELUM PPN ) 362.50 20,500.00 20,862.50

JASA 10 % 2,086.25

JUMLAH 22,948.75

DIBULATKAN 22,948.00

22. 1.0000 bh Pasang tutup panel ukuran 30x30

1.0000 bh Tutup panel 30x30 @ Rp. 28,750.00 28,750.00

0.0500 org Tukang listrik @ Rp. 29,000.00 1,450.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

0.0250 org Mandor @ Rp. 32,500.00 812.50

JUMLAH ( BELUM PPN ) 4,262.50 28,750.00 33,012.50

JASA 10 % 3,301.25

JUMLAH 36,313.75

DIBULATKAN 36,313.00

23. 1.0000 bh Pasang MCB Ampere + box tutup panel ukuran 30 x 30

1.0000 bh MCB 10 Ampere + box @ Rp. 42,000.00 42,000.00

0.0500 org Tukang listrik @ Rp. 29,000.00 1,450.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

0.0250 org Mandor @ Rp. 32,500.00 812.50

JUMLAH ( BELUM PPN ) 4,262.50 42,000.00 46,262.50

JASA 10 % 4,626.25

JUMLAH 50,888.75

DIBULATKAN 50,888.00

24. 1.0000 bh Pasang Kapasitor 12,5 uF

1.0000 bh Kapasitor 12,5 uF @ Rp. 26,000.00 26,000.00

0.0500 org Tukang listrik @ Rp. 29,000.00 1,450.00

0.1000 org Pekerja @ Rp. 20,000.00 2,000.00

0.0250 org Mandor @ Rp. 32,500.00 812.50

JUMLAH ( BELUM PPN ) 4,262.50 26,000.00 30,262.50

JASA 10 % 3,026.25

JUMLAH 33,288.75

DIBULATKAN 33,288.00

Analisa Gedung - 202

Page 203: Rab Versi Sni Lengkap

(1) (3) (4) (5)(2)

25. 1.0000 set Pasang Stang Ornamen 2,2 meter + Lampu SRP 822/250 Watt Son + pengetesan dan penyalaan

0.5000 org Pekerja @ Rp. 20,000.00 10,000.00

0.5000 org Tukang Listrik @ Rp. 29,000.00 14,500.00

1.2500 org Pengawas @ Rp. 37,200.00 46,500.00

0.5000 org Mandor @ Rp. 32,500.00 16,250.00

JUMLAH (A) 87,250.00 - 87,250.00

26. Pengetesan dan Penyalaan

1.0000 ttk @ Rp. 7,000.00 7,000.00

JUMLAH (B) 7,000.00 - 7,000.00

JUMLAH ( A + B ) ( BELUM PPN ) 94,250.00

JASA 10 % 9,425.00

JUMLAH 103,675.00

DIBULATKAN 103,675.00

27. 1.0000 set Pasang Stang Ornamen 6 meter + Lampu SRP 822/250 Watt Son

0.8750 org Pekerja @ Rp. 20,000.00 17,500.00

0.8750 org Tukang Listrik @ Rp. 29,000.00 25,375.00

1.8033 org Pengawas @ Rp. 37,200.00 67,082.76

0.7413 org Mandor @ Rp. 32,500.00 24,093.23

JUMLAH (C) 134,050.99 - 134,050.99

JUMLAH ( B + C ) ( BELUM PPN ) 141,050.99

JASA 10 % 14,105.10

JUMLAH 155,156.08

DIBULATKAN 155,156.00

28. 1.0000 set Pasang Stang Ornamen 2,2 meter + Lampu SRP 822/250 Watt Son

0.5000 org Pekerja @ Rp. 20,000.00 10,000.00

0.5000 org Tukang Listrik @ Rp. 29,000.00 14,500.00

1.2500 org Pengawas @ Rp. 37,200.00 46,500.00

0.5000 org Mandor @ Rp. 32,500.00 16,250.00

JUMLAH (D) 87,250.00 - 87,250.00

JUMLAH ( B + D ) ( BELUM PPN ) 94,250.00

JASA 10 % 9,425.00

JUMLAH 103,675.00

DIBULATKAN 103,675.00

29. 1.0000 set Pasang Tiang Octogonal Cabang 1, h= 7 meter+ lampu SRP 822/250 Watt Son

0.4200 m3

Pondasi Tiang Beton bertulang 1:2:3 @ Rp. 4,313,943.43 1,811,856.24

2.8500 org Pekerja @ Rp. 20,000.00 57,000.00

2.8500 org Tukang Listrik @ Rp. 29,000.00 82,650.00

2.0075 org Pengawas @ Rp. 37,200.00 74,679.00

1.0000 org Mandor @ Rp. 32,500.00 32,500.00

JUMLAH (E) 246,829.00 1,811,856.24 2,058,685.24

JUMLAH ( B + E ) ( BELUM PPN ) 2,065,685.24

JASA 10 % 206,568.52

JUMLAH 2,272,253.76

DIBULATKAN 2,272,253.00

30. 1.0000 set Pasang Tiang Octogonal Cabang 1, h= 9 meter + lampu SRP 822/250 Watt Son

0.4200 m3

Pondasi Tiang Beton bertulang 1:2:3 @ Rp. 4,313,943.43 1,811,856.24

3.1000 org Pekerja @ Rp. 20,000.00 62,000.00

3.1000 org Tukang Listrik @ Rp. 29,000.00 89,900.00

2.5000 org Pengawas @ Rp. 37,200.00 93,000.00

1.2100 org Mandor @ Rp. 32,500.00 39,325.00

JUMLAH (F) 284,225.00 1,811,856.24 2,096,081.24

JUMLAH ( B + F ) ( BELUM PPN ) 2,103,081.24

JASA 10 % 210,308.12

JUMLAH 2,313,389.36

DIBULATKAN 2,313,389.00

Analisa Gedung - 203

Page 204: Rab Versi Sni Lengkap

(1) (3) (4) (5)(2)

31. 1.0000 set Pasang Tiang Octogonal Cabang 2, h= 9 meter+ lampu SRP 822/250 Watt Son

0.4200 m3

Pondasi Tiang Beton bertulang 1:2:3 @ Rp. 4,313,943.43 1,811,856.24

3.3000 org Pekerja @ Rp. 20,000.00 66,000.00

3.3000 org Tukang Listrik @ Rp. 29,000.00 95,700.00

2.5782 org Pengawas @ Rp. 37,200.00 95,909.04

1.2433 org Mandor @ Rp. 32,500.00 40,407.25

JUMLAH (G) 298,016.29 1,811,856.24 2,109,872.53

JUMLAH ( B + G) ( BELUM PPN ) 2,116,872.53

JASA 10 % 211,687.25

JUMLAH 2,328,559.78

DIBULATKAN 2,328,559.00

32. 1.0000 set Pasang Tiang Octogonal Cabang 3, h= 9 m+ lampu SRP 822/250 Watt Son

0.4200 m3

Pondasi Tiang Beton bertulang 1:2:3 @ Rp. 4,313,943.43 1,811,856.24

3.8100 org Pekerja @ Rp. 20,000.00 76,200.00

3.8100 org Tukang Listrik @ Rp. 29,000.00 110,490.00

2.6626 org Pengawas @ Rp. 37,200.00 99,048.72

1.2650 org Mandor @ Rp. 32,500.00 41,112.50

JUMLAH (H) 326,851.22 1,811,856.24 2,138,707.46

JUMLAH ( B + H) ( BELUM PPN ) 2,145,707.46

JASA 10 % 214,570.75

JUMLAH 2,360,278.20

DIBULATKAN 2,360,278.00

33. 1.0000 set Pasang Tiang Octogonal Cabang 3, h= 11 m+ lampu SRP 822/250 Watt Son

0.4200 m3

Pondasi Tiang Beton bertulang 1:2:3 @ Rp. 4,313,943.43 1,811,856.24

4.2500 org Pekerja @ Rp. 20,000.00 85,000.00

4.2500 org Tukang Listrik @ Rp. 29,000.00 123,250.00

2.9287 org Pengawas @ Rp. 37,200.00 108,947.64

1.2939 org Mandor @ Rp. 32,500.00 42,051.75

JUMLAH (I) 359,249.39 1,811,856.24 2,171,105.63

JUMLAH ( B + I) ( BELUM PPN ) 2,178,105.63

JASA 10 % 217,810.56

JUMLAH 2,395,916.19

DIBULATKAN 2,395,916.00

34. 1.0000 set Bongkar armatur pada stang ornamen existing + pasang lampu SRP 822/150 Watt Son + return

0.9000 org Pekerja @ Rp. 20,000.00 18,000.00

0.9000 org Tukang Listrik @ Rp. 29,000.00 26,100.00

2.1044 org Pengawas @ Rp. 37,200.00 78,283.68

0.8418 org Mandor @ Rp. 32,500.00 27,358.50

0.0500 unit Retur material existing @ Rp. 100,000.00 5,000.00

JUMLAH (J) 154,742.18 - 154,742.18

JUMLAH ( B + J) ( BELUM PPN ) 161,742.18

JASA 10 % 16,174.22

JUMLAH 177,916.40

DIBULATKAN 177,916.00

35. 1.0000 set Bongkar armatur pada stang ornamen existing + pasang Lampu SRP 822/250 Watt Son + retur

0.8750 org Pekerja @ Rp. 20,000.00 17,500.00

0.8750 org Tukang Listrik @ Rp. 29,000.00 25,375.00

1.6995 org Pengawas @ Rp. 37,200.00 63,221.40

0.6798 org Mandor @ Rp. 32,500.00 22,093.50

0.0500 unit Retur material existing @ Rp. 100,000.00 5,000.00

JUMLAH (K) 133,189.90 - 133,189.90

JUMLAH ( B + K) ( BELUM PPN ) 140,189.90

JASA 10 % 14,018.99

JUMLAH 154,208.89

DIBULATKAN 154,208.00

Analisa Gedung - 204

Page 205: Rab Versi Sni Lengkap

(1) (3) (4) (5)(2)

36. 1.0000 set Bongkar armatur pada tang existing + pasang Lampu SRP 822/250 Watt Son + retur

0.9000 org Pekerja @ Rp. 20,000.00 18,000.00

0.9000 org Tukang Listrik @ Rp. 29,000.00 26,100.00

2.1044 org Pengawas @ Rp. 37,200.00 78,283.68

0.8418 org Mandor @ Rp. 32,500.00 27,358.50

0.0500 unit Retur material existing @ Rp. 100,000.00 5,000.00

JUMLAH (L) 154,742.18 - 154,742.18

JUMLAH ( B + L) ( BELUM PPN ) 161,208.00

JASA 10 % 16,120.80

JUMLAH 177,328.80

DIBULATKAN 177,328.00

37. 1.0000 set Bongkar komponen lama existing + pasang komponen Lampu SRP 822/250 Watt Son + retur

0.8500 org Pekerja @ Rp. 20,000.00 17,000.00

0.8500 org Tukang Listrik @ Rp. 29,000.00 24,650.00

1.9554 org Pengawas @ Rp. 37,200.00 72,740.88

0.7822 org Mandor @ Rp. 32,500.00 25,421.50

0.0500 unit Retur material existing @ Rp. 100,000.00 5,000.00

JUMLAH (M) 144,812.38 - 144,812.38

JUMLAH ( B + M) ( BELUM PPN ) 151,812.38

JASA 10 % 15,181.24

JUMLAH 166,993.62

DIBULATKAN 166,993.00

Analisa Gedung - 205

Page 206: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 150.00 HP

3 Kapasitas Cp 50.00 Ton/jam

4 Alat Baru : a. Umur Ekonomis A 10.00 Tahun

b. Jam Kerja dalam 1 Tahun W 1,500.00 Jam

c. Harga Alat B 7,500,000,000.00 Rupiah

5 Alat Yang Dipakai : a. Umur Ekonomis A ' 10.00 Tahun

b. Jam Kerja dalam 1 Tahun W ' 1,500.00 Jam

c. Harga Alat B ' 7,500,000,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 750,000,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.23852 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a. Biaya Pengmbalian Modal = ( B - C ) x D E 1,073,352.41 Rupiah

W '

b. Asuransi dll = 0,002 x B ' F 10,000.00 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 1,083,352.41 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 80,625.00 Rupiah

Bahan bakar pemanasan = 12 x 0,7 Cp x Ms H2 1,806,000.00 Rupiah

material

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 21,000.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 625,000.00 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 3 org / Jam ) x U2 M 8,250.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 2,544,500.00 Rp

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 3,627,852.41 Rp

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN

ASPHALT MIXING PLANT

Analisa Alat - 206

Page 207: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 47.00 HP

3 Kapasitas Cp 6.00 Ton

4 Alat Baru : a. Umur Ekonomis A 6.00 Tahun

b. Jam Kerja dalam 1 Tahun W 2,000 Jam

c. Harga Alat B 715,000,000.00 Rupiah

5 Alat Yang Dipakai : a. Umur Ekonomis A ' 6.00 Tahun

b. Jam Kerja dalam 1 Tahun W ' 2,000.00 Jam

c. Harga Alat B ' 715,000,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 71,500,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.30071 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a. Biaya Pengembalian Modal = ( B - C ) x D E 96,752.07 Rupiah

W '

b. Asuransi dll = 0,002 x B ' F 715.00 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 97,467.07 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 25,262.50 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 6,580.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 44,687.50 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 82,905.00 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 180,372.07 Rupiah

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

No URAIAN KODE KOEF. SATUAN

ASPHALT FINISHER

URAIAN ANALISA ALAT

Analisa Alat - 207

Page 208: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 15.00 HP

3 Kapasitas Cp 800.00 Liter

4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W 2,000 Jam

c. Harga Alat B 145,000,000.00 Rupiah

5 Alat Yang Dipakai : a. Umur Ekonomis A ' 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W ' 2,000.00 Jam

c. Harga Alat B ' 145,000,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 14,500,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a. Biaya Pengembalian Modal = ( B - C ) x D E 21,818.28 Rupiah

W '

b. Asuransi dll = 0,002 x B ' F 145.00 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 21,963.28 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 8,062.50 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 2,100.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 9,062.50 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 25,600.00 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 47,563.28 Rupiah

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

ASPHALT SPRAYER

No URAIAN KODE KOEF. SATUAN

URAIAN ANALISA ALAT

Analisa Alat - 208

Page 209: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 140.00 HP

3 Kapasitas Cp Ton

4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W 2,000 Jam

c. Harga Alat B 700,000,000.00 Rupiah

5 Alat Yang Dipakai : a. Umur Ekonomis A ' 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W ' 2,000.00 Jam

c. Harga Alat B ' 700,000,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 70,000,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a. Biaya Pengembalian Modal = ( B - C ) x D E 105,329.61 Rupiah

W '

b. Asuransi dll = 0,002 x B ' F 700.00 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 106,029.61 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 75,250.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 19,600.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 43,750.00 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 144,975.00 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 251,004.61 Rupiah

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN KODE KOEF. SATUANNo

BULLDOZER 100 -150 HP

URAIAN ANALISA ALAT

Analisa Alat - 209

Page 210: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 80.00 HP

3 Kapasitas Cp Ton

4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W 2,000 Jam

c. Harga Alat B 175,000,000.00 Rupiah

5 Alat Yang Dipakai : a. Umur Ekonomis A ' 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W ' 2,000.00 Jam

c. Harga Alat B ' 175,000,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 17,500,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a. Biaya Pengembalian Modal = ( B - C ) x D E 26,332.40 Rupiah

W '

b. Asuransi dll = 0,002 x B ' F 175.00 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 26,507.40 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 43,000.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 11,200.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 10,937.50 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 71,512.50 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 98,019.90 Rupiah

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

No URAIAN KODE KOEF. SATUAN

URAIAN ANALISA ALAT

COMPRESSOR 4000 - 6500 L/M

Analisa Alat - 210

Page 211: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 105.00 HP

3 Kapasitas Cp 1.50 Ton

4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam

c. Harga Alat B 840,000,000.00 Rupiah

5 Alat Yang Dipakai : a. Umur Ekonomis A ' 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W ' 2,000.00 Jam

c. Harga Alat B ' 840,000,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 84,000,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a. Biaya Pengembalian Modal = ( B - C ) x D E 126,395.53 Rupiah

W '

b. Asuransi dll = 0,002 x B ' F 840.00 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 127,235.53 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 56,437.50 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 14,700.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 52,500.00 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 130,012.50 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 257,248.03 Rupiah

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

WHEEL LOADER 1,0 - 1,6 M3

URAIAN KODE KOEF.No SATUAN

URAIAN ANALISA ALAT

Analisa Alat - 211

Page 212: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 50.00 HP

3 Kapasitas Cp 8.00 Ton

4 Alat Baru a Umur Ekonomis A 5.00 Tahun

b Jam Kerja dalam 1 Tahun W 2,000.00 Jam

c Harga Alat B 460,000,000.00 Rupiah

5 Alat yang dipakai a Umur Ekonomis A ' 5.00 Tahun

b Jam Kerja dalam 1 Tahun W ' 2,000.00 Jam

c Harga Alat B ' 460,000,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 46,000,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a. Biaya Pengembalian Modal = ( B - C ) x D E 69,216.60 Rupiah

W '

b. Asuransi dll = 0,002 x B ' F 460.00 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 69,676.60 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 26,875.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 7,000.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 28,750.00 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 69,000.00 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 138,676.60 Rupiah

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

URAIAN KODENo KOEF. SATUAN

TANDEM ROLLER 6 - 8 T

Analisa Alat - 212

Page 213: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 60.00 HP

3 Kapasitas Cp 10.00 Ton

4 Alat Baru a Umur Ekonomis A 5.00 Tahun

b Jam Kerja dalam 1 Tahun W 1,800.00 Jam

c Harga Alat B 510,000,000.00 Rupiah

5 Alat yang dipakai a Umur Ekonomis A ' 5.00 Tahun

b Jam Kerja dalam 1 Tahun W ' 1,800.00 Jam

c Harga Alat B ' 510,000,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 51,000,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a. Biaya Pengembalian Modal = ( B - C ) x D E 85,266.82 Rupiah

W '

b. Asuransi dll = 0,002 x B ' F 566.67 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 85,833.49 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 32,250.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 8,400.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 35,416.67 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 82,441.67 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 168,275.16 Rupiah

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

PNEUMATIC TYRE ROLLER 8 - 10 T

SATUAN

URAIAN ANALISA ALAT

No URAIAN KODE KOEF.

Analisa Alat - 213

Page 214: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 125.00 HP

3 Kapasitas Cp 8.00 Ton

4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam

c. Harga Alat B 145,000,000.00 Rupiah

5 Alat Yang Dipakai : a. Umur Ekonomis A ' 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W ' 2,000.00 Jam

c. Harga Alat B ' 145,000,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 14,500,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a. Biaya Pengembalian Modal = ( B - C ) x D E 21,818.28 Rupiah

W '

b. Asuransi dll = 0,002 x B ' F 145.00 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 21,963.28 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 67,187.50 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 17,500.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 9,062.50 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 100,125.00 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 122,088.28 Rupiah

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN

DUMP TRUCK

Analisa Alat - 214

Page 215: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 175.00 HP

3 Kapasitas Cp 125.00 KVA

4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam

c. Harga Alat B 440,000,000.00 Rupiah

5 Alat Yang Dipakai : a. Umur Ekonomis A ' 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W ' 2,000.00 Jam

c. Harga Alat B ' 440,000,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 44,000,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a. Biaya Pengembalian Modal = ( B - C ) x D E 66,207.18 Rupiah

W '

b. Asuransi dll = 0,002 x B ' F 440.00 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 66,647.18 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 94,062.50 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 24,500.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 27,500.00 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 152,437.50 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 219,084.68 Rupiah

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

GENERATOR SET

URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN

Analisa Alat - 215

Page 216: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 125.00 HP

3 Kapasitas Cp - -

4 Alat Baru a Umur Ekonomis A 5.00 Tahun

b Jam Kerja dalam 1 Tahun W 2,000.00 Jam

c Harga Alat B 880,000,000.00 Rupiah

5 Alat yang dipakai a Umur Ekonomis A ' 5.00 Tahun

b Jam Kerja dalam 1 Tahun W ' 2,000.00 Jam

c Harga Alat B ' 880,000,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 88,000,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a. Biaya Pengembalian Modal = ( B - C ) x D E 132,414.36 Rupiah

W '

b. Asuransi dll = 0,002 x B ' F 880.00 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 133,294.36 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 67,187.50 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 17,500.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 55,000.00 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 146,062.50 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 279,356.86 Rupiah

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

MOTOR GRADER > 100 HP

No URAIAN KODE KOEF. SATUAN

URAIAN ANALISA ALAT

Analisa Alat - 216

Page 217: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 75.00 HP

3 Kapasitas Cp 7.00 Ton

4 Alat Baru Umur Ekonomis A 4.00 Tahun

Jam Kerja dalam 1 Tahun W 2,000.00 Jam

Harga Alat B 500,000,000.00 Rupiah

5 Alat yang dipakai a Umur Ekonomis A ' 4.00 Tahun

b Jam Kerja dalam 1 Tahun W ' 2,000.00 Jam

c Harga Alat B ' 500,000,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 50,000,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.38629 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a. Biaya Pengembalian Modal = ( B - C ) x D E 86,915.05 Rupiah

W '

b. Asuransi dll = 0,002 x B ' F 500.00 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 87,415.05 Rp

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 40,312.50 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 10,500.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 31,250.00 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam =( H1 + H2 + I + K + L + M ) P 88,437.50 Rp

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 175,852.55 Rp

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

VIBRATORY ROLLER 5 - 8 T

No URAIAN KODE KOEF. SATUAN

URAIAN ANALISA ALAT

Analisa Alat - 217

Page 218: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 100.00 HP

3 Kapasitas Cp 4,000.00 Liter

4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam

c. Harga Alat B 50,000,000.00 Rupiah

5 Alat Yang Dipakai : a. Umur Ekonomis A ' 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W ' 2,000.00 Jam

c. Harga Alat B ' 50,000,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 5,000,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a Biaya Pengembalian Modal = ( B - C ) x D E 7,523.54 Rupiah

W '

b Asuransi dll = 0,002 x B ' F 50.00 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 7,573.54 Rp

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 53,750.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 14,000.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 3,125.00 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 77,250.00 Rp

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 84,823.54 Rp

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

WATER TANK TRUCK 3000 - 4000 L

No URAIAN KODE KOEF. SATUAN

URAIAN ANALISA ALAT

Analisa Alat - 218

Page 219: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 3.00 HP

3 Kapasitas Cp - Liter

4 Alat Baru : a. Umur Ekonomis A 4.00 Tahun

b. Jam Kerja dalam 1 Tahun W 1,000.00 Jam

c. Harga Alat B 3,500,000.00 Rupiah

5 Alat Yang Dipakai : a. Umur Ekonomis A ' 4.00 Tahun

b. Jam Kerja dalam 1 Tahun W ' 1,000.00 Jam

c. Harga Alat B ' 3,500,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 350,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.38629 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a Biaya Pengembalian Modal = ( B - C ) x D E 1,216.81 Rupiah

W '

b Asuransi dll = 0,002 x B ' F 7.00 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 1,223.81 Rp

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 1,612.50 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 420.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 437.50 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 8,845.00 Rp

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 10,068.81 Rp

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN

JACK HAMMER

Analisa Alat - 219

Page 220: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 5.00 HP

3 Kapasitas Cp 0.170 Ton

4 Alat Baru : a. Umur Ekonomis A 4.00 Tahun

b. Jam Kerja dalam 1 Tahun W 1,000.00 Jam

c. Harga Alat B 3,000,000.00 Rupiah

5 Alat Yang Dipakai : a. Umur Ekonomis A ' 4.00 Tahun

b. Jam Kerja dalam 1 Tahun W ' 1,000.00 Jam

c. Harga Alat B ' 3,000,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 300,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.38629 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a Biaya Pengembalian Modal = ( B - C ) x D E 1,042.98 Rupiah

W '

b Asuransi dll = 0,002 x B ' F 6.00 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 1,048.98 Rp

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 2,687.50 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 700.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 375.00 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 10,137.50 Rp

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 11,186.48 Rp

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN

TAMPER

Analisa Alat - 220

Page 221: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 220.00 HP

3 Kapasitas Cp 50.00 Ton/Jam

4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam

c. Harga Alat B 491,500,000.00 Rupiah

5 Alat Yang Dipakai : a. Umur Ekonomis A ' 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W ' 2,000.00 Jam

c. Harga Alat B ' 491,500,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 49,150,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a Biaya Pengembalian Modal = ( B - C ) x D E 73,956.43 Rupiah

W '

b Asuransi dll = 0,002 x B ' F 491.50 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 74,447.93 Rp

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 118,250.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 30,800.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 30,718.75 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 2 org / Jam ) x U2 M 5,500.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 188,893.75 Rp

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 263,341.68 Rp

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIANNo

URAIAN ANALISA ALAT

STONE CRUSHER

SATUANKOEF.KODE

Analisa Alat - 221

Page 222: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 55.00 HP

3 Kapasitas Cp 8.00 Ton

4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam

c. Harga Alat B 125,000,000.00 Rupiah

5 Alat Yang Dipakai : a. Umur Ekonomis A ' 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W ' 2,000.00 Jam

c. Harga Alat B ' 125,000,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 12,500,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a Biaya Pengembalian Modal = ( B - C ) x D E 18,808.86 Rupiah

W '

b Asuransi dll = 0,002 x B ' F 125.00 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 18,933.86 Rp

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 29,562.50 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 7,700.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 7,812.50 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 51,450.00 Rp

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 70,383.86 Rp

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIANNo

URAIAN ANALISA ALAT

THREE WHEEL ROLLER 6 - 8 T

SATUANKOEF.KODE

Analisa Alat - 222

Page 223: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 10.00 HP

3 Kapasitas Cp - -

4 Alat Baru : a. Umur Ekonomis A 4.00 Tahun

b. Jam Kerja dalam 1 Tahun W 1,000.00 Jam

c. Harga Alat B 12,000,000.00 Rupiah

5 Alat Yang Dipakai : a. Umur Ekonomis A ' 4.00 Tahun

b. Jam Kerja dalam 1 Tahun W ' 1,000.00 Jam

c. Harga Alat B ' 12,000,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 1,200,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.38629 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a Biaya Pengembalian Modal = ( B - C ) x D E 4,171.92 Rupiah

W '

b Asuransi dll = 0,002 x B ' F 24.00 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 4,195.92 Rp

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 5,375.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 1,400.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 1,500.00 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 14,650.00 Rp

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 18,845.92 Rp

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

CONCRETE VIBRATOR

URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN

Analisa Alat - 223

Page 224: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 15.00 HP

3 Kapasitas Cp 500.00 Liter

4 Alat Baru : a. Umur Ekonomis A 4.00 Tahun

b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam

c. Harga Alat B 45,000,000.00 Rupiah

5 Alat Yang Dipakai : a. Umur Ekonomis A ' 4.00 Tahun

b. Jam Kerja dalam 1 Tahun W ' 2,000.00 Jam

c. Harga Alat B ' 45,000,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 4,500,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.38629 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a Biaya Pengembalian Modal = ( B - C ) x D E 7,822.35 Rupiah

W '

b Asuransi dll = 0,002 x B ' F 45.00 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 7,867.35 Rp

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 8,062.50 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 2,100.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 2,812.50 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 19,350.00 Rp

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 27,217.35 Rp

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

CONCRETE MIXER 0.3 - 0.6 M3

URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN

Analisa Alat - 224

Page 225: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 150.00 HP

3 Kapasitas Cp 15.00 Ton

4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam

c. Harga Alat B 300,000,000.00 Rupiah

5 Alat Yang Dipakai : a. Umur Ekonomis A ' 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W ' 2,000.00 Jam

c. Harga Alat B ' 300,000,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 30,000,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a Biaya Pengembalian Modal = ( B - C ) x D E 45,141.26 Rupiah

W '

b Asuransi dll = 0,002 x B ' F 300.00 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 45,441.26 Rp

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 80,625.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 21,000.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 18,750.00 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 126,750.00 Rp

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 172,191.26 Rp

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIANNo

URAIAN ANALISA ALAT

CRANE 10 - 15 TON

SATUANKOEF.KODE

Analisa Alat - 225

Page 226: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 100.00 HP

3 Kapasitas Cp 6.00 Ton

4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam

c. Harga Alat B 100,000,000.00 Rupiah

5 Alat Yang Dipakai : a. Umur Ekonomis A ' 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W ' 2,000.00 Jam

c. Harga Alat B ' 100,000,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 10,000,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a. Biaya Pengembalian Modal = ( B - C ) x D E 15,047.09 Rupiah

W '

b. Asuransi dll = 0,002 x B ' F 100.00 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 15,147.09 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 53,750.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 14,000.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 6,250.00 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 80,375.00 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 95,522.09 Rupiah

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

DUMP TRUCK 3 - 4 M3

No URAIAN KODE KOEF. SATUAN

URAIAN ANALISA ALAT

Analisa Alat - 226

Page 227: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 80.00 HP

3 Kapasitas Cp 0.50 M3

4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam

c. Harga Alat B 250,000,000.00 Rupiah

5 Alat Yang Dipakai : a. Umur Ekonomis A ' 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W ' 2,000.00 Jam

c. Harga Alat B ' 250,000,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 25,000,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a. Biaya Pengembalian Modal = ( B - C ) x D E 37,617.72 Rupiah

W '

b. Asuransi dll = 0,002 x B ' F 250.00 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 37,867.72 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 43,000.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 11,200.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 15,625.00 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 76,200.00 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 114,067.72 Rupiah

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

EXCAVATOR 80 - 140 HP

URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN

Analisa Alat - 227

Page 228: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 100.00 HP

3 Kapasitas Cp 4.00 M3

4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam

c. Harga Alat B 250,000,000.00 Rupiah

5 Alat Yang Dipakai : a. Umur Ekonomis A ' 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W ' 2,000.00 Jam

c. Harga Alat B ' 250,000,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 25,000,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a. Biaya Pengembalian Modal = ( B - C ) x D E 37,617.72 Rupiah

W '

b. Asuransi dll = 0,002 x B ' F 250.00 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 37,867.72 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 53,750.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 14,000.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 15,625.00 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 89,750.00 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 127,617.72 Rupiah

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

FLAT BED TRUCK 3 - 4 M3

URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN

Analisa Alat - 228

Page 229: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 6.00 HP

3 Kapasitas Cp - -

4 Alat Baru : a. Umur Ekonomis A 2.00 Tahun

b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam

c. Harga Alat B 5,000,000.00 Rupiah

5 Alat Yang Dipakai : a. Umur Ekonomis A ' 2.00 Tahun

b. Jam Kerja dalam 1 Tahun W ' 2,000.00 Jam

c. Harga Alat B ' 5,000,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 500,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.65455 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a. Biaya Pengembalian Modal = ( B - C ) x D E 1,472.73 Rupiah

W '

b. Asuransi dll = 0,002 x B ' F 5.00 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 1,477.73 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 3,225.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 840.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 312.50 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 10,752.50 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 12,230.23 Rupiah

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

WATER PUMP 70 - 100 mm

URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN

Analisa Alat - 229

Page 230: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 75.00 HP

3 Kapasitas Cp - -

4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam

c. Harga Alat B 100,000,000.00 Rupiah

5 Alat Yang Dipakai : a. Umur Ekonomis A ' 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W ' 2,000.00 Jam

c. Harga Alat B ' 100,000,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 10,000,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a. Biaya Pengembalian Modal = ( B - C ) x D E 15,047.09 Rupiah

W '

b. Asuransi dll = 0,002 x B ' F 100.00 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 15,147.09 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 40,312.50 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 10,500.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 6,250.00 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 63,437.50 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 78,584.59 Rupiah

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

FULVI MIXER

URAIAN ANALISA ALAT

No URAIAN KODE KOEF. SATUAN

Analisa Alat - 230

Page 231: Rab Versi Sni Lengkap

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga Pw 90.00 HP

3 Kapasitas Cp 1.60 M3

4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam

c. Harga Alat B 300,000,000.00 Rupiah

5 Alat Yang Dipakai : a. Umur Ekonomis A ' 5.00 Tahun

b. Jam Kerja dalam 1 Tahun W ' 2,000.00 Jam

c. Harga Alat B ' 300,000,000.00 Rupiah

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B C 30,000,000.00 Rupiah

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A' D 0.33438 -

( 1 + i )^A'-1

3 Biaya pasti per jam

a. Biaya Pengembalian Modal = ( B - C ) x D E 45,141.26 Rupiah

W '

b. Asuransi dll = 0,002 x B ' F 300.00 Rupiah

W '

Biaya Pasti Perjam = ( E + F ) G 45,441.26 Rupiah

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms H1 48,375.00 Rupiah

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp I 12,600.00 Rupiah

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B ' K 18,750.00 Rupiah

W '

4 Operator = ( 1 org / Jam ) x U1 L 3,625.00 Rupiah

5 Pembantu Operator ( 1 org / Jam ) x U2 M 2,750.00 Rupiah

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M ) P 86,100.00 Rupiah

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P ) T 131,541.26 Rupiah

V LAIN LAIN

1 Tingkat suku bunga ( i ) 20.00 % / Tahun

2 Upah Operator / Sopir U1 3,625.00 Rp / Jam

3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam

4 Bahan bakar bensin Mb 4,500.00 Liter

5 Bahan bakar solar Ms 4,300.00 Liter

6 Minyak Pelumas Mp 14,000.00 Liter

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIANNo

URAIAN ANALISA ALAT

TRACK LOADER 75 - 100 HP

SATUANKOEF.KODE

Analisa Alat - 231

Page 232: Rab Versi Sni Lengkap

E01

Alat Baru

Alat Baru

Alat Baru

Khusus AMP

URAIAN ANALISA ALAT

KET.

Analisa Alat - 232

Page 233: Rab Versi Sni Lengkap

E02

Alat Baru

Alat Baru

Alat Baru

KET.

URAIAN ANALISA ALAT

Analisa Alat - 233

Page 234: Rab Versi Sni Lengkap

E03

Alat Baru

Alat Baru

Alat Baru

KET.

URAIAN ANALISA ALAT

Analisa Alat - 234

Page 235: Rab Versi Sni Lengkap

E04

Alat Baru

Alat Baru

Alat Baru

KET.

URAIAN ANALISA ALAT

Analisa Alat - 235

Page 236: Rab Versi Sni Lengkap

E05

Alat Baru

Alat Baru

Alat Baru

KET.

URAIAN ANALISA ALAT

Analisa Alat - 236

Page 237: Rab Versi Sni Lengkap

E15

Alat Baru

Alat Baru

Alat Baru

KET.

URAIAN ANALISA ALAT

Analisa Alat - 237

Page 238: Rab Versi Sni Lengkap

E17

Alat Baru

Alat Baru

Alat Baru

KET.

URAIAN ANALISA ALAT

Analisa Alat - 238

Page 239: Rab Versi Sni Lengkap

E18

Alat Baru

Alat Baru

Alat Baru

KET.

URAIAN ANALISA ALAT

Analisa Alat - 239

Page 240: Rab Versi Sni Lengkap

E09

Alat Baru

Alat Baru

Alat Baru

URAIAN ANALISA ALAT

KET.

Analisa Alat - 240

Page 241: Rab Versi Sni Lengkap

E12

Alat Baru

Alat Baru

Alat Baru

URAIAN ANALISA ALAT

KET.

Analisa Alat - 241

Page 242: Rab Versi Sni Lengkap

E12

Alat Baru

Alat Baru

Alat Baru

KET.

URAIAN ANALISA ALAT

Analisa Alat - 242

Page 243: Rab Versi Sni Lengkap

E19

Alat Baru

Alat Baru

Alat Baru

KET.

URAIAN ANALISA ALAT

Analisa Alat - 243

Page 244: Rab Versi Sni Lengkap

E23

Alat Baru

Alat Baru

Alat Baru

KET.

URAIAN ANALISA ALAT

Analisa Alat - 244

Page 245: Rab Versi Sni Lengkap

E26

Alat Baru

Alat Baru

Alat Baru

URAIAN ANALISA ALAT

KET.

Analisa Alat - 245

Page 246: Rab Versi Sni Lengkap

E25

Alat Baru

Alat Baru

Alat Baru

URAIAN ANALISA ALAT

KET.

Analisa Alat - 246

Page 247: Rab Versi Sni Lengkap

E21

Alat Baru

Alat Baru

Alat Baru

URAIAN ANALISA ALAT

KET.

Analisa Alat - 247

Page 248: Rab Versi Sni Lengkap

E16

Alat Baru

Alat Baru

Alat Baru

URAIAN ANALISA ALAT

KET.

Analisa Alat - 248

Page 249: Rab Versi Sni Lengkap

E20

Alat Baru

Alat Baru

Alat Baru

URAIAN ANALISA ALAT

KET.

Analisa Alat - 249

Page 250: Rab Versi Sni Lengkap

E06

Alat Baru

Alat Baru

Alat Baru

URAIAN ANALISA ALAT

KET.

Analisa Alat - 250

Page 251: Rab Versi Sni Lengkap

E07

Alat Baru

Alat Baru

Alat Baru

URAIAN ANALISA ALAT

KET.

Analisa Alat - 251

Page 252: Rab Versi Sni Lengkap

E08

Alat Baru

Alat Baru

Alat Baru

KET.

URAIAN ANALISA ALAT

Analisa Alat - 252

Page 253: Rab Versi Sni Lengkap

E10

Alat Baru

Alat Baru

Alat Baru

URAIAN ANALISA ALAT

KET.

Analisa Alat - 253

Page 254: Rab Versi Sni Lengkap

E11

Alat Baru

Alat Baru

Alat Baru

URAIAN ANALISA ALAT

KET.

Analisa Alat - 254

Page 255: Rab Versi Sni Lengkap

E22

Alat Baru

Alat Baru

Alat Baru

URAIAN ANALISA ALAT

KET.

Analisa Alat - 255

Page 256: Rab Versi Sni Lengkap

E27

Alat Baru

Alat Baru

Alat Baru

URAIAN ANALISA ALAT

KET.

Analisa Alat - 256

Page 257: Rab Versi Sni Lengkap

E14

Alat Baru

Alat Baru

Alat Baru

URAIAN ANALISA ALAT

KET.

Analisa Alat - 257

Page 258: Rab Versi Sni Lengkap

JENIS PEKERJAAN : LATASTON ( HRS )

SATUAN : M2

HARGA

NO KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A TENAGA

1 Pekerja ( L 01 ) 0.0113 2,500.00

2 Mandor ( L 03 ) 0.0016 4,062.50

JUMLAH HARGA TENAGA

B BAHAN

1 Agregat Kasar ( M 03 ) M3 0.0121 126,500.00

2 Agregat Halus ( M 04 ) M3 0.0232 79,750.00

3 Filler ( M 05 ) Kg 4.8004 750.00

4 Aspal ( M 10 ) Kg 5.2962 10,650.00

JUMLAH HARGA BAHAN

C PERALATAN

1 Wheel Loader ( E 15 ) Jam 0.0011 #REF!

2 AMP ( E 01 ) Jam 0.0016 #REF!

3 Genset ( E 12 ) Jam 0.0016 #REF!

4 Dump Truck ( E 09 ) Jam 0.0143 #REF!

5 Aspal Finisher ( E 02 ) Jam 0.0020 #REF!

6 Tandem Roller ( E 17 ) Jam 0.0017 #REF!

7 Pneumatic Tyre Roller ( E 18 ) Jam 0.0013 #REF!

8 Alat Bantu Ls 1.0000 500.00

JUMLAH HARGA PERALATAN

JUMLAH

JASA 10 %

JUMLAH ( BELUM TERMASUK PPN )

DIBULATKAN

1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator

4

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA

MASING MASING HARGA SATUAN

Analisa EI - 633

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )

dan biaya biaya lainnya

Jam

Jam

Analisa - E 258

Page 259: Rab Versi Sni Lengkap

SATUAN : M2

I ASUMSI

1 Menggunakan alat berat ( cara mekanik )

2 Lokasi pekerjaan sepanjang jalan

3 Kondisi existing jalan sedang

4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0 Km

5 Tebal lapisan padat t 0.03 m

6 Jam kerja efektif 1 hari Tk 7.00 Jam

7 Faktor kehilangan material

- Agregat Fh 1 1.10 -

- Aspal Fh 2 1.05 -

8 Komposisi campuran HRS ( Spesifikasi )

- Coarse Agregat 20 - 40 % CA 29.50 %

- Fine Agregat 47 - 67 % FA 56.50 %

- Fraksi Filler 5 - 9 % FF 6.49 %

- Aspal minimum 7,3 % As 7.51 %

9 Berat jenis bahan

- HRS D1 2.24 t / m3

- Coarse Agregat dan fine agregat D2 1.80 t / m3

- Fraksi Filler D3 2.00 t / m3

- Aspal D4 1.03 t / m3

II METODA KERJA

1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP

2

3

4

III PEMAKAIAN BAHAN ALAT DAN TENAGA

1 BAHAN

a Agregat kasar = {( CA x D1 x t m3 ) x ( Fh 1 )}/ D2 M03 0.0121 m3

b Agregat halus = {( FA x D1 x t m3 ) x ( Fh 1 )}/ D2 M04 0.0232 m3

c Filler = {( FF x D1 x t m3 ) x ( Fh 1 )} M05 4.8004 Kg

d Aspal = {( AS x D1 x t m3 ) x ( Fh 2 )}x1000 M10 5.2962 Kg

2 ALAT

a Wheel Loader ( E 15 )

Kapasitas bucket V 1.50 m3

Faktor bucket Fb 0.90 -

Faktor efisiensi alat Fa 0.83 -

Waktu siklus Ts 1

- Muat T1 1.50 menit

- Lain lain T2 0.50 menit

Ts 1 2.00 menit

Kap Produksi / Jam = Q1 900.40 m2

Koefisien Alat / m2 = ( E 15 ) 0.0011 Jam

Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan

menggunakan alat bantu

Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat

langsung ke dalam Dump Truck dan diangkut ke lokasi pekerjaan.

Campuran panas HRS dihampar dengan Finisher dan dipadatakan dengan

Tandem dan Peneumatic Tire Roller

URAIAN ANALISA HARGA SATUAN LATASTON ( HRS )

No KOEF. SATUAN

Analisa EI - 633

KODEURAIAN

D2 x V x Fb x Fa x 60

D1 x t x Ts1

1 / Q1

Analisa - E 259

Page 260: Rab Versi Sni Lengkap

b Aspalt Mixing Plant ( AMP ) ( E 01 )

Kapasitas produksi V 50.00 ton / jam

faktor Efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = Q2 617.56 m2

Koefisien Alat / m2 = ( E 01 ) 0.0016 Jam

c Generator Set ( Genset ) ( E 12 )

Kapasitas produksi / jam = sama dengan AMP Q3 617.56 m2

Koefisien Alat / m2 = ( E 12 ) 0.0016 Jam

d Dump Truk ( DT ) ( E 09 )

Kapasitas bak V 8.00 ton

Faktor efisiensi alat Fa 0.83 -

Kecepatan rata rata bermuatan v1 40.00 km / jam

Kecepatan rata rata kosong v2 50.00 km / jam

Kapasitas AMP batch Q2 b 0.50 ton

Waktu menyiapkan 1 batch HRS Tb 1.00 menit

Waktu Siklus Ts2

- Mengisi bak = T1 16.00 menit

- Angkut = T2 30.00 menit

- Tunggu + Dumping + Putar T3 15.00 menit

- Kembali = T4 24.00 menit

Ts2 85.00 menit

Kapasitas Produksi / jam = Q4 69.75 m2

Koefisien Alat / m2 = ( E 09 ) 0.0143 Jam

e Finisher ( E 02 )

Kapasitas produksi V 40.00 km / jam

Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = Q5 494.05 m2

Koefisien Alat / m2 = ( E 02 ) 0.0020 Jam

f Tandem Roller ( E 17 )

Kecepatan rata rata alat v 3.50 km/jam

Lebar efektif pemadatan b 1.20 m

Jumlah lintasan n 6.00 lintasan

Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = Q6 581.00 m2

Koefisien Alat / m2 = ( E 17 ) 0.0017 Jam

V x Fa

1 / Q2

V x Fa

D1 x t

1 / Q3

( V : Q2b ) x Tb

( L : v1 ) x 60 menit

( L : v2 ) x 60 menit

1 / Q5

D1 x t

V x Fa x 60

D1 x t x Ts2

1 / Q4

KODE KOEF.

( v x 1000 ) x b x Fa

n

1 / Q6

SATUANNo URAIAN

Analisa - E 260

Page 261: Rab Versi Sni Lengkap

g Pneumatic Tire Roller ( E 18 )

Kecepatan rata rata alat v 5.00 km / jam

Lebar efektif pemadatan b 1.50 m

Jumlah lintasan n 8.00 lintasan

Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = Q7 778.13 m2

Koefisien Alat / m2 = ( E 18 ) 0.0013 Jam

h Alat Bantu

Diperlukan :

- Kereta dorong = 2 bh

- Skop = 3 bh

- Garpu = 2 bh

- Tongkat kontrol ketebalan hamparan

3 TENAGA

Produksi menentukan : ASPALT MIXING PLANT ( AMP ) Q2 617.56 m2 / jam

Produksi HRS / hari = Qt 4,322.92 m2

Kebutuhan tenaga

- Pekerja P 7.00 orang

- Mandor M 1.00 orang

Koefisien tenaga /m2 :

- Pekerja = ( L 01 ) 0.0113 jam

- Mandor = ( L 03 ) 0.0016 jam

4 HARGA DASAR SATUAN UPAH, BAHAN, DAN ALAT

( Lihat Lampiran )

5 ANALISA HARGA SATUAN PEKERJAAN

DIDAPAT HARGA SATUAN PEKERJAAN

Rp / M2

6 WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan = . . . . . . . Bulan

7 VOLUME PEKERJAAN YANG DIPERLUKAN

Volume Pekerjaan = . . . . . . . M2

( Tk x M ) / Qt

Lihat perhitungan dalam " Formulir Standart Untuk Perekaman Analisa

Masing - nasing Harga Satuan "

( Tk x P ) / Qt

#REF!

Tk x Q2

( v x 1000 ) x b x Fa

n

1 / Q7

No URAIAN KODE KOEF. SATUAN

Analisa - E 261

Page 262: Rab Versi Sni Lengkap

JENIS PEKERJAAN : LASTON ( AC )

SATUAN : M2

HARGA

NO KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A TENAGA

1 Pekerja ( L 01 ) 0.0217 2,500.00

2 Mandor ( L 03 ) 0.0022 4,062.50

JUMLAH HARGA TENAGA

B BAHAN

1 Agregat Kasar ( M 03 ) M3 0.0336 126,500.00

2 Agregat Halus ( M 04 ) M3 0.0149 79,750.00

3 Filler ( M 05 ) Kg 4.8015 750.00

4 Aspal ( M 10 ) Kg 6.6150 10,650.00

JUMLAH HARGA BAHAN

C PERALATAN

1 Wheel Loader ( E 15 ) Jam 0.0015 #REF!

2 AMP ( E 01 ) Jam 0.0022 #REF!

3 Genset ( E 12 ) Jam 0.0022 #REF!

4 Dump Truck ( E 09 ) Jam 0.0348 #REF!

5 Aspal Finisher ( E 02 ) Jam 0.0027 #REF!

6 Tandem Roller ( E 17 ) Jam 0.0016 #REF!

7 Pneumatic Tyre Roller ( E 18 ) Jam 0.0023 #REF!

8 Alat Bantu Ls 1.0000 500.00

JUMLAH HARGA PERALATAN

JUMLAH

JASA 10 %

JUMLAH ( BELUM TERMASUK PPN )

DIBULATKAN

1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator

4

Analisa EI - 634

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )

dan biaya biaya lainnya

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA

MASING MASING HARGA SATUAN

Jam

Jam

Analisa - E 262

Page 263: Rab Versi Sni Lengkap

SATUAN : M2

I ASUMSI

1 Menggunakan alat berat

2 Lokasi pekerjaan sepanjang jalan

3 Kondisi existing jalan sedang

4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0 Km

5 Tebal lapisan ( AC ) padat t 0.04 m

6 Jam kerja efektif 1 hari Tk 7.00 Jam

7 Faktor kehilangan material

- Agregat Fh 1 1.10 -

- Aspal Fh 2 1.05 -

8 Komposisi campuran AC ( Spesifikasi )

- Coarse Agregat 30 - 50 % CA 61.15 %

- Fine Agregat 39 - 59 % FA 27.00 %

- Filler 4,5 - 7,5 % FF 4.85 %

- Aspal minimum 6,7 % As 7.00 %

9 Berat jenis bahan

- AC D1 2.25 t / m3

- Coarse Agregat dan fine agregat D2 1.80 t / m3

- Filler D3 2.00 t / m3

- Aspal D4 1.03 t / m3

II METODA KERJA

1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP

2

3

4

III PEMAKAIAN BAHAN ALAT DAN TENAGA

1 BAHAN

a Agregat kasar = {( CA x D1 x t m3 ) x ( Fh 1 )}/ D2 M03 0.034 m3

b Agregat halus = {( FA x D1 x t m3 ) x ( Fh 1 )}/ D2 M04 0.015 m3

c Filler = {( FF x D1 x t m3 ) x ( Fh 1 )} M05 4.802 Kg

d Aspal = {( AS x D1 x t m3 ) x ( Fh 2 )}x1000 M10 6.615 Kg

2 ALAT

a Wheel Loader ( E 15 )

Kapasitas bucket V 1.50 m3

Faktor bucket Fb 0.90 -

Faktor efisiensi alat Fa 0.83 -

Waktu siklus Ts 1

- Muat T1 1.50 menit

- Lain lain T2 0.50 menit

Ts 1 2.00 menit

Kap Produksi / Jam = Q1 672.30 m3

Koefisien Alat / m2 = ( E 15 ) 0.0015 Jam

Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan

menggunakan alat bantu

D2 x V x Fb x Fa x 60

D1 x t x Ts1

1 / Q1

Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat

langsung ke dalam Dump Truck dan diangkut ke lapangan

Campuran panas AC dihampar dengan Finisher dan dipadatakan dengan

Tandem dan Tire Roller

Analisa EI - 634

URAIAN ANALISA HARGA SATUAN LASTON ( AC )

SATUANNo URAIAN KODE KOEF.

Analisa - E 263

Page 264: Rab Versi Sni Lengkap

b Aspalt Mixing Plant ( AMP ) ( E 01 )

Kapasitas produksi V 50.00 ton / jam

faktor Efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = Q2 461.11 m2

Koefisien Alat / m2 = ( E 01 ) 0.0022 Jam

c Generator Set ( Genset ) ( E 12 )

Kapasitas produksi / jam = sama dengan AMP Q3 461.11 m2

Koefisien Alat / m2 = ( E 12 ) 0.0022 Jam

d Dump Truk ( DT ) ( E 09 )

Kapasitas bak V 4.00 m3

Faktor efisiensi alat Fa 0.83 -

Kecepatan rata rata bermuatan v1 40.00 km / jam

Kecepatan rata rata kosong v2 50.00 km / jam

Kapasitas AMP batch Q2 b 0.50 ton

Waktu menyiapkan 1 batch AC Tb 1.00 menit

Waktu Siklus Ts2

- Mengisi bak = T1 8.00 menit

- Angkut = T2 29.99 menit

- Tunggu + Dumping + Putar T3 15.00 menit

- Kembali = T4 23.99 menit

Ts2 76.98 menit

Kapasitas Produksi / jam = Q4 28.75 m2

Koefisien Alat / m2 = ( E 09 ) 0.0348 Jam

e Finisher ( E 02 )

Kapasitas produksi V 40.00 ton / jam

Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = Q5 368.89 m2

Koefisien Alat / m2 = ( E 02 ) 0.0027 Jam

f Tandem Roller ( E 17 )

Kecepatan rata rata alat v 2.50 km / jam

Lebar efektif pemadatan b 1.20 m

Jumlah lintasan n 4.00 lintasan

Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = Q6 622.50 m2

Koefisien Alat / m2 = ( E 17 ) 0.0016 Jam

1 / Q2

1 / Q3

URAIAN

D1 x t x Ts2

V x Fa

D1 x t

1 / Q5

1 / Q6

( L : v1 ) x 60 menit

1 / Q4

( v x 1000 ) x b x Fa

n

V x Fa

D1 x t

V x Fa x 60

( L : v2 ) x 60 menit

No KODE

( V : Q2b ) x Tb

KOEF. SATUAN

Analisa - E 264

Page 265: Rab Versi Sni Lengkap

g Pneumatic Tire Roller ( E 18 )

Kecepatan rata rata alat v 3.50 km / jam

Lebar efektif pemadatan b 1.20 m

Jumlah lintasan n 8.00 lintasan

Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = Q7 435.75 m2

Koefisien Alat / m2 = ( E 18 ) 0.0023 Jam

h Alat Bantu

Diperlukan :

- Rambu = 2 bh

- Kereta dorong = 2 bh

- Skop = 3 bh

- Garpu = 2 bh

- Tongkat kontrol ketebalan hamparan

3 TENAGA

Produksi menentukan : ASPALT MIXING PLANT ( AMP ) Q2 461.11 m2 / jam

Produksi AC / hari = Qt 3,227.78 m2

Kebutuhan tenaga

- Pekerja P 10.00 orang

- Mandor M 1.00 orang

Koefisien tenaga /m2 :

- Pekerja = ( L 01 ) 0.0217 jam

- Mandor = ( L 03 ) 0.0022 jam

4 HARGA DASAR SATUAN UPAH, BAHAN, DAN ALAT

( Lihat Lampiran )

5 ANALISA HARGA SATUAN PEKERJAAN

DIDAPAT HARGA SATUAN PEKERJAAN

Rp / M2

6 WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan = . . . . . . . Bulan

7 VOLUME PEKERJAAN YANG DIPERLUKAN

Volume Pekerjaan = . . . . . . . M2

( Tk x P ) / Qt

( Tk x M ) / Qt

Lihat perhitungan dalam " Formulir Standart Untuk Perekaman Analisa

Masing - nasing Harga Satuan "

( v x 1000 ) x b x Fa

n

1 / Q7

Tk x Q2

#REF!

URAIAN KODE KOEF. SATUANNo

Analisa - E 265

Page 266: Rab Versi Sni Lengkap

JENIS PEKERJAAN : ASPHALT TREATED BASE ( ATB )

SATUAN : M3

HARGA

NO KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A TENAGA

1 Pekerja ( L 01 ) 0.3880 2,500.00

2 Mandor ( L 03 ) 0.0554 4,062.50

JUMLAH HARGA TENAGA

B BAHAN

1 Agregat Kasar ( M 03 ) M3 0.7028 126,500.00

2 Agregat Halus ( M 04 ) M3 0.5341 79,750.00

3 Filler ( M 05 ) Kg 139.2 750.00

4 Aspal ( M 10 ) Kg 157.0 10,650.00

JUMLAH HARGA BAHAN

C PERALATAN

1 Wheel Loader ( E 15 ) Jam 0.0380 #REF!

2 AMP ( E 01 ) Jam 0.0554 #REF!

3 Genset ( E 12 ) Jam 0.0554 #REF!

4 Dump Truck ( E 09 ) Jam 0.4906 #REF!

5 Aspal Finisher ( E 02 ) Jam 0.0767 #REF!

6 Tandem Roller ( E 17 ) Jam 0.0430 #REF!

7 Pneumatic Tyre Roller ( E 18 ) Jam 0.0321 #REF!

8 Alat Bantu Ls 1.0000 500.00

JUMLAH HARGA PERALATAN

JUMLAH

JASA 10 %

JUMLAH ( BELUM TERMASUK PPN )

DIBULATKAN

1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator

4

MASING MASING HARGA SATUAN

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )

dan biaya biaya lainnya

Analisa EI - 635

Jam

Jam

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA

Analisa - E 266

Page 267: Rab Versi Sni Lengkap

SATUAN : M3

I ASUMSI

1 Menggunakan alat berat ( Cara mekanik )

2 Lokasi pekerjaan sepanjang jalan

3 Kondisi existing jalan sedang

4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0 Km

5 Tebal lapisan ( ATB ) padat t 0.04 m

6 Jam kerja efektif 1 hari Tk 7.00 Jam

7 Faktor kehilangan material

- Agregat Fh 1 1.10 -

- Aspal Fh 2 1.05 -

8 Komposisi campuran ATB ( Spesifikasi )

- Coarse Agregat 40 - 60 % CA 50.00 %

- Fine Agregat 26 - 49,5 % FA 38.00 %

- Fraksi Filler 4,5 - 7,5 % FF 5.50 %

- Aspal minimum 6 % As 6.50 %

9 Berat jenis bahan

- ATB D1 2.30 t / m3

- Coarse Agregat dan fine agregat D2 1.80 t/m3

- Fraksi Filler D3 2.00 t/m3

- Aspal D4 1.03 t/m3

II METODA KERJA

1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP

2

3

4

III PEMAKAIAN BAHAN ALAT DAN TENAGA

1 BAHAN

a Agregat kasar = {( CA x D1 x 1 m3 ) x ( Fh 1 )}/ D2 M03 0.7028 m3

b Agregat halus = {( FA x D1 x 1 m3 ) x ( Fh 1 )}/ D2 M04 0.5341 m3

c Filler = {( FF x D1 x 1 m3 ) x ( Fh 1 )} M05 139.2 Kg

d Aspal = {( AS x D1 x 1 m3 ) x ( Fh 2 )} M10 157.0 Kg

2 ALAT

a Wheel Loader ( E 15 )

Kapasitas bucket V 1.50 m3

Faktor bucket Fb 0.90 -

Faktor efisiensi alat Fa 0.83 -

Waktu siklus Ts 1

- Muat T1 1.50 menit

- Lain lain T2 0.50 menit

Ts 1 2.00 menit

Kap Produksi / Jam = Q1 26.31 m3

Koefisien Alat / m2 = ( E 15 ) 0.0380 Jam

URAIAN

D2 x V x Fb x Fa x 60

D1 x Ts1

1 / Q1

Analisa EI - 635

KODE

URAIAN ANALISA HARGA SATUAN ASPHALT TREATED BASE ( ATB )

KOEF.No

Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat

langsung ke dalam Dump truck dan diangkut ke lokasi pekerjaan

Campuran panas ATB dihampar dengan Finisher dan dipadatakan dengan

Tandem dan Pneumatic Roller

Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan

menggunakan alat bantu

SATUAN

Analisa - E 267

Page 268: Rab Versi Sni Lengkap

b Aspalt Mixing Plant ( AMP ) ( E 01 )

Kapasitas produksi V 50.00 ton / jam

Faktor Efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = Q2 18.04 m3

Koefisien Alat / m3 = ( E 01 ) 0.0554 Jam

c Generator Set ( Genset ) ( E 12 )

Kapasitas produksi / jam = sama dengan AMP Q3 18.04 m3

Koefisien Alat / m3 = ( E 12 ) 0.0554 Jam

d Dump Truk ( DT ) ( E 09 )

Kapasitas bak V 8.00 ton

Faktor efisiensi alat Fa 0.83 -

Kecepatan rata rata bermuatan v1 40.00 km / jam

Kecepatan rata rata kosong v2 50.00 km / jam

Kapasitas AMP batch Q2 b 0.50 ton

Waktu menyiapkan 1 batch ATB Tb 1.00 menit

Waktu Siklus Ts2

- Mengisi bak = T1 16.00 menit

- Angkut = T2 29.99 menit

- Tunggu + Dumping + Putar T3 15.00 menit

- Kembali = ( L : v2 ) x 60 menit T4 23.99 menit

Ts2 84.99 menit

Kapasitas Produksi / jam = Q4 2.04 m3

Koefisien Alat / m3 = ( E 09 ) 0.4906 Jam

e Finisher

Kapasitas produksi V 40.00 ton/jam

Faktor efisiensi alat Fa 0.75 -

Kapasitas produksi / jam = Q5 13.04 m3

Koefisien Alat / m3 = 1 / Q5 ( E 02 ) 0.0767 Jam

f Tandem Roller ( E 17 )

Kecepatan rata rata alat v 3.50 km / jam

Lebar efektif pemadatan b 1.20 m

Jumlah lintasan n 6.00 lintasan

Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = Q6 23.24 m3

Koefisien Alat / m3 = ( E 17 ) 0.0430 Jam

1 / Q3

1 / Q2

V x Fa

D1

1 / Q6

V x Fa

D1

1 / Q4

V x Fa x 60

D1 x Ts2

No URAIAN KODE KOEF.

( v x 1000 ) x b x t x Fa

n

( L : v1 ) x 60 menit

( V : Q2b ) x Tb

SATUAN

Analisa - E 268

Page 269: Rab Versi Sni Lengkap

g Pneumatic Tire Roller ( E 18 )

Kecepatan rata rata alat v 5.00 km / jam

Lebar efektif pemadatan b 1.50 m

Jumlah lintasan n 8.00 lintasan

Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = Q7 31.13 m3

Koefisien Alat / m3 = ( E 18 ) 0.0321 Jam

h Alat Bantu

Diperlukan :

- Kereta dorong = 2 bh

- Skop = 3 bh

- Garpu = 2 bh

- Tongkat kontrol ketebalan hamparan

3 TENAGA

Produksi menentukan : ASPALT MIXING PLANT ( AMP ) Q2 18.04 m3 / jam

Produksi ATB / hari = Qt 126.30 m3

Kebutuhan tenaga

- Pekerja P 7.00 orang

- Mandor M 1.00 orang

Koefisien tenaga /m2 :

- Pekerja = ( L 01 ) 0.3880 jam

- Mandor = ( L 03 ) 0.0554 jam

4 HARGA DASAR SATUAN UPAH, BAHAN, DAN ALAT

( Lihat Lampiran )

5 ANALISA HARGA SATUAN PEKERJAAN

DIDAPAT HARGA SATUAN PEKERJAAN

Rp / M3

6 WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan = . . . . . . . . . . .Bulan

7 VOLUME PEKERJAAN YANG DIPERLUKAN

Volume Pekerjaan = . . . . . . . . . . . M2

( Tk x P ) / Qt

( Tk x M ) / Qt

1 / Q7

( v x 1000 ) x b x t x Fa

n

Tk x Q2

Lihat perhitungan dalam " Formulir Standart Untuk Perekaman Analisa

Masing - nasing Harga Satuan "

#REF!

SATUANNo URAIAN KODE KOEF.

Analisa - E 269

Page 270: Rab Versi Sni Lengkap

JENIS PEKERJAAN : LAPIS RESAP PENGIKAT (PRIME COAT)

SATUAN : LITER

HARGA

NO KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A TENAGA

1 Pekerja ( L 01 ) 0.0301 2,500.00

2 Mandor ( L 03 ) 0.0060 4,062.50

JUMLAH HARGA TENAGA

B BAHAN

1 Aspal ( M 10 ) ( M 10 ) Kg 0.6417 10,650.00

2 Karosene ( M 11 ) ( M 11 ) Liter 0.4889 1,000.00

JUMLAH HARGA BAHAN

C PERALATAN

1 Asphalt Sprayer ( E 03 ) Jam 0.0030 #REF!

2 Compresor ( E 05 ) Jam 0.0031 #REF!

3 Dump Truck ( E 08 ) Jam 0.0030 #REF!

JUMLAH HARGA PERALATAN

JUMLAH

JASA 10 %

JUMLAH ( BELUM TERMASUK PPN )

DIBULATKAN

1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator

4

MASING MASING HARGA SATUAN

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA

Jam

Jam

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )

dan biaya biaya lainnya

Analisa EI - 611

Analisa - E 270

Page 271: Rab Versi Sni Lengkap

SATUAN : L

I ASUMSI

1 Menggunakan alat berat

2 Lokasi pekerjaan sepanjang jalan

3 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.00 Km

4 Jam kerja efektif 1 hari Tk 7.00 Jam

5 Faktor kehilangan material Fh 1.10 -

6 Komposisi campuran AC ( Spesifikasi )

- Aspal AC - 10 atau AC - 20 AS 56 %

- Minyak Flux / pencair K 44 %

7 Berat jenis bahan

- Aspal AC - 10 atau AC - 20 D1 1.05 Kg / Lt

- Minyak Flux / pencair D2 0.80 Kg / Lt

8 Bahan dasar ( aspal dan minyak pencair ) semuanya diterima di Lokasi Pekerjaan

II METODA KERJA

1 Aspal dan minyak Flux dicampur dan dipanaskan sehingga menjadi campuran aspal cair

2 Permukaan yang akan dilapis dibersihkan dari debu dan kotoran dg air kompresor

3 Campuran aspal cair disemprotkan dg aspahalt sprayer ke atas permukaan yg akan dilapis

4 Angkutan aspal dan minyak Flux menggunakan Dump truck

III PEMAKAIAN BAHAN ALAT DAN TENAGA

1 BAHAN

Untuk mendapatkan 1 liter lapis resap pengikat diperlukan

( 1 Liter x Fh ) PC 1.1000 liter

a Aspal = AS x PC x D1 M10 0.6417 kg

b Kerosene = K x PC M11 0.4889 liter

2 ALAT

a Asphalt Sprayer ( E 03 )

Kapasitas alat V 800.00 liter

Faktor efisiensi alat Fa 0.83 -

Waktu siklus ( termasuk proses pemanasan ) Ts 2.00 jam

Kap Produksi / Jam = Q1 332.00 liter

Koefisien Alat / Liter = ( E 03 ) 0.0030 jam

b Air Compresor ( E 05 )

Kapasitas alat -----------> Diambil V 400.00 m2 / jam

Aplikasi Lapis Resap Pengikat Rata rata ( Spesifikasi ) Ap 0.80 liter / m2

Kapasitas produksi / jam = Q2 320.00 liter

Koefisien Alat / liter = ( E 05 ) 0.0031 jam

V x Ap

1 / Q2

URAIAN ANALISA HARGA SATUAN LAPIS RESAP PENGIKAT

1 / Q1

V x Fa

Ts

URAIAN KODENo

Analisa EI - 611

KOEF. SATUAN

Analisa - E 271

Page 272: Rab Versi Sni Lengkap

c Dump Truk ( DT ) ( E 08 )

Sebagai alat pengangkut bahan di lokasi pekerjaan Dump Truck melayani alat

Asphalt Sprayer

Kapasitas Produksi / jam = Q3 332.00 liter

Koefisien Alat / m2 = ( E 08 ) 0.0030 jam

3 TENAGA

Produksi menentukan : ASPALT FINISHER Q4 332.00 Liter

Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt 2,324.00 Liter

Kebutuhan tenaga

- Pekerja P 10.00 orang

- Mandor M 2.00 orang

Koefisien tenaga /liter :

- Pekerja = ( L 01 ) 0.0301 jam

- Mandor = ( L 03 ) 0.0060 jam

4 HARGA DASAR SATUAN UPAH, BAHAN, DAN ALAT

( Lihat Lampiran )

5 ANALISA HARGA SATUAN PEKERJAAN

DIDAPAT HARGA SATUAN PEKERJAAN

Rp / LITER

6 WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan = . . . . . . . . . . . Bulan

7 VOLUME PEKERJAAN YANG DIPERLUKAN

Volume Pekerjaan = . . . . . . . . . . . Liter

Lihat perhitungan dalam " Formulir Standart Untuk Perekaman Analisa

Masing - nasing Harga Satuan "

1 / Q3

V x Fa

Ts

( Tk x P ) / Qt

( Tk x M ) / Qt

#REF!

No URAIAN KODE KOEF. SATUAN

Analisa - E 272

Page 273: Rab Versi Sni Lengkap

JENIS PEKERJAAN : LAPIS PONDASI AGREGAT KLAS A

SATUAN : M3

HARGA

NO KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A TENAGA

1 Pekerja ( L 01 ) 0.4373 2,500.00

2 Mandor ( L 03 ) 0.0625 4,062.50

JUMLAH HARGA TENAGA

B BAHAN

1 Agregat Kasar ( M 03 ) M3 0.7680 126,500.00

2 Agregat Halus ( M 04 ) M3 0.4320 79,750.00

JUMLAH HARGA BAHAN

C PERALATAN

1 Wheel Loader ( E 15 ) Jam 0.0625 #REF!

2 Dump Truck ( E 09 ) Jam 0.1994 #REF!

3 Motor Grader ( E 13 ) Jam 0.0117 #REF!

4 Vibratory Roller ( E 19 ) Jam 0.0178 #REF!

5 Pneumatic Tyre Roller ( E 18 ) Jam 0.0043 #REF!

6 Water Tank Truck ( E 23 ) Jam 0.0211 #REF!

7 Alat Bantu Ls 1.0000 500.00

JUMLAH HARGA PERALATAN

JUMLAH

JASA 10 %

JUMLAH ( BELUM TERMASUK PPN )

DIBULATKAN

UNTUK 1 M2 TEBAL 20 CM

UNTUK 1 M2 TEBAL 15 CM

UNTUK 1 M2 TEBAL 10 CM

1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator

4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )

dan biaya biaya lainnya

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA

MASING MASING HARGA SATUAN

Analisa EI - 511

Jam

Jam

Analisa - E 273

Page 274: Rab Versi Sni Lengkap

SATUAN : M3

I ASUMSI

1 Menggunakan alat berat Cara mekanik

2 Lokasi pekerjaan sepanjang jalan

3 Kondisi existing jalan sedang

4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0 Km

5 Tebal Agregat padat t 0.15 m

6 Faktor kembang material ( padat - lepas ) Fk 1.20

7 Jam kerja efektif per hari Tk 7.00 Jam

8 Proporsi campuran

- Agregat Kasar Ak 64.00 %

- Agregat halus Ah 36.00 %

II METODA KERJA

1

2

3

4

III PEMAKAIAN BAHAN ALAT DAN TENAGA

1 BAHAN

a Agregat kasar = Ak x 1 m3 x Fk M03 0.7680 m3

b Agregat halus = Ah x 1 m3 x Fk M04 0.4320 m3

2 ALAT

a Wheel Loader ( E 15 )

Kapasitas bucket V 1.50 m3

Faktor bucket Fb 0.90 -

Faktor efisiensi alat Fa 0.83 -

Waktu siklus Ts 1

- Mencampur T1 2.50 menit

- Memuat dan Lain lain T2 1.00 menit

Ts 1 3.50 menit

Kap Produksi / Jam = Q1 16.01 m3

Koefisien Alat / m3 = ( E 15 ) 0.0625 Jam

b Dump Truk ( DT ) ( E 09 )

Kapasitas bak V 6.00 m3

Faktor efisiensi alat Fa 0.83 -

Kecepatan rata rata bermuatan v1 45.00 km / jam

Kecepatan rata rata kosong v2 60.00 km / jam

Waktu Siklus Ts2

- Waktu tempuh isi = T1 26.65 menit

- Waktu tempuh kosong = T2 19.99 menit

- lain lain termasuk menurunkan Agregat T3 3.00 menit

Ts2 49.65 menit

Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan

level permukaan dengan menggunakan alat bantu

WHEEL LOADER mencampur dan memuat agregat ke dalam Dump Truck di

Base camp

Dump Truck mengangkut Agregat ke lokasi pekerjaan dan dihampar dg motor

Grader

Hamparan Agregat di basahi dengan Water Tank Truck sebelum dipadatkan

dengan Tandem Roller & PTR

Fk x Ts1

1 / Q1

( L : v1 ) x 60 menit

( L : v2 ) x 60 menit

Analisa EI - 511

No URAIAN KODE KOEF. SATUAN

V x Fb x Fa x 60

URAIAN ANALISA HARGA SATUAN LAPIS PONDASI AGREGAT KLAS A

Analisa - E 274

Page 275: Rab Versi Sni Lengkap

Kapasitas Produksi / jam = Q2 5.02 m3

Koefisien Alat / m3 = ( E 09 ) 0.1994 Jam

c Motor Grader ( E 13 )

Panjang hamparan Lh 50.00 m

Lebar efektif kerja blade b 2.40 m

Faktor Efisiensi alat Fa 0.83 -

Kecepatan rata rata alat v 4.00 km / jam

Jumlah lintasan n 6.00 Lintas

Waktu siklus Ts 3

- Perataan 1 Lintasan = Lh : ( v x 1000 x 60 menit ) T1 0.75 menit

- Lain lain T2 1.00 menit

Ts 3 1.75 menit

Kapasitas produksi / jam = Q3 85.37 m3

Koefisien Alat / m3 = ( E 02 ) 0.0117 Jam

d Vibratory Roller ( E 19 )

Kecepatan rata rata alat v 3.00 km / jam

Lebar efektif pemadatan b 1.20 m

Jumlah lintasan n 8.00 lintasan

Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = Q4 56.03 m3

Koefisien Alat / m3 = ( E 19 ) 0.0178 Jam

e Pneumatic Tire Roller ( E 18 )

Kecepatan rata rata alat v 5.00 km/jam

Lebar efektif pemadatan b 1.50 m

Jumlah lintasan n 4.00 lintasan

Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = Q5 233.44 m3

Koefisien Alat / m3 = 1 / Q5 ( E 18 ) 0.0043 Jam

f Water Tank Truck ( E 23 )

Volume tangki air v 4.00 m3

Kebutuhan air / m3 agregat padat Wc 0.07 m3

Pengisian tangki / jam n 1.00 kali

Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = Q6 47.43 m3

Koefisien Alat / m3 = ( E 23 ) 0.0211 Jam

1 / Q4

( v x 1000 ) x b x t x Fa

n

v x n x Fa

Wc

1 / Q6

1 / Q2

Lh x b x t x Fa x 60

n x Ts 3

1 / Q3

( v x 1000 ) x b x t x Fa

n

V x Fa x 60

Fk x Ts2

No URAIAN KODE KOEF. SATUAN

Analisa - E 275

Page 276: Rab Versi Sni Lengkap

g Alat Bantu

Diperlukan :

- Kereta dorong = 2 bh

- Skop = 3 bh

- Garpu = 2 bh

3 TENAGA

Produksi menentukan : WHEEL LOADER Q1 16.01 m3 / jam

Produksi Agregat / hari = Tk x Q1 Qt 112.05 m3

Kebutuhan tenaga

- Pekerja P 7.00 orang

- Mandor M 1.00 orang

Koefisien tenaga /m2 :

- Pekerja = ( L 01 ) 0.4373 jam

- Mandor = ( L 03 ) 0.0625 jam

4 HARGA DASAR SATUAN UPAH, BAHAN, DAN ALAT

( Lihat Lampiran )

5 ANALISA HARGA SATUAN PEKERJAAN

DIDAPAT HARGA SATUAN PEKERJAAN

Rp / M2

6 WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan = . . . . . . . . . .Bulan

7 VOLUME PEKERJAAN YANG DIPERLUKAN

Volume Pekerjaan = . . . . . . . . . .M3

Lihat perhitungan dalam " Formulir Standart Untuk Perekaman Analisa

Masing - nasing Harga Satuan "

( Tk x P ) / Qt

( Tk x M ) / Qt

#REF!

No URAIAN KODE KOEF. SATUAN

Analisa - E 276

Page 277: Rab Versi Sni Lengkap

JENIS PEKERJAAN : LAPIS PONDASI AGREGAT KLAS B

SATUAN : M3

HARGA

NO KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A TENAGA

1 Pekerja ( L 01 ) 0.4373 2,500.00

2 Mandor ( L 03 ) 0.0625 4,062.50

JUMLAH HARGA TENAGA

B BAHAN

1 Agregat Kasar ( M 03 ) M3 0.7080 126,500.00

2 Agregat Halus ( M 04 ) M3 0.4920 79,750.00

JUMLAH HARGA BAHAN

C PERALATAN

1 Wheel Loader ( E 15 ) Jam 0.0625 #REF!

2 Dump Truck ( E 09 ) Jam 0.1994 #REF!

3 Motor Grader ( E 13 ) Jam 0.0117 #REF!

4 Vibratory Roller ( E 19 ) Jam 0.0178 #REF!

5 Pneumatic Tyre Roller ( E 18 ) Jam 0.0043 #REF!

6 Water Tank Truck ( E 23 ) Jam 0.0211 #REF!

7 Alat Bantu Ls 1.0000 500.00

JUMLAH HARGA PERALATAN

JUMLAH

JASA 10 %

JUMLAH ( BELUM TERMASUK PPN )

DIBULATKAN

UNTUK 1 M2 TEBAL 20 CM

UNTUK 1 M2 TEBAL 15 CM

UNTUK 1 M2 TEBAL 10 CM

1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator

4

Jam

MASING MASING HARGA SATUAN

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )

dan biaya biaya lainnya

Analisa EI - 512

Jam

Analisa - E 277

Page 278: Rab Versi Sni Lengkap

SATUAN : M3

I ASUMSI

1 Menggunakan alat berat

2 Lokasi pekerjaan sepanjang jalan

3 Kondisi existing jalan sedang

4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0 Km

5 Tebal Agregat padat t 0.15 m

6 Faktor kembang material ( padat - lepas ) Fk 1.20

7 Jam kerja efektif per hari Tk 7.00 Jam

8 Proporsi campuran

- Agregat Kasar Ak 59.00 %

- Agregat halus Ah 41.00 %

II METODA KERJA

1

2

3

4

III PEMAKAIAN BAHAN ALAT DAN TENAGA

1 BAHAN

a Agregat kasar = Ak x 1 m3 x Fk M03 0.7080 m3

b Agregat halus = Ah x 1 m3 x Fk M04 0.4920 m3

2 ALAT

a Wheel Loader ( E 15 )

Kapasitas bucket V 1.50 m3

Faktor bucket Fb 0.90 -

Faktor efisiensi alat Fa 0.83 -

Waktu siklus Ts 1

- Mencampur T1 2.50 menit

- Memuat dan Lain lain T2 1.00 menit

Ts 1 3.50 menit

Kap Produksi / Jam = Q1 16.01 m3

Koefisien Alat / m2 = ( E 15 ) 0.0625 Jam

b Dump Truk ( DT ) ( E 09 )

Kapasitas bak V 6.00 m3

Faktor efisiensi alat Fa 0.83 -

Kecepatan rata rata bermuatan v1 45.00 km / jam

Kecepatan rata rata kosong v2 60.00 km / jam

Waktu Siklus Ts2

- Waktu tempuh isi = T1 26.65 menit

- Waktu tempuh kosong = T2 19.99 menit

- lain lain termasuk menurunkan Agregat T3 3.00 menit

Ts2 49.65 menit

WHEEL LOADER mencampur dan memuat agregat ke dalam Dump Truck di

Base camp

Dump Truck mengangkut Agregat ke lokasi pekerjaan dan dihampar dengan

motor Grader

Hamparan Agregat di basahi dengan Water Tank Truck sebelum dipadatkan

dengan Tandem Roller & PTR

Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan

level permukaan dengan menggunakan alat bantu

1 / Q1

URAIAN ANALISA HARGA SATUAN LAPIS PONDASI AGREGAT KLAS B

Analisa EI - 512

V x Fb x Fa x 60

Fk x Ts1

No URAIAN KODE KOEF. SATUAN

( L : v1 ) x 60 menit

( L : v2 ) x 60 menit

Analisa - E 278

Page 279: Rab Versi Sni Lengkap

Kapasitas Produksi / jam = Q2 5.02 m3

Koefisien Alat / m2 = ( E 09 ) 0.1994 Jam

c Motor Grader ( E 13 )

Panjang hamparan Lh 50.00 m

Lebar efektif kerja blade b 2.40 m

Faktor Efisiensi alat Fa 0.83 -

Kecepatan rata rata alat v 4.00 km / jam

Jumlah lintasan n 6.00 Lintas

Waktu siklus Ts 3

- Perataan 1 Lintasan = ( Lh x 60 ) : ( v x 1000 ) T1 0.75 menit

- Lain lain T2 1.00 menit

Ts 3 1.75 menit

Kapasitas produksi / jam = Q3 85.37 m3

Koefisien Alat / m2 = ( E 02 ) 0.0117 Jam

d Vibratory Roller ( E 17 )

Kecepatan rata rata alat v 3.00 km / jam

Lebar efektif pemadatan b 1.20 m

Jumlah lintasan n 8.00 lintasan

Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = Q4 56.03 m3

Koefisien Alat / m2 = ( E 17 ) 0.0178 Jam

e Pneumatic Tire Roller ( E 18 )

Kecepatan rata rata alat v 5.00 km / jam

Lebar efektif pemadatan b 1.50 m

Jumlah lintasan n 4.00 lintasan

Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = Q5 233.44 m3

Koefisien Alat / m2 = ( E 18 ) 0.0043 Jam

f Water Tank Truck ( E 23 )

Volume tangki air v 4.00 km / jam

Kebutuhan air / m3 agregat padat Wc 0.07 m3

Pengisian tangki / jam n 1.00 lintasan

Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = Q6 47.43 m3

Koefisien Alat / m2 = ( E 23 ) 0.0211 Jam

( v x 1000 ) x b x t x Fa

n

1 / Q4

( v x 1000 ) x b x t x Fa

1 / Q2

Lh x b x t x Fa x 60

n x Ts 3

1 / Q3

1 / Q6

n

1 / Q5

v x n x Fa

Wc

V x Fa x 60

Fk x Ts2

No URAIAN KODE KOEF. SATUAN

Analisa - E 279

Page 280: Rab Versi Sni Lengkap

g Alat Bantu

Diperlukan :

- Kereta dorong = 2 bh

- Skop = 3 bh

- Garpu = 2 bh

3 TENAGA

Produksi menentukan : WHEEL LOADER Q1 16.01 m3 / jam

Produksi Agregat / hari = Qt 112.05 m3 / jam

Kebutuhan tenaga

- Pekerja P 7.00 orang

- Mandor M 1.00 orang

Koefisien tenaga /m2 :

- Pekerja = ( L 01 ) 0.4373 jam

- Mandor = ( L 03 ) 0.0625 jam

4 HARGA DASAR SATUAN UPAH, BAHAN, DAN ALAT

( Lihat Lampiran )

5 ANALISA HARGA SATUAN PEKERJAAN

DIDAPAT HARGA SATUAN PEKERJAAN

Rp / M2

6 WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan = . . . . . . . . . .Bulan

7 VOLUME PEKERJAAN YANG DIPERLUKAN

Volume Pekerjaa = . . . . . . . . . .M2

Lihat perhitungan dalam " Formulir Standart Untuk Perekaman Analisa

Masing - nasing Harga Satuan "

Tk x Q1

( Tk x P ) / Qt

( Tk x M ) / Qt

#REF!

KODE KOEF.No URAIAN SATUAN

Analisa - E 280

Page 281: Rab Versi Sni Lengkap

JENIS PEKERJAAN : LAPIS PEREKAT (TACK COAT)

SATUAN : LITER

HARGA

NO KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A TENAGA

1 Pekerja ( L 01 ) 0.0301 2,500.00

2 Mandor ( L 03 ) 0.0060 4,062.50

JUMLAH HARGA TENAGA

B BAHAN

1 Aspal ( M 10 ) Kg 0.8880 10,650.00

2 Kerosene ( M 11 ) Liter 0.2530 1,000.00

JUMLAH HARGA BAHAN

C PERALATAN

1 Asphalt Sprayer ( E 03 ) Jam 0.0030 #REF!

2 Compresor ( E 05 ) Jam 0.0063 #REF!

3 Dump Truck ( E 08 ) Jam 0.0030 #REF!

JUMLAH HARGA PERALATAN

JUMLAH

JASA 10 %

JUMLAH ( BELUM TERMASUK PPN )

DIBULATKAN

1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator

4

Jam

Jam

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )

dan biaya biaya lainnya

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA

Analisa EI - 612

MASING MASING HARGA SATUAN

Analisa - E 281

Page 282: Rab Versi Sni Lengkap

SATUAN : M3

I ASUMSI

1 Menggunakan alat berat

2 Lokasi pekerjaan sepanjang jalan

3 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.00 Km

4 Jam kerja efektif 1 hari Tk 7.00 Jam

5 Faktor kehilangan material Fh 1.10 -

6 Komposisi campuran ( Spesifikasi )

- Aspal AC - 10 atau AC - 20 AS 77 %

- Minyak Flux / pencair K 23 %

7 Berat jenis bahan

- Aspal AC - 10 atau AC - 20 D1 1.05 Kg / Lt

- Minyak Flux / pencair D2 0.80 Kg / Lt

8

II METODA KERJA

1

2

3

4 Angkutan aspal dan minyak Flux menggunakan Dump truck

III PEMAKAIAN BAHAN ALAT DAN TENAGA

1 BAHAN

Untuk mendapatkan 1 liter lapis resap pengikat diperlukan

( 1 Liter x Fh ) PC 1.1000 Liter

a Aspal = AS x PC x D1 M10 0.8880 Kg

b Kerosene = K x PC M11 0.2530 Liter

2 ALAT

a Asphalt Sprayer ( E 03 )

Kapasitas alat V 800.00 Liter

Faktor efisiensi alat Fa 0.83 -

Waktu siklus ( termasuk proses pemanasan ) Ts 2.00 Jam

Kap Produksi / Jam = Q1 332.00 Liter

Koefisien Alat / Liter = ( E 03 ) 0.0030 Jam

b Air Compresor ( E 05 )

Kapasitas alat . . . . . Diambil V 400.00 m2 / jam

Aplikasi Lapis Resap Pengikat Rata rata ( Spesifikasi ) Ap 0.40 Liter / m2

Kapasitas produksi / jam = Q2 160.00 Liter

Koefisien Alat / liter = ( E 05 ) 0.0063 Jam

Campuran aspal cair disemprotkan dg aspahalt sprayer ke atas permukaan yg

akan dilapis

Bahan dasar ( aspal dan minyak pencair ) semuanya diterima di Lokasi

Pekerjaan

URAIAN ANALISA HARGA SATUAN LAPIS PEREKAT

No URAIAN KODE KOEF.

Aspal dan minyak Flux dicampur dan dipanaskan sehingga menjadi campuran

aspal cair

Permukaan yang akan dilapis dibersihkan dari debu dan kotoran dg air

kompresor

V x Fa

Ts

SATUAN

Analisa EI - 612

1 / Q1

V x Ap

1 / Q2

Analisa - E 282

Page 283: Rab Versi Sni Lengkap

c Dump Truk ( DT ) ( E 08 )

Sebagai alat pengangkut bahan di lokasi pekerjaan Dump Truck melayani alat

Asphalt Sprayer

Kapasitas Produksi / jam = Q3 332.00 Liter

Koefisien Alat / m2 = ( E 08 ) 0.0030 Jam

3 TENAGA

Produksi menentukan : ASPALT FINISHER Q4 332.00 Liter

Produksi Lapis Perekat / hari = Tk x Q4 Qt 2,324.00 Liter

Kebutuhan tenaga

- Pekerja P 10.00 orang

- Mandor M 2.00 orang

Koefisien tenaga /liter :

- Pekerja = ( L 01 ) 0.0301 jam

- Mandor = ( L 03 ) 0.0060 jam

4 HARGA DASAR SATUAN UPAH, BAHAN, DAN ALAT

( Lihat Lampiran )

5 ANALISA HARGA SATUAN PEKERJAAN

DIDAPAT HARGA SATUAN PEKERJAAN

Rp / Liter

6 WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan = . . . . . . . . . .Bulan

7 VOLUME PEKERJAAN YANG DIPERLUKAN

Volume Pekerjaan = . . . . . . . . . .Liter

Lihat perhitungan dalam " Formulir Standart Untuk Perekaman Analisa

Masing - nasing Harga Satuan "

V x Fa

Ts

1 / Q3

( Tk x P ) / Qt

( Tk x M ) / Qt

No URAIAN KODE KOEF. SATUAN

#REF!

Analisa - E 283

Page 284: Rab Versi Sni Lengkap

JENIS PEKERJAAN : PENYIAPAN BADAN JALAN (PEMADATAN DAN PERATAAN)

SATUAN : M2

HARGA

NO KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A TENAGA

1 Pekerja ( L 01 ) 0.0161 2,500.00

2 Mandor ( L 02 ) 0.0040 4,062.50

JUMLAH HARGA TENAGA

B BAHAN

JUMLAH HARGA BAHAN

C PERALATAN

1 Motor Grader ( E 13 ) Jam 0.0025 #REF!

2 Vibratory Roller ( E 19 ) Jam 0.0040 #REF!

3 Water Tank Truck ( E 23 ) Jam 0.0105 #REF!

4 Alat Bantu Ls 1.0000 500.00

JUMLAH HARGA PERALATAN

JUMLAH

JASA 10 %

JUMLAH ( BELUM TERMASUK PPN )

DIBULATKAN

1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator

4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )

dan biaya biaya lainnya

Analisa EI - 33

Jam

Jam

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA

MASING MASING HARGA SATUAN

Analisa - E 284

Page 285: Rab Versi Sni Lengkap

SATUAN : M2

I ASUMSI

1 Pekerjaan dilakukan pada hanya pada tanah galian

2 Pekerjaan dilakukan secara mekanis

3 Lokasi pekerjaan : sepanjang jalan

4 Kondisi jalan : jelek / belum padat

5 Jam kerja efektif per hari Tk 7.00 Jam

II URUTAN KERJA

1 Motor Grader meratakan permukaan hasil galian

2 Vibro Roller memadatkan permukaan jalan yang telah diratakan oleh Motor grader

3 Sekelompok pekerja akan membanru meratakan badan jalan dengan alat bantu

permukaan dengan menggunakan alat bantu

III PEMAKAIAN BAHAN ALAT DAN TENAGA

1 BAHAN

Tidak diperlukan bahan / material

2 ALAT

a Motor Grader ( E 13 )

Panjang hamparan Lh 50.00 m

Lebar efektif kerja blade b 2.40 m

Faktor Efisiensi alat Fa 0.83 -

Kecepatan rata rata alat v 2.00 km / jam

Jumlah lintasan n 6.00 Lintas

Waktu siklus Ts 1

- Perataan 1 Lintasan = Lh : ( v x 1000 x 60 menit ) T1 1.50 menit

- Lain lain T2 1.00 menit

Ts 1 2.50 menit

Kapasitas produksi / jam = Q1 398.40 m3

Koefisien Alat / m3 = ( E 02 ) 0.0025 Jam

b Vibratory Roller ( E 19 )

Kecepatan rata rata alat v 2.00 km / jam

Lebar efektif pemadatan b 1.20 m

Jumlah lintasan n 8.00 lintasan

Faktor efisiensi alat Fa 0.83 -

Kapasitas produksi / jam = Q2 249.00 m3

Koefisien Alat / m3 = ( E 19 ) 0.0040 Jam

c Water Tank Truck ( E 23 )

Volume tangki air v 4.00 m3

Kebutuhan air / m3 agregat padat Wc 0.07 m3

Pengisian tangki / jam n 2.00 kali

Faktor efisiensi alat Fa 0.83 -

Analisa EI - 33

No URAIAN KODE KOEF. SATUAN

( PEMADATAN DAN PERATAAN )

Lh x b x Fa x 60

n x Ts 1

1 / Q1

( v x 1000 ) x b x Fa

URAIAN ANALISA HARGA SATUAN PENYIAPAN BADAN JALAN

n

1 / Q2

Analisa - E 285

Page 286: Rab Versi Sni Lengkap

Kapasitas produksi / jam = Q3 94.86 m3

Koefisien Alat / m3 = ( E 23 ) 0.0105 Jam

g Alat Bantu

Diperlukan :

- Skop = 3 bh

3 TENAGA

Produksi menentukan : VIBRATORY ROLLER Q2 249.00 m3 / jam

Produksi Pekerjaan / hari = Qt 1,743.00 m3

Kebutuhan tenaga

- Pekerja P 4.00 orang

- Mandor M 1.00 orang

Koefisien tenaga /m2 :

- Pekerja = ( L 01 ) 0.0161 jam

- Mandor = ( L 03 ) 0.0040 jam

4 HARGA DASAR SATUAN UPAH, BAHAN, DAN ALAT

( Lihat Lampiran )

5 ANALISA HARGA SATUAN PEKERJAAN

DIDAPAT HARGA SATUAN PEKERJAAN

Rp / M2

6 WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan = . . . . . . . . . .Bulan

7 VOLUME PEKERJAAN YANG DIPERLUKAN

Volume Pekerjaan = . . . . . . . . . .M3

Lihat perhitungan dalam " Formulir Standart Untuk Perekaman Analisa

Masing - nasing Harga Satuan "

Wc

#REF!

1 / Q3

Tk x Q2

( Tk x P ) / Qt

( Tk x M ) / Qt

v x n x Fa

No URAIAN KODE KOEF. SATUAN

Analisa - E 286

Page 287: Rab Versi Sni Lengkap

JUMLAH

HARGA

(Rp.)

28.34

6.58

34.92

1,532.51

1,850.41

3,600.33

56,404.89

63,388.13

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

500.00

#REF!

#REF!

#REF!

#REF!

#REF!

Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan

Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA

MASING MASING HARGA SATUAN

Analisa EI - 633

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )

dan biaya biaya lainnya

Analisa - E 287

Page 288: Rab Versi Sni Lengkap

URAIAN ANALISA HARGA SATUAN LATASTON ( HRS )

Analisa EI - 633

KET.

Analisa - E 288

Page 289: Rab Versi Sni Lengkap

KET.

Analisa - E 289

Page 290: Rab Versi Sni Lengkap

Lump sum

KET.

Analisa - E 290

Page 291: Rab Versi Sni Lengkap

JUMLAH

HARGA

(Rp.)

54.22

8.81

63.03

4,254.51

1,184.29

3,601.13

70,449.75

79,489.67

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

500.00

#REF!

#REF!

#REF!

#REF!

#REF!

Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan

Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran

Analisa EI - 634

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )

dan biaya biaya lainnya

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA

MASING MASING HARGA SATUAN

Analisa - E 291

Page 292: Rab Versi Sni Lengkap

Analisa EI - 634

URAIAN ANALISA HARGA SATUAN LASTON ( AC )

KET.

Analisa - E 292

Page 293: Rab Versi Sni Lengkap

KET.

Analisa - E 293

Page 294: Rab Versi Sni Lengkap

Lump sum

KET.

Analisa - E 294

Page 295: Rab Versi Sni Lengkap

JUMLAH

HARGA

(Rp.)

969.88

225.15

1,195.03

88,901.39

42,595.36

104,399.98

1,672,049.95

1,907,946.68

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

500.00

#REF!

#REF!

#REF!

#REF!

#REF!

Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan

Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran

MASING MASING HARGA SATUAN

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )

dan biaya biaya lainnya

Analisa EI - 635

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA

Analisa - E 295

Page 296: Rab Versi Sni Lengkap

KET.

Analisa EI - 635

URAIAN ANALISA HARGA SATUAN ASPHALT TREATED BASE ( ATB )

Analisa - E 296

Page 297: Rab Versi Sni Lengkap

KET.

Analisa - E 297

Page 298: Rab Versi Sni Lengkap

Lump sum

KET.

Analisa - E 298

Page 299: Rab Versi Sni Lengkap

JUMLAH

HARGA

(Rp.)

75.30

24.47

99.77

6,834.30

488.90

7,323.19

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan

Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran

MASING MASING HARGA SATUAN

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )

dan biaya biaya lainnya

Analisa EI - 611

Analisa - E 299

Page 300: Rab Versi Sni Lengkap

100 Bagian

80 Bagian

Campuran

URAIAN ANALISA HARGA SATUAN LAPIS RESAP PENGIKAT

KET.

Analisa EI - 611

Analisa - E 300

Page 301: Rab Versi Sni Lengkap

KET.

Analisa - E 301

Page 302: Rab Versi Sni Lengkap

JUMLAH

HARGA

(Rp.)

1,093.26

253.79

1,347.05

97,152.00

34,452.00

131,604.00

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

500.00

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan

Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )

dan biaya biaya lainnya

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA

MASING MASING HARGA SATUAN

Analisa EI - 511

Analisa - E 302

Page 303: Rab Versi Sni Lengkap

Tabel; 5.1.2 (a)

Analisa EI - 511

KET.

URAIAN ANALISA HARGA SATUAN LAPIS PONDASI AGREGAT KLAS A

Analisa - E 303

Page 304: Rab Versi Sni Lengkap

3 x pp

KET.

Analisa - E 304

Page 305: Rab Versi Sni Lengkap

Lump sum

KET.

Analisa - E 305

Page 306: Rab Versi Sni Lengkap

JUMLAH

HARGA

(Rp.)

1,093.26

253.79

1,347.05

89,562.00

39,237.00

128,799.00

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

500.00

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan

Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran

MASING MASING HARGA SATUAN

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )

dan biaya biaya lainnya

Analisa EI - 512

Analisa - E 306

Page 307: Rab Versi Sni Lengkap

Tabel; 5.1.2 (a)

URAIAN ANALISA HARGA SATUAN LAPIS PONDASI AGREGAT KLAS B

Analisa EI - 512

KET.

Analisa - E 307

Page 308: Rab Versi Sni Lengkap

3 x pp

KET.

Analisa - E 308

Page 309: Rab Versi Sni Lengkap

Lump sum

KET.

Analisa - E 309

Page 310: Rab Versi Sni Lengkap

JUMLAH

HARGA

(Rp.)

75.30

24.47

99.77

9,456.82

253.00

9,709.82

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan

Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )

dan biaya biaya lainnya

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA

Analisa EI - 612

MASING MASING HARGA SATUAN

Analisa - E 310

Page 311: Rab Versi Sni Lengkap

100 Bagian

30 Bagian

Campuran

URAIAN ANALISA HARGA SATUAN LAPIS PEREKAT

KET.

Analisa EI - 612

Analisa - E 311

Page 312: Rab Versi Sni Lengkap

KET.

Analisa - E 312

Page 313: Rab Versi Sni Lengkap

JUMLAH

HARGA

(Rp.)

40.16

16.32

56.48

#REF!

#REF!

#REF!

500.00

#REF!

#REF!

#REF!

#REF!

#REF!

Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan

Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )

dan biaya biaya lainnya

Analisa EI - 33

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA

MASING MASING HARGA SATUAN

Analisa - E 313

Page 314: Rab Versi Sni Lengkap

3 x pp

Analisa EI - 33

KET.

( PEMADATAN DAN PERATAAN )

URAIAN ANALISA HARGA SATUAN PENYIAPAN BADAN JALAN

Analisa - E 314

Page 315: Rab Versi Sni Lengkap

Lump sum

KET.

Analisa - E 315

Page 316: Rab Versi Sni Lengkap

HARGA HARGA JUMLAH

UPAH BAHAN HARGA

PEKERJAAN PERSIAPAN

1 1 M2 Pekerjaan Pengukuran Gedung 5,423.00 - 542,300.00

2 1 M1 Pengukuran dan pemasangan bouwplank untuk gedung dan saluran 6,036.00 35,246.00 41,282.00

3 1 M2 Membersihkan lapangan dan perataan 3,987.00 - 3,987.00

4 1 buah Membuat Papan Nama Proyek 80x120 cm 143,158.00 182,293.00 325,451.00

5 1 M2 Pembuatan jalan sementara, tebal 25 cm 25,575.00 30,975.00 56,550.00

6 1 M2 Pembuatan kantor sementara, dengan lantai plesteran 152,762.00 507,042.00 659,804.00

7 1 M1 Pembuatan pagar sementara dari seng gelombang tinggi 2 meter 16,830.00 101,984.00 118,814.00

PEKERJAAN TANAH

1 1 M3 Galian tanah biasa sedalam sampai 1 meter 10,230.00 - 10,230.00

2 1 M3 Galian tanah biasa sedalam 1 - 2 meter 13,452.00 - 13,452.00

3 1 M3 Galian tanah biasa sedalam 2 - 3 meter 18,797.00 - 18,797.00

4 1 M3 Galian tanah keras sedalam sampai 1 meter 15,966.00 - 15,966.00

5 1 M3 Galian tanah cadas sedalam sampai 1 meter 31,968.00 - 31,968.00

6 1 M3 Galian tanah lumpur sedalam 1 meter 21,073.00 - 21,073.00

7 1 M1 Membuat sumur 57,187.00 70,400.00 127,587.00

8 1 M3 Mengangkut tanah sejauh 30 meter 7,617.00 - 7,617.00

9 1 M3 Pembuangan tanah sejauh 150 meter 13,139.00 - 13,139.00

10 1 M3 Membuang tanah dengan menghampar 5,857.00 - 5,857.00

11 1 M3 Urug kembali bekas galian 4,903.00 - 4,903.00

12 1 M2 Meratakan tanah ditumbuk halus 5,857.00 - 5,857.00

13 1 M3 Urug pasir 6,957.00 72,600.00 79,557.00

14 1 M3 Urug tanah mendatangkan 6,957.00 46,200.00 53,157.00

15 1 M3 Urugan sirtu 6,393.00 87,120.00 93,513.00

16 1 M3 Pemasangan lapisan ijuk 3,836.00 99,000.00 102,836.00

17 1 M2 Gebalan rumput 11,893.00 7,040.00 18,933.00

PEKERJAAN PASANGAN

1 1 M3 Pasangan pondasi batu kosong 31,638.00 123,750.00 155,388.00

2 1 M3 Pasangan pondasi 1 Kp : 1 Sm : 1 Ps 55,811.00 180,693.00 236,504.00

3 1 M3 Pasangan pondasi 1 Pc : 3 Kp : 5 Ps 55,811.00 235,988.00 291,800.00

4 1 M3 Pasangan pondasi 1 Pc : 3 Kp : 10 Ps 55,811.00 200,918.00 256,730.00

5 1 M3 Pasangan pondasi 1 Pc : 4 Ps 55,811.00 277,257.00 333,068.00

6 1 M2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps 10,931.00 36,108.00 47,039.00

7 1 M2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps 10,931.00 40,209.00 51,140.00

8 1 M2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps 22,082.00 72,297.00 94,379.00

9 1 M2 Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps 22,082.00 84,321.00 106,403.00

10 1 M2 Pasangan dinding bataco 15,248.00 34,474.00 49,722.00

11 1 M2 Pasangan roster 25/25 cm 15,248.00 49,049.00 64,297.00

PEKERJAAN BETON

1 1 M3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr 59,317.00 395,813.00 455,131.00

2 1 M3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr 47,547.00 300,231.00 347,778.00

3 1 M3 Beton cyclope 1pc:3ps:5kr 176,275.00 202,749.00 379,024.00

4 1 M3 Membuat beton bertulang, 1 Pc : 1,5 Ps : 2,5 Kr 91,492.00 443,916.00 535,408.00

5 1 M3 Membuat beton dengan mutu K 225 176,275.00 434,504.00 610,779.00

6 1 M3 Membuat beton dengan mutu K 275 176,275.00 439,222.00 615,497.00

7 1 M3 Membuat beton dengan mutu K 300 176,275.00 462,502.00 638,777.00

8 1 kg Pembesian dengan besi polos 9,657.00 9,279.00 9,657.00

9 1 kg Pembesian dengan besi ulir 9,773.00 9,395.00 9,773.00

10 1 M2 Cetakan beton / begisting memakai papan 23,045.00 61,298.00 84,343.00

11 1 M2 Cetakan beton / begisting memakai multiplek 23,045.00 69,251.00 92,296.00

12 1 M3 Membongkar cetakan 88,000.00 - 88,000.00

REKAPITULASI ANALISA

NO. SATUAN MACAM PEKERJAAN

Rekapitulasi - 316

Page 317: Rab Versi Sni Lengkap

HARGA HARGA JUMLAH

UPAH BAHAN HARGANO. SATUAN MACAM PEKERJAAN

13 1 M3 Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai dolken ) 467,293.00 770,000.00 1,237,293.00

14 1 M3 Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai scafolding ) 884,702.00 704,000.00 884,702.00

15 1 M3 Pek. Beton 1:2:3 tanpa dolken, 100 kg besi 415,569.00 1,936,759.00 2,352,328.00

16 1 M3 Pek. Beton 1:2:3 tanpa dolken, 125 kg besi 425,019.00 2,168,749.00 2,593,768.00

17 1 M3 Pek. Beton 1:2:3 tanpa dolken, 150 kg besi 434,469.00 2,400,739.00 2,835,209.00

18 1 M3 Pek. Beton 1:2:3 tanpa dolken, 175 kg besi 443,920.00 2,632,729.00 3,076,649.00

19 1 M3 Pek. Beton 1:2:3 tanpa dolken, 200 kg besi 453,370.00 2,864,719.00 3,318,090.00

20 1 M3 Pek. Beton 1:2:3 dengan memakai dolken, 100 kg besi 882,862.00 2,706,759.00 3,589,622.00

21 1 M3 Pek. Beton 1:2:3 dengan memakai dolken, 125 kg besi 892,313.00 2,938,749.00 3,831,062.00

22 1 M3 Pek. Beton 1:2:3 dengan memakai dolken, 150 kg besi 901,763.00 3,170,739.00 4,072,503.00

23 1 M3 Pek. Beton 1:2:3 dengan memakai dolken, 175 kg besi 911,213.00 3,402,729.00 4,313,943.00

24 1 M3 Pek. Beton 1:2:3 dengan memakai dolken, 200 kg besi 920,664.00 3,634,719.00 4,555,383.00

25 1 M3 Pek. Beton 1:2:3 dengan memakai scaffolding, 100 kg besi 596,271.00 2,640,759.00 3,237,031.00

26 1 M3 Pek. Beton 1:2:3 dengan memakai scaffolding, 125 kg besi 605,721.00 2,872,749.00 3,478,471.00

27 1 M3 Pek. Beton 1:2:3 dengan memakai scaffolding, 150 kg besi 615,172.00 3,104,739.00 3,719,911.00

28 1 M3 Pek. Beton 1:2:3 dengan memakai scaffolding, 175 kg besi 624,622.00 3,336,729.00 3,961,352.00

29 1 M3 Pek. Beton 1:2:3 dengan memakai scaffolding, 200 kg besi 634,073.00 3,568,719.00 4,202,792.00

PEKERJAAN PELESTERAN

1 1 M2 Plesteran batu kali 1pc:4ps 16,225.00 7,219.00 23,444.00

2 1 M2 Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm 9,790.00 3,195.00 12,985.00

3 1 M2 Plesteran 1 Pc : 4 Ps, tebal 15 mm 9,790.00 6,042.00 15,832.00

4 1 M2 Plesteran beton 1 Pc : 3 Ps, tebal 15 mm 12,894.00 7,697.00 20,591.00

5 1 M1 Plesteran skoneng 1 Pc : 2 Ps ( untuk gedung ) 3,729.00 587.00 4,316.00

6 1 M2 Plesteran siar adukan 1 Pc : 2 Ps 5,934.00 4,968.00 10,902.00

7 1 M2 Plesteran Ciprat, 1 Pc : 2 Ps 9,391.00 4,598.00 13,989.00

8 1 M2 Acian dinding bata 2,772.00 2,941.00 5,713.00

9 1 M2 Pasang dinding batu hias tempel 27,115.00 82,100.00 109,215.00

PEKERJAAN PASANG TEGEL

1 1 M2 Pasang tegel abu-abu 30/30 20,281.00 35,591.00 55,872.00

2 1 M2 Pasang tegel abu-abu 20/20 20,281.00 26,791.00 47,072.00

PEKERJAAN KERAMIK

1 1 M2 Pasang ubin porselin 22,721.00 50,679.00 73,401.00

2 1 M2 Pasang tegel keramik 20/20 dan 30/30 22,721.00 51,797.00 74,519.00

3 1 M2 Pasang tegel keramik 10/20 berglasir 22,721.00 38,047.00 60,769.00

4 1 M2 Pasang tegel keramik 20/20 berglasir 22,721.00 40,247.00 62,969.00

5 1 M2 Pasang tegel keramik 30/30 berglasir 22,721.00 40,797.00 63,519.00

6 1 M1 Pasang plint keramik ukuran 10 x 40 cm 2,433.00 12,039.00 14,473.00

7 1 M1 Pasang plint keramik ukuran 10 x 30 cm 2,433.00 8,749.00 11,182.00

8 1 M1 Pasang keramik stepnosing granito 5/30 4,544.00 37,530.00 42,075.00

9 1 M1 Pasang list keramik dinding 5/20 4,544.00 28,004.00 32,549.00

10 1 M2 Pasang keramik dinding 20/25 29,419.00 52,736.00 82,155.00

PEKERJAAN CONBLOCK

1 1 M2 Pasang conblock tipe segi-empat abu-abu 6 cm, K-200 20,281.00 45,100.00 65,381.00

2 1 M2 Pasang conblock tipe segi-empat abu-abu 8 cm, K-200 20,281.00 54,395.00 74,676.00

3 1 M2 Pasang conblock tipe segi-enam abu-abu 6 cm, K-200 20,281.00 44,935.00 65,216.00

4 1 M2 Pasang conblock tipe segi-enam abu-abu 8 cm, K-200 20,281.00 54,395.00 74,676.00

5 1 M2 Pasang conblock tipe segi-empat warna 6 cm, K-200 20,281.00 50,875.00 71,156.00

6 1 M2 Pasang conblock tipe segi-empat warna 8 cm, K-200 20,281.00 60,225.00 80,506.00

7 1 M2 Pasang conblock tipe segi-enam warna 6 cm, K-200 20,281.00 50,875.00 71,156.00

8 1 M2 Pasang conblock tipe segi-enam warna 8 cm, K-200 20,281.00 60,225.00 80,506.00

9 1 M2 Pasang grassblock bulat tebal 10 cm 20,281.00 48,565.00 68,846.00

10 1 M2 Pasang grassblock tebal 10 cm 20,281.00 48,565.00 68,846.00

11 1 bh Pasang buis beton dia. 80 cm 9,693.00 35,200.00 44,893.00

Rekapitulasi - 317

Page 318: Rab Versi Sni Lengkap

HARGA HARGA JUMLAH

UPAH BAHAN HARGANO. SATUAN MACAM PEKERJAAN

PEKERJAAN RANGKA ATAP

1 1 M3 Membuat kuda-kuda kayu kamper 534,050.00 5,878,290.00 6,412,340.00

2 1 M3 Membuat kuda-kuda kayu kruing 534,050.00 5,394,290.00 5,928,340.00

3 1 M3 Membuat kuda-kuda kayu bengkirai 534,050.00 7,088,290.00 7,622,340.00

4 1M3 Pasang kuda-kuda kayu lama 534,050.00 130,790.00 664,840.00

5 1M3 Pasang Nook,Goording dan Jurai kayu bengkirai 534,050.00 6,964,540.00 7,498,590.00

6 1M3 Pasang Goording Lama 534,050.00 7,040.00 541,090.00

7 1M2 Pasang usuk 5/7, reng 2/3 lama 5,946.00 2,200.00 8,146.00

8 1 M2 Pasang usuk 5/7, reng 2/3 kayu jati 5,946.00 237,600.00 243,546.00

9 1 M2 Pasang usuk 5/7 kayu jati, reng 2/3 kayu bengkirai 5,946.00 190,575.00 196,521.00

10 1 M2 Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu jati 5,946.00 116,902.00 122,849.00

11 1 M2 Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu bengkirai 5,946.00 69,877.00 75,824.00

12 1 M2 Pasang usuk 5/7, reng 3/4 kayu jati 5,946.00 277,200.00 283,146.00

13 1 M2 Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu jati lokal 5,946.00 93,142.00 99,089.00

14 1 M2 Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu bengkirai 5,946.00 81,262.00 87,209.00

15 1 M3 Membuat kusen pintu / jendela kayu jati (klas plitur) 874,225.00 24,200,000.00 25,074,225.00

16 1 M3 Membuat kusen pintu / jendela kayu jati (lokal) 874,225.00 9,680,000.00 10,554,225.00

17 1 M3 Membuat kusen pintu / jendela kayu kamper 808,225.00 6,270,000.00 7,078,225.00

18 1 M3 Membuat kusen pintu / jendela kayu kruing 808,225.00 5,742,000.00 6,550,225.00

19 1 M3 Membuat kusen pintu / jendela kayu bengkirai 808,225.00 8,398,225.00 8,398,225.00

20 1 M2 Pasang pintu teakwood rangkap, rangka kayu jati 87,422.00 554,664.00 642,086.00

21 1 M2 Pasang pintu teakwood rangkap, rangka kayu jati lokal 87,422.00 257,136.00 344,558.00

22 1 M2 Pasang pintu teakwood rangkap, rangka kayu kamper 87,422.00 198,924.00 286,346.00

23 1 M2 Pasang pintu teakwood rangkap, rangka kayu kruing 87,422.00 182,754.00 270,176.00

24 1 M2 Pasang pintu teakwood rangkap, rangka kayu bengkirai 87,422.00 209,704.00 297,126.00

25 1 M2 Pasang pintu dan jendela kaca kayu jati 92,180.00 847,000.00 939,180.00

26 1 M2 Pasang pintu dan jendela kaca kayu jati lokal 92,180.00 315,700.00 407,880.00

27 1 M2 Pasang pintu dan jendela kaca kayu kamper 92,180.00 211,750.00 303,930.00

28 1 M2 Pasang pintu dan jendela kaca kayu kruing 92,180.00 182,875.00 275,055.00

29 1 M2 Pasang pintu dan jendela kaca kayu bengkirai 92,180.00 231,000.00 323,180.00

30 1 M2 Mengerjakan daun pintu / jendela panil kayu jati 115,225.00 968,000.00 1,083,225.00

31 1 M2 Mengerjakan daun pintu / jendela panil kayu jati lokal 115,225.00 360,800.00 476,025.00

32 1 M2 Mengerjakan daun pintu / jendela panil kayu kamper 115,225.00 242,000.00 357,225.00

33 1 M2 Mengerjakan daun pintu / jendela panil kayu kruing 115,225.00 209,000.00 324,225.00

34 1 M2 Mengerjakan daun pintu / jendela panil kayu bengkirai 115,225.00 264,000.00 379,225.00

35 1 M2 Pasang pintu dan jendela jalusi kayu jati 142,450.00 1,548,800.00 1,691,250.00

36 1 M2 Pasang pintu dan jendela jalusi kayu jati 142,450.00 577,280.00 719,730.00

37 1 M2 Pasang pintu dan jendela jalusi kayu kamper 133,512.00 387,200.00 520,712.00

38 1 M2 Pasang pintu dan jendela jalusi kayu kruing 133,512.00 334,400.00 467,912.00

39 1 M2 Pasang pintu dan jendela jalusi kayu bengkirai 133,512.00 422,400.00 555,912.00

40 1 M2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu kamper 12,711.00 63,580.00 76,291.00

41 1 M2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu kruing 12,711.00 58,300.00 71,011.00

42 1 M2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu bengkirai 12,711.00 76,780.00 89,491.00

43 1 M2 Pasang rangka langit-langit (60 x 120) m, kayu kamper 13,919.00 68,981.00 82,900.00

44 1 M2 Pasang rangka langit-langit (60 x 120) m, kayu kruing 13,919.00 63,261.00 77,180.00

45 1 M2 Pasang rangka langit-langit (60 x 120) m, kayu bengkirai 13,919.00 83,281.00 97,200.00

46 1 M2 Langit-langit asbes (1,00 x 1,00) m tanpa plepet 3,273.00 12,226.00 15,500.00

47 1 M2 Langit-langit asbes (1,00 x 1,00) m memakai plepet 3,273.00 18,056.00 21,330.00

48 1 M2 Langit2 asbes (1,00 x 1,00) m, rangka kamper tanpa plepet 15,985.00 75,460.00 91,445.00

49 1 M2 Langit2 asbes (1,00 x 1,00) m, rangka kruing tanpa plepet 15,985.00 70,180.00 86,165.00

50 1 M2 Langit2 asbes (1,00 x 1,00) m, rangka bengkirai tanpa plepet 15,985.00 88,660.00 104,645.00

51 1 M2 Langit2 asbes (1,00 x 1,00) m, rangka kayu kamper dg plepet 15,985.00 81,416.00 97,402.00

52 1 M2 Langit2 asbes (1,00 x 1,00) m, rangka kayu kruing dg plepet 15,985.00 76,136.00 92,122.00

53 1 M2 Langit2 asbes (1,00 x 1,00) m, rangka ky bengkirai dg plepet 15,985.00 94,616.00 110,602.00

54 1 M2 Langit2 gypsum t; 9 mm, rangka 60 x 120 kayu kamper 19,241.00 89,985.00 109,227.00

55 1 M2 Langit2 gypsum t;l 9 mm, rangka 60 x 120 kayu kruing 19,241.00 84,265.00 103,507.00

56 1 M2 Langit2 gypsum t; 9 mm, rangka 60 x 120 ky bengkirai 19,241.00 104,285.00 123,527.00

57 1 M2 Langit-langit gypsum board tebal 9 mm, rangka hollow 19,241.00 71,329.00 90,571.00

58 1 M2 Langit2 kalsiboard t; 3.5 mm, rangka 60 x 120 ky kamper 19,241.00 91,648.00 110,890.00

59 1 M2 Langit2 kalsiboard t;l 3.5 mm, rangka 60 x 120 ky kruing 19,241.00 85,928.00 105,170.00

Rekapitulasi - 318

Page 319: Rab Versi Sni Lengkap

HARGA HARGA JUMLAH

UPAH BAHAN HARGANO. SATUAN MACAM PEKERJAAN

60 1 M2 Langit2 kalsiboard t; 3.5 mm, rangka 60 x 120 ky bengkirai 19,241.00 105,948.00 125,190.00

61 1 M2 Langit-langit kalsiboard tebal 3.5 mm, rangka hollow 19,241.00 72,992.00 92,234.00

62 1 M2 Langit-langit akustik 60 x 120 cm + rangka alumunium 21,855.00 289,767.00 311,623.00

63 1 M1 Pasang list profil cornees gypsum lebar sampai 5 cm 4,077.00 8,690.00 12,767.00

64 1 M1 Pasang list profil cornees gypsum lebar 5 - 10 cm 4,077.00 14,500.00 18,577.00

65 1 M1 Pasang list profil cornees gypsum lebar lebih dari 10 cm 4,170.00 23,941.00 28,111.00

66 1 M1 List langit-langit kayu profil 3,036.00 6,765.00 9,801.00

67 1 M1 Pasang lisplank ukuran (2 x 20) cm, kayu jati 6,036.00 116,688.00 122,724.00

68 1 M1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu jati 6,036.00 208,648.00 214,684.00

69 1 M1 Pasang lisplank ukuran (2 x 20) cm, kayu jati lokal 6,036.00 43,824.00 49,860.00

70 1 M1 Pasang lisplank ukuran (2 x 20) cm, kayu kamper 6,036.00 29,568.00 35,604.00

71 1 M1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu kamper 6,036.00 52,558.00 58,594.00

72 1 M1 Pasang lisplank ukuran (2 x 20) cm, kayu kruing 6,036.00 25,608.00 31,644.00

73 1 M1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu kruing 6,036.00 45,463.00 51,499.00

74 1 M1 Pasang lisplank ukuran (2 x 20) cm, kayu bengkirai 6,036.00 32,208.00 38,244.00

75 1 M1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu bengkirai 6,036.00 57,288.00 63,324.00

76 1 M2 Membuat listplank asbes plat ram kayu kamper 80,107.00 144,265.00 224,372.00

77 1 M2 Membuat listplank asbes plat ram kayu kruing 80,107.00 133,265.00 213,372.00

78 1 M2 Membuat listplank asbes plat ram kayu bengkirai 80,107.00 171,765.00 251,872.00

79 1 M1 Mengerjakan papan ruiter kayu kamper 2/20 3,592.00 24,376.00 27,968.00

80 1 M1 Mengerjakan papan ruiter kayu kruing 2/20 3,592.00 21,076.00 24,668.00

81 1 M1 Mengerjakan papan ruiter kayu bengkirai 2/20 3,592.00 26,576.00 30,168.00

82 1 M1 Pasang talang datar, seng BJLS 28, papan kayu kamper 17,438.00 92,037.00 109,475.00

83 1 M1 Pasang talang datar, seng BJLS 28, papan kayu kruing 17,438.00 84,117.00 101,555.00

84 1 M1 Pasang talang datar, seng BJLS 28, papan kayu bengkirai 17,438.00 97,317.00 114,755.00

85 1 M1 Pasang talang miring, seng BJLS 28, papan kayu kamper 15,018.00 148,907.00 163,925.00

86 1 M1 Pasang talang miring, seng BJLS 28, papan kayu kruing 15,018.00 133,232.00 148,250.00

87 1 M1 Pasang talang miring, seng BJLS 28, papan kayu bengkirai 15,018.00 159,357.00 174,375.00

88 1 M1 Pasang talang torong 16,769.00 31,900.00 48,669.00

89 1 M1 Pasang talang ½ lingkaran D - 10 cm, seng BJLS 28 12,488.00 145,640.00 158,128.00

90 1 M2 Pasang dinding pemisah teakwood rangkap, rangka kayu kamper 22,440.00 151,893.00 174,333.00

91 1 M2 Pas. dinding pemisah plywoodwood rangkap, rangka ky kamper 26,702.00 197,268.00 223,971.00

92 1 M2 Pasang plywood tebal 4 mm, untuk dinding 3,339.00 18,590.00 21,929.00

PEKERJAAN ATAP

1 1 M2 Pasang genteng lama 8,112.00 - 8,112.00

2 1 M2 Pasang genteng paris 8,112.00 16,500.00 24,612.00

3 1 M2 Pasang genteng paris untuk rumah tingkat 10,491.00 16,500.00 26,991.00

4 1 M2 Pasang genteng beton besar Natural ( isi 9 / m2 ) 8,112.00 27,225.00 35,337.00

5 1 M2 Pas. genteng beton besar Natural ( isi 9 / m2 ) untuk r. tingkat 10,491.00 27,225.00 37,716.00

6 1 M2 Pasang genteng beton besar Warna ( isi 9 / m2 ) 8,112.00 43,758.00 51,870.00

7 1 M2 Pas. genteng beton besar Warna ( isi 9 / m2 ) untuk r. tingkat 10,491.00 43,758.00 54,249.00

8 1 M1 Pasang bubungan genteng paris 16,225.00 12,838.00 29,063.00

9 1 M1 Pasang bubungan genteng beton Natural 16,225.00 17,293.00 33,518.00

10 1 M1 Pasang bubungan genteng beton Warna 16,225.00 22,507.00 38,732.00

11 1 M2 Pasang atap asbes gelombang (2,5 x 0,92 m) x 5 mm 6,127.00 35,862.00 41,989.00

12 1 M2 Pasang atap asbes gelombang (2,00 x 0,92 m) x 5 mm 5,890.00 34,452.00 40,342.00

13 1 M2 Pasang atap asbes gelombang (1,80 x 0,92 m) x 5 mm 5,890.00 38,598.00 44,488.00

14 1 M2 Pasang atap asbes gelombang (300 x 1,05 m) x 4 mm 5,890.00 28,703.00 34,594.00

15 1 M2 Pasang atap asbes gelombang (2,40 x 1,05 m) x 4 mm 5,791.00 30,758.00 36,549.00

16 1 M2 Pasang atap asbes gelombang (2,10 x 1,05 m) x 4 mm 5,791.00 33,491.00 39,283.00

17 1 M2 Pasang atap asbes gelombang (1,50 x 1,05 m) x 4 mm 5,791.00 32,870.00 38,661.00

18 1 M2 Pasang atap asbes gelombang (3,00 x 1,08 m) x 6 mm 5,791.00 47,156.00 52,947.00

19 1 M2 Pasang atap sbes gelombang (2,40 x 1,08 m) x 6 mm 5,791.00 46,908.00 52,699.00

20 1 M2 Pasang atap asbes gelombang (2,10 x 1,08 m) x 6 mm 5,791.00 43,804.00 49,595.00

21 1 M2 Pasang atap asbes gelombang (1,80 x 1,08 m) x 6 mm 5,791.00 43,675.00 49,467.00

22 1 M1 Pasang bubung stel gelombang 0,92 m 6,580.00 81,510.00 88,090.00

Rekapitulasi - 319

Page 320: Rab Versi Sni Lengkap

HARGA HARGA JUMLAH

UPAH BAHAN HARGANO. SATUAN MACAM PEKERJAAN

23 1 M1 Pasang nok stel gelombang 1,05 m 6,580.00 71,940.00 78,520.00

24 1 M1 Pasang nok stel gelombang 1,08 m 6,580.00 70,345.00 76,925.00

25 1 M1 Pasang atap genteng metal zinc alume type prima roof 8,093.00 111,438.00 119,532.00

26 1 M1 Pasang atap metal gelombanmg 8,093.00 72,600.00 80,693.00

27 1 M2 Pasang alumunium foil / sisalation 5,414.00 28,875.00 34,289.00

28 1 M2 Pasang atap polikarbonat 26,324.00 339,515.00 365,839.00

PEKERJAAN CAT-CATAN

1 1 M2 Mengikis / mengerok permukaan cat tembok lama 3,389.00 825.00 4,214.00

2 1 M2 Pengecatan bidang kayu lama 3,914.00 13,948.00 17,862.00

3 1 M2 4,282.00 19,756.00 24,038.00

4 1 M2 4,635.00 22,924.00 27,559.00

5 1 M2 Pelaburan bidang kayu dengan politur 2,214.00 16,984.00 19,198.00

1 1 M2 Pelaburan bidang kayu dengan vernis 8,484.00 2,975.00 11,460.00

6 1 M2 2,448.00 4,697.00 7,145.00

7 1 M2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 1,985.00 3,135.00 5,120.00

8 1 M2 Pengecatan tembok tidak terlindung dari panas dan hujan 2,448.00 22,792.00 25,240.00

9 1 M2 Melabur tembok dengan kapur sirih 3,419.00 2,695.00 6,114.00

10 1 M2 Melabur tembok lama dengan kapur sirih (untuk pemeliharaan) 1,121.00 2,365.00 3,486.00

11 1 M2 Pengecatan bidang besi ( 3 x ) 4,635.00 11,224.00 15,860.00

12 1 M2 Pengecacatan permukaan baja dengan meni besi 6,891.00 2,563.00 9,454.00

13 1 M2 Pengecacatan permukaan baja dengan meni besi memakai perancah 12,073.00 4,763.00 16,836.00

14 1 M2 Pengetiran kayu ( 2 x ) 2,378.00 3,080.00 5,458.00

15 1 M2 Pekerjaan cat duco 3 x 14,173.00 28,865.00 43,038.00

16 1 M2 Mengerjakan Cat Sungging 252,311.00 17,644.00 269,955.00

17 1 M2 Mengecat genteng 2,448.00 16,632.00 19,080.00

PEKERJAAN BONGKARAN

1 1 M3 Membongkar pasangan batu kali 129,800.00 - 129,800.00

2 1 M3 Membongkar pasangan batu merah dan membersihkan 62,700.00 - 62,700.00

3 1 M3 Membongkar beton bertulang dan membersihkan 185,625.00 - 185,625.00

4 1 M2 Pekerjaan bongkar lantai tegel untuk dipergunakan lagi 4,757.00 - 4,757.00

5 1 M2 Mengupas plesteran lama 3,196.00 - 3,196.00

6 1 M2 Membongkar genteng / sirap untuk dipergunakan lagi 4,757.00 - 4,757.00

7 1 M2 Membongkar atap seng 3,575.00 - 3,575.00

8 1 M2 Membongkar usuk / reng dipakai lagi 6,952.00 - 6,952.00

9 1 M2 Membongkar usuk / reng tidak dipakai lagi 4,757.00 - 4,757.00

10 1 M3 314,600.00 - 314,600.00

11 1 M3 29,150.00 - 29,150.00

12 1 M3 Mengerjakan kembali bangunan kayu yang telah dibongkar 534,050.00 - 534,050.00

ANALISA SUPLEMEN

1 1 M1 Pengelasan Single ( las listrik ) 82,720.00 103,950.00 186,670.00

PEKERJAAN SANITASI

2 1 bh Memasang kloset duduk/monoblock 111,628.00 1,457,500.00 1,569,128.00

3 1 bh Memasang kloset jongkok porselen 122,595.00 88,378.00 210,973.00

4 1 bh Memasang urinoir 59,125.00 1,128,428.00 1,187,553.00

5 1 bh Memasang wastafel 78,787.00 340,169.00 418,956.00

6 1 bh Memasang bak mandi fiberglass volume 0,30 m3 143,027.00 356,950.00 499,977.00

7 1 bh Memasang badkip porselen 35,956.00 198,000.00 233,956.00

8 1 bh Memasang bak fiberglass volume 1 m3 air 264,000.00 1,016,400.00 1,280,400.00

9 1 M1 Memasang pipa beton, diameter 15 cm - 20 cm 5,678.00 44,627.00 50,306.00

10 1 M1 Memasang pipa beton, diameter 30 cm - 100 cm 15,413.00 175,230.00 190,643.00

Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak

digunakan lagi

Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis

cat penutup

Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis

cat penutup

Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat

penutup)

Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk

digunakan lagi

Rekapitulasi - 320

Page 321: Rab Versi Sni Lengkap

HARGA HARGA JUMLAH

UPAH BAHAN HARGANO. SATUAN MACAM PEKERJAAN

11 1 bh Memasang bak kontrol pas.bata (30 x 30) cm, tinggi 35 cm 101,725.00 99,281.00 201,006.00

12 1 bh Memasang bak kontrol pas. bata (45 x 45) cm, tinggi 50 cm 49,637.00 164,359.00 213,997.00

13 1 bh Memasang bak kontrol pas. bata (60 x 60) cm, tingg 65 cm 75,251.00 250,437.00 325,688.00

14 1 M1 Memasang pipa galvanis diameter 1/2" 5,172.00 25,575.00 30,747.00

15 1 M1 Memasang pipa galvanis diameter 3/4" 5,172.00 42,625.00 47,797.00

16 1 M1 Memasang pipa galvanis diameter 1" 5,172.00 63,937.00 69,110.00

17 1 M1 Memasang pipa galvanis diameter 1 1/2" 8,608.00 85,250.00 93,858.00

18 1 M1 Memasang pipa PVC tipe AW diameter 1/2" 2,869.00 5,392.00 8,261.00

19 1 M1 Memasang pipa PVC tipe AW diameter 3/4" 2,869.00 7,246.00 10,115.00

20 1 M1 Memasang pipa PVC tipe AW diameter 1" 2,869.00 8,738.00 11,607.00

21 1 M1 Memasang pipa PVC tipe AW diameter 1 1/2" 2,869.00 19,181.00 22,050.00

22 1 M1 Memasang pipa PVC tipe AW diameter 2" 4,312.00 25,575.00 29,887.00

23 1 M1 Memasang pipa PVC tipe AW diameter 2 1/2" 2,869.00 34,952.00 37,821.00

24 1 M1 Memasang pipa PVC tipe AW diameter 3" 7,777.00 34,952.00 42,729.00

25 1 M1 Memasang pipa PVC tipe AW diameter 4" 7,777.00 57,543.00 65,320.00

26 1 bh Memasang bak cuci piring stainless steel 10,778.00 632,500.00 643,278.00

27 1 bh Memasang kran diameter 3/4" atau 1/2" 3,753.00 27,568.00 31,322.00

28 1 bh Memasang floor drain 3,753.00 60,500.00 64,253.00

PEKERJAAN BESI DAN ALUMUNIUM

1 1 kg Pasang rangka atap baja 1,673.00 12,628.00 14,301.00

2 1 M2 Pasang pintu besi baja 35,249.00 825,000.00 860,249.00

3 1 M2 Pasang pintu gulung besi 63,178.00 275,000.00 338,178.00

4 1 M2 Pasang pintu lipat 55,279.00 550,000.00 605,279.00

5 1 M2 Pasang Rolling door 67,654.00 220,000.00 287,654.00

6 1 M2 Pasang pintu alumunium 55,279.00 440,000.00 495,279.00

7 1 M2 Pasang teralis besi 63,104.00 111,320.00 174,424.00

8 1 M2 Pasang kawat harmonika 5,875.00 41,360.00 47,235.00

9 1 M2 Pasang kawat nyamuk 5,875.00 21,092.00 26,967.00

10 1 M2 Pasang kawat kassa 5,875.00 23,210.00 29,085.00

11 1 M2 Pasang jendela nako & tralis 11,750.00 24,626.00 36,377.00

PEKERJAAN KUNCI DAN KACA

1 1 bh Pasang kunci tanam antik 23,372.00 275,000.00 298,372.00

2 1 bh Pasang kunci tanam biasa 17,256.00 137,500.00 154,756.00

3 1 bh Pasang kunci tanam kamar mandi 16,878.00 55,000.00 71,878.00

4 1 bh Pasang kunci tanam silinder 16,797.00 82,500.00 99,297.00

5 1 bh Pasang engsel pintu 5,843.00 12,100.00 17,943.00

6 1 bh Pasang engsel jendela kupu-kupu 4,056.00 8,250.00 12,306.00

7 1 bh Pasang engsel angin 8,112.00 3,300.00 11,412.00

8 1 bh Pasang spring knip 5,843.00 8,250.00 14,093.00

9 1 bh Pasang kait angin 5,843.00 3,300.00 9,143.00

10 1 bh Pasang door closer 19,476.00 165,000.00 184,476.00

11 1 bh Pasang kunci selot 7,790.00 55,000.00 62,790.00

12 1 bh Pasang pegangan pintu / door holder 19,476.00 16,500.00 35,976.00

13 1 bh Pasang door stop 3,895.00 16,500.00 20,395.00

14 1 bh Pasang rel pintu dorong 23,372.00 220,000.00 243,372.00

15 1 bh Pasang kunci lemari 9,738.00 13,200.00 22,938.00

16 1 M2 Pasang kaca, tebal 3 mm 5,843.00 59,895.00 65,738.00

17 1 M2 Pasang kaca, tebal 5 mm 5,843.00 73,205.00 79,048.00

18 1 M2 Pasang kaca cermin, tebal 5 mm 5,843.00 145,200.00 151,043.00

19 1 M2 Pasang kaca patri, tebal 5 mm 5,843.00 363,000.00 368,843.00

Rekapitulasi - 321

Page 322: Rab Versi Sni Lengkap

No. Jenis Pekerjaan Volume Sat Harga Satuan Jumlah Harga

A Pekerjaan Persiapan

Uitzet bouplank

Brak, gudang, keet pengawas

Pembersihan dan penataan tanah

B Pekerjaan Tanah

1 Galian tanah foot plate

2 Galian tanah pondasi

3 Urug tanah kembali

4 Urug tanah peninggian peil 30 cm sisa tanah

5 Urug pasir bawah lantai dan pondasi

C Pekerjaan Beton Bertulang K-225

1 Lantai kerja 1:3:5

2 Beton foot plate 15 buah

3 Beton sloof 15/25

4 Beton kolom struktur 15/40

5 Beton kolom struktur 15/30

6 Beton kolom struktur 15/25