r32 split series - daikin... daikin.tcf.032c3/10-2015 dekra (nb0344) 2159619.0551-emc 01 a 02 d...
TRANSCRIPT
INSTALLATION MANUALR32 Split Series
ModelsARXM25M2V1BARXM35M2V1BARXP20K3V1BARXP25K3V1BARXP35K3V1B
RXJ20M2V1BRXJ25M2V1BRXJ35M2V1BRXM20M2V1BRXM25M2V1BRXM35M2V1BRXP20K3V1BRXP25K3V1BRXP35K3V1B
3PEN386697-2F.book Page 1 Friday, February 3, 2017 8:30 AM
Dai
kin
Indu
strie
s C
zech
Rep
ublic
s.r.
o.
CE - D
ECLA
RATIO
N-OF
-CON
FORM
ITYCE
- KON
FORM
ITÄTS
ERKL
ÄRUN
GCE
- DEC
LARA
TION-
DE-C
ONFO
RMITE
CE - C
ONFO
RMITE
ITSVE
RKLA
RING
CE - D
ECLA
RACI
ON-D
E-CO
NFOR
MIDA
DCE
- DIC
HIAR
AZIO
NE-D
I-CON
FORM
ITACE
- ∆HΛ
ΩΣΗ ΣΥ
ΜΜΟΡ
ΦΩΣΗ
Σ
CE - D
ECLA
RAÇÃ
O-DE
-CON
FORM
IDAD
ECE
- ЗАЯ
ВЛЕН
ИЕ-О
-СОО
ТВЕТ
СТВИ
ИCE
- OVE
RENS
STEM
MELS
ESER
KLÆ
RING
CE - F
ÖRSÄ
KRAN
-OM-
ÖVER
ENST
ÄMME
LSE
CE - E
RKLÆ
RING
OM-
SAMS
VAR
CE - I
LMOI
TUS-
YHDE
NMUK
AISU
UDES
TACE
- PRO
HLÁŠ
ENÍ-O
-SHO
DĚ
CE - I
ZJAV
A-O-
USKL
AĐEN
OSTI
CE - M
EGFE
LELŐ
SÉGI
-NYI
LATK
OZAT
CE - D
EKLA
RACJ
A-ZG
ODNO
ŚCI
CE - D
ECLA
RAŢIE
-DE-
CONF
ORMI
TATE
CE - I
ZJAV
A O
SKLA
DNOS
TICE
- VAS
TAVU
SDEK
LARA
TSIO
ONCE
- ДЕК
ЛАРА
ЦИЯ-ЗА
-ϹЪО
ТВЕТ
СТВИ
Е
CE - A
TITIK
TIES-
DEKL
ARAC
IJACE
- ATB
ILSTĪB
AS-D
EKLA
RĀCI
JACE
- VYH
LÁSE
NIE-
ZHOD
YCE
- UYG
UNLU
K-BE
YANI
01are
in co
nform
ity w
ith th
e foll
owing
stan
dard(
s) or
other
norm
ative
docu
ment(
s), pr
ovide
d tha
t thes
e are
used
in ac
corda
nce w
ith ou
rins
tructi
ons:
02de
r/den
folge
nden
Norm
(en) o
der e
inem
ande
ren N
ormdo
kume
nt od
er -do
kume
nten e
ntspri
cht/e
ntspre
chen
, unte
r der
Vorau
ssetz
ung,
daß s
ie ge
mäß u
nsere
n Anw
eisun
gen e
inges
etzt w
erden
:03
sont
confo
rmes
à la/
aux n
orme(s
) ou a
utre(s
) doc
umen
t(s) n
ormati
f(s), p
our a
utant
qu'ils
soien
t utilis
és co
nform
émen
t à no
s ins
tructi
ons:
04co
nform
de vo
lgend
e norm
(en) o
f één
of m
eer a
ndere
bind
ende
docu
mente
n zijn
, op v
oorw
aarde
dat z
e word
en ge
bruikt
overe
enko
mstig
onze
instr
uctie
s:05
están
en co
nform
idad c
on la
(s) si
guien
te(s)
norm
a(s) u
otro(
s) do
cume
nto(s)
norm
ativo
(s), s
iempre
que s
ean u
tilizad
os de
acue
rdo co
nnu
estra
s ins
trucc
iones
:06
sono
confo
rmi a
l(i) se
guen
te(i) s
tanda
rd(s)
o altro
(i) do
cume
nto(i)
a cara
ttere
norm
ativo
, a pa
tto ch
e ven
gano
usati
in co
nform
ità al
leno
stre i
struz
ioni:
07είναι σύμφ
ωνα μ
ε το(α
) ακόλουθο(α
) πρότυπ
ο(α) ή
άλλο
έγγραφ
ο(α) κανονισμ
ών, υπό
την π
ροϋπ
όθεση ό
τι χρησιμ
οποιο
ύνται σύμφω
ναμε
τις οδ
ηγίες
μας:
08es
tão e
m co
nform
idade
com
a(s) s
eguin
te(s)
norm
a(s) o
u ou
tro(s)
doc
umen
to(s)
norm
ativo
(s), d
esde
que
este
s seja
m uti
lizado
s de
acord
o com
as no
ssas
instr
uçõe
s:09
соответст
вуют
следую
щим ста
ндартам или други
м норм
ативны
м докум
ентам,
при условии их
использования
согла
сно наши
минструкциям:
10ov
erhold
er føl
gend
e sta
ndard
(er) e
ller a
ndet/
andre
retni
ngsg
ivend
e do
kume
nt(er)
, foru
dsat
at dis
se a
nven
des
i hen
hold
til vo
reins
truks
er:11
respe
ktive
utru
stning
är u
tförd
i öve
renss
tämme
lse m
ed o
ch fö
ljer f
öljan
de s
tanda
rd(er)
elle
r and
ra no
rmgiv
ande
dok
umen
t, un
der
föruts
ättnin
g att a
nvän
dning
sker
i öve
renss
tämme
lse m
ed vå
ra ins
trukti
oner:
12res
pekti
ve u
tstyr
er i o
veren
sstem
melse
med
følge
nde
stand
ard(er
) elle
r and
re no
rmgiv
ende
dok
umen
t(er),
unde
r foru
tssetn
ing a
v at
disse
bruk
es i h
enho
ld til
våre
instru
kser:
13va
staav
at se
uraav
ien s
tanda
rdien
ja m
uiden
ohje
ellist
en d
okum
enttie
n va
atimu
ksia
edell
yttäe
n, ett
ä nii
tä kä
ytetää
n oh
jeide
mme
muka
isesti
:14
za př
edpo
kladu
, že j
sou v
yužív
ány v
soula
du s
našim
i pok
yny,
odpo
vídají
násle
dujíc
ím no
rmám
nebo
norm
ativn
ím do
kume
ntům:
15u s
kladu
sa sl
ijedećim
stan
dardo
m(im
a) ili d
rugim
norm
ativn
im do
kume
ntom(
ima),
uz uv
jet da
se on
i kori
ste u
sklad
u s na
šim up
utama
:
16me
gfelel
nek a
z aláb
bi sz
abvá
ny(ok
)nak v
agy e
gyéb
irány
adó d
okum
entum
(ok)na
k, ha
azok
at elő
írás s
zerin
t has
ználj
ák:
17sp
ełniają
wymo
gi na
stępu
jącyc
h no
rm i
innyc
h do
kume
ntów
norm
aliza
cyjny
ch, p
od w
arunk
iem ż
e uż
ywan
e są
zgo
dnie
z na
szym
iins
trukc
jami:
18su
nt în
confo
rmita
te cu
urmă
torul
(urmă
toarel
e) sta
ndard
(e) sa
u alt(e
) doc
umen
t(e) n
ormati
v(e), c
u con
diţia
ca ac
estea
să fie
utiliz
ate în
confo
rmita
te cu
instr
ucţiu
nile n
oastr
e:19
sklad
ni z n
asled
njimi
stan
dardi
in dr
ugim
i norm
ativi,
pod p
ogoje
m, da
se up
orablj
ajo v
sklad
u z na
šimi n
avod
ili:20
on va
stavu
ses j
ärgmi
s(t)e
stand
ardi(te
)ga võ
i teist
e norm
atiivs
ete do
kume
ntide
ga, k
ui ne
id ka
sutat
akse
vasta
valt m
eie ju
hend
itele:
21съответст
ват на
следните
стандарти
или
други
норма
тивни
докум
енти
, при
условие
, че
се и
зползват
съгласно
наши
теинструкции
:22
atitin
ka že
miau
nurod
ytus s
tanda
rtus i
r (arba
) kitu
s norm
inius
doku
mentu
s su s
ąlyga
, kad
yra n
audo
jami p
agal
mūsų
nurod
ymus
:23
tad, ja
lietot
i atbi
lstoš
i ražo
tāja n
orādīj
umiem
, atbi
lst se
kojoš
iem st
anda
rtiem
un ci
tiem
norm
atīvie
m do
kume
ntiem
:24
sú v
zhod
e s na
sledo
vnou
(ými) n
ormou
(ami) a
lebo i
ným(
i) norm
atívn
ym(i)
doku
mento
m(am
i), za
pred
pokla
du, ž
e sa p
oužív
ajú v
súlad
esn
ašim
návo
dom:
25ürü
nün,
talim
atları
mıza
göre
kulla
nılma
sı koşu
luyla
aşağıda
ki sta
ndart
lar ve
norm
belirt
en be
lgeler
le uy
umlud
ur:
01Dir
ectiv
es, a
s ame
nded
.02
Direk
tiven
, gem
äß Än
derun
g.03
Direc
tives
, telle
s que
mod
ifiées
.04
Richtl
ijnen
, zoa
ls ge
amen
deerd
.05
Direc
tivas
, seg
ún lo
enme
ndad
o.06
Dirett
ive, c
ome d
a mod
ifica.
07Οδ
ηγιών, όπ
ως έχ
ουν τροπο
ποιηθ
εί.08
Direc
tivas
, con
forme
alter
ação
em.
09Ди
ректи
в со в
семи
поправками
.
10Dir
ektiv
er, m
ed se
nere
ændri
nger.
11Dir
ektiv,
med
föret
agna
ändri
ngar.
12Dir
ektiv
er, m
ed fo
retatt
e end
ringe
r.13
Direk
tiivejä
, sella
isina k
uin ne
ovat
muute
ttuina
.14
v plat
ném
zněn
í.15
Smjer
nice,
kako
je iz
mijen
jeno.
16irá
nyelv
(ek) é
s mód
osítá
saik
rende
lkezé
seit.
17z p
óźnie
jszym
i pop
rawka
mi.
18Dir
ectiv
elor, c
u ame
ndam
entel
e res
pecti
ve.
19Dir
ektiv
e z vs
emi s
preme
mbam
i.20
Direk
tiivid
koos
muu
datus
tega.
21Ди
ректи
ви, с
техните и
зменения
.22
Direk
tyvos
e su p
apild
ymais
.23
Direk
tīvās
un to
papil
dināju
mos.
24Sm
ernice
, v pl
atnom
znen
í.25
Deǧiş
tirilm
iş ha
lleriy
le Yö
netm
elikle
r.
01fol
lowing
the p
rovisio
ns of
:02
gemä
ß den
Vorsc
hrifte
n der:
03co
nform
émen
t aux
stipu
lation
s des
:04
overe
enko
mstig
de be
palin
gen v
an:
05sig
uiend
o las
disp
osicio
nes d
e:06
seco
ndo l
e pres
crizio
ni pe
r:07
με τή
ρηση
των δ
ιατάξεω
ν των
:08
de ac
ordo c
om o
previs
to em
:09
в соответствии с
положе
ниям
и:
10un
der ia
gttag
else a
f bes
temme
lserne
i:11
enlig
t villk
oren i
:12
gitt i
henh
old til
beste
mmels
ene i
:13
noud
attae
n mää
räyks
iä:14
za do
držen
í usta
nove
ní pře
dpisu
:15
prema
odred
bama
:16
köve
ti a(z)
:17
zgod
nie z
posta
nowie
niami
Dyre
ktyw:
18în
urma p
reved
erilor
:
19ob
upoš
tevan
ju do
ločb:
20va
stava
lt nõu
etele:
21следвайки к
лаузите н
а:22
laika
ntis n
uosta
tų, pa
teikia
mų:
23iev
ērojot
prasība
s, ka
s note
iktas
:24
održi
avajú
c usta
nove
nia:
25bu
nun k
oşull
arına
uygu
n olar
ak:
01No
te *
as se
t out
in <A
> and
judg
ed po
sitive
ly by <
B>
acco
rding
to th
e Cert
ificate
<C>.
02Hin
weis
*wie
in <A
> aufg
eführt
und v
on <B
> pos
itiv be
urteilt
ge
mäß Z
ertifik
at<C
>.03
Rema
rque *
tel qu
e défi
ni da
ns <A
> et é
valué
positi
veme
nt pa
r <B
> con
formé
ment
au Ce
rtifica
t<C>
.04
Beme
rk *
zoals
verm
eld in
<A> e
n pos
itief b
eoord
eeld
door
<B> o
veree
nkom
stig Ce
rtifica
at<C
>.05
Nota
*co
mo se
estab
lece e
n <A>
y es
valor
ado
positi
vame
nte po
r <B>
de ac
uerdo
con e
l Ce
rtifica
do<C
>.
06No
ta *
deline
ato ne
l <A>
e giu
dicato
positi
vame
nte
da<B
> sec
ondo
il Cert
ificato
<C>.
07Ση
μείωση
*όπ
ως κα
θορίζ
εται στο
<A> κ
αι κρίνεται
θετικά α
πό
το <B
> σύμφω
να με
το Πι
στοπ
οιητικ
ό<C>
.08
Nota
*tal
como
estab
elecid
o em
<A> e
com
o pare
cer
positi
vo de
<B> d
e aco
rdo co
m o C
ertific
ado<
C>.
09Пр
имечание
*как
указа
но в
<A> и
в соотв
етстви
и сп
олож
ительны
м реш
ением <
B> со
гласно
Свид
етель
ству<
C>.
10Be
mærk
*so
m an
ført i
<A> o
g pos
itivt v
urdere
t af <
B>
ihen
hold
til Cert
ifikat
<C>.
11Inf
ormati
on *
enligt
<A> o
ch go
dkän
ts av
<B> e
nligt
Certif
ikatet
<C>.
12Me
rk *
som
det fr
emko
mmer
i <A>
og gj
enno
m po
sitiv
bedø
mmels
e av <
B> ifø
lge Se
rtifika
t<C>
.13
Huom
*jot
ka on
esite
tty as
iakirja
ssa <A
> ja j
otka <
B> on
hy
väksy
nyt S
ertifik
aatin
<C> m
ukais
esti.
14Po
znám
ka *
jak by
lo uv
eden
o v <A
> a po
zitivně z
jištěn
o <B>
vs
oulad
u sos
vědč
ením
<C>.
15Na
pome
na *
kako
je izl
ožen
o u <A
> i po
zitivn
o ocije
njeno
od
stran
e <B>
prem
a Cert
ifikatu
<C>.
16Me
gjegy
zés *
a(z) <
A> al
apján
, a(z)
<B> i
gazo
lta a
megfe
lelést,
a(z
) <C>
tanús
ítván
y sze
rint.
17Uw
aga *
zgod
nie z
doku
menta
cją <A
>, po
zytyw
ną op
inią
<B> i
Świad
ectw
em<C
>.18
Notă
*aş
a cum
este
stabili
t în <A
> şi a
precia
t poz
itiv
de<B
> în c
onfor
mitat
e cu C
ertific
atul<
C>.
19Op
omba
*ko
t je do
ločen
o v <A
> in o
dobre
no s
stran
i <B>
vs
kladu
sce
rtifika
tom<C
>.20
Märku
s *na
gu on
näida
tud do
kume
ndis <
A> ja
heak
s kiid
etud <
B> jä
rgi va
stava
lt sert
ifikaa
dile<
C>.
21Забележк
а *как
то е и
злож
ено в
<A> и
оценено п
олож
ително
от <B
> съгл
асно
Сертиф
иката
<C>.
22Pa
staba
*ka
ip nu
statyt
a <A>
ir ka
ip tei
giama
i nus
pręsta
<B>
paga
l Sert
ifikatą
<C>.
23Pie
zīmes
*kā
norād
īts <A
> un a
tbilsto
ši <B>
pozitī
vajam
vē
rtējum
am sa
skaņā
ar se
rtifikā
tu<C
>.24
Pozn
ámka
*ak
o bolo
uved
ené v
<A> a
pozití
vne z
istené
<B>
vsúla
de s
osve
dčen
ím<C
>.25
Not *
<A>’d
a belir
tildiği
gibi ve
<C>S
ertifik
asına
göre
<B> t
arafın
dan o
lumlu
olarak
değe
rlend
irildiği
gibi.
<A>
DA
IKIN
.TC
F.03
2C3/
10-2
015
<B>
DEK
RA
(NB
0344
)
<C>
2159
619.
0551
-EM
C
01 a
decla
res un
der it
s sole
resp
onsib
ility th
at the
air c
ondit
ioning
mod
els to
whic
h this
decla
ration
relat
es:
02 d
erklär
t auf
seine
allei
nige V
erantw
ortun
g daß
die M
odell
e der
Klima
gerät
e für
die di
ese E
rkläru
ng be
stimm
t ist:
03 f
décla
re so
us sa
seule
resp
onsa
bilité
que l
es ap
parei
ls d'a
ir con
dition
né vi
sés p
ar la
prése
nte dé
clarat
ion:
04 l
verkl
aart h
ierbij
op ei
gen e
xclus
ieve v
erantw
oorde
lijkhe
id da
t de a
ircon
dition
ing un
its w
aarop
deze
verkl
aring
betre
kking
heeft
:05
ede
clara
baja
su ún
ica re
spon
sabil
idad q
ue lo
s mod
elos d
e aire
acon
dicion
ado a
los c
uales
hace
refer
encia
la de
clarac
ión:
06 i
dichia
ra so
tto su
a res
pons
abilità
che i
cond
iziona
tori m
odell
o a cu
i è rif
erita
ques
ta dic
hiaraz
ione:
07 g
δηλώ
νει με
αποκλειστική
της ε
υθύνη ό
τι τα μ
οντέλ
α των
κλιμα
τιστικών
συσκευών
στα ο
ποία αναφ
έρετα
ι η παρούσα
δήλω
ση:
08 p
decla
ra so
b sua
exclu
siva r
espo
nsab
ilidad
e que
os m
odelo
s de a
r con
dicion
ado a
que e
sta de
claraç
ão se
refer
e:
09 u
заявляет, и
сключ
ительно
под с
вою о
тветст
венность,
что м
одели к
ондиционеров
возду
ха, к
которым
относится
насто
ящее
заявление:
10 q
erklæ
rer un
der e
nean
svar,
at kl
imaa
nlægm
odell
erne,
som
denn
e dek
larati
on ve
drører
:11
sde
klarer
ar i e
gens
kap a
v huv
udan
svari
g, att
luftk
ondit
ioneri
ngsm
odell
erna s
om be
rörs a
v den
na de
klarat
ion in
nebä
r att:
12 n
erklæ
rer et
fullst
endig
ansv
ar for
at de
luftk
ondis
joneri
ngsm
odell
er so
m be
røres
av de
nne d
eklar
asjon
, inne
bærer
at:
13 j
ilmoit
taa yk
sinom
aan o
malla
vastu
ullaa
n, ett
ä täm
än ilm
oituk
sen t
arkoit
tamat
ilmas
tointi
laitte
iden m
allit:
14 c
prohla
šuje
ve sv
é plné
odpo
vědn
osti,
že m
odely
klim
atiza
ce, k
nimž
se to
to pro
hláše
ní vz
tahuje
:15
yizja
vljuje
pod i
sključiv
o vlas
titom
odgo
vorno
šću d
a su m
odeli
klim
a uređ
aja na
koje
se ov
a izja
va od
nosi:
16 h
teljes
felelős
sége
tuda
tában
kijel
enti,
hogy
a klí
mabe
rende
zés m
odell
ek, m
elyek
re e n
yilatko
zat v
onatk
ozik:
17 m
dekla
ruje n
a włas
ną i w
yłącz
ną od
powie
dzial
ność
, że m
odele
klim
atyza
torów
, któr
ych d
otycz
y nini
ejsza
dekla
racja:
18 r
decla
ră pe
prop
rie ră
spun
dere
că ap
aratel
e de a
er co
ndiţio
nat la
care
se re
feră a
ceas
tă de
claraţ
ie:19
oz v
so od
govo
rnostj
o izja
vlja, d
a so m
odeli
klim
atskih
napra
v, na
kater
e se i
zjava
nana
ša:
20 x
kinnit
ab om
a täie
likul v
astut
usel,
et kä
esole
va de
klarat
sioon
i alla
kuulu
vad k
liimas
eadm
ete m
udeli
d:21
bдекларира н
а своя о
тговорност, ч
е моделите к
лима
тична и
нсталация, за
които с
е отнася т
ази д
екларация:
22 t
visišk
a sav
o atsa
komy
be sk
elbia,
kad o
ro ko
ndicio
navim
o prie
taisų
mod
eliai,
kurie
ms yr
a taik
oma š
i dek
larac
ija:
23 v
ar pil
nu at
bildīb
u apli
ecina
, ka tālā
k uzs
kaitīt
o mod
eļu ga
isa ko
ndicio
nētāj
i, uz k
uriem
attie
cas š
ī dek
larāc
ija:
24 k
vyhla
suje
na vl
astnú
zodp
oved
nosť,
že tie
to klim
atizačn
é mod
ely, n
a ktor
é sa v
zťahu
je tot
o vyh
lásen
ie:25
wtam
amen
kend
i soru
mlulu
ǧund
a olm
ak üz
ere bu
bildi
rinin
ilgili o
lduǧu
klim
a mod
elleri
nin aş
aǧıda
ki gib
i oldu
ǧunu
beya
n ede
r:
EN
6033
5-2-
40,
3P394245-7F
Tets
uya
Baba
Man
agin
g D
irect
orPi
lsen
, 1st
of D
ec. 2
015
01**
DICz
*** is
autho
rised
to co
mpile
the T
echn
ical C
onstr
uctio
n File
.02
**DI
Cz***
hat d
ie Be
rechti
gung
die T
echn
ische
Kons
trukti
onsa
kte zu
samm
enzu
stelle
n.03
**DI
Cz***
est a
utoris
é à co
mpile
r le D
ossie
r de C
onstr
uctio
n Tec
hniqu
e.04
**DI
Cz***
is be
voeg
d om
het T
echn
isch C
onstr
uctie
doss
ier sa
men t
e stel
len.
05**
DICz
*** es
tá au
toriza
do a
comp
ilar e
l Arch
ivo de
Con
struc
ción T
écnic
a.06
**DI
Cz***
è au
torizz
ata a
redige
re il F
ile Te
cnico
di C
ostru
zione
.
07**
Η DI
Cz***
είναι εξο
υσιοδ
οτημένη
να συ
ντάξει
τον Τ
εχνικ
ό φάκελο
κατασκευής
.08
**A D
ICz**
* está
autor
izada
a co
mpila
r a do
cume
ntaçã
o téc
nica d
e fab
rico.
09**
Комп
ания
DIC
z*** у
полном
очена с
оставить
Комп
лект технической д
окум
ентации.
10**
DICz
*** er
autor
iseret
til at
udarb
ejde d
e tek
niske
kons
trukti
onsd
ata.
11**
DICz
*** är
bemy
ndiga
de at
t sam
mans
tälla
den t
eknis
ka ko
nstru
ktion
sfilen
.12
**DI
Cz***
har ti
llatel
se til
å ko
mpile
re de
n Tek
niske
kons
truks
jonsfi
len.
13**
DICz
*** on
valtu
utettu
laati
maan
Tekn
isen a
siakir
jan.
14**
Spole
čnos
t DIC
z*** m
á oprá
vněn
í ke k
ompil
aci s
oubo
ru tec
hnick
é kon
struk
ce.
15**
DICz
*** je
ovlaš
ten za
izrad
u Dato
teke o
tehn
ičkoj
kons
trukc
iji.16
**A
DICz
*** jo
gosu
lt a műs
zaki
kons
trukc
iós do
kume
ntáció
össz
eállít
ására
.17
**DI
Cz***
ma u
powa
żnien
ie do
zbier
ania
i opra
cowy
wania
doku
menta
cji ko
nstru
kcyjn
ej.18
**DI
Cz***
este
autor
izat să c
ompil
eze D
osaru
l tehn
ic de
cons
trucţi
e.
19**
DICz
*** je
poob
lašče
n za s
estav
o dato
teke s
tehn
ično m
apo.
20**
DICz
*** on
volita
tud ko
ostam
a teh
nilist
doku
menta
tsioo
ni.21
**DI
Cz***
е оторизирана д
а състави
Акта
за те
хническа
конструкц
ия.
22**
DICz
*** yr
a įga
liota
suda
ryti šį te
chnin
ės ko
nstru
kcijo
s failą.
23**
DICz
*** ir
autor
izēts
sastā
dīt te
hnisk
o dok
umen
tāciju
.24
**Sp
oločn
osť D
ICz**
* je op
rávne
ná vy
tvoriť
súbo
r tech
nicke
j kon
štruk
cie.
25**
DICz
*** Te
knik
Yapı
Dosy
asını
derle
meye
yetki
lidir.
Low
Volta
ge 2
006/
95/E
CM
achi
nery
200
6/42
/EC
Elec
trom
agne
tic C
ompa
tibilit
y 20
04/1
08/E
C** *
RXM
20M
2V1B
,RXM
25M
2V1B
,RXM
35M
2V1B
,RXJ
20M
2V1B
,RXJ
25M
2V1B
,RXJ
35M
2V1B
,AR
XM25
M2V
1B,A
RXM
35M
2V1B
,
***DI
Cz =
Daikin
Indu
stries
Cze
ch R
epub
lic s.r
.o.
3PEN386697-2F.book Page 1 Friday, February 3, 2017 8:30 AM
Dai
kin
Indu
strie
s C
zech
Rep
ublic
s.r.
o.
CE - D
ECLA
RATIO
N-OF
-CON
FORM
ITYCE
- KON
FORM
ITÄTS
ERKL
ÄRUN
GCE
- DEC
LARA
TION-
DE-C
ONFO
RMITE
CE - C
ONFO
RMITE
ITSVE
RKLA
RING
CE - D
ECLA
RACI
ON-D
E-CO
NFOR
MIDA
DCE
- DIC
HIAR
AZIO
NE-D
I-CON
FORM
ITACE
- ∆HΛ
ΩΣΗ ΣΥ
ΜΜΟΡ
ΦΩΣΗ
Σ
CE - D
ECLA
RAÇÃ
O-DE
-CON
FORM
IDAD
ECE
- ЗАЯ
ВЛЕН
ИЕ-О
-СОО
ТВЕТ
СТВИ
ИCE
- OVE
RENS
STEM
MELS
ESER
KLÆ
RING
CE - F
ÖRSÄ
KRAN
-OM-
ÖVER
ENST
ÄMME
LSE
CE - E
RKLÆ
RING
OM-
SAMS
VAR
CE - I
LMOI
TUS-
YHDE
NMUK
AISU
UDES
TACE
- PRO
HLÁŠ
ENÍ-O
-SHO
DĚ
CE - I
ZJAV
A-O-
USKL
AĐEN
OSTI
CE - M
EGFE
LELŐ
SÉGI
-NYI
LATK
OZAT
CE - D
EKLA
RACJ
A-ZG
ODNO
ŚCI
CE - D
ECLA
RAŢIE
-DE-
CONF
ORMI
TATE
CE - I
ZJAV
A O
SKLA
DNOS
TICE
- VAS
TAVU
SDEK
LARA
TSIO
ONCE
- ДЕК
ЛАРА
ЦИЯ-ЗА
-ϹЪО
ТВЕТ
СТВИ
Е
CE - A
TITIK
TIES-
DEKL
ARAC
IJACE
- ATB
ILSTĪB
AS-D
EKLA
RĀCI
JACE
- VYH
LÁSE
NIE-
ZHOD
YCE
- UYG
UNLU
K-BE
YANI
01are
in co
nform
ity w
ith th
e foll
owing
stan
dard(
s) or
other
norm
ative
docu
ment(
s), pr
ovide
d tha
t thes
e are
used
in ac
corda
nce w
ith ou
rins
tructi
ons:
02de
r/den
folge
nden
Norm
(en) o
der e
inem
ande
ren N
ormdo
kume
nt od
er -do
kume
nten e
ntspri
cht/e
ntspre
chen
, unte
r der
Vorau
ssetz
ung,
daß s
ie ge
mäß u
nsere
n Anw
eisun
gen e
inges
etzt w
erden
:03
sont
confo
rmes
à la/
aux n
orme(s
) ou a
utre(s
) doc
umen
t(s) n
ormati
f(s), p
our a
utant
qu'ils
soien
t utilis
és co
nform
émen
t à no
s ins
tructi
ons:
04co
nform
de vo
lgend
e norm
(en) o
f één
of m
eer a
ndere
bind
ende
docu
mente
n zijn
, op v
oorw
aarde
dat z
e word
en ge
bruikt
overe
enko
mstig
onze
instr
uctie
s:05
están
en co
nform
idad c
on la
(s) si
guien
te(s)
norm
a(s) u
otro(
s) do
cume
nto(s)
norm
ativo
(s), s
iempre
que s
ean u
tilizad
os de
acue
rdo co
nnu
estra
s ins
trucc
iones
:06
sono
confo
rmi a
l(i) se
guen
te(i) s
tanda
rd(s)
o altro
(i) do
cume
nto(i)
a cara
ttere
norm
ativo
, a pa
tto ch
e ven
gano
usati
in co
nform
ità al
leno
stre i
struz
ioni:
07είναι σύμφ
ωνα μ
ε το(α
) ακόλουθο(α
) πρότυπ
ο(α) ή
άλλο
έγγραφ
ο(α) κανονισμ
ών, υπό
την π
ροϋπ
όθεση ό
τι χρησιμ
οποιο
ύνται σύμφω
ναμε
τις οδ
ηγίες
μας:
08es
tão e
m co
nform
idade
com
a(s) s
eguin
te(s)
norm
a(s) o
u ou
tro(s)
doc
umen
to(s)
norm
ativo
(s), d
esde
que
este
s seja
m uti
lizado
s de
acord
o com
as no
ssas
instr
uçõe
s:09
соответст
вуют
следую
щим ста
ндартам или други
м норм
ативны
м докум
ентам,
при условии их
использования
согла
сно наши
минструкциям:
10ov
erhold
er føl
gend
e sta
ndard
(er) e
ller a
ndet/
andre
retni
ngsg
ivend
e do
kume
nt(er)
, foru
dsat
at dis
se a
nven
des
i hen
hold
til vo
reins
truks
er:11
respe
ktive
utru
stning
är u
tförd
i öve
renss
tämme
lse m
ed o
ch fö
ljer f
öljan
de s
tanda
rd(er)
elle
r and
ra no
rmgiv
ande
dok
umen
t, un
der
föruts
ättnin
g att a
nvän
dning
sker
i öve
renss
tämme
lse m
ed vå
ra ins
trukti
oner:
12res
pekti
ve u
tstyr
er i o
veren
sstem
melse
med
følge
nde
stand
ard(er
) elle
r and
re no
rmgiv
ende
dok
umen
t(er),
unde
r foru
tssetn
ing a
v at
disse
bruk
es i h
enho
ld til
våre
instru
kser:
13va
staav
at se
uraav
ien s
tanda
rdien
ja m
uiden
ohje
ellist
en d
okum
enttie
n va
atimu
ksia
edell
yttäe
n, ett
ä nii
tä kä
ytetää
n oh
jeide
mme
muka
isesti
:14
za př
edpo
kladu
, že j
sou v
yužív
ány v
soula
du s
našim
i pok
yny,
odpo
vídají
násle
dujíc
ím no
rmám
nebo
norm
ativn
ím do
kume
ntům:
15u s
kladu
sa sl
ijedećim
stan
dardo
m(im
a) ili d
rugim
norm
ativn
im do
kume
ntom(
ima),
uz uv
jet da
se on
i kori
ste u
sklad
u s na
šim up
utama
:
16me
gfelel
nek a
z aláb
bi sz
abvá
ny(ok
)nak v
agy e
gyéb
irány
adó d
okum
entum
(ok)na
k, ha
azok
at elő
írás s
zerin
t has
ználj
ák:
17sp
ełniają
wymo
gi na
stępu
jącyc
h no
rm i
innyc
h do
kume
ntów
norm
aliza
cyjny
ch, p
od w
arunk
iem ż
e uż
ywan
e są
zgo
dnie
z na
szym
iins
trukc
jami:
18su
nt în
confo
rmita
te cu
urmă
torul
(urmă
toarel
e) sta
ndard
(e) sa
u alt(e
) doc
umen
t(e) n
ormati
v(e), c
u con
diţia
ca ac
estea
să fie
utiliz
ate în
confo
rmita
te cu
instr
ucţiu
nile n
oastr
e:19
sklad
ni z n
asled
njimi
stan
dardi
in dr
ugim
i norm
ativi,
pod p
ogoje
m, da
se up
orablj
ajo v
sklad
u z na
šimi n
avod
ili:20
on va
stavu
ses j
ärgmi
s(t)e
stand
ardi(te
)ga võ
i teist
e norm
atiivs
ete do
kume
ntide
ga, k
ui ne
id ka
sutat
akse
vasta
valt m
eie ju
hend
itele:
21съответст
ват на
следните
стандарти
или
други
норма
тивни
докум
енти
, при
условие
, че
се и
зползват
съгласно
наши
теинструкции
:22
atitin
ka že
miau
nurod
ytus s
tanda
rtus i
r (arba
) kitu
s norm
inius
doku
mentu
s su s
ąlyga
, kad
yra n
audo
jami p
agal
mūsų
nurod
ymus
:23
tad, ja
lietot
i atbi
lstoš
i ražo
tāja n
orādīj
umiem
, atbi
lst se
kojoš
iem st
anda
rtiem
un ci
tiem
norm
atīvie
m do
kume
ntiem
:24
sú v
zhod
e s na
sledo
vnou
(ými) n
ormou
(ami) a
lebo i
ným(
i) norm
atívn
ym(i)
doku
mento
m(am
i), za
pred
pokla
du, ž
e sa p
oužív
ajú v
súlad
esn
ašim
návo
dom:
25ürü
nün,
talim
atları
mıza
göre
kulla
nılma
sı koşu
luyla
aşağıda
ki sta
ndart
lar ve
norm
belirt
en be
lgeler
le uy
umlud
ur:
01Dir
ectiv
es, a
s ame
nded
.02
Direk
tiven
, gem
äß Än
derun
g.03
Direc
tives
, telle
s que
mod
ifiées
.04
Richtl
ijnen
, zoa
ls ge
amen
deerd
.05
Direc
tivas
, seg
ún lo
enme
ndad
o.06
Dirett
ive, c
ome d
a mod
ifica.
07Οδ
ηγιών, όπ
ως έχ
ουν τροπο
ποιηθ
εί.08
Direc
tivas
, con
forme
alter
ação
em.
09Ди
ректи
в со в
семи
поправками
.
10Dir
ektiv
er, m
ed se
nere
ændri
nger.
11Dir
ektiv,
med
föret
agna
ändri
ngar.
12Dir
ektiv
er, m
ed fo
retatt
e end
ringe
r.13
Direk
tiivejä
, sella
isina k
uin ne
ovat
muute
ttuina
.14
v plat
ném
zněn
í.15
Smjer
nice,
kako
je iz
mijen
jeno.
16irá
nyelv
(ek) é
s mód
osítá
saik
rende
lkezé
seit.
17z p
óźnie
jszym
i pop
rawka
mi.
18Dir
ectiv
elor, c
u ame
ndam
entel
e res
pecti
ve.
19Dir
ektiv
e z vs
emi s
preme
mbam
i.20
Direk
tiivid
koos
muu
datus
tega.
21Ди
ректи
ви, с
техните и
зменения
.22
Direk
tyvos
e su p
apild
ymais
.23
Direk
tīvās
un to
papil
dināju
mos.
24Sm
ernice
, v pl
atnom
znen
í.25
Deǧiş
tirilm
iş ha
lleriy
le Yö
netm
elikle
r.
01fol
lowing
the p
rovisio
ns of
:02
gemä
ß den
Vorsc
hrifte
n der:
03co
nform
émen
t aux
stipu
lation
s des
:04
overe
enko
mstig
de be
palin
gen v
an:
05sig
uiend
o las
disp
osicio
nes d
e:06
seco
ndo l
e pres
crizio
ni pe
r:07
με τή
ρηση
των δ
ιατάξεω
ν των
:08
de ac
ordo c
om o
previs
to em
:09
в соответствии с
положе
ниям
и:
10un
der ia
gttag
else a
f bes
temme
lserne
i:11
enlig
t villk
oren i
:12
gitt i
henh
old til
beste
mmels
ene i
:13
noud
attae
n mää
räyks
iä:14
za do
držen
í usta
nove
ní pře
dpisu
:15
prema
odred
bama
:16
köve
ti a(z)
:17
zgod
nie z
posta
nowie
niami
Dyre
ktyw:
18în
urma p
reved
erilor
:
19ob
upoš
tevan
ju do
ločb:
20va
stava
lt nõu
etele:
21следвайки к
лаузите н
а:22
laika
ntis n
uosta
tų, pa
teikia
mų:
23iev
ērojot
prasība
s, ka
s note
iktas
:24
održi
avajú
c usta
nove
nia:
25bu
nun k
oşull
arına
uygu
n olar
ak:
01No
te *
as se
t out
in <A
> and
judg
ed po
sitive
ly by <
B>
acco
rding
to th
e Cert
ificate
<C>.
02Hin
weis
*wie
in <A
> aufg
eführt
und v
on <B
> pos
itiv be
urteilt
ge
mäß Z
ertifik
at<C
>.03
Rema
rque *
tel qu
e défi
ni da
ns <A
> et é
valué
positi
veme
nt pa
r <B
> con
formé
ment
au Ce
rtifica
t<C>
.04
Beme
rk *
zoals
verm
eld in
<A> e
n pos
itief b
eoord
eeld
door
<B> o
veree
nkom
stig Ce
rtifica
at<C
>.05
Nota
*co
mo se
estab
lece e
n <A>
y es
valor
ado
positi
vame
nte po
r <B>
de ac
uerdo
con e
l Ce
rtifica
do<C
>.
06No
ta *
deline
ato ne
l <A>
e giu
dicato
positi
vame
nte
da<B
> sec
ondo
il Cert
ificato
<C>.
07Ση
μείωση
*όπ
ως κα
θορίζ
εται στο
<A> κ
αι κρίνεται
θετικά α
πό
το <B
> σύμφω
να με
το Πι
στοπ
οιητικ
ό<C>
.08
Nota
*tal
como
estab
elecid
o em
<A> e
com
o pare
cer
positi
vo de
<B> d
e aco
rdo co
m o C
ertific
ado<
C>.
09Пр
имечание
*как
указа
но в
<A> и
в соотв
етстви
и сп
олож
ительны
м реш
ением <
B> со
гласно
Свид
етель
ству<
C>.
10Be
mærk
*so
m an
ført i
<A> o
g pos
itivt v
urdere
t af <
B>
ihen
hold
til Cert
ifikat
<C>.
11Inf
ormati
on *
enligt
<A> o
ch go
dkän
ts av
<B> e
nligt
Certif
ikatet
<C>.
12Me
rk *
som
det fr
emko
mmer
i <A>
og gj
enno
m po
sitiv
bedø
mmels
e av <
B> ifø
lge Se
rtifika
t<C>
.13
Huom
*jot
ka on
esite
tty as
iakirja
ssa <A
> ja j
otka <
B> on
hy
väksy
nyt S
ertifik
aatin
<C> m
ukais
esti.
14Po
znám
ka *
jak by
lo uv
eden
o v <A
> a po
zitivně z
jištěn
o <B>
vs
oulad
u sos
vědč
ením
<C>.
15Na
pome
na *
kako
je izl
ožen
o u <A
> i po
zitivn
o ocije
njeno
od
stran
e <B>
prem
a Cert
ifikatu
<C>.
16Me
gjegy
zés *
a(z) <
A> al
apján
, a(z)
<B> i
gazo
lta a
megfe
lelést,
a(z
) <C>
tanús
ítván
y sze
rint.
17Uw
aga *
zgod
nie z
doku
menta
cją <A
>, po
zytyw
ną op
inią
<B> i
Świad
ectw
em<C
>.18
Notă
*aş
a cum
este
stabili
t în <A
> şi a
precia
t poz
itiv
de<B
> în c
onfor
mitat
e cu C
ertific
atul<
C>.
19Op
omba
*ko
t je do
ločen
o v <A
> in o
dobre
no s
stran
i <B>
vs
kladu
sce
rtifika
tom<C
>.20
Märku
s *na
gu on
näida
tud do
kume
ndis <
A> ja
heak
s kiid
etud <
B> jä
rgi va
stava
lt sert
ifikaa
dile<
C>.
21Забележк
а *как
то е и
злож
ено в
<A> и
оценено п
олож
ително
от <B
> съгл
асно
Сертиф
иката
<C>.
22Pa
staba
*ka
ip nu
statyt
a <A>
ir ka
ip tei
giama
i nus
pręsta
<B>
paga
l Sert
ifikatą
<C>.
23Pie
zīmes
*kā
norād
īts <A
> un a
tbilsto
ši <B>
pozitī
vajam
vē
rtējum
am sa
skaņā
ar se
rtifikā
tu<C
>.24
Pozn
ámka
*ak
o bolo
uved
ené v
<A> a
pozití
vne z
istené
<B>
vsúla
de s
osve
dčen
ím<C
>.25
Not *
<A>’d
a belir
tildiği
gibi ve
<C>S
ertifik
asına
göre
<B> t
arafın
dan o
lumlu
olarak
değe
rlend
irildiği
gibi.
<A>
DA
IKIN
.TC
F.03
2C14
/01-
2017
<B>
DEK
RA
(NB
0344
)
<C>
2159
619.
0551
-EM
C
01 a
decla
res un
der it
s sole
resp
onsib
ility th
at the
air c
ondit
ioning
mod
els to
whic
h this
decla
ration
relat
es:
02 d
erklär
t auf
seine
allei
nige V
erantw
ortun
g daß
die M
odell
e der
Klima
gerät
e für
die di
ese E
rkläru
ng be
stimm
t ist:
03 f
décla
re so
us sa
seule
resp
onsa
bilité
que l
es ap
parei
ls d'a
ir con
dition
né vi
sés p
ar la
prése
nte dé
clarat
ion:
04 l
verkl
aart h
ierbij
op ei
gen e
xclus
ieve v
erantw
oorde
lijkhe
id da
t de a
ircon
dition
ing un
its w
aarop
deze
verkl
aring
betre
kking
heeft
:05
ede
clara
baja
su ún
ica re
spon
sabil
idad q
ue lo
s mod
elos d
e aire
acon
dicion
ado a
los c
uales
hace
refer
encia
la de
clarac
ión:
06 i
dichia
ra so
tto su
a res
pons
abilità
che i
cond
iziona
tori m
odell
o a cu
i è rif
erita
ques
ta dic
hiaraz
ione:
07 g
δηλώ
νει με
αποκλειστική
της ε
υθύνη ό
τι τα μ
οντέλ
α των
κλιμα
τιστικών
συσκευών
στα ο
ποία αναφ
έρετα
ι η παρούσα
δήλω
ση:
08 p
decla
ra so
b sua
exclu
siva r
espo
nsab
ilidad
e que
os m
odelo
s de a
r con
dicion
ado a
que e
sta de
claraç
ão se
refer
e:
09 u
заявляет, и
сключ
ительно
под с
вою о
тветст
венность,
что м
одели к
ондиционеров
возду
ха, к
которым
относится
насто
ящее
заявление:
10 q
erklæ
rer un
der e
nean
svar,
at kl
imaa
nlægm
odell
erne,
som
denn
e dek
larati
on ve
drører
:11
sde
klarer
ar i e
gens
kap a
v huv
udan
svari
g, att
luftk
ondit
ioneri
ngsm
odell
erna s
om be
rörs a
v den
na de
klarat
ion in
nebä
r att:
12 n
erklæ
rer et
fullst
endig
ansv
ar for
at de
luftk
ondis
joneri
ngsm
odell
er so
m be
røres
av de
nne d
eklar
asjon
, inne
bærer
at:
13 j
ilmoit
taa yk
sinom
aan o
malla
vastu
ullaa
n, ett
ä täm
än ilm
oituk
sen t
arkoit
tamat
ilmas
tointi
laitte
iden m
allit:
14 c
prohla
šuje
ve sv
é plné
odpo
vědn
osti,
že m
odely
klim
atiza
ce, k
nimž
se to
to pro
hláše
ní vz
tahuje
:15
yizja
vljuje
pod i
sključiv
o vlas
titom
odgo
vorno
šću d
a su m
odeli
klim
a uređ
aja na
koje
se ov
a izja
va od
nosi:
16 h
teljes
felelős
sége
tuda
tában
kijel
enti,
hogy
a klí
mabe
rende
zés m
odell
ek, m
elyek
re e n
yilatko
zat v
onatk
ozik:
17 m
dekla
ruje n
a włas
ną i w
yłącz
ną od
powie
dzial
ność
, że m
odele
klim
atyza
torów
, któr
ych d
otycz
y nini
ejsza
dekla
racja:
18 r
decla
ră pe
prop
rie ră
spun
dere
că ap
aratel
e de a
er co
ndiţio
nat la
care
se re
feră a
ceas
tă de
claraţ
ie:19
oz v
so od
govo
rnostj
o izja
vlja, d
a so m
odeli
klim
atskih
napra
v, na
kater
e se i
zjava
nana
ša:
20 x
kinnit
ab om
a täie
likul v
astut
usel,
et kä
esole
va de
klarat
sioon
i alla
kuulu
vad k
liimas
eadm
ete m
udeli
d:21
bдекларира н
а своя о
тговорност, ч
е моделите к
лима
тична и
нсталация, за
които с
е отнася т
ази д
екларация:
22 t
visišk
a sav
o atsa
komy
be sk
elbia,
kad o
ro ko
ndicio
navim
o prie
taisų
mod
eliai,
kurie
ms yr
a taik
oma š
i dek
larac
ija:
23 v
ar pil
nu at
bildīb
u apli
ecina
, ka tālā
k uzs
kaitīt
o mod
eļu ga
isa ko
ndicio
nētāj
i, uz k
uriem
attie
cas š
ī dek
larāc
ija:
24 k
vyhla
suje
na vl
astnú
zodp
oved
nosť,
že tie
to klim
atizačn
é mod
ely, n
a ktor
é sa v
zťahu
je tot
o vyh
lásen
ie:25
wtam
amen
kend
i soru
mlulu
ǧund
a olm
ak üz
ere bu
bildi
rinin
ilgili o
lduǧu
klim
a mod
elleri
nin aş
aǧıda
ki gib
i oldu
ǧunu
beya
n ede
r:
EN
6033
5-2-
40,
3P475203-2
Tets
uya
Baba
Man
agin
g D
irect
orPi
lsen
, 1st
of F
ebru
ary
2017
01**
DICz
*** is
autho
rised
to co
mpile
the T
echn
ical C
onstr
uctio
n File
.02
**DI
Cz***
hat d
ie Be
rechti
gung
die T
echn
ische
Kons
trukti
onsa
kte zu
samm
enzu
stelle
n.03
**DI
Cz***
est a
utoris
é à co
mpile
r le D
ossie
r de C
onstr
uctio
n Tec
hniqu
e.04
**DI
Cz***
is be
voeg
d om
het T
echn
isch C
onstr
uctie
doss
ier sa
men t
e stel
len.
05**
DICz
*** es
tá au
toriza
do a
comp
ilar e
l Arch
ivo de
Con
struc
ción T
écnic
a.06
**DI
Cz***
è au
torizz
ata a
redige
re il F
ile Te
cnico
di C
ostru
zione
.
07**
Η DI
Cz***
είναι εξο
υσιοδ
οτημένη
να συ
ντάξει
τον Τ
εχνικ
ό φάκελο
κατασκευής
.08
**A D
ICz**
* está
autor
izada
a co
mpila
r a do
cume
ntaçã
o téc
nica d
e fab
rico.
09**
Комп
ания
DIC
z*** у
полном
очена с
оставить
Комп
лект технической д
окум
ентации.
10**
DICz
*** er
autor
iseret
til at
udarb
ejde d
e tek
niske
kons
trukti
onsd
ata.
11**
DICz
*** är
bemy
ndiga
de at
t sam
mans
tälla
den t
eknis
ka ko
nstru
ktion
sfilen
.12
**DI
Cz***
har ti
llatel
se til
å ko
mpile
re de
n Tek
niske
kons
truks
jonsfi
len.
13**
DICz
*** on
valtu
utettu
laati
maan
Tekn
isen a
siakir
jan.
14**
Spole
čnos
t DIC
z*** m
á oprá
vněn
í ke k
ompil
aci s
oubo
ru tec
hnick
é kon
struk
ce.
15**
DICz
*** je
ovlaš
ten za
izrad
u Dato
teke o
tehn
ičkoj
kons
trukc
iji.16
**A
DICz
*** jo
gosu
lt a műs
zaki
kons
trukc
iós do
kume
ntáció
össz
eállít
ására
.17
**DI
Cz***
ma u
powa
żnien
ie do
zbier
ania
i opra
cowy
wania
doku
menta
cji ko
nstru
kcyjn
ej.18
**DI
Cz***
este
autor
izat să c
ompil
eze D
osaru
l tehn
ic de
cons
trucţi
e.
19**
DICz
*** je
poob
lašče
n za s
estav
o dato
teke s
tehn
ično m
apo.
20**
DICz
*** on
volita
tud ko
ostam
a teh
nilist
doku
menta
tsioo
ni.21
**DI
Cz***
е оторизирана д
а състави
Акта
за те
хническа
конструкц
ия.
22**
DICz
*** yr
a įga
liota
suda
ryti šį te
chnin
ės ko
nstru
kcijo
s failą.
23**
DICz
*** ir
autor
izēts
sastā
dīt te
hnisk
o dok
umen
tāciju
.24
**Sp
oločn
osť D
ICz**
* je op
rávne
ná vy
tvoriť
súbo
r tech
nicke
j kon
štruk
cie.
25**
DICz
*** Te
knik
Yapı
Dosy
asını
derle
meye
yetki
lidir.
Low
Volta
ge 2
014/
35/E
UM
achi
nery
200
6/42
/EC
Elec
trom
agne
tic C
ompa
tibilit
y 20
14/3
0/EU
** *
RXP
20K
3V1B
, RXP
25K
3V1B
, RXP
35K
3V1B
, AR
XP20
K3V
1B, A
RXP
25K
3V1B
, AR
XP35
K3V
1B
***DI
Cz =
Daikin
Indu
stries
Cze
ch R
epub
lic s.r
.o.
3PEN386697-2F.book Page 1 Friday, February 3, 2017 8:30 AM
3PEN386697-2F.book Page 1 Friday, February 3, 2017 8:30 AM
Safety Precautions
• The precautions described herein are classified as WARNING and CAUTION. They both contain important information regarding safety. Be sure to observe all precautions without fail.
• Meaning of WARNING and CAUTION notices
WARNING .... Failure to follow these instructions properly may result in personal injury or loss of life.
CAUTION ..... Failure to observe these instructions properly may result in property damage or personal injury, which may be serious depending on the circumstances.
• The safety marks shown in this manual have the following meanings:
• After completing installation, conduct a trial operation to check for faults and explain to the customer how to operate the air conditioner and take care of it with the aid of the operation manual.
• The English text is the original instruction. Other languages are translations of the original instructions.
Be sure to follow the instructions. Be sure to establish an earth connection. Never attempt.
WARNING• Ask your dealer or qualified personnel to carry out installation work.
Do not attempt to install the air conditioner yourself. Improper installation may result in water leakage, electric shocks or fire. • Install the air conditioner in accordance with the instructions in this installation manual.
Improper installation may result in water leakage, electric shocks or fire. • Be sure to use only the specified accessories and parts for installation work.
Failure to use the specified parts may result in the unit falling, water leakage, electric shocks or fire. • Install the air conditioner on a foundation strong enough to withstand the weight of the unit.
A foundation of insufficient strength may result in the equipment falling and causing injury. • Electrical work must be performed in accordance with relevant local and national regulations and with instructions
in this installation manual. Be sure to use a dedicated power supply circuit only. Insufficiency of power circuit capacity and improper workmanship may result in electric shocks or fire.
• Use a cable of suitable length. Do not use tapped wires or an extension lead, as this may cause overheating, electric shocks or fire.
• Make sure that all wiring is secured, the specified wires are used, and that there is no strain on the terminal connections or wires. Improper connections or securing of wires may result in abnormal heat build-up or fire.
• When wiring the power supply and connecting the wiring between the indoor and outdoor units, position the wires so that the control box lid can be securely fastened. Improper positioning of the control box lid may result in electric shocks, fire or over heating terminals.
• If refrigerant gas leaks during installation, ventilate the area immediately. Toxic gas may be produced if the refrigerant comes into contact with fire.
• After completing installation, check for refrigerant gas leakage. Toxic gas may be produced if the refrigerant gas leaks into the room and comes into contact with a source of fire, such as a fan heater, stove or cooker.
• When installing or relocating the air conditioner, be sure to bleed the refrigerant circuit to ensure it is free of air, and use only the specified refrigerant (R32). The presence of air or other foreign matter in the refrigerant circuit causes abnormal pressure rise, which may result in equipment damage and even injury.
• During installation, attach the refrigerant piping securely before running the compressor. If the refrigerant pipes are not attached and the stop valve is open when the compressor is run, air will be sucked in, causing abnormal pressure in the refrigeration cycle, which may result in equipment damage and even injury.
• During pump-down, stop the compressor before removing the refrigerant piping. If the compressor is still running and the stop valve is open during pump-down, air will be sucked in when the refrigerant piping is removed, causing abnormal pressure in the refrigeration cycle, which may result in equipment damage and even injury.
• Be sure to earth the air conditioner. Do not earth the unit to a utility pipe, lightning conductor or telephone earth lead. Imperfect earthing may result in electric shocks.
• Be sure to install an earth leakage breaker. Failure to install an earth leakage breaker may result in electric shocks or fire.
• If the supply cord is damaged, it must be replaced by the manufacturer, its service agent or similarly qualified persons in order to avoid a hazard.
Read the precautions in this manual carefully before operating the unit. This appliance is filled with R32.
1 English
3PEN386697-2F.book Page 2 Friday, February 3, 2017 8:30 AM
Safety Precautions
AccessoriesAccessories supplied with the outdoor unit:
CAUTION• Do not install the air conditioner at any place where there is a danger of flammable gas leakage.
In the event of a gas leakage, build-up of gas near the air conditioner may cause a fire to break out. • While following the instructions in this installation manual, install drain piping to ensure proper drainage
and insulate piping to prevent condensation. Improper drain piping may result in indoor water leakage and property damage.
• Tighten the flare nut according to the specified method such as with a torque wrench. If the flare nut is too tight, it may crack after prolonged use, causing refrigerant leakage.
• Make sure to provide for adequate measures in order to prevent that the outdoor unit be used as a shelter by small animals. Small animals making contact with electrical parts can cause malfunctions, smoke or fire. Please instruct the customer to keep the area around the unit clean.
• The temperature of refrigerant circuit will be high, please keep the inter-unit wire away from copper pipes that are not thermally insulated.
• This appliance is intended to be used by expert or trained users in shops, in light industry and on farms, or for commercial and household use by lay persons.
• Sound pressure level is less than 70 dB(A).• Only use accessories, optional equipment and spare parts made or approved by DAIKIN.
(A) Installation manual + R32 manual 1
(B) Drain plug (heat pump models)
It is on the bottom of the packing case.
1
(C) Refrigerant charge label
1
(D) Multilingual fluorinated greenhouse gases label
1
Contains fluorinated greenhouse gases
21 1
1
2
2 kgtCO2eq1000
GWP × kg==
+
kg=
kg=GWP: 675R32
English 2
3PEN386697-2F.book Page 3 Friday, February 3, 2017 8:30 AM
Operation limitsUse the system in the following temperature and humidity ranges for safe and effective operation.
(a) To avoid condensation and water dripping out of the unit. If the temperature or the humidity is beyond these conditions, safety devices may be put in action and the air conditioner may not operate.
The setting temperature range of the remote controller is:
Precautions for Selecting the Location1) Choose a place solid enough to bear the weight and vibration of the unit, where the operation noise will not be amplified.2) Choose a location where the hot air discharged from the unit or the operation noise will not cause a nuisance to the neighbours of
the user.3) Avoid places near a bedroom and the like, so that the operation noise will cause no trouble.4) There must be sufficient spaces for carrying the unit into and out of the site.5) There must be sufficient space for air passage and no obstructions around the air inlet and the air outlet.6) The site must be free from the possibility of flammable gas leakage in a nearby place.7) Install units, power cords and inter-unit wire at least 3m away from television and radio sets. This is to prevent interference to
images and sounds. (Noises may be heard even if they are more than 3m away depending on radio wave conditions.)8) In coastal areas or other places with salty atmosphere of sulfate gas, corrosion may shorten the life of the air conditioner.9) Since drain flows out of the outdoor unit, do not place under the unit anything which must be kept away from moisture.
NOTECannot be installed hanging from ceiling or stacked.
CAUTIONWhen operating the air conditioner in a low outdoor ambient temperature, be sure to follow the instructions described below.• To prevent exposure to wind, install the outdoor unit with its suction
side facing the wall.• Never install the outdoor unit at a site where the suction side may be
exposed directly to wind.• To prevent exposure to wind, it is recommended to install a baffle
plate on the air discharge side of the outdoor unit.• In heavy snowfall areas, select an installation site where the snow
will not affect the unit.
Cooling HeatingOutdoor temperature –10~46°C –15~24°C Indoor temperature 18~32°C 10~30°C
Indoor humidity ≤80%(a)
Cooling operation Heating operation AUTO operation18-32°C 10-30°C 18-30°C
Construct a large canopy Construct a pedestal
Install the unit high enough off the ground to prevent burying in snow.
3 English
3PEN386697-2F.book Page 4 Friday, February 3, 2017 8:30 AM
Outdoor Unit Installation Drawings
**
*
(Foo
t bolt
-hole
cent
res)31
1
574(Foot bolt-hole centres)(From unit’s side)
105.5
O.D. 9.5mmGas pipe
Liquid pipe O.D. 6.4mm
20g/m
15m
20mMax. allowable piping length
Max. allowable piping height
Additional refrigerantrequired for refrigerant pipe exceeding 10m in length.
1.5mMin. allowable piping lengthWrap the insulation pipe with the finishing tape from bottom to top.
In sites with poor drainage, use block bases for outdoor unit. Adjust foot height until the unit is leveled. Otherwise, water leakage or pooling of water may occur.
Where there is a danger of the unit falling, use foot bolts, or wires.
250mm from wall
unit: mm
How to remove the stop valve cover
Remove the screw on the stop valve cover.Slide the cover downward to remove it.How to attach the stop valve cover
Insert the upper part of the stop valve cover into the outdoor unit.Tighten the screws.
Stop valve cover
Allow space for piping and electrical servicing.
* Be sure to add the proper amount of additional refrigerant.Failure to do so may result in reduced performance.
** The suggested shortest pipe length is 1.5m, in order to avoid noise from the outdoor unit and vibration. (Mechanical noise and vibration may occur depending on how the unit is installed and the environment in which it is used.)
Allow 300mm of work space below the ceilling surface
CAUTION**Set the piping length
from 1.5m to 20m.
English 4
3PEN386697-2F.book Page 5 Friday, February 3, 2017 8:30 AM
Installation Guidelines• Where a wall or other obstacle is in the path of outdoor unit’s inlet or outlet airflow, follow the installation guidelines below.• For any of the following installation patterns, the wall height on the outlet side should be 1200mm or less.
Precautions on Installation• Check the strength and level of the installation ground so that the unit will not cause any operating vibration or noise after installed.• In accordance with the foundation drawing, fix the unit securely by means of the foundation bolts. (Prepare 4 sets of M8 or M10
foundation bolts, nuts and washers each which are available on the market.)• It is best to screw in the foundation bolts until their ends are 20mm from the foundation surface.
Outdoor Unit Installation1. Installing outdoor unit
1) When installing the outdoor unit, refer to “Precautions for Selecting the Location” and the “Outdoor Unit Installation Drawings.”2) If drain work is necessary, follow the procedures below.
2. Drain work1) Use drain plug for drainage.2) If the drain port is covered by a mounting base or floor surface, place additional
foot bases of at least 30mm in height under the outdoor unit’s feet.3) In cold areas, do not use a drain hose with the outdoor unit.
(Otherwise, drain water may freeze, impairing heating performance.)
More than 50
Direction of air
1200 or less
More than 100
More than 50 More than 50
More than 100
More than 150
Top viewSide view
Top view
More than 150
More than 300More than 50
unit: mm
Wall facing one side Wall facing two sides
Wall facing three sides
20
Drain port
Bottom frame
Drain plug
Hose (available commercially, inner dia. 16mm)
5 English
3PEN386697-2F.book Page 6 Friday, February 3, 2017 8:30 AM
Outdoor Unit Installation3. Flaring the pipe end
1) Cut the pipe end with a pipe cutter.2) Remove burrs with the cut surface facing
downward so that the chips do not enter the pipe.3) Put the flare nut on the pipe.4) Flare the pipe.5) Check that the flaring is properly made.
WARNING• Do not use mineral oil on flared part.• Prevent mineral oil from getting into the system as this would reduce the lifetime of the units.• Never use piping which has been used for previous installations. Only use parts which are delivered with the unit.• Never install a dryer to this R32 unit in order to guarantee its lifetime.• The drying material may dissolve and damage the system.• Incomplete flaring may cause refrigerant gas leakage.• Protect or enclose refrigerant tubing to avoid mechanical damage.
4. Refrigerant piping work CAUTION
• Use the flare nut fixed to the main unit. (To prevent cracking of the flare nut by aged deterioration.)• To prevent gas leakage, apply refrigeration oil only to the inner surface of the flare. (Use refrigeration oil for R410A or R32.)• Use torque wrenches when tightening the flare nuts to prevent damage to the flare nuts and gas leakage.• After the piping work is finished (after checking for gas leaks), open the stop valves or the compressor might break down.
• Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand. Then tighten them fully with the torque wrenches.
4-1 Cautions on pipe handling1) Protect the open end of the pipe against dust and moisture.2) All pipe bends should be as gentle as possible. Use a pipe bender
for bending.
A
A
(Cut exactly at right angles.) Remove burrs.
Set exactly at the position shown below.Flaring
Die
CheckFlare’s inner surface must be flaw-free.
The pipe end must be evenly flared in a perfect circle.
Make sure that the flare nut is fitted.
0-0.5mm
Clutch-type
Flare tool for R410A/R32
1.0-1.5mm
Clutch-type (Ridgid-type)
1.5-2.0mm
Wing-nut type (Imperial-type)
Conventional flare tool
Torque wrench
Piping union
Flare nut
Flare nutSpanner
Flare nut tightening torque
Liquid side
1/4 inch
14.2-17.2N • m(144-175kgf • cm)
Gas side
3/8 inch
32.7-39.9N • m(333-407kgf • cm)
Valve cap tightening torque
Liquid side
1/4 inch
21.6-27.4N • m(220-280kgf • cm)
Gas side
3/8 inch
21.6-27.4N • m(220-280kgf • cm)
Service port cap tightening torque
10.8-14.7N • m (110-150kgf • cm)
Do not apply refrigeration oil to the outer surface.
Apply refrigeration oil to the inner surface of the flare.
Do not apply refrigeration oil to the flare nut to avoid tightening with excessive torque.
[Apply oil][Tighten]
Wall
If no flare cap is available, cover the flare mouth with tape to keep dirt or water out.
Be sure to place a cap.
Rain
English 6
3PEN386697-2F.book Page 7 Friday, February 3, 2017 8:30 AM
Outdoor Unit Installation4-2 Selection of copper and heat insulation materials
When using commercial copper pipes and fittings, observe the following:1) Insulation material: Polyethylene foam
Heat transfer rate: 0.041 to 0.052W/mK (0.035 to 0.045kcal/mh°C)Refrigerant gas pipe’s surface temperature reaches 110°C max.Choose heat insulation materials that will withstand this temperature.
2) Be sure to insulate both the gas and liquid piping and to provide insulation dimensions as below.
3) Use separate thermal insulation for gas and liquid refrigerant pipes.
5. Evacuating the air with a vacuum pump and checking gas leakage
WARNING• Do not mix any substance other than the specified refrigerant (R32) into the refrigeration cycle.• When refrigerant gas leaks occur, ventilate the room as soon and as much as possible.• R32, as well as other refrigerants, should always be recovered and never be released directly into the environment.• Use a vacuum pump for R32 or R410A exclusively. Using the same vacuum pump for different refrigerants may damage the
vacuum pump or the unit.• Use tools for R32 or R410A (such as the gauge manifold, charging hose, or vacuum pump adapter).
• When piping work is completed, it is necessary to evacuate the air and check for gas leakage.
• If using additional refrigerant, perform air evacuating from the refrigerant pipes and indoor unit using a vacuum pump, then charge additional refrigerant.
• Use a hexagonal wrench (4mm) to operate the stop valve rod.• All refrigerant pipe joints should be tightened with a torque wrench at the specified
tightening torque.
Gas side Liquid side Gas pipe thermal insulation
Liquid pipe thermal insulation
O.D. 9.5mm O.D. 6.4mm I.D. 12-15mm I.D. 8-10mmMinimum bend radius Thickness 10mm Min.
30mm or moreThickness 0.8mm (C1220T-O)
1) Connect projection side of charging hose (which comes from gauge manifold) to gas stop valve’s service port.
2) Fully open gauge manifold’s low-pressure valve (Lo) and completely close its high-pressure valve (Hi). (High-pressure valve subsequently requires no operation.)
3) Do vacuum pumping and make sure that the compound pressure gauge reads –0.1MPa (–76cmHg).*1
4) Close gauge manifold’s low-pressure valve (Lo) and stop vacuum pump. (Keep this state for a few minutes to make sure that the compound pressure gauge pointer does not swing back.)*2
5) Remove caps from liquid stop valve and gas stop valve.
6) Turn the liquid stop valve’s rod 90 degrees counterclockwise with a hexagonal wrench to open valve. Close it after 5 seconds, and check for gas leakage.Using soapy water, check for gas leakage from indoor unit’s flare and outdoor unit’s flare and valve rods.After the check is complete, wipe all soapy water off.
7) Disconnect charging hose from gas stop valve’s service port, then fully open liquid and gas stop valves.(Do not attempt to turn valve rod beyond its stop.)
8) Tighten valve caps and service port caps for the liquid and gas stop valves with a torque wrench at the specified torques.
Gas pipe
Inter-unit wire
Liquid pipe
Drain hoseFinishing tape
Gas pipe insulation
Liquid pipe insulation
Compound pressure gauge
Pressure metre
High-pressure valve
Low-pressure valve
Vacuum pump Service port
Liquid stop valveValve caps
Gas stop valve
Charging hoses
Gauge manifold
7 English
3PEN386697-2F.book Page 8 Friday, February 3, 2017 8:30 AM
Outdoor Unit Installation*1. Pipe length vs. vacuum pump run time.
*2. If the compound pressure gauge pointer swings back, refrigerant may have water content or a loose pipe joint may exists. Check all pipe joints and retighten nuts as needed, then repeat steps 2) through 4).
6. Refilling the refrigerantCheck the type of refrigerant to be used on the machine nameplate.Fill from the gas pipe in liquid form.
Pump Down OperationIn order to protect the environment, be sure to pump down when relocating or disposing of the unit.
1) Remove the valve cap from liquid stop valve and gas stop valve.2) Carry out forced cooling operation.3) After 5 to 10 minutes, close the liquid stop valve with a hexagonal wrench.4) After 2 to 3 minutes, close the gas stop valve and stop forced cooling operation.
Forced cooling operation Using the indoor unit ON/OFF switch
Press the indoor unit ON/OFF switch for at least 5 seconds. (The operation will start.)• Forced cooling operation will stop automatically after around 15 minutes.
To stop the operation, press the indoor unit ON/OFF switch. Using the indoor unit’s remote controller
• Please read about the procedure in “Trial operation from remote controller” in the installation manual attached to the indoor unit. Please set the operation mode to “cooling”.
Pipe length Up to 15m More than 15mRun time Not less than 10 min. Not less than 15 min.
65
Please fill in with indelible ink, the factory refrigerant charge of the product,
tCO2eq calculation according to the formula (rounded up to 2 decimal places)
the additional refrigerant amount charged in the field and the total refrigerant charge
on the refrigerant charge label supplied with the product.
Important information regarding the refrigerant usedThis product contains fluorinated greenhouse gases. Do not vent gases into the atmosphere.Refrigerant type:GWP value:
factory refrigerant charge of the product: see unit name plate
additional refrigerant amount charged in the field
total refrigerant charge
greenhouse gas emissions of the total refrigerant charge expressed as tonnes CO2-equivalent
outdoor unit
refrigerant cylinder and manifold for charging
The filled out label must be adhered in the proximity of the product charging port (e.g. onto the inside of the stop valve cover).
GWP = global warming potential (1) (1) Contains fluorinated greenhouse gases
21 1
1
2
2 kgtCO2eq1000
GWP × kg==
+
kg=
kg=GWP: 675
675R32
R32
NOTENational implementation of EU regulation on certain fluorinated greenhouse gases may require to provide the appropriate official national language on the unit. Therefore an additional multilingual fluorinated greenhouse gases label is supplied with the unit. Sticking instructions are illustrated on the backside of that label.
NOTICE
In Europe, the greenhouse gas emissions of the total refrigerant charge in the system (expressed as tonnes CO2 -equivalent) is used to determine the maintenance intervals. Follow the applicable legislation.
Formula to calculate the greenhouse gas emissions:GWP value of the refrigerant × Total refrigerant charge [in kg] / 1000
Use the GWP value mentioned on the refrigerant charge label. This GWP value is based on the 4th IPCC Assessment Report. The GWP value mentioned in the manual might be outdated (i.e., based on the 3rd IPCC Assessment Report).
Liquid stop valve
Gas stop valve
Service port
Valve cap
Close
Hexagonal wrench
English 8
3PEN386697-2F.book Page 9 Friday, February 3, 2017 8:30 AM
Pump Down Operation
CAUTION• When pressing the switch, do not touch the terminal block. It has a high voltage, so doing so may cause electric shock.• After closing the liquid stop valve, close the gas stop valve within 3 minutes, then stop the forced cooling operation.
Facility Setting (cooling at low outdoor temperature)This function is designed for facilities such as equipment or computer rooms. It is never to be used in a residence or office where people occupy the space.
1) Cutting jumper 6 (J6) on the circuit board will expand the operation range down to –15°C. However it will stop if the outdoor temperature drops below –20°C and start back up once the temperature rises again.
CAUTION• If the outdoor unit is installed where the heat exchanger of the unit is exposed to direct wind, provide a windbreak wall.• Intermittent noises may be produced by the indoor unit due to the outdoor fan turning on and off when using facility settings.• Do not place humidifiers or other items which might raise the humidity in rooms where facility settings are being used.
A humidifier might cause dew condensation from the indoor unit outlet vent.• Cutting jumper 6 (J6) sets the indoor fan tap to the highest position. Notify the user about this.
WARNINGThe unit is accompanied with the label below. Please read the following instructions carefully.
WARNING1)
2)
3) 4) 5)
• When the refrigeration circuit has a leak, do not execute pump down with the compressor.• Use recovery system into separate cylinder.• Warning, explosive hazard exists when executing pump down.• Pump down with compressor can lead to self-combustion due to air entering during pump
down.
Used symbols:1) Warning sign (ISO 7010 – W001)2) Warning, Explosive material (ISO 7010 – W002)3) Read Operator’s manual (ISO 7000 – 0790)4) Operator’s manual; operating instructions (ISO 7000 – 1641)5) Service indicator; read technical manual (ISO 7000 – 1659)
1 2 3
J12
J11
J9J8J6J5
Cut J6 with nippers or a similar tools.
9 English
3PEN386697-2F.book Page 10 Friday, February 3, 2017 8:30 AM
Wiring WARNING• Do not use tapped wires, stranded wires, extension cords, or starburst connections, as they may cause overheating,
electrical shock, or fire.• Do not use locally purchased electrical parts inside the product. (Do not branch the power for the drain pump, etc., from the
terminal block.) Doing so may cause electric shock or fire.• Be sure to install an earth leak detector. (One that can handle higher harmonics.)
(This unit uses an inverter, which means that an earth leak detector capable of handling higher harmonics must be used, in order to prevent malfunctioning of the earth leak detector itself.)
• Use an all-pole disconnection type breaker with at least 3mm between the contact point gaps.• Do not connect the power wire to the indoor unit. Doing so may cause electric shock or fire.Do not turn ON the safety breaker
until all work is completed.
1) Strip the insulation from the wire (20mm).2) Connect the connection wires between the
indoor and outdoor units so that the terminal numbers match. Tighten the terminal screws securely. We recommend a flathead screwdriver be used to tighten the screws. The screws are packed with the terminal block.
Observe the notes mentioned below when wiring to the power supply terminal block.Precautions to be taken for power supply wiring.
CAUTION• When connecting the connection wires to the terminal block using a single core wire, be sure to perform curling.
Problems with the work may cause heat and fires.
• If the stranded wires must be used, make sure to use the round crimp-style terminal for connection to the power supply terminal block. Place the round crimp-style terminals on the wires up to the covered part and secure in place.
3) Pull the wire and make sure that it does not disconnect. Then fix the wire in place with a wire stop.
Safety breaker 10A
Earth leakage circuit breaker
Earth
Inter-unit wire 4-core 1.5mm² or moreH05RN
Firmly fix the wires with the terminal screws. Outdoor unit
Indoor unit
Power supply50Hz 220-240V
Firmly fix the wires with the terminal screws.
Power supply wire 3-core 2.5mm² or moreH05RN
Use the specified wire type and connect it securely.
Firmly secure wire retainer so wire terminations will not receive external stress.
Power supply terminal block
Shape wires so that the service lid and stop valve cover fit securely.
Strip wire end to this point.
Excessive strip length may cause electrical shock or leakage.
Good Wrong
Good WrongStripping wire at terminal block
Stranded wire
Round crimp-style terminal
English 10
3PEN386697-2F.book Page 11 Friday, February 3, 2017 8:30 AM
WiringWiring diagram
For applied parts and numbering refer to the wiring diagram sticker supplied on the unit. Part numbering is realized by Arabic numbers in ascending order for each part and is represented in the overview below by symbol “*” in the part code.
: CONNECTION : PROTECTIVE EARTH (SCREW)
,: CONNECTOR : RECTIFIER
: EARTH : RELAY CONNECTOR
: FIELD WIRING : SHORT CIRCUIT CONNECTOR
: INDOOR UNIT : TERMINAL
: OUTDOOR UNIT : TERMINAL STRIP
: PROTECTIVE EARTH : WIRE CLAMP
BLK : BLACK GRN : GREEN PNK : PINK WHT : WHITE
BLU : BLUE GRY : GREY PRP, PPL : PURPLE YLW : YELLOW
BRN : BROWN ORG : ORANGE RED : RED
A*P : PRINTED CIRCUIT BOARD PTC* : THERMISTOR PTC
BS* : PUSH BUTTON ON / OFF, OPERATION SWITCH Q* : INSULATED GATE BIPOLAR TRANSISTOR (IGBT)
BZ, H*O : BUZZER Q*DI : EARTH LEAK CIRCUIT BREAKER
C* : CAPACITOR Q*L : OVERLOAD PROTECTOR
CN*, E*AC*, HA*, HE, HL*, HN*, HR*, MR*_A, MR*_B, S*, X*A
: CONNECTION, CONNECTOR Q*M : THERMO SWITCH
D*, V*D : DIODE R* : RESISTOR
DB* : DIODE BRIDGE R*T : THERMISTOR
DS* : DIP SWITCH RC : RECEIVER
E*H : HEATER S*C : LIMIT SWITCH
F*U, FU* (FOR CHARACTERISTICS REFER TO PCB INSIDE YOUR UNIT)
: FUSE S*L : FLOAT SWITCH
FG* : CONNECTOR (FRAME GROUND) S*NPH : PRESSURE SENSOR (HIGH)
H* : HARNESS S*NPL : PRESSURE SENSOR (LOW)
H*P, LED*, V*L : PILOT LAMP, LIGHT EMITTING DIODE S*PH, HPS* : PRESSURE SWITCH (HIGH)
HAP : LIGHT EMITTING DIODE (SERVICE MONITOR GREEN) S*PL : PRESSURE SWITCH (LOW)
IES : INTELLIGENT EYE SENSOR S*T : THERMOSTAT
IPM* : INTELLIGENT POWER MODULE S*W, SW* : OPERATION SWITCH
K*R, KCR, KFR, KHuR : MAGNETIC RELAY SA* : SURGE ARRESTOR
L : LIVE SR*, WLU : SIGNAL RECEIVER
L* : COIL SS* : SELECTOR SWITCH
L*R : REACTOR SHEET METAL : TERMINAL STRIP FIXED PLATE
M* : STEPPER MOTOR T*R : TRANSFORMER
M*C : COMPRESSOR MOTOR TC, TRC : TRANSMITTER
M*F : FAN MOTOR V*, R*V : VARISTOR
M*P : DRAIN PUMP MOTOR V*R : DIODE BRIDGE
M*S : SWING MOTOR WRC : WIRELESS REMOTE CONTROLLER
MR*, MRCW*, MRM*, MRN* : MAGNETIC RELAY X* : TERMINAL
N : NEUTRAL X*M : TERMINAL STRIP (BLOCK)
PAM : PULSE-AMPLITUDE MODULATION Y*E : ELECTRONIC EXPANSION VALVE COIL
PCB* : PRINTED CIRCUIT BOARD Y*R, Y*S : REVERSING SOLENOID VALVE COIL
PM* : POWER MODULE Z*C : FERRITE CORE
PS : SWITCHING POWER SUPPLY ZF, Z*F : NOISE FILTER
11 English
3PEN386697-2F.book Page 12 Friday, February 3, 2017 8:30 AM
Trial Operation and Testing1. Trial operation and testing
1-1 Measure the supply voltage and make sure that it falls in the specified range.1-2 Trial operation should be carried out in either cooling or heating mode.
• In cooling mode, select the lowest programmable temperature; in heating mode, select the highest programmable temperature.1) Trial operation may be disabled in either mode depending on the room temperature.2) After trial operation is complete, set the temperature to a normal level (26°C to 28°C in cooling mode, 20°C to 24°C
in heating mode).3) For protection, the system disables restart operation for 3 minutes after it is turned off.
1-3 Carry out the test operation in accordance with the operation manual to ensure that all functions and parts, such as louver movement, are working properly.• The air conditioner requires a small amount of power in its standby mode. If the system is not to be used for some
time after installation, shut off the circuit breaker to eliminate unnecessary power consumption.• If the circuit breaker trips to shut off the power to the air conditioner, the system will restore the original operation
mode when the circuit breaker is opened again.
2. Test items Test items Symptom Check
Indoor and outdoor units are installed properly on solid bases. Fall, vibration, noise
No refrigerant gas leaks. Incomplete cooling/heating function
Refrigerant gas and liquid pipes and indoor drain hose extension are thermally insulated. Water leakage
Draining line is properly installed. Water leakageSystem is properly earthed. Electrical leakageThe specified wires are used for inter-unit wiring. Inoperative or burn damage
Indoor or outdoor unit’s air inlet or air outlet has clear path of air. Incomplete cooling/heating function
Stop valves are opened. Incomplete cooling/heating function
Indoor unit properly receives remote control commands. Inoperative
English 12
3P386697-2F 2016.12
Cop
yrig
ht 2
015
Dai
kin
3PEN386697-2F.book Page 1 Friday, February 3, 2017 8:30 AM