r1 ds-dm annual mean change no (ug/m3 2 r2 r3 birnam r4 … · ds-dm annual mean change no2 (ug/m3)...
TRANSCRIPT
BANKFOOT
LUNCARTY
A9
A9
STANLEY
MURTHLY
BIRNAM
R9
R8R7
R6
R5
R3
R2R1
R24R23 R22 R21
R20R18
R17 R16
R15R14
R13R12 R11
R19*
R4
R10
?
N
0 0.5 1 1.5 20.25 KilometresReproduced by permssion of Ordnance Survey on behalf of HMSO. © Crown copyright and database right 2013. All rights reserved. Ordnance Survey Licence number 100046668.
Legend Modelled Road Links
DS-DM Annual Mean Change NO2 (ug/m3)0.0 - 0.50.5 - 1.01.0 - 1.51.5 - 2.02.0 - 2.9
Drawing Title
Drawing Status
Drawing No.Client No.
This drawing is not to be used in whole in or part other than for the intended purposeand project as defined on this drawing. Refer to the contract for full terms and conditions.
FIGURE 14.4
FINALScale @A3Jacobs No.
DO NOT SCALEB15576021:50,000
Modelled Opening Year (2019) NO2 Results:Change Due to the Proposed Scheme
SHEET 1 of 1
Rev 0
FIGURE 14.4
Significance Criteria (IAN 174/13, June 2013)Large >4Medium > 2 to 4Small > 0.4 to 2Negligible 0 to 0.4
Annual mean NO2 Air Quality Objective = 40 ug/m3
DM = Do Minimum ScenarioDS = Do Something Scenario
Proposed Scheme(DMRB Stage 3 Design)
95 Bothwell Street, Glasgow, G2 7HX, UK.Tel: +44(0)141 204 2511 Fax:+44(0)141 226 3109
www.jacobs.com
Project
Client
A9 Dualling: Luncarty to Pass of Birnam
Drawn Check'd Appr'dPurpose of revisionRev. Date Rev'dRMES Publication0 MAR 2014 NB AGJenC