Qwik-Fill 8D On-Board Baery Watering System Installaon and Operaon Package Contents Installaon 1 2 3 4 Important Prior to inial installaon, inspect the exisng baery water level. If the baery has been neglected and the level is extremely low, manually fill each cell so all plates are covered. Next, charge the baeries before installing and using Qwik-Fill. Filling a baery that has been neglected and then charging it can cause the water level to expand during the charging process, thereby resulng in the loss of electrolyte. Once Qwik-Fill is installed, monthly filling aſter charging will prevent an extremely low water level to occur. Remove exisng vent caps and install valves by simply pushing them in by hand. Link valves together using the provided clear tubing. You may connect up to 18 valves (3 baeries) together into one system. If the baeries are separated by several feet, allow the tubing to sag between baeries. Ensure that the tops of all baeries linked together are at the same level. Install the feed tube near the center of the plumbing layout using the included tee. Cover the remaining barbs with red end caps. 8D Each kit includes: 1 valve per cell Clear tubing 2 red end caps 1 tee Male coupler Squeeze bulb filler with filter Kit A - 6 cells Kit B - 12 cells Kit C - 18 cells A B C

Upload: others

Post on 22-May-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Qwik-Fill 8D On-Board Battery Watering System Installation

Qwik-Fill 8D On-Board Battery Watering System

Installation and OperationPackage Contents

Installation

1

2

3

4

ImportantPrior to initial installation, inspect the existing battery water level. If the battery has been neglected and the level is extremely low, manually fill each cell so all plates are covered. Next, charge the batteries before installing and using Qwik-Fill. Filling a battery that has been neglected and then charging it can cause the water level to expand during the charging process, thereby resulting in the loss of electrolyte. Once Qwik-Fill is installed, monthly filling after charging will prevent an extremely low water level to occur.

Remove existing vent caps and install valves by simply pushing them in by hand.

Link valves together using the provided clear tubing. You may connect up to 18 valves (3 batteries) together into one system. If the batteries are separated by several feet, allow the tubing to sag between batteries. Ensure that the tops of all batteries linked together are at the same level.

Install the feed tube near the center of the plumbing layout using the included tee.

Cover the remaining barbs with red end caps.

8DEach kit includes: • 1 valve per cell• Clear tubing• 2 red end caps• 1 tee• Male coupler• Squeeze bulb filler with filter Kit A - 6 cells Kit B - 12 cells Kit C - 18 cells

A B C

Page 2: Qwik-Fill 8D On-Board Battery Watering System Installation

1

2

3

4

5

Insert the squeeze bulb filler assembly into a jug of distilled water. Prime bulb by squeezing until it is filled with water.

Remove the dust cap from the water supply line and connect it to the squeeze bulb filler assembly by snapping the quick couplers together.

Squeeze the bulb with firm pressure to begin pumping water into the battery cells. When the bulb becomes hard, all cells are full.

Immediately disconnect the squeeze bulb filler assembly from the water supply line and replace the dust cap.

Any water remaining in the squeeze bulb filler assembly may be pumped back into the distilled water jug.

ImportantBatteries should only be filled after charging.

Operation

8DQwik-Fill 8D On-Board Battery Watering System

Installation and Operation

Flow-Rite Controls • 960 74th St., Byron Center, MI 49315 • phone: 616-583-1700 • fax: 616-878-5151 • www.flow-rite.com

BL-505 Rev 06/14US & Foreign patents and patents pending