questions on qm stability study
DESCRIPTION
Questions on QM Stability StudyTRANSCRIPT
Q - 1: What is the purpose of a 'shelf life' study? 1-1
A.
B. Determine the effects of environmental conditions on a
material or batch*
Q - 2: What procedure requires the creation of physical samples
of a material or batch for storage under controlled conditions for
a specific period of time? 1-1
A. Stability Study*
B.
C. Shelf Life Study*
Q - 3: Identify a step in a stability study. 1-1
A. Create physical samples of material or batch*
B. Store samples under controlled condition for duration of study*
C. Remove sample from storage and test according to the test
plan specified intervals*
D. Evaluate actual life of product on basis of results of tests*
Q - 4: Which of the following is an environmental condition that
may impact the life of a product and which is evaluated in a
stability study?
A. Temperature*
B. Brightness*
C. Moisture*
Q - 5: Identify a requirement of a stability study. 1-1
A. Create and store physical samples for a specific time period*
B. Remove samples from storage to test according to test plan*
C. Compare test results to life expentancy of product under
predefined reccommendations*
Q - 6: What is the synonym for a stability study? 1-1
A. Shelf Life Study*
Q - 7: A stability study can be defined on what basis? 1-2
A. Regulations relevant to the product prior to its introduction to
the market*
B. Regulations relevant to the product after its introduction to the
market*
Q - 8: Why is a stability study used in the R&D department? 1-2
A. Determine the ideal composition of a product to ensure it
meets the stability requirements defined for specific storage
conditions*
B. Determine the ideal packaging of a product to ensure it meets
the stagility requirements defined for specific storage conditions*
C.
Q - 9: The Stability Study application is integrated with what
other components? 1-2
A. Quality Management component*
B. Asset Life cycle Management component*
C. Materials Management component*
Q - 10: Which of the following is an activity of a stability study?
1-4
A. Create stability study*
B. Create confirmation test initial sample*
C. Plan stability study*
D. Perform stability study tests *
E. Complete stability study*
Q - 11: The object pertinent to the Stability Study test is what? 2
A. Quality Notification*
Q - 21: What is used to trigger the individual steps of a stability
study? 2
A. Action Box in Quality Notification*
Q - 13: What quality notification types are used as the control
object for a stability study? 3-1
A. QS*
B. QR*
C. QT*
Q - 14: The criteria of a stability study from a business
perspective include what? 3-2
A. The product to be tested*
B. The time period during which the product is tested*
C. The conditions under which the product is stored*
D. The characteristics of the substance or product to be
evaluated*
E. The times at which the substance or product is tested*
F. The identifed effects on the substance or product of the
storage conditions*
Q - 15: What triggers a step in a stability study? 3-3
A. Pre-defined follow-up function in quality notificatin action box*
Q - 16: Which of the following is a requirement in order to create
a customer quality notificatin type for use in a stability study? 3-3
A. Customization of functions in the notification action box to
meet requirements of business processed*
Q - 17: Which of the following is a true statement? 3-3
A. Standard quality notification types must be used for a stability
study
B. Custom quality notification types may be used for a stability
study*
C.
Q - 18: Which of the following is an object that can be assigned to
a stability study depending on the particular activity of the
study? 3-4
A. Initial sample*
B. Document*
C. Stability BOM*
D. Inspection Lot for the Initial Test*
E. Inspection Lot for Stability Test*
F. Stability Sample for Storage Conditions*
G. Test Schedule*
Q - 19: Which of the following can be customized? 3-3
A. Notification Type*
B. Functions of Quality Notification Action Box*
Q - 20: The Quality Notification Type QR is used for which of the
following? 3-3
A. A stability study conducted with reference to a material
B. A stability study conducted without reference to a material*
C. Trial-related stability study
Q - 21: What is the purpose of the quality notification type QS? 3-
3
A. A stability study conducted with reference to a material*
B. A stability study conducted without reference to a material*
C. Trial-related stability study
Q - 22: What is the purpose of the quality notification type QT? 3-
3
A. A stability study conducted with reference to a material
B. A stability study conducted without reference to a material
C. Trial-related stability study*
Q - 23: What is the basis of the sequence of the follow-up
functions in the action box of a quality notification? 3-3
A. Logical sequence of events of stability study*
Q - 24: What determines if particular objects such as a sample or
a document are assigned to a stability study? 3-4
A. The particular step of the stability study that is performed*
Q - 25: What is the structure of the stability study object? 3-5
Q - 26: The stability study is performed during what phase of a
product life cycle? 4-1
A. R&D*
B. Production*
Q - 27: What is used to document processes in a stability study?
4-2
A. User Status*
Q - 28: Each activity in a stability study is documented by what?
4-2
A. User status*
Q - 29: Which of the following is a true statement? 4-2
A. One to one relationship exists between step in stability study
and a follow-up action in the quality notification action box
B. One to one relationship does not exist between a step in a
stability study and a follow-up action in the quality notification
action box*
Q - 30: The process flow of a stability study is dependent on
what? 4-2
A. Text requirements*
Q - 31: Some steps in a stability study are triggered by what? 4-2
A.
B. Follow-up function in action box*
Q - 32: The creation of an inspection lot for the initial sample is a
step in what phase of the stability study? 5-2
A. Initiation of stability study phase
B. Initial testing phase*
Q - 33: The creation of a storage list is a step in what phase of the
stability test? 5-3
A. Stability study planning phase*
Q - 34: The creation of the inspection lot for the initial sample is a
step in what phase of the stability study? 5-2
A. Initial test phase*
Q - 35: The creation of an inspection plan for each storage
condition is a step in what phase of a stability study?
A. Initiate stability study
B. Initial test
C. Plan stability study*
Q - 36: What is the third phase of a stability study? 5-3
A. Plan Stability Test*
Q - 37: What determines the sequence in which the steps of a
stability study are performed? 3-3
A. The sequence of the follow-up functions in the action box of
the quality notification*
Q - 38: Which of the following is a true statement regarding a
status profile? 6
A. New user status can be created to reflect the processing status
of a stabilitys tudy*
Q - 39: Which of the following is an activity of the 'initial test'
phase of a stability study that can be triggered by a follow-up
action ? 5-2
A. Create inspection lot for the initial sample*
B. Perform intial test
C. Record results for initial test
D. Complete initial test with usage decision for inspection lot
Q - 40: What is the first phase of a stability study? 5-1
Q - 41: How are inspection plans assigned to storage conditions?
5-3
A. Creation of test schedule*
Q - 42: Which of the following is an activity of the 'Initiate the
Stability Study' phase of the study? 5-1
A. Create quality notification*
B. Create a physical sample record for the initial sample*
C. Assign stability BOM to stability study (for study that
references a material)*
D. Confirm receipt by lab of initial sample*
Q - 43: The assignment of inspection plans to storage conditions
by processing a testing schedule is a step in what phase of the
stabilitystudy? 5-3
A. Initiate the stability study
B. Initial test for stability study
C. Create plan for stability study*
Q - 44: The creation of physical samples occurs in what phase of
a stability study? 5-3
A. Stability planning phase*
Q - 45: The placement of physical samples in storage is a step in
what phase of a stability study? 5-3
A. Stability planning phase
Q - 46: What is the purpose of Document Flow in relations to a
stability study? 6-
A. Display objects related to stability study*
Q - 47: The purpose of a stability study is what? 1-1
A. Determine the effect of specific environment conditions on
compound, material or batch over specified period of time*
Q - 48: The performance of the initial test is a step in what phase
of the stability study? 5-2
A. Initial test phase*
Q - 49: The identification of a start date for a stability study is a
step in what phase of the study? 5-3
A. Planning Phase*
Q - 50: The definition of storage conditions and the creation of a
testing schedule and inspection plan are steps in what phase of a
stability tudy? 5-3
A. Plan Stability Study*
Q - 51: The selection of the start date of a stability study is a step
in what phase of a stability study? 5-3
A. Plan stability study phase*
Q - 52: The maintenance of storage data for samples is a step in
what phase of a stability study? 5-3-g
A. Plan stability study phase*
Q - 53: The completion of the test schedule is a step in what
phase of the stabilitys tudy? 5-3
A. Plan stability plan phase*
Q - 54: Which of the following activities of the first phase of a
stability study that can be triggered via a follow-up function in an
action box includ which of the following? 5-1
A. Create quality notification
B. Create physical sample record for initial sample*
C. Assign stability BOM to stability study*
D. Confirm receipt fo initial sample*
Q - 55: The confirmation of the receipt of the initial sample at the
lab is a step of what phase of the stability study? 5-1
A. Initial Phase of stability study*
Q - 56: Recording test results for the initial test of the stability
study occurs in what phase of the stability study? 5-2
A. Initial Test Phase*
Q - 57: The quality notification is? 3-1
A. Business object used to process the activities of a stability
study*
Q - 58: The creation of physical samples, the creation A.
B. Stability planning phase*of labels, and the placement of samle
in storage are steps in what phase of a stability study? 5-3
A. Plan stability study phase*
Q - 59: The assignment of inspection plans to storage conditions,
the completion of a testing schedule, and the maintenance of
sample records are steps in what phase of a stability study? 5-3
Q - 60: The fourth phase of a stability study is what? 5-4
A. Perform stability test*
Q - 61: Identify the activities that related to the Stability Study
Planning Phase. 5-3
A. Creation of physical samples*
B. Placement of sample in storage*
C. Determination of start date*
Q - 62: The removal of samples from a storage area and the
testing of the samples are steps in what phase of the stability
study? 6-1
A. Stability Testing phase*
Q - 63: The completin of all tests of a stability study is a step in
what phase of a stability study? 6-1
A. Stabilty Testing phase*
B. Complete Stability Study phase
Q - 64: Test date monitoring is a step in what phase of a stability
study? 6-1
A. Stability Testing phase *
Q - 65: The creation of a batch job to create an inspectio lot is a
step in what phase of a stability study? 6-1
A.
B. Stability Testing phase*
Q - 66: The removal of samples from storage for testing is a step
in what phase of a stability study? 6-1
A. Stability Testing phase*
Q - 67: 3, 6, 9, and 12 months are examples of what? 13-1
A. Package*
Q - 68: Identify a restriction regarding the assignment of
inspection plans to storage conditions in a testing schedule. 13-2
A. Assigned inspection plan must use the identical strategy to
that of testing schedule*
Q - 69: The analysis of the processes of a stability study is a step
in what phase of a stability study? 6-1
A. Stability testing phase*
Q - 70: The creation of a schedule for the background job to creat
inspection lots on scheduled dates is a step in what phase of a
stability study? 6-1
A. Stability testing phase*
Q - 71:
Q - 72: Which of the following is a requirement to conduct a
stability study? 4-1
A. Creation of physical samples of material to be examined*
B.
C. Use of tests to inspect samples*
Q - 73: A user statust that is assigned to a stability study process
has what effect? 4-2
A. Allows a subsequent step in a stability study*
B.
C. Disallows a subsequent step in a stability study*
Q - 74: Identify a rule regarding the assignment of a stability
study strategy of inspection plans to storage conditions in a
testing schedule. 13-2
A. No limit to the assignment of strategy to inspection plans or
test schedule*
Q - 75: What is the result of the assignment of packages to an
inspection operation in an nspection plan? 13-2-a
A. Multiple sets of unique frequencies can be assigned to one
storage condition*
Q - 76: What determines the number of strategies that are
required to conduct a stability study? 13-2
A. Testing frequencies used in the stability study*
Q - 77: What is the business scenario that is usually performed in
a lab to determine the effects of particular storage conditions on
a product over a long period of time?
A. Stability study*
Q - 78: What assignments must be made to use a strategy to
conduct a stability study? 13-2
A. Strategy is assigned to the header of an inspection plan for a
storage condition*
B.Strategy packages are assigned to an operatin in the test
schedule in an inspection plan*
C. Strategy schedules the parameters that are assigned to test
schedule*
Q - 79: The set of all possible testing frequencies used in a
stability study are references where?13-2
A. Strategy*
Q - 80: What entries are made for a strategy in an inspection
plan? 13-2
A. Strategy is assigned to the inspection plan header*
B. Strategy packages are assigned at the operation level*
Q - 81: What triggers the individual processes of a stability
study? 3-3
A. Follow-up functions in the quality notification action box *
Q - 82: T/F It is possible to define unique operation specific test
frequencies (packages) for one storage location. 13-2
A. True*
B. False
Q - 83: A strategy package is assigned to an inspectio plan at
what level? 13-2
A. Header level
B. Operation Level
C. A or B *
D. Neither A nor B
Q - 84: Which of the following is a characteristic of a stability
study strategy? 13-3
A. Determines the sequence of planned stability tests*
B. Assigned to unlimited number of inspection plans*
C. Includes packages which identify the frequency of test*
D. More than one strategy can be defined based on individual
testing frequency*
E. Includes the scheduling parameters and indicators*
Q - 85: What is included in the structure of a stability study? 13-
3
A. Header*
B. Scheduling parameters*
C. Scheduling indicators*
D. Packages*
Q - 86: The quality notification type 'QR' is used for what
purpose? 3-3
A. A stability study conducted with reference to a material
B. A stability study conducted without reference to a material*
C. Trial-related stability study
Q - 87: The quality notificatin type 'QS' is used for what purpose?
3-3
A. A stability study conducted with reference to a material*
B. A stability study conducted without reference to a material
C. Trial-related stability study
Q - 88:
Q - 89: The activities of a stability study 'completion ' phase that
can be triggered by a follow-up function in an action box include
what? 6-2
A. Cancel Study*
B. Deactivate study*
C. Complete study
Q - 90: The completion of a stability study consits of what
activity? 6-2
A. Complete stability study*
B. Cancel stability study for some storage conditions*
C. Deactivate study for some storage conditions*
Q - 91: Identify a parameter for a stability study strategy. 13-4
A.
B. Scheduling indicator that controls the execution of a time
based test strategy*
C. Call Horizon*
Q - 92: 13-4
Q - 93: 13-4
Q - 94: A stability study strategy is identical to which of the
following? 14-2
A. Maintenance strategy*
Q - 95: Monitoring testing dates is a step in what phase of a
stability study? 6
A. Stability testing phase*
Q - 96: The cancellation of a stability study for one or more
storage conditions is a step in what phase of a stability study? 6-
2
A. complete stability study phase*
Q - 97: Which of the following is a required entry for the creation
of a stability study strategy?
A. Name*
B. Description*
C. Scheduling indicator*
D. Strategy unit value*
E. Call horizon value*
Q - 98: What is the function of a quality notification in relation to
a stability study? 16
A. Creates a stability study*
B. Documents intent to conduct stability study*
Q - 99: The creation of physical sample record for the initial
sample and the confirmatin of receipt of the initial sample are
steps in what phase of a stability study?5-1
A. Initiate Stability Study phase*
Q - 100: What is the function of a physical sample record that is
created for an initial sample? 16-2-2
A. Created prior to receipt of physical samples*
Q - 101: What step of the 'initiating stability study' phase must be
completed prior to the inspection of the initial sample? 16-2
A. Confirmation of receipt of initial sample*
Q - 102: What is the business object used to process the activities
of a stability study? 3-1
A. Quality Notification*
Q - 103:'Initiating a Stability Study' is a phase that immediately
precedes what other phase? 16-3
A. 'Initial test' phase*
Q - 104: What is the purpose of the quality notification type 'QR'?
17-2-2
A. Stability study without a material*
B. Stability study with a material
Q - 105: Which of the following is a prerequisite to the creation
and conduct of a stability study? 17-1
A. Creation of notification to document the intent to conduct the
stability study*
Q - 106: Which of the following is required to create a stability
study? 17
A. Notification type*
B. Stabililty Study Identifier*
C. Material number*
D. Client
E. Inspection Lot Number
Q - 107: What is the first step of the 'Initiate Study' phase of the
stability study? 17-1
A.
B. Create stability study *
Q - 108: What method can be used to create the key for a
stability study? 17-2-3
A. Internal number assignment*
B. External number assignment*
Q - 109: Which of the following is included in a stability study
inspectio plan? 25-2
A. Characteristics to be tested in the study*
Q - 110: What is the purpose of performing the inspection of the
initial sample? 25-1
A. Ensure that the test of the sample meets the requirements of
the study*
B. Ensure that the sample meets the requirements of the study*
Q - 111: The confirmation of the receipt of the initial sample is a
step in what phase of the stability study? 23-1
A. 'Initiate Stability Study' phase*
Q - 112: The specification of the storage conditions for samples is
a step in what phase of the stability study? 5-3-4
A. Initiate stability study
B. Initial Test
C. Stability Planning*
D. Stability Testing
E. Completing Study
Q - 113: What is the purpose of a physical sample record in
relation to a stability study? 10
A. Means to identify the physical samples created and processed
in a stability study*
Q - 114: What is the purpose of a physical sample drawing
number in relation to a stability study? 10-1
A. Means to identify a physical sample that is created and
processed in a stability study
B. Means to identify all physical samples that is created and
processed in a stability study*
Q - 115: Which of the following is a type of record created when a
stability study is processed? 10-1
A. Stability study (Quality Notification)*
B. Physical Sample Drawing Number*
C. Individual Physical Sample Record*
Q - 116: A physical sample drawing includes a reference to what?
10-2
A. Stability study*
Q - 117: Which of the following is included in a stability study
storage list? 44-1
A. Description of each storage condition*
B. Description of the physical sample associated with each
storage condition*
C. Planned Quanity of physical samples created for each storage
condition*
D. Number of test performed for each storage condition*
E. Storage location for each stability sample*
F. Actual quantity of physical samples created for each storage
condition*
Q - 118: Description of sample defined for each storage condition,
number of test performed for each storage condition, and
description of storage condition are examples of what? 44-1
A.Data included in stability study storage list*
Q - 119: The storage list will indicate what quantity of physical
samples if a testing schedule is not completed? 44-2
A. '0' quantity*
Q - 120: Why does a storage list indicate a '0' quantity of physical
samples prior to the completion of a testing schedule? 44-2
A. Testing schedule is required to calculate physical sample
quantities for each storage condition*
Maintaining storage data for each stability sample in the system
is a step in what phase of a stability study? 46
A. Plan stability test phase*
Q - 121: What is the resul of the creation of storage data for each
stability study? 46-2
A. Stability sample is released for each storage condition and
stability study can be initiated*
B. Storage data is documented by the system*
Q - 122: Identify a prerequisite to the calculation of physical
sample quantities for each storage condition? 44-2
A. Completion of testing schedule*
Q - 123: What is a prerequisite to maintaining storage data? 46-3
A. Storage conditions specified in the stability study*
Q - 124: Activities of the 'complete the stability study' phase that
can be triggered by follow-up functions include which of the
following? 6-2
A. Cancel study for all storage conditions*
B. Deactivate study for all storage conditions*
C. Enter usage decision for sample *
Q - 125:T/F Custom user statuses can be defined. 8
A. True*
F. False
Q - 126: The system status assigned to the stability study is an
indication of what? 7-2
A. Documents the steps of the study that have been performed*
B. Infers steps of the study that can be performed*
C. Infers steps of the study that cannot be performed*
Q - 127: The user status is documented where? 7-1
A. Quality notification header*
B. Quality notification item
Q - 128: The creation of a quality notification is a step in what
phase of a stability study? 5-1
A. Initiate the stability study phase*
Q - 129: One stability test is completed for which of the
following? 29-1
A. Each lot for each storage condition*
Q - 130: When a usage decision for an inspection lot is made,
which of the following can occur? 29-1
A. Study can be continued for the storage condition*
B. Stability study can be completed or deactivate for a storage
condition on a temporary basis*
C. Stability study can be completed*
Q - 141: What is the last step of a stability study? 6-2
A. Complete stability study*
Q - 142: Any activity that can be performed following the entry of
a usage decision is controlled by what? 29-2-1
A. Follow-up action that is executed when a usage decision is
made for an inspection lot *
Q - 143: The deactivation of a stability study for one or more
storage conditions is a step in what phase of a stability study? 6-
2
A. Complete stability study phase*
Q - 144: The assignment of a stability BOM to a stability study
relates to what phase of a stability study? 5-
A. Initiate stability study phase*
Q - 145: What is the prerequisite to the completion of a stability
study? 29-2
A. Test Results have been recorded for inspection characteristics*
Q - 146: What is the result of the completion of an inspection test
for storage condition for inspection lot with a usage decision to
discontinue the study? 31
A.Stability study can be cancelled or completed*
Q - 147: What is included in the print copy of a storage list for
stability samples? 32-3-6
A. Quantity of samples required for each stability sample*
B. Storage conditions for each sample*
Q - 148: What is the result of the completion of a testing
schedule? 32-3-5
A. Status of stability study is updated to reflect the completion of
scheduled activities *
Q - 149: Which of the following is a valid follow-up action for a
usage decision for an inspection lot for a stability test? 29-2
A. Complete initial test*
B. Confirm stability inspection lot*
C. Complete or cancel stability study*
D. Lock sample for storage condition*
Q - 150: What is the objective of processing a testing schedule?
32-3-4
A. Assignment of inspectio nplan to each storage condition item
in the schedule*
Q - 151: What is a result of the creation of a testing schedule for
a stability study? 32-3-3
A. The creation of an item in the testing schedule for each
storage condition that is specified i the stability study*
Q - 152: What is a stability study strategy? 13-1
A. Test schedule that can be assigned to an unlimited number of
inspection plans*
B. Determines the chronological sequence of planned stability
tests*
Q - 153: Why is the asseignment of the inspection plan to each
storage condition in a testing schedule required? 32-3-4
A. Calculation of quantities to be placed in storage to serve as
stability samples*
Q - 154: Which of the following is a true statment? 13-1
A. A strategy can be assigned to an unlimited number of
inspection plans for a storage condition*
B. A strategy can be assigned to an unlimited number of testing
schedules*
Q - 155: The 'packages' referred to in a stability study strategy
are used for what purpose? 13-1
A. Specify the frequency with which individual tests are
performed*
Q - 156: A package is an element of what? 13-1
A. Strategy*
Q - 157: Why is it possible to define multiple, operation-specific
testing frequencies for one storage location? 13-1
A More than one package can be assigned to an inspection
operation*
B. A package specifies the test frequency
Q - 158: One physical sample drawing number refers to what? 10
A. All physical sample records for an initial sample*
B. all physical sample records for stability samples*
Q - 159: What is used to determine the frequency with which
tests in a stability study are performed? 13-1
A. Packages*
Q - 160: T/F Testing dates can be defined for a study before or
after a stability study is initiated. 11-2
A. True*
B. False
Q - 161: Basic data that is defined for a stability study includes
whichof the following? 11-2
A. Storage conditions to be tested*
B. Scheduling strategies*
Q - 162:
Q - 163: The inspection of an initial sample is a step in what
phase of a stability study? 5-2
A. Initial testing phase*
B. Initiation of the stability study
C. Stability test
Q - 164: Which of the following is the second phase of a stability
study? 5-2
A.
B. Initial Test phase*
Q - 165: The entry of the usage decision for an inspection lot for
an initial sample is a step in what phase of a stability study? 5-2
A. Initiate Stability Study
B. Initial Test Phase*
C. Stability Test
D. Stability Planning
E. Completion of Stability Study
Q - 166: The activities of the initial testing phase of a stability
study include which of the following? 5-2
A. Create inspection lot for initial sample*
B. Perform Initial Test*
C. Record Test Results*
D. Complete initial test with usage decision for inspection lot*
Q - 167: The basic data for a stability study includes which of the
following? 11-1
A. Storage conditions to be tested*
B. Scheduling strategies*
Q - 168: A scheduling strategy includes which of the following?
11-1
A. Time intervals*
B. Times Bases*
Q - 169: What is the first step in planning a stability study? 12
A.
B. Selecting a storage condition*
Q - 170: Which of the following is a step in the 'process stability
test' phase of a stability study? 48
A. Print physical sample labels*
B. Attach labels to physical samples*
C. Place samples in storage*
Q - 171: The creation of a physical sample record for the 'initial
sample' is a step in what phase of a stability study? 5-1
A. Initiate the stability study*
Q - 172: Which of the following is an example of a storage
condition? 12-1
A. Temperature*
B. Humidity*
C. Light*
D. Atmospheric Pressure*
Q - 173: What is a 'storage condition'? 12-1
A. Description of an attribute of the environment in whcih the
material or product is stored *
Q - 174: How is a storage condition defined?
A. Master record
B. Customizing*
Q - 175: Which of the following is a prerequisite to planning a
stability test? 12-2
A. Storage conditions defined in IMG*
Q - 176: What is the significance of a storage condition to a
stability study? 12-2
A. A stability study examines the effects of individual storage
conditions on specific characteristic of a material over an
extended period of time*
Q - 177: A 'month' is an example of what in relation to a stability
study? 11-2
A. Time Base
B. Time Interval*
C. Strategy
D. Package in Strategy
Q - 178: A 5-year period is an example of what/ 11-2
A. Time base in stability study strategy*
B. Time interval in stability study strategy
C. Strategy
D. Package
Q - 179: What is a package in relation to a stabiity study? 11-2
A. Basic data for a stability study*
B. Time interval for a stability study*
Q - 180: How is a physical sample drawing number created? 10-2
A. Automatically created when initial sample is created*
Q - 181: What is a prerequisite to create an inspection lot for the
initial sample? 26-2
A. Inspection plan with characteristics required for the initial test*
B. Plan to process physical samples*
Q - 182: 26-2 requirement to process physical samples
Q - 183: What is the effect of the completion of the initial test
with a usage decision for the inspection lot? 25-4
A. An acceptance leads to the continuance of the stability study
and the need to plan stability tests*
B. A rejection leads to the discontinuance of the stability study
and the initiation of follow-up functions by means of the action
box in a quality notification*
C.
Q - 184: A stability study must be completed for which of the
following? 25
A. Each storage condition in the study*
Q - 185: What completes a test for a storage condition in a
stability study? 25
A. Entry of usage decision for inspection lot*
Q - 186: Identify a characteristic of a physical sample drawing
number. 10-2
A. One physical sample drawing number is associated with all
physical samples processed in the study*
B. The physical sample drawing number is created automatically
when an initial sample is created*
C. A physical sample drawing number is associated with both
initial samples and stability samples*
D. All physical sample records refer to one physical sample
drawing number*
Q - 187: What is the purpose of the 'cal horizon' scheduling
parameter in the structure of a 'strategy'? 13-3
A.
B. Determines the start date of a test on basis of planned
date......*?
Q - 188: What types of samples are referenced by one physical
sample drawing number? 10-2
A. Initial sample
B. Stability sample
Q - 189: What is the effect of the creation of an inspection lot for
an initial sample? 27-2
A. Inspection lot is created to which inspection characteristics
are assigned*
B. Initial sample is inspected*
C. Inspection results are recorded*
D. Inspection lot is completed for the initial test*
Q - 190: What activity completes the initial test? 28-1
A. Entry of usage decision*
Q - 191: Which of the following is a valid usage decision code that
is used to complete an initial test? 28-1
A. Complete initial test - study will be continued*
B. Complelte initial test - study will not be continued*
C. Do no complete initial test - study will not be continued
Q - 192: The user status is set automatically following a usage
decision by what means? 28-2
A. The follow-up action triggers the entry of the status 'Initial Test
Completed'*
Q - 193: Identify a prerequistie to the completion of an initial
test. 28-2
A. Record inspection results for characteristics*
B. Valuate and close characteristics *
C.
Q - 194: What determines that stability test is not continued
following the initial test phase of the study? 28-1
A. Entry of usage decision - complete initial test: study should not
be continued*
Q - 195: T/F The user status that is triggered by the completion of
the initial test depends on the usage decision for the inspection
lot.28-2
A. True
B. False*
Q - 196: Which of the following can occur following the entry of a
usage decision for an initial study of a stability study? 29-1
A. Stability study is continued for storage condition*
B.
C. Stability study is deactivated on a temporary basis*
D. Stability study is completed*
Q - 197: What effect is achieved by the entry of the usage
decision for an inspection lot? 29-2
A. Stability study is completed for a storage condition*
Q - 198: Identify a required assignment to an inspection plan. 32-
3-2
A. Assign strategy to inspection plan header*
B. Assign package(s) in strategy to inspection operation(s) *
Q - 199: What is the effect of the selection and assingment of a
storage condition to a stability study? 32-3-1
A. Physical sample record is automatically created to document
the stability sample to be stored and tested under the specified
storage conditions*
Q - 200: What determines that stability test is continued following
the initial test phase of the study? 28-1
A. Entry of usage decision - complete initial test: study should be
continued*
Q - 201: An inspection plan is created for which of the following?
32-3-2
A. Each storage condition identified in the stability study*
B. The stability study
Q - 202: What is the third step of the stability study? 32
A. Plan stability study*
Q - 203: What is a prerequisite to the 'Plan Stability Study' phase
of a stability study? 32-2
A. Create initial sample*
B.
C. Define storage conditions*
D. Create strategy*
Q - 204: What is one purpose of the scheduling and deadline
monitoring function of the stability study? 33-2
A. View test dates for stabilitys study*
Q - 205: On what basis are the testing dates for the duration of
the study calculated? 33-2
A. Start date specified in the stability study*
Q - 206: Which of the following is an element in the stability study
structure? 34-3
A.Header in which the maintenance strategy scheduling
information is assigned to the test schedule*
B. Items created by follow-up function for each storage condition
defined for the stability study*
Q - 207: What data is maintained for the testing schedule item for
each physical sample associated with a storage condition? 3-2
A. Inspection type that is assigned to inspection lot*
B. Inspection plan that is assigned to each storage condition*
Q - 208: 34-4-2
Q - 209: 34-3-1
Q - 210: What method is used to create a testing schedule? 34-2
A. Follow-up function defined for stability study*
Q - 201: What is a stability study test schedule? 34-1
A. Object used to plan the scope and frequency of stability tests*
B. Object used to determine the storage conditions to be tested,
testing dates and inspection plans to be used??*
Q - 202: What is determined by a testing schedule? 34-1
A. Frequency of stability tests*
B. Scope of stability tests*
Q - 203: Which of the following is defined for a stability test? 34-
1
A. Scope of stability test*
B. Storage condisions to be tested*
C. Test dates*
D. Inspection plans*
E. Frequency of stability tests*
Q - 204: The scope of stability study testing as specified in the
testing schedule refers to what? 34-1
A. Storage condisions to be tested*
B. Testing dates*
C. Inspection plans*
Q - 205: A testing schedule is created for which of the following?
34-2
A. Study that tests storage conditions in predefined intervals*
Q - 206: Which of the following is a true statement? 34-2
A. A testing schedule is assigned to any stability study
B. The one stability study for which it is created*
Q - 207: What method is used to create a stability study testing
schedule? 34-2
A. Follow-up function in stability study*
Q - 208: How does the assignment of an inspection plan to a
storage condition occur? 34-2
A. Testing schedule*
Q - 209: What is the relationship between the number of items in
a test schedule to the number of storage conditions in a stability
study?
A. One to one relationship between an item in the schedule to a
storage condition specified in a stability study*
Q - 210: A stability study requires that an inspection plan be
assigned to which of the following? 34-2
A. A storage condition defined for the stability study
B. Each storage condition defined for the stability study*
Q - 211: An item in a testing schedule is defined for which of the
following? 34-2
A. Each storage condition in a stability study*
Q - 212: Which of the following is an element in a testing
schedule? 34-3
A. Header*
B. Item*
Q - 213: The header of a testing schedule includes which of the
following? 34-3-1
A. Scheduling data retrieved from the assigned maintenance
strategy*
Q - 214: An item in a testing schedule is automatically calculated
for which of the following? 34-3-1
A. Each storage condition in the strategy*
Q - 215: T/F A follow-up function in the stability study can be
used to create a testing schedule. 34-3-2
A. True*
B. False
Q - 216: What is maintained for each testing schedule item?
A. Inspection type used to create the inspection lots for each
storage condition*
B. Inspection plan used to inspect the storage condition*
Q - 217: Which of the following describes a testing schedule? 35-
2
A. Time-based strategy*
Q - 218: On what basis are test dates automatically calculated
using a follow-up function? 35-3
A. Start date for the stability study*
Q - 219: A testing schedule is a type of which of the following?
35-2
A. Maintenance plan*
Q - 220: The creation of inspection lots for specified dates occurs
on what date? 35-4
A. Planned date as specified in test schedule*
B. Data calculated on the basis of lead time* ?????
Q - 221: What is the result of the completion of the test schedule
for a stability study?
A. Status of stability study confirms that activity is completed*
Q - 222: What is a prerequisite to the assignment of storage
conditions in a stability study? 36-2
A. Definition of storage conditions....*
Q - 223: How is a storage condition selected for a stability study?
36-3-3
A. Follow-up function in quality notification defined for stability
study*
Q - 224: What is the effective quantity of physical samples for a
storage condition? 36-3-5
A. Quantity for a specific storage condition * Number of planned
tests for the storage condition*
Q - 225: What is the result of specifying the storage condition in a
stability study? 36-4
A.
B. Storage condition is stored in the stability study*
C. Physical sample is automatically created for each storage
condition*
Q - 226: What is the purpose of the physical sample record?
A. Identify a physical sample to be stored under the defined
storage condition*
Q - 227: What is required to create a test schedule? 37-1
A. Storage conditions specified in a stability study*
B. Scheduling period defined in stability study*
C. Inspection type defined*
D. Strategy defined*
Q - 228: What activities are performed using the test scheduling
function? 37-1
A. Create test schedule*
B. Revise test schedule*
Q - 229: Which of the following can occur following the creation of
a testing schedule? 38-2
A. Test schedule can be processed to assign an inspection plan
to each storage condition*
Q - 230: Identify the elements of an inspection plan created for a
stability study. 39-2
A. Header*
B. Operation*
C. Package*
D. Characteristic*
Q - 231: Which of the following is a prerequisite to processing the
testing schedule? 40-2
A. Creation of an inspection plan for each storabe condition*
Q - 232: What occurs when a test schedule is processed? 41
A. Assignment of inspection plan to each storage condition or
item in test schedule*
Q - 233: What occurs following the assignment of an inspection
plan to a storage condition? 42-2
A. Completion of the testing schedule*
Q - 234: What occurs following the completion of a test schedule?
43-4
A. Print the storage list*
Q - 235: Which of the following is included in a stability study
storage list? 44-1
A. Description of each storage condition*
B. Description of the physical sample associated with each
storage condition*
C. Planned Quanity of physical samples created for each storage
condition*
D. Number of test performed for each storage condition*
E. Storage location for each stability sample*
F. Actual quantity of physical samples created for each storage
condition*
Q - 236: Identify a prerequisite to printing physical sample
labels? 48-2
A. Release of stability samples for storage conditions*
Q - 237: Identify a prerequisite to the definition of a start date for
a stability study. 49-1
A. Completion of test schedule*
B. Storage of stability samples under specified conditions*
Q - 238: T/F The definition of a start date for a stability study is a
follow-fup function. 49-1
A. True*
B. False
Q - 239: Identify a restriction related to the definition of the start
date for a stability study. 49-1
A. Date must not lie in the future*
B. The storage date of the initial sample must be prior to the start
date of the stability study*
Q - 240: What must occur prior to the completion of a test
schedule? 43-2
A. Assignment of inspection plan to each storage condition in the
test schedule*
Q - 241: What is the result of the definition of a start date for a
stability test? 49-4
A. Calculation of test dates for the duration of the stability study*
Q - 242: Which of the following refers to the duration of a stability
study? 49-4
A. Scheduling periodof in the testing schedule*
Q - 243: What is used to ensure the system creates an inspection
lot for each storage condition when the due date of a stability
study is reached? 50-2
A. Deadline monitoring*
Q - 244: The performance of a stability test includes which of the
following? 50-3-4
A. Selection of the inspection lot for the test using the work list
for results recording*
B. Inspection of sample for a storage condition and recording
results for characteristics*
C. Complete test with a usage decision for the inspection lot*
Q - 245: Work list 50-3 4a
Q - 246: Complete stability study 50
Q - 247: Remove stability samples from storage 50
Q - 248: Which of the following is a prerequisite to the
performance of a stability study? 50-2
A. Definition of the start date for a stability study*
Q - 249: perform stability test 50
Q - 250: What is used to view and process test dates for planned
stability tests? 51-1
A. Test Scheduling functions*
B. Deadline monitoring functions*
Q - 251: On what basis are due dates for stability tests
calculated? 51-2
A. Assigned packages*
B. Scheduling parameters in test schedule*
Q - 252: Which of the following is a method used to display or
process test dates that should be processed?51-2
A. Test Schedule Display function*
B. Scheduling functions*
Q - 253: Deadline monitoring functions are initiated at regular
intervals by what? 51-3
A. Planned Report *
Q - 254:Identify a function performed by the 'planned report'
used in deadline monitoring? 51-3-2
A. Monitor due dates for planned stability tests for a defined time
period*
B. Create inspection lots for test dates as they become due*
Q - 255: Scheduling overview 51-4
Q - 256: What is the purpose of scheduling evaluations? 51-4
A. Monitor test dates by means of a worklist*
Q - 257: What is displayed in the 'Packages in Inspection Plan'
list? 61-1
A. released inspection plans with inspection operations and
assigned packages*
Q - 258: What report is used to determine the packages that have
been assigned to operations or operations to which packages
have not been assigned? 61-1
A Display Packages in Inspection Plans list*
Q - 259: True/False The definition of a start date for a stability
study is a follow-up function in a quality notification action box.
49-3
A. True*
B. False
Q - 260: The 'scheduling function' is _______? 51
A. First step of the Perform Stability Test phase*
Q - 261: The automatic deadline monitoring function controls
what? 51-3
A. Creation of inspection lots for test dates*
Q - 262: Identify a prerequisite to the creation of a scheduling
overview. 53-2
A. Start date is defined for the study*
B. Test dates are scheduled*
Q - 263: Identify a purpose of deadline monitoring report. 44-1
A. Monitor test dates for testing schedule*
B. Create inspection lots for test dates*
C. Update test schedule*
Q - 264: Which of the following can occur following the creation of
an inspection plan for a storage condition? 40-2
A. Process a testing schedule*
Q - 265: Identify a requirement to start deadline monitoring at
regular intervals? 55-2
A. Create report variant containing selection criteria for the
execution of a planned report*
B. Create a background job that specifies dates or intervals of job
execution*
Q - 266: T/F The deadline monitoring planned report can be an
automated or manual process. 55-2
A. True*
B. False
Q - 267: Identify a pre-requisite to deadline monitoring for a
stability study. 55-3
A. Define start date for stability study*
Q - 268: What is the 'scheduling overview list'? 58-1
A. Workplace-related list of all test dates for selected testing
schedule items*
Q - 269: stability study history list 60-1
Q - 270: As inspection plan should be created for which of the
following? 40-12
A. Each storage condition*
Q - 271: The creation of a testing schedule to reflect the desired
scope and frequency of tests is a step in what phase of the
stability test? 5-3
A. Initiate Stability study
B. Initiate tests
2
A. Automatic assignment following creation of test schedule*
Q - 273: Identify a follow-up functin accessed by the quality
notification action box? 62-4
A.Complete*
B. CAncel*
C. Deactivate*
Q - 274: Identify a method used to complete a stability study. 62-
1
A. Complete study as planned*
B. Cancel study*
C. Deactivate study*
Q - 275: Identify a result of the completion of a stability study.
62-2
A. User status is set ot complete*
B. Test schedule is deactivated*
C. Physical samples are locked*
Q - 276: When are stability study samples removed from
storage? 62-4
A. Completion of study*
B. Cancellation of study*
C. Deactivation of study*
Q - 277: Identify a prerequisite to the completion of a stability
study. 63-2
A. No test date remains open in the schedule*
Q - 278: How is the removal of a sample from storage triggered?
64-1
A. Follow-up function in study*
Q - 279: What method is used to deactivate and reactivate a
stability study? 65-1
A. Follow-up function*
Q - 280: What does the 'X' status of a stability study sample
mean? 68-2
A. Physical sample no longer exists*
Q - 281: Identify a determinant of the procedure used to add a
storage condition to a stability study? 71
A. Activities that have been performed to date*
Q - 282: What is an inspection lot in relation to a stability study?
A. Record used to process a stability test*
Q - 283: How is a stability study inspection lot created?
A. Scheduling objects are executed to determine test dates*
Q - 284:What is the purpose of a stability study scheduling
object?
A. Determine test dates*
Q - 285: What is the significance of a quality notification in
relation to a stability study?
A. Manage activities of a stability study*
Q - 286: the creation of a testing schedule to reflect the desired
scope and the frequency of tests is a step in what phase of a
stability test? 5-3
A. Initiate stability study
B. Initiate test
C. Stability planning*
D. Stability test
E. Complete stability study
Q - 287: Whiat is the processing step that follows the completion
of an inspection lot for the initial test? 31-2
A. Accpetance usage decision leads to continuting the study and
planning the stability tests
B. Rejection usage decision leads to cancellation of the study or
completing the study*
Q - 288: Identify a step in a stability study that occurs after the
creation of a stability study. 18-2
A. Create initial sample*
B. Assign stability BOM to study*
C. Confirm initial sample*
Q - 289: The second step of the first phase of a stability study is
which of the following? 19=1
A. Create initial sample*
Q - 290: The physical sample to be tested is delivered to the lab
at what point in the stability study? 19
A. After the creation of the study*
B. Before the creation of the study
C. A or B
Q - 291: Which of the following is a prerequisite to the creation of
an initial sample?
A. Creation of stability study*
Q - 292: Which of the following describes the initial sample? 19-1
A. Physical sample subject to a stability test that determines the
suitability of the sample for a stability study**
B. Sample delivered t lab following creation of the stability study*
Q - 293: What is a possible source of material for the stability
study? 19-1
A. Identifcal supply of materials from which initial sample is
selected*
B. Different supply of materials than that from which initial
sample is selected*
Q - 294: Which of the following is true regarding the creation of a
physical sample record for an initial sample? 19-1
A. Function is documented in the quality notification*
B. Physical sample record status is updated*
Q - 295: What is represetned by a physical sample record? 19-1
A. The plan for the receipt of the initial sample by the test
facility*
Q - 296: What is a stability BOM? 21-1
A. comonents or ingrediants of a material or product to be
tested*
Q - 297: What is required by the receipt of the initial sample? 23-
1
A. Confirm the receipt of the sample by the execution of a follow-
up function in an action box*
Q - 298: Which of the following refers to the confirmation of the
initial sample? 23-2
A. Record inspection results during initial test????
Q - 299: What is a restriction related to the confirmation of the
initial sample function? 23-1
A. The activity can be performed one time only*
Q - 300: What is the difference between the creation of an
inspection plan for an initial test and for a stability test? 25-2
A. Inspection plan for initial test can be created using QM function
or Engineering Workbench*
B. Inspection plan for stability study can be created with
Engineering Workbench*
Q - 301: The 'confirmation of an initial sample' is documented as
what? 23-2
A. Task in quality notification*
Q - 302: Which of the following may be required to confirm the
receipt of the physical sample in the lab? 23-2
A. Digital signature*
Q - 303: What is a requirement to confirm the initial sample? 23-
2
A. Creation of stability study*
B. Creation of the initial sample*
Q - 304: Which of the following is a step in the second phase of a
stability study? 25-1
A. Create, confirm, test initial sample*
Q - 305: Which of the following is a method that can be used to
create an inspection plan for a stability study? 25-2
A. Engineering Workbench*
B. QM function*
Q - 306: What is the objective of the the inspection of the initial
sample of a stability study? 25-1
A. Determine by inspection results if initial samples meet the
requirements of the study prior to the conduct of the stability
tests*
Q - 307: Identify a requirement to perform the initial test of a
stability study. 25-2
A. Create stability study*
B. Create initial sample*
C. Confirm initial sample*
Create inspection plan with inspection characteristics*
Q - 309: The functions of the Engineering Workbench can be used
for which of the following? 25-2
A. Creation of an inspection plan for an initial test of a stability
study*
B. Creation of an inspection plan for the stability study*
Q - 310: What activity occurs subsequent to the creation of a
physical sample record? 20-2
A. Confirm receipt of physical sample*
B. Assign stability BOM
C. Create inspection lot for initial sample*
D. Define storage conditions for stability samples*
E. Create test schedule*
Q - 311: What is the effect of the creation of a physical sample
record? 19-1
A. Task is documented in quality notification*
B. Status in physical sample record is unpdated*
C. Data retrieved from stability study and entered to physical
sample record*
Q - 312: What is the effect of the confirmation of the initial
sample? 23-1
A. System confirms the physical sample drawing*
B. System updates physical sample record*
C. Initial sample is released*
Q - 313: Which of the following is an activity of the stability
planning phase that can be triggered by a follow up function for a
stability study? 5-3
A. Define storage conditions*
B. Create test schedule*
C. Assign inspection plans to storage conditions*
D. Complete test schedule*
E. Maintain data for storage samples*
F. Calculate test dates*
Q - 314: Identify a step in the performance of the initial test. 35-3
A. Create inspection lot for initial sample*
B. Select inspection lot in worklist for results recording*
C. Inspect initial sample and record inspection results*
D. Complete initial test with usage decision for the inspection lot*
Q - 315: Identify a function performed by the automatic deadline
monitoring planned report.. 51-3
A. Due dates for stability test are monitored for specified time
period*
B. Inspection lot is created for each storage condition for due
dates of test*
Q - 316: What statement is true regarding a stability study
strategy? 13-2
A. Strategy is assigned to inspection plan*
B. Strategy packages assigned to inspertion operation*
C.
Q - 317: Which of the following is an activity of the performance
of an initial test of a stability study? 25-3
A. Create inspection lot for initial sample*
B. Inspect initial sample and record results*
C. Complete initial test with usage decision for inspection lot*
Q - 318: Which of the following data is maintained for each
sample to be stored under a storage condition? 46-1
A. Quantity of each sample to be placed in storage*
B. Storage Date*
C. Location of storage condition *
D. Number of physical sample labels*
Q - 319: Which of the following is an object used in a stability
study?
A. Quality notification*
B. Test Schedule*
C. Physical sample record*
D. Inspection lot*
E. Scheduling object*
Q - 320: What is a storage removal list? 67-1
A. List of samples for all storage conditions and their processing
status*
B.
Q - 321: What is the result of the completion of a stability study?
63-4
A. Test Schedule is locked*
B. Physical samples are locked*
C. Lots that are not completed are cancelled*
D. Usage decision closes characteristic*
E. Print storage removal list*
F. Samples removed from storage or reserve samples created*
Q - 322: Which of the following is a rule that governs the
maintenance of storage data? 46-1?????
A. Storage date must be subsequent to the date of receipt of
sample*
B. Storage date must not be a future date*
C. Default quantity for a storage condition must be replaced with
an actual quantity*
D. Total sample quantity is greater than 0*
E.
Q - 323: Which of the following is an activity required to plan a
stability test? 5-3
A. Define storage conditions for samples*
B. Create physical sample record for sampe*
C. Create test schedule to plan frequency and scope of test*
D. Create inspection plans for stability study*
E. Assign strategy to test plan header*
F. Assign packages to inspection operation*
G. Create test schedule by creating one item for each storage
condition in study*
H. Process test schedule to assign test plan to each staorage
condition in schedule*
I. Complete test schedule*
J. Print storage list for sample*
K. Calculate quantity for samples and storage conditions*
L. Maintain data for samples*
M. Draw samples from material of first sample*
N. Prnt sample labels and atach to samples*
O. Place samples in storage*
P. Define start date of study*
Q. Calculate test dates*
Q - 324: Identify a step performed for each sample during the
performance of a stability test. 50
A. Inspection lots for test dates are created using deadline
monitoring*
B. Shop papers are printed for each inspection lot when it is
created*
C. Sample drawing instruction is used to remove samples from
storage conditions and delivered to lab for test*
D. Perform test*
E. Complete stability study*
F. Remove stability samples from storage*
Q - 325: Identify a step used to create an inspection plan for a
storage condition when the engineering workbench is used in the
process. 39-1
A. Select a work area*
B. Activate inspection points for physical samples in the plan
header*
C. Assign a strategy to plan header*
D. Specify intervals at which each operation in plan will be
tested*
Q - 326: Identify a step in the execution of a stability test
A. Deadline monitoring function is used to create inspection lots
for future test dates*
B. Shop papers accessed for inspection lot when lot created*
C. Remove samples from storage conditions per sample drawing
instruction and deliver to lab for testing*
D. Perform test*
E. Record test results*
F. Return sample to storage*
G. Complete test with usage decision for lot*
H. Repeat for each test in study*
I. Evaluate results of test*
Q - 327: Identify an unlanned activity for a stability study. 70-2
A. Add storage conditions for samples*
B. Creat lot for a storage condition*
C. Revise storage condition*
D. Deactivate storage condition*
E. Activate storage condition*
F. Deletion of storage condition*
G. Addition of tests to inspection plan*
H. Addition of test dates to test schedule*
I. Deactivation of stability study*
J. Reactivation of stability study*
Q - 328: What is the objective
Q - 329: What is the objective
Q - 400: is calculated on the basis of
Q - 401: Which of the following is an example of a function
Q - 402: Control indicator
Q - 403: is dependent on
Q - 404: Why is used
Q - 405: can be changed
Q - 406: What is the function of
Q - 407: indicator determines
Q - 408: difference
Q - 409: _______, _____________, and _______ are examples of x.
Q - 410: What is triggered by x?
Q - 411: Which of the following is defined in the IMG
Q - 412: Attributes of x include
Q - 413: The x function requires
Q - 414: Which of the following is a restriction regarding
Q - 415: x determines
Q - 416: x is determined by which of the following?
Q - 417: If x, which of the following is an example of
Q - 418: which of the following can be replaced
Q - 419: which of the following cannot be replaced
Q - 420: list displays
Q - 421: requirement to delete
Q - 422: restriction regarding the deletion
Q - 423: Which of the following is an example of a function
Q - 424: What is the purpose of the x data element
Q - 425: What statement is relevant to
Q - 426: What procedures exist to
Q - 427: determines
Q - 428: Where is x specified
Q - 429: What determines
Q - 430: What determines how
Q - 431: How is x determined
Q - 432: What determines if
Q - 433: What determines the format
Q - 434: default values
Q - 435: determines what is used
Q - 436: determines if x deleted
Q - 437: What IMG element
Q - 438: Is x data defined for each
Q - 439: _________,___________, and _________- is defined
Q - 440: For each
Q - 441:_______________ can be defined
Q - 442: What data element(s) is found in
Q - 443: What x data is defined in
Q - 444: Which of the following is a true statement regarding
creation
Q - 445: Why are x assigned
Q - 446: difference between
Q - 447: functions that can be performed using the x transaction
code
Q - 448: function that can be performed using the x list
Q - 449: purpose of the assignment
Q - 450: At the time x, you can
Q - 461: The parameters are defined in
Q - 462: is flagged for by
Q - 463: What is used to determine x for
Q - 464: What is a prerequisite
Q - 465: What is the result
Q - 466: Where is x set
Q - 467: is defined at the x level of
Q - 468: Data elements that are defined at the x level include
Q - 469: What is the function of the x
Q - 470: What is the function of the x field
Q - 471: What types of
Q - 472:______,_______, and _____ are data elements in a
Q - 473: ______, ________, and ______ is entered in the definition of
x
Q - 474: x function is dependent on x
Q - 475: default values are dependent on x
Q - 476: the date of x is dependent on
Q - 477: the x that is used is dependent on
Q - 478: As x, you can
Q - 479: What is the effect
Q - 480: What is the x date
Q - 481: Why is x used
Q - 482: is not found
Q - 483: function requires
Q - 484: x refers to
Q - 485: restriction related to
Q - 486: Which of the following is a result
Q - 487: The purpose of the assignment
Q - 488: restriction related to the change
Q - 489: x and y data elements determine
Q - 490: result of a linkage
Q - 491: What controls
Q - 492: Which of the following controls x
Q - 493: Which of the following pertains to
Q - 494: Which of the following is true
Q - 495: What is the ffect
Q - 496: Which of the following is controlled
Q - 497: x cannot be changed
Q - 498: Data elements
Q - 499: What enables
Q - 500: What activity
Q - 501: What is the effect
Q - 502: What is the purpose
Q - 503: example of functions
Q - 504: As x is created, you can
Q - 505: is dependent on
Q - 506: What is the function
Q - 507: ________, ___________, and __ are data elements in
Q - 508: ___________, _____, and ___________ is entered during th e
definition of x
Q - 509: is dependent on
Q - 510: What is the result
Q - 511: Where is x set
Q - 512: What is used to determine x
Q - 513: What is the result
Q - 514: What determines
Q - 515: is data defined for
Q - 516: What is the function of
Q - 517: What statement is relevant
Q - 518: x,x, and c are examples of what
Q - 519: What method
Q - 520: Advantage of
Q - 521: Which of the following is an example of
Q - 522: What is the significant of
Q - 523: The x function can be used
Q - 524: A x list can be created for
Q - 525: What is the relationship between
Q - 526: How is x identified
Q - 527: A x is snonomous with y
Q - 528: is automatically
Q - 529: x date is referenced for what purpose
Q - 530: More than on x can be
Q - 531: x is an example
Q - 532: is dependent on
Q - 533: is used in
Q - 534: Which of the following describes