quality assurance project plans for point and nonpoint source data

9
Quality Assurance Project Plans for Point and Nonpoint Source Data Jeffrey S. Sweeney University of Maryland Chesapeake Bay Program Office [email protected] 410-267-9844 Tributary Strategy Workgroup Meeting MD DNR June 12, 2006

Upload: hamlin

Post on 08-Jan-2016

33 views

Category:

Documents


0 download

DESCRIPTION

Quality Assurance Project Plans for Point and Nonpoint Source Data. Jeffrey S. Sweeney University of Maryland Chesapeake Bay Program Office [email protected] 410-267-9844 Tributary Strategy Workgroup Meeting MD DNR June 12, 2006. Quality Assurance Project Plans. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Quality Assurance Project Plans for Point and Nonpoint Source Data

Quality Assurance Project Plans for Point and Nonpoint

Source Data

Jeffrey S. SweeneyUniversity of Maryland

Chesapeake Bay Program [email protected]

410-267-9844

Tributary Strategy Workgroup MeetingMD DNR

June 12, 2006

Page 2: Quality Assurance Project Plans for Point and Nonpoint Source Data

Quality Assurance Project Plans

Quality Assurance Project Plans (QAPPs) for the collection and use of environmental data are needed from signatory jurisdictions and headwater states.

• Point source data and non-point source BMP implementation levels reported annually to the Chesapeake Bay Program (CBP) office for use in the CBP Watershed Model. o U.S. EPA Chesapeake Bay Program Grant and Cooperative Agreement

Guidance (March, 2006) – pages 11-12 Chesapeake Bay Program Quality Assurance Guidelines and Requirements

– Attachment 7 at http://www.epa.gov/Region3/chesapeake/grants.htm#2006

Responsibilities for development of QAPP Guidance and requirements for their development Schedules for their submission Review and approval of the QAPPs

o QA/R-5: EPA Requirements for Quality Assurance Project Plans (March, 2001) http://www.epa.gov/quality1/qs-docs/r5-final.pdf Important elements for nonpoint source data, under section 2.2.9 “Non-

direct Measurements” and Chapter 3 “Projects Using Existing Data”

Page 3: Quality Assurance Project Plans for Point and Nonpoint Source Data

Quality Assurance Project Plans

Why are QAPPs needed?• Comments to the public on the quality of the data behind the

Bay Program’s annual Restoration Assessment for Reducing Pollution, published on CBP’s web siteo http://www.chesapeakebay.net/assess/methods/index.htm under Part

Two: Restoration Efforts and Reducing Pollution Methods for Reducing Pollution Summary, Wastewater Pollution Controls,

and Agricultural Pollution Controls

Page 4: Quality Assurance Project Plans for Point and Nonpoint Source Data

Reducing Pollution:Agricultural Pollution Controls

Data sources, methodology and restoration goals used to develop the environmental indicators featured in the Chesapeake Bay 2005 Health and Restoration

Assessment at http://www.chesapeakebay.net/assess/methods/index.htm

Page 5: Quality Assurance Project Plans for Point and Nonpoint Source Data

Reducing Pollution:Wastewater Pollution Controls

Data sources, methodology and restoration goals used to develop the environmental indicators featured in the Chesapeake Bay 2005 Health and Restoration

Assessment at http://www.chesapeakebay.net/assess/methods/index.htm

Page 6: Quality Assurance Project Plans for Point and Nonpoint Source Data

Quality Assurance Project Plans

Why are QAPPs needed?• Understand the various sources of nonpoint source BMP data

within and among jurisdictions. • Understand any analyses done by jurisdictions prior to

submissions to the CBP office. • Ensure on-the-ground pollutant controls are best and equitably

represented in the CBP Watershed Model• Enable CBP office nonpoint source data analysts to accurately

translate tracked BMP implementation data exchanged on the National Environmental Information Exchange Network (NEIEN)

• Prepare for likely future detailed scrutiny of all Watershed Model inputs

Page 7: Quality Assurance Project Plans for Point and Nonpoint Source Data

Quality Assurance Project Plans

Essential components of a QAPP• Standard Operating Procedures for Managing Nonpoint Source Data• Data Acquisition and Management of Non-Direct Measurements

o Listing of all BMPs for which implementation is tracked, compiled, analyzed and reported to the CBP office annually.

o For each BMP or relevant groups of BMPs, a description of the project data management scheme, tracing the path of the data from the non-measurement source to its use in the project’s database or computer model.

o For each BMP, define the acceptance criteria for the use of this data in the project and discuss any limitations on the use of the data resulting from uncertainty in its quality. For example, accounting for double-counting

o For each BMP, a detailed description of the procedures being used to process, compile, and analyze the data prior to submission to the CBP office annually.

o QAPPs should specifically address the reasonableness of each BMP’s implementation level, understanding CBP BMP definitions and how environmental data is applied in CBP watershed models. Does each BMP’s implementation level reasonably reflect on-the-ground

conditions – or are results of the data management indicating conservative or optimistic levels compared to best-professional judgments of on-the-ground conditions?

Page 8: Quality Assurance Project Plans for Point and Nonpoint Source Data

Quality Assurance Project Plans

Essential components of a QAPP• Data Acquisition and Management of Non-Direct Measurements

o Final QAPPs need, in part, to answer the following questions as outlined in the “Indicator and Data Survey” of the Chesapeake Bay Restoration Assessment for the Reduction Pollution environmental indicator at http://www.chesapeakebay.net/assess/methods/index.htm Were the data collected according to an EPA-approved Quality Assurance

Plan? Are the descriptions of the survey design clear, complete and sufficient to

enable the survey to be reproduced? Were the compilation and analysis methods performed consistently

throughout the data record? If datasets from two or more agencies are merged, are their survey

designs and methods comparable? Are uncertainty measurements or estimates available for the data sets? Do the uncertainty and variability impact the conclusions that can be

inferred from the data and the utility of the ultimate use of the data – nutrient and sediment load changes as assessed by CBP watershed models?

Are there noteworthy limitations or gaps in the data record?

Page 9: Quality Assurance Project Plans for Point and Nonpoint Source Data

Quality Assurance Project Plans

Submission requirements• Single QAPP for all nonpoint source BMPs is preferable.

o Separate SOW for each jurisdictional program (i.e., source sector) is acceptable.

o Refer to CIMS “Chesapeake Bay Program Guidance for Data Management” (October, 2003) at http://www.chesapeakebay.net/cims/data_management_guidance_03.pdf

• Timelineo After 7/15/06 deadline for point source information and nonpoint

source BMPs. o Before late-summer work for “Chesapeake Bay 2006 Health and

Restoration Assessment, Part Two: Restoration Efforts”o With nonpoint source BMP data exchanged through NEIEN node.