qicl large storage tank site erection capabilities
TRANSCRIPT
![Page 1: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/1.jpg)
QICL’s Large Storage Tanks Site Erection Capabilities
![Page 2: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/2.jpg)
AEGEAN MARINE PETROLEUM
Tank Farm Package
8 nos. Fuel Oil Tank
4 nos. Diesel Fuel Tank
2 nos. Off spec Storage Tank
( Dia. 49.2 / 34.6 /24.8 m)
Complete Civil, Mechanical &
Electrical Works
Instrumentation & Control,
Heating and Fire Fighting
Systems
Waste Water Collection System
Jetty Pipeline
EPC Contract for Tank Terminal
Fujairah Tank Terminal Project
Aegean Marine
Petroleum
![Page 3: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/3.jpg)
Aegean – Fujairah Tank Terminal
![Page 4: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/4.jpg)
AEGEAN MARINE PETROLEUM
![Page 5: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/5.jpg)
Aegean – Fujairah Tank Terminal
![Page 6: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/6.jpg)
AEGEAN MARINE PETROLEUM
![Page 7: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/7.jpg)
AEGEAN MARINE PETROLEUM
![Page 8: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/8.jpg)
AEGEAN MARINE PETROLEUM
![Page 9: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/9.jpg)
AEGEAN MARINE PETROLEUM
![Page 10: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/10.jpg)
AEGEAN MARINE PETROLEUM
![Page 11: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/11.jpg)
AEGEAN MARINE PETROLEUM
![Page 12: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/12.jpg)
AEGEAN MARINE PETROLEUM
![Page 13: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/13.jpg)
AEGEAN MARINE PETROLEUM
![Page 14: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/14.jpg)
AEGEAN MARINE PETROLEUM
![Page 15: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/15.jpg)
AEGEAN MARINE PETROLEUM
![Page 16: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/16.jpg)
AEGEAN MARINE PETROLEUM
![Page 17: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/17.jpg)
AEGEAN MARINE PETROLEUM
![Page 18: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/18.jpg)
AEGEAN MARINE PETROLEUM
![Page 19: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/19.jpg)
AEGEAN MARINE PETROLEUM
![Page 20: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/20.jpg)
AEGEAN MARINE PETROLEUM
![Page 21: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/21.jpg)
AEGEAN MARINE PETROLEUM
![Page 22: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/22.jpg)
SUB-CONTRACTOR: QUALITY INTERNATIONAL FUJAIRAH MAIN CONTRACTOR: ROTARY ENGINEERING LIMITED
CLIENT: FUJAIRAH OIL TERMINAL FZC, FUJAIRAH, UAE
ROTARY ENGINEERING – Fujairah Oil Terminal
![Page 23: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/23.jpg)
PRE-FABRICATION PACKAGE : PRE-FABRICAITON FOR 23 TANKS , WEIGHT : 10,500 MT
TANK NO. SERVICE ROOF TYPE DIMENSIONS
(MTR)
CAPACITY
(M3)
T-101 CRUDE OIL / FUEL OIL EXTERNAL FLOATING ROOF 72.0 ´ 22.30 83,400
T-102 CRUDE OIL / FUEL OIL EXTERNAL FLOATING ROOF 72.0 ´ 22.30 83,400
T-103 CRUDE OIL / FUEL OIL EXTERNAL FLOATING ROOF 72.0 ´ 22.30 83,400
T-107 CRUDE OIL / FUEL OIL EXTERNAL FLOATING ROOF 26.0 ´ 20.0 9,400
T-108 CRUDE OIL / FUEL OIL EXTERNAL FLOATING ROOF 26.0 ´ 20.0 9,400
T-901 SERVICE WATER DOME ROOF 16.50 ´ 20.0 5,000
T-702 DIESEL CONE ROOF 4.0 ´ 5.0 50
T-301 GASOLINE / NAFTHA ALUMINUM DOME & C.S IFR 44.0 ´ 20.0 27,600
T-302 GASOLINE / NAFTHA ALUMINUM DOME & C.S IFR 44.0 ´ 20.0 27,600
T-303 GASOLINE / NAFTHA ALUMINUM DOME & C.S IFR 44.0 ´ 20.0 27,600
T-304 GASOLINE / NAFTHA ALUMINUM DOME & C.S IFR 44.0 ´ 20.0 27,600
T-305 GASOLINE / NAFTHA ALUMINUM DOME & C.S IFR 36.0 ´ 20.0 18,400
T-306 GASOLINE / NAFTHA ALUMINUM DOME & C.S IFR 36.0 ´ 20.0 18,400
T-307 GASOLINE / NAFTHA ALUMINUM DOME & C.S IFR 36.0 ´ 20.0 18,400
T-308 GASOLINE / NAFTHA ALUMINUM DOME & C.S IFR 36.0 ´ 20.0 18,400
T-309 GASOLINE / NAFTHA ALUMINUM DOME & C.S IFR 36.0 ´ 20.0 18,400
T-310 GASOLINE / NAFTHA ALUMINUM DOME & C.S IFR 36.0 ´ 20.0 18,400
T-311 GASOLINE/NAPHTHA C.S DOME ROOF + C.S IFR 20.0 ´ 20.0 5,600
T-312 GASOLINE/NAPHTHA C.S DOME ROOF + C.S IFR 20.0 ´ 20.0 5,600
T-313 GASOLINE/NAPHTHA C.S DOME ROOF + C.S IFR 20.0 ´ 20.0 5,600
T-314 GASOLINE/NAPHTHA C.S DOME ROOF + C.S IFR 20.0 ´ 20.0 5,600
T-401 SLOP C.S DOME ROOF + C.S IFR 9.20 ´ 10.0 500
T-402 SLOP C.S DOME ROOF + C.S IFR 9.20 ´ 10.0 500
ROTARY ENGINEERING – Fujairah Oil Terminal
![Page 24: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/24.jpg)
ERECTION PACKAGE : ERECTION OF 7 NOS OF TANKS , WEIGHT : 3,885 MT
TANK NO. SERVICE ROOF TYPE DIMENSIONS
(MTR)
CAPACITY
(M3)
T-101 CRUDE OIL / FUEL OIL EXTERNAL FLOATING ROOF 72.0 ´ 22.30 83,400
T-102 CRUDE OIL / FUEL OIL EXTERNAL FLOATING ROOF 72.0 ´ 22.30 83,400
T-103 CRUDE OIL / FUEL OIL EXTERNAL FLOATING ROOF 72.0 ´ 22.30 83,400
T-107 CRUDE OIL / FUEL OIL EXTERNAL FLOATING ROOF 26.0 ´ 20.0 9,400
T-108 CRUDE OIL / FUEL OIL EXTERNAL FLOATING ROOF 26.0 ´ 20.0 9,400
T-901 SERVICE WATER DOME ROOF 16.50 ´ 20.0 5,000
T-702 DIESEL CONE ROOF 4.0 ´ 5.0 50
ROTARY ENGINEERING – Fujairah Oil Terminal
![Page 25: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/25.jpg)
ROTARY ENGINEERING – Fujairah Oil Terminal
![Page 26: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/26.jpg)
ROTARY ENGINEERING – Fujairah Oil Terminal
![Page 27: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/27.jpg)
ROTARY ENGINEERING – Fujairah Oil Terminal
![Page 28: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/28.jpg)
ROTARY ENGG. – Fujairah Oil Terminal Tanks - 72 mtrs. Dia. - With External Floating Roof
![Page 29: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/29.jpg)
ROTARY ENGG. – Fujairah Oil Terminal Tanks - 72 mtrs. Dia. - With External Floating Roof
![Page 30: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/30.jpg)
ROTARY ENGG. – Fujairah Oil Terminal Tanks - 72 mtrs. Dia. - With External Floating Roof
![Page 31: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/31.jpg)
ROTARY ENGG. – Fujairah Oil Terminal Tanks - 72 mtrs. Dia. - With External Floating Roof
![Page 32: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/32.jpg)
ROTARY ENGG. – Fujairah Oil Terminal Tanks - 72 mtrs. Dia. - With External Floating Roof
![Page 33: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/33.jpg)
ROTARY ENGINEERING – Fujairah Oil Terminal
![Page 34: QICL Large Storage Tank Site Erection Capabilities](https://reader033.vdocuments.mx/reader033/viewer/2022052207/587349781a28ab56378b4a35/html5/thumbnails/34.jpg)
ROTARY ENGINEERING – Fujairah Oil Terminal