qad planning and scheduling workbenches: enhancements & strategy review

31
QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review Carianne Nieuwstraten, QAD Product Manager MWUG, March 20, 2012

Upload: jude

Post on 25-Feb-2016

53 views

Category:

Documents


1 download

DESCRIPTION

QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review. Carianne Nieuwstraten , QAD Product Manager . MWUG , March 20, 2012. QAD Planning and Scheduling Workbenches: MSW/PSW. Agenda. MSW/PSW Benefits and Value Enhancements Review Strategy Review. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

QAD Planning and Scheduling Workbenches: Enhancements & Strategy ReviewCarianne Nieuwstraten, QAD Product Manager

MWUG, March 20, 2012

Page 2: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

Agenda

• MSW/PSW Benefits and Value• Enhancements Review• Strategy Review

2

QAD Planning and Scheduling Workbenches: MSW/PSW

Page 3: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

Master & Production Scheduling Objective• Establish an item’s most optimum build

schedule that meets customer demand.- Measurements :

• Improved Customer Service- On time deliveries- Reduced back orders

• Improved and Reduced Inventories- Inventory turns- Reduced inventory investment

• Stable Manufacturing Schedule- Increased production efficiency- Reduced set up costs/time- Reduced overtime costs

QAD Planning and Scheduling Workbenches: MSW/PSW

3

Page 4: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

Master Scheduler’s Challenge

ExecutivesROI must improve; the stockholders are not happy!

ManufacturingThere are too many changes! Provide fixed schedules and the correct parts and delivery will improve. Sales

Service levels are down. I need more inventory! Whatever it takes to keep the customer happy!

EngineeringThere’s a new product introduction scheduled for the fall! But we need more time for design!

FinanceThere’s too much cash tied up in inventory!

4

QAD Planning and Scheduling Workbenches: MSW/PSW

Page 5: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

Production Scheduler’s ChallengeManufacturingLabor / machine resources not available for 2nd shift – what are you going to do about this?

SalesDrops in a new high priority order due tomorrow, which order can be moved?

MaterialsYou can’t change the schedule on short notice and expect the materials to be available.

FinanceHigh variances to “plan” (extra setup, downtime, labor), you need to optimize your production schedule.

5

QAD Planning and Scheduling Workbenches: MSW/PSW

Page 6: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

Planning & Scheduling ChallengesQAD Planning and Scheduling Workbenches: MSW/PSW

6

Page 7: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

Capacity FrameDisplays capacity information per selected resource in the Schedule Grid- Balance your planned and required capacity.

Supply/Demand FrameProvides demand & supply information per selected item in the Schedule Grid.- Primary information used for scheduling decision making.

Schedule GridThe primary context of the workbench. - View and modify your production schedules for each item.

MSW – Master Scheduling Workbench

7

Page 8: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

MSW – Master Scheduling Workbench

Supporting PanelsEnables master scheduling action and decision making.

Represents over 30 maintenance programs and reports!

8

Page 9: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

Production Order Sequence GridSchedule and sequence production orders by item attributes

Production Order BrowseSearch & group data per user specification

- Drag & Drop the orders to the desired position on the Sequence Grid.

Production Order MaintenanceView and maintain all order details

PSW – Production Scheduling Workbench

9

Page 10: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

Production Scheduling Workbench (PSW)

Master Schedule Workbench (MSW)

Production Scheduling Release To shop Floor ExecutionMaster Scheduling

Months-Weeks-Days Day-Shift-IntervalsDays

Maximize production efficiency through

schedule optimization

Create a master schedule balanced to Supply /Demand /Resources

Click For Next Point

• Avoid costly downtime• Reduce costly expedites• Reduce late customer shipments

Component Available Check (CAC)

Release to production with verification of

available materials

QAD Planning and Scheduling Workbenches: MSW/PSW

Tying It Together

10

Page 11: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

Customer: Cascade Engineering– Multi-business manufacturer (automotive,

commercial truck & bus, solid waste & recycling, home & office)

– Leading provider of engineered plastics systems and components (plus growing number of sustainability-focused products and services)

– Headquartered in Grand Rapids, MI, USA– 7 Manufacturing Facilities in NA– 1 Manufacturing Facility in Europe– QAD 2008 SE, repetitive

Pain Points– Capacity visibility– Schedule changes

Live– Two plants; first plant live: April 10, 2011– Roll out to 4 plants in next 4 months

11

Page 12: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

Customer: Superior Essex– A global leader in the design and

manufacture of copper and aluminum round and rectangular magnet wire used in motors and transformers

– Headquartered in Fort Wayne, Indiana, USA

– 2008 SE, discrete Pain Points

– No master scheduling process in place– Limited to no capacity visibility– Homegrown scheduling system

Live– First plant: February 10, 2012– Roll out to 5 more plants in next 6 months

12

Page 13: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

New Workbench

Enhancements13

Page 14: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

• Business Scenario: Maintenance department needs to schedule maintenance for a machine/line. Might impact production plan.

• Planner Objective: Understanding of maintenance plans ahead of time allowing Planner to communicate with maintenance department to schedule best date/time for maintenance with minimal impact on production plan, where possible.

1. EAM Order Visualization

14

QAD Planning and Scheduling Workbenches: MSW/PSW

Page 15: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

15

EAM Orders Created• No WB

visualization

• No consumption of WB capacity

Maintenance work starts

• No change on WB

EAM Orders Scheduled•

Visualization on WB

• No impact to capacity on WB

Order Closed•

Scheduler can see work is complete and see history if desired

Visualize EAM OrdersQAD Planning and Scheduling Workbenches: MSW/PSW

Page 16: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

EAM Detail | Summary - Details

16

Repair Tech Schedules

(firms) EAM order

WB alerts scheduler request for acceptance

Scheduler reviews EAM Repair Order

Scheduler speaks with

Repair Tech if there is a conflict

Repair Tech makes changes

to order as needed

QAD Planning and Scheduling Workbenches: MSW/PSW

Page 17: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

EAM Detail | Date/Time

17

I can see the planned start and end time and estimated down time

impact

If this is not acceptable, I can speak with

Maintenance Dept. to reschedule it!

QAD Planning and Scheduling Workbenches: MSW/PSW

Page 18: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

EAM Detail|Resource Relationships

18

I can visualize the relationship of the

production line to the work centers.

QAD Planning and Scheduling Workbenches: MSW/PSW

Page 19: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

• Business Scenario: Process generates more than one product - examples:- Injection molding - Metal stamping

• Planner Objective: Manage the various products as a joint structure.

2. Co-\By-Product Support

19

QAD Planning and Scheduling Workbenches: MSW/PSW

Page 20: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

• Solution: - Integration of existing standard co-\by-product

capabilities into MSW/PSW- ….with additional benefit that co\by functionality can

now also be leveraged in repetitive environments when using the workbenches

2. Co-\By-Product Support

20

QAD Planning and Scheduling Workbenches: MSW/PSW

Page 21: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

2. Co-\By-Product Support

21

QAD Planning and Scheduling Workbenches: MSW/PSW

Page 22: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

• Business Scenario: Customer increases demand for end item already scheduled for particular due date; multiple BOM levels- Causes schedule increase for end item- May require increase of one or more lower assembly

schedules to meet short-term demand increase

• Planner Objective: Quickly gauge impact of demand increase/change across all BOM levels

3. Product Structure Filter

22

QAD Planning and Scheduling Workbenches: MSW/PSW

Page 23: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

3. Product Structure Filter

23

QAD Planning and Scheduling Workbenches: MSW/PSW

Page 24: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

• Workbenches – General:- eB2.1 SP4 and Up, add-on- 2010.1EE+, core

• Availability – New Enhancements- 2012 EE except for co\by- EE Package – target: mid-April- SE Package – target: mid/end of May

• Documentation- Install, user and training guides

Availability and Documentation

24

QAD Planning and Scheduling Workbenches: MSW/PSW

Page 25: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

Vision/Strategy

25

Page 26: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

26

Master Schedule

Material Plan

VisionQAD Planning and Scheduling Workbenches: MSW/PSW

Load-Leveling Constraint-

Based Master Scheduler

Master Scheduling Workbench

Material Requirements

Planning

Production Scheduling Workbench

Finite Capacity Production Scheduler

Page 27: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

• Are tied to the goals of the Master Scheduler being:- Create a level schedule

• Level by Volume and Mix - Load, Setup, other - Meet customer delivery expectations

• Make to Order, Make to stock, Manage Backlog- Business Interests

• Manage Inventory, (Safety Stock, Seasonal, Customer service levels, Buffer)

• Manage Number of Setups • Customer/Item Priorities• Reduce expediting, overtime, etc.• Other

Business Drivers

27

QAD Planning and Scheduling Workbenches: MSW/PSW

Page 28: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

28

Calculates a level loaded (constraint based) Master Production Schedule

over a user defined period of time for a site or group of production lines.

MPS Leveling CalculationPlanning / Scheduling

Time

Volu

me

Demand

Level Production

Page 29: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

29

Master Schedule

Material Plan

VisionQAD Planning and Scheduling Workbenches: MSW/PSW

Load-Leveling Constraint-

Based Master Scheduler

Master Scheduling Workbench

Material Requirements

Planning

Production Scheduling Workbench

Finite Capacity Production Scheduler

Page 30: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

30

Learn More: www.qad.com/explore

Page 31: QAD Planning and Scheduling Workbenches: Enhancements & Strategy Review

• Carianne Nieuwstraten- Phone: 503-236-0025- E-mail: [email protected]

Contact Information

31

QAD Planning and Scheduling Workbenches: MSW/PSW