q.1 speed of mega project can be increased by using.. a)automation b)software c)latest computers...

231
Q.1 Speed of mega project can be increased by using .. a)Automation b)Software c)Latest computers d)Latest materials

Upload: elijah-nicholson

Post on 17-Dec-2015

222 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.1 Speed of mega project can be increased by using ..

a) Automationb) Softwarec) Latest computersd) Latest materials

Page 2: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.2 By using automation in construction, .. Is reduced to a large extent.

a) Steps in the projectb) Human effortsc) Efficiencyd) load

Page 3: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.3 Main advantage of automation in the construction industry is ..

a) Foreign currencyb) Manual controlc) Coordationd) Completion of risky work without human

loss

Page 4: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.4 In spite of very less human resources, developed contries have tremendous speed of completing mega-projects due to ..

a) Use of machines and robotsb) Supply of plenty of moneyc) Very less politics involvedd) Less corruption

Page 5: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.5 Use of machinery and robots has resulted in to ..

a) High quality worksb) Increase in costc) Unemploymentd) High quality works with speedy completion

Page 6: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.6 Under-water tunnels are drilled and built with high precision due to ..

a) Modern surveyingb) Good planningc) Latest tunnel boring machinesd) robots

Page 7: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.7 Through automation may yield fast constructions, the social issue is ..

a) High costb) Unemployment of skilled labourc) High investment d) politics

Page 8: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.8 The best application of automation can be said to be ..

a) Surveyingb) G.I.S.c) G.P.S.d) Large depth mining

Page 9: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.9 R.M.C. plants, earth excavators, cranes, etc. are necessary components of ..

a) Modernization of civil engineeringb) Automation in constructionc) Open economy in indiad) Project management

Page 10: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.10 Risky or hazardous operation can be handled easily through ..

a) Automationb) Tunnelsc) Fast track constructionsd) Skilled labour

Page 11: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.11 Main characteristic of automation in construction industry is ..

a) High cost and speedy constructionb) High quality and speedy constructionc) Labour intension and high costd) Labour intensive and high speed

Page 12: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.12 Automation is adopted by developed countries because ..

a) It is very convenient for themb) It is designed easilyc) It gives fast completion with high quality at

low risk.d) It is low cost, low quality and less labour

method.

Page 13: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.13 Although automation needs high initial investment, it has become necessity of the 21st century due to ..

a) Latest fashionb) Need of international tradec) Need of high quality speedy constructionsd) Need of foreign exchange

Page 14: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.14 .. Type of greyish cement is manufactured by using argillacious and calcareous materials.

a) Ordinary, artificialb) Colouredc) Speciald) best

Page 15: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.15 Ordinary portland cement ( O.P.C.) is an artificial ..

a) core materialb) Reinforced materialc) Bonding materiald) fixture

Page 16: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.16 meaning of 1:4 c.m. is ..a) cement mortar with 1 part of cement and 4

parts of mortarb) cement mortar with 1 part of cement and 4

parts of sandc) Crushed mortar with 1 part of cement and 4

parts of sandd) Crushed mortar with 1 part of calcareous and

4 parts of mortar

Page 17: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.17 Mixture of one part of cement, three parts of sand with adequate amount of water is designated as ..

a) M 1 :3b) C.M. 1 : 3c) C.M. 3: 1d) M 3 : 1

Page 18: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.18 Historically, a cement manufactured with in colour similar to the sandstone at portland, england is known as ..

a) Sandstone cementb) Sandstone portland cementc) special portland cementd) ordinary portland cement

Page 19: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.19 The cement manufactured with a volcanic substance in it is known as ..

a) Pozzolona cementb) volcanic cementc) volatile cementd) coloured cement

Page 20: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.20 White cement is manufactured with large proportion of .. In it.

a) White colourb) White marblec) White puttyd) White chalk

Page 21: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.21 For ornamental constructions such as temples .. Are used.

a) Special strength cementb) Ordinary cementsc) Coloured cementsd) Poor cements

Page 22: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.22 A natural or artificial binding materials used in construction such as walls are known as ..

a) Bindersb) Cementsc) Adhesivesd) glues

Page 23: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.23 When cement is mixed with water .. Type of chemical reaction takes place.

a) Exothermicb) Endothermicc) Balancedd) reversible

Page 24: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.24 Natural cements are not used for constructions because ..

a) They are in natureb) They do not have good strengthc) They are of dark colourd) They are difficult to exploit

Page 25: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.25 If hand is inserted in a cement mass, what happens ?

a) Hand feels coolb) Hand get irritationc) Hand becomes wetd) Hand feels exothermic reaction.

Page 26: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.26 Good O.P.C. should be .. In colour.a) Whitish brownb) Brownish greyc) greenish greyd) Dark grey

Page 27: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.27 Good quality of cement is judged if it does not contain ..

a) air pocketb) Moisturec) Insectsd) lumps

Page 28: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.28 When paste of O.P.C. is prepared in water, the paste should be felt .. Between the fingers.

a) Stickyb) Hotc) Hardd) Very soft and silky

Page 29: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.29 Sulphate resisting cement is used mainly for ..

a) Warehousesb) Cold storagesc) Marine constructionsd) Chemical plants

Page 30: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.30 If good quality cement is kept on the palm and gently rubbed, there should be feeling like a touch of ..

a) Soft silkb) Flourc) Saw dustd) chalk

Page 31: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.31 For cement manufacturing, the constituents and raw materials are burnt at temperature ..

a) 1000C to 2000C b) 1200C to 3000C c) 5000C to 7000C d) 15000C to 16000C

Page 32: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.32 .. Cement is used for mass concreting work.

a) Ordinary portlandb) Rapid hardeningc) Law heatd) High tension

Page 33: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.33 Two main constituents of brick are ..a) Silica and aluminab) Lime and ironc) Iron and clayd) Lime and silica

Page 34: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.34 According to indian standards, actual size of brick should be ..

a) 20 cm x 10 cm x 10 cmb) 20 cm x 9 cm x 9 cmc) 19 cm x 9 cm x 9 cmd) 19 cm x 10 cm x 10 cm

Page 35: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.35 A small depression on one of the largest faces of brick is a ..

a) Defectb) Frogc) Depressiond) frost

Page 36: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.36 Ttpically in a brick wall, the frog on the brick is kept on the .. Side.

a) Innerb) Outerc) Bottomd) top

Page 37: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.37 Four major operations of brick manufacturing are ..

a) Preparing brick earth, moulding, drying,burning.

b) Digging, mixing,moulding burningc) Mixing, moulding, drying, heating.d) Mixing, watering, moulding, heating

Page 38: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.38 Deformed, dark coloured (overburnt) bricks are called .. Brick.

a) Pozzolonab) Zhamac) Zombid) jomba

Page 39: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.39 For proper bonding, usually depth of ‘frog’ on the brick is about ..

a) 100 mmb) 10 mmc) 1 mmd) 9 cm

Page 40: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.40 The smallest face of standard brick is actual area .. Cm2.

a) 180b) 200c) 171d) 81

Page 41: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.41 Actual size of the largest face of a standard brick is ..

a) 19 cm x 19 cmb) 20 cm x 10 cmc) 19 cm x 9 cmd) 10 cm x 10 cm

Page 42: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.42 A good quality brick has .. Colour.a) Uniform reddish-brownb) Non-uniform redc) Uniform redd) Uniform grey

Page 43: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.43 Quality of brick can be ascertained by allowing it to fall from a height of about ..

a) 10 mb) 1.8 mc) 2 md) 1 m

Page 44: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.44 when soaked in water, a good quality brick does not absorb water more than .. Of its dry weight.

a) 10 %b) 15 %c) 20 %d) 30 %

Page 45: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.45 Dried bricks are burnt in different types of ..

a) Kilnsb) Electric ovensc) Electric heatersd) Gas chambers

Page 46: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.46 A brick dropped from 1 m height on to the ground breaks in to two pieces. Hence it is a ..

a) Zhama brickb) Fire brickc) Cheap brickd) Poor quality brick

Page 47: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.47 In a brick-wall, brick are properly placed and bonded in ..

a) Mortarb) Cement pastec) Concreted) lime

Page 48: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.48 .. Brick is used as road metal or aggregate for road concrete or brick-bat lime concrete.

a) Class-Ib) Zhamac) Poor qualityd) Fire clay

Page 49: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.49 Average compressive strength of good quality burnt clay brick should be ..

a) about 5N/mm2

b) about 55N/mm2

c) about 18N/mm2

d) 20N/mm2

Page 50: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.50 .. Bricks are used in furnaces, chemical plants, etc.

a) Zhamab) Firec) Waterproofd) Class-I

Page 51: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.51 In maharashtra, the commonly found rock is ..

a) Slateb) Baselatec) Basaltd) quartz

Page 52: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.52 Slate is a .. Type of rock/stone used for roofing.

a) Compact igneousb) Softc) Stratifiedd) Hard and granular

Page 53: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.53 Stone blocks are generally used for ..a) Staircasesb) Roofc) Wallsd) shelf

Page 54: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.54 Broken stone pieces are termed as ..a) Fine aggregateb) coarse aggregatec) Block metald) Crushed rock

Page 55: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.55 Sandstone, shale are examples of .. Rock.a) Sedimentaryb) Rudimentaryc) Igneousd) metamorphic

Page 56: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.56 Artificial sand is obtained by ..a) Cementing silt particlesb) Gluing the soil particlesc) Crushing natural stoned) Heating the sandstone

Page 57: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.57 Natural sand is a product of..a) Weathering and attrition of stoneb) Soil and siltc) Desertsd) Crushed concrete

Page 58: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.58 Sand is an essential component of ..a) Roofb) Wallsc) Mortars and concretesd) brick

Page 59: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.59 .. Is an inert material useful in concrete and mortar.

a) Reinforcementb) Silicac) Aluminad) sand

Page 60: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.60 Bulking of sand means ..a) Purchasing the sand in bulkb) Absorption of water by sandc) Increase in the volume of sandd) Swelling of sand particles

Page 61: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.61 Structural steel typically contains .. Carbon.

a) 0.5 to 2 %b) 0.25 to 1.25 %c) 0.05 to 1.95 %d) 5 to 15 %

Page 62: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.62 Yield strength of mild steel bars is about ..

a) 250 N/ mm2

b) 25 N/ mm2

c) 2.5 N/ m2

d) 250 N/ m2

Page 63: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.63 TOR steel bars are used as .. In concrete.a) Grillsb) Fastnersc) Reinforcementd) filler

Page 64: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.64 For column of a steel structure, which of the following can not be used ?

a) Angleb) Channelc) ‘T’d) High yield strength bars.

Page 65: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.65 For pre-stressed concrete, .. Are used.a) Tor steel barsb) Twisted and ribbed barsc) High tensile strength wiresd) Mild steel with high strength

Page 66: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.66 Roughness on the surface of reinforcement bars is necessary for ..

a) Good bonding with concreteb) Proper handling of barsc) Grip for placing the barsd) Better grip for tensioning the bars

Page 67: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.67 R.C.C beams and columns contain ..a) Cement concrete and steel cablesb) Cement concrete and steel barsc) Lime concrete and tor steel rodsd) Cement mortar and steel bars

Page 68: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.68 A cement concrete without any steel in it is known as ..

a) P.C.C.b) R.C.C.c) P.S.C.d) S.C.C.

Page 69: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.69 ‘T.M.T.’ bars mean ..a) Temperature maintained twistedb) Top machine treatedc) Thermo-mechanically treatedd) Thermal machine twisted

Page 70: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.70 Prestressing wire or cable generally consists of about .. Individual wires.

a) 14b) 9c) 3d) 25

Page 71: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.71 Meaning of M20 concrete is ..a) Concrete of 20 N/ mm2 compressive

strengthb) Concrete of 20 N/ m2 tensile strengthc) Concrete of 20 % compressive strengthd) Concrete of 20 % water content

Page 72: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.72 A concrete mix 1 : 4 : 8 : means ..a) 1 part of sand, 4 parts of cement, 8 parts

coarse aggregateb) 1 part of coarse aggregate, 4 parts of sand, 8

parts of cementc) 1 part of cement, 4 parts coarse aggregate, 8

parts of sandd) 1 part of cement, 4 parts sand, 8 parts coarse

aggregate

Page 73: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.73 Concrete ingradients are practically taken by .. For mixing.

a) Volumeb) Weightc) Massd) Volume and mass

Page 74: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.74 The step concrete mixing involves .. As two sub-steps.

a) Watering and shufflingb) Dry and wet mixingc) Proportioning and wateringd) Batching and shuffling

Page 75: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.75 In a standard concrete mix, the proportion of sand to coarse aggregate is ..

a) 1:4b) 1:3c) 1:2d) 1:1

Page 76: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.76 The terms ‘fine aggregate’ and ‘coarse aggregate’ in concrete refer to ..

a) Sand and small pieces of stone respectivelyb) Cement and sand respectivelyc) Sand and blocks of stone respectivelyd) Cement and small pieces of stone

respectively

Page 77: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.77 reinforcement bars in R.C.C. provide .. To the concrete.

a) Additional compressive strengthb) Bonding strengthc) Tensile strengthd) Better workability

Page 78: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.78 P.C.C. can not be used for ..a) Column of a multi storeyed buildingb) Foundation for a ground floor small buildingc) Footing of a compound walld) Levelling course over plinth

Page 79: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.79 Wet concrete poured on the site in the formwork is knowns as ..

a) Precast concreteb) Form concretec) Ready mix concreted) In-sity concrete

Page 80: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.80 Indian standards prescribe minimum .. Grade for R.C.C.

a) M 40b) M 30c) M 20d) M 10

Page 81: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.81 Compressive strength of R.C.C.is primarily due to ..

a) High factor of safetyb) Concrete portionc) Steel portiond) Mix design

Page 82: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.82 Precast or pre-fabricated concrete members are cast and cured ..

a) In the forms at the site itselfb) Before using for constructionsc) In the factory under uncontrolled conditionsd) Properly near a water body

Page 83: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.83 Main advantages of pre-cast or pre-fabricated concrete is ..

a) Fast-track constructionsb) Cost savingc) Less material requiredd) Less labour required

Page 84: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.84 Mnimum concrete grade for pre-stressed concrete is ..

a) M 40b) M 30c) M 20d) M 10

Page 85: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.85 prestressed members are generally designed and used for ..

a) Long span girdersb) Short columns of bungalowsc) Footingsd) Lintels and sills of windows

Page 86: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.86 Pre-tensioning process of prestressed concrete means ..

a) Cable is tensioned and put in to the concreteb) Tensioned cables are purchased and usedc) Cable is tensioned before concretingd) Cable is tensioned after concreting

Page 87: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.87 Tensioning of cable of a prestressed concrete member is typically done by using ..

a) Hydraulic ramb) Hydraulic motorc) Electric jackd) Hydraulic jack

Page 88: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.88 ‘Post-tensioning’ in the context of prestressed concrete means ..

a) Applying pull to the cable while concreting work is done

b) Applyng tension to the cable before concreting

c) Pulling the cable after concretingd) Purchasing and using redy-made tensioned

cable

Page 89: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.89 Precast blocks have main advantage of ..a) Reducing wastageb) Reducing costc) Improved strengthd) Multiple uses

Page 90: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.90 Curing of concrete is necessary for ..a) Closing the holes and cracksb) Checking the water proofing quality of

concretec) Initiating chemical reaction with cementd) Dissipation of heat of hydration

Page 91: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.91 Vibration of wet concrete is done for ..a) Removing excess waterb) Checking strength of formworkc) Avoiding honey-combingd) Improving the strength of cement

Page 92: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.92 Final (expected or designed) strength is achieved by concrete ..

a) Immediately after hardeningb) In about one weekc) In about two weeksd) In about a month

Page 93: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.93 .. Materials respond to the changes in the surroundings.

a) Specialb) Smartc) Costlyd) electronic

Page 94: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.94 Which of the following is not a valid type (class) of bricks ?

a) Zhamab) Class-IIc) Class-IVd) Class-III

Page 95: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.95 Approximate cost of construction materials in the total cost of construction work (project) varies from ..

a) 10 % to 20 %b) 20 % to 25 %c) 10 % to 40 %d) 30 % to 50 %

Page 96: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.96 Speed of construction mainly depends on ..

a) Availability of materials and labourb) Availability of electricity and roadsc) Accessibility of the sited) Engineer in-charge

Page 97: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.97 Oldest building material of man-made category is ..

a) Brickb) Cementc) Timberd) Stone blocks

Page 98: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.98 Uniform coloured, plane surfaces, fairly straight edges of a brick indicate that ..

a) It is a machine made brickb) It is a class-III brickc) It is a class-I brickd) It is a zhama brick

Page 99: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.99 Slightly under-burnt brick with non-straight edges and surface is termed as .. brick.

a) Class-IIIb) Class-IIc) Zhamad) Class-I

Page 100: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.100 Which of the following does not indicate use of bricks ?

a) B.B.L.C.b) Footing for light foundationsc) Pavementsd) roofing

Page 101: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.101 Now-a-days uses of bricks are very much reduced because ..

a) they have to be importedb) Non-availability of proper soilc) Expertise is not availabled) Fashion has changed

Page 102: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.1O2 More use of cement blocks for walls is due to ..

a) Speedy construction with material savingb) Labour is available at cheap ratesc) People do not like bricks now-a-daysd) Change of fashion

Page 103: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.103 Fire-clay bricks are used for furnaces because ..

a) It is mandatory as per rulesb) They do not easily breakc) They withstand high tensionsd) They withstand very high temperatures

Page 104: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.104 For places with very high temperatures and heat, .. bricks are used.

a) Zhamab) Class-Ic) Class-IIId) Fire-clay

Page 105: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.105 Lime stone gets converted in to .. Under high temperatures and high pressures.

a) Marbleb) Basaltc) Sandstoned) Black stone

Page 106: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.106 The sedimentary rocks typically contain ..

a) Sands and bouldersb) Planes of stratificationc) Micad) Iron ores

Page 107: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.107 .. Of the following is not the use (application) of stones.

a) Ballast for railwaysb) Coarse aggregatec) Roof coveringd) Cement manufacturing

Page 108: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.108 Use of mortar is mainly for ..a) Foundationsb) plasteringc) Fittingd) Painting

Page 109: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.109 Fe 250 means ..a) Mild steel with yield strength 250 N/mm2

b) Tor steel with compressive strength 250 N/m2

c) Ferrous equivalent of 250d) Ferric material with melting point 2500cs

Page 110: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.110 Excessive shrinkage and cracks in plaster are reduced because of ..

a) Sandb) Cementc) Silicad) Pure water

Page 111: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.111 Plain cement concrete with 15 N/mm2

Comprssive strength is designated as ..a) PCC-15b) IS-PCCc) M 15d) PCC-M 15

Page 112: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.112 When mild steel bars are used in a cement concrete, it is knowns as ..

a) R.C.C.b) P.S.C.c) P.C.C.d) M.S.C.C.

Page 113: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.113 Designation ‘MXX’ for a concrete indicates ..

a) Concrete mix of compressive strength XXb) R.C.C.with tensile strength XXc) Concrete material of bonding strength XXd) Concrete mix having tensile strength XX

Page 114: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.114 A layer of .. Is generally used below foundations for levelling.

a) R.C.C.b) P.C.C.c) D.P.C.d) Sand or coarse aggregate

Page 115: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.115 For filling minor voids and gaps in wet concrete, .. Are used.

a) Conveyor beltsb) Hydraulic jacksc) Hammersd) vibrators

Page 116: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.116 Meaning of ‘prestressing’ is ..a) Relieving the tensionb) Setting up compressive stressesc) Tightening the anchor boltsd) Inducing tensile stresses

Page 117: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.117 A prestressed member can with stand more loads due to ..

a) The tension set up in the cableb) Better quality of cementc) Very large sections usedd) Use of anchor bolds

Page 118: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.118 Precast concrete is mainly used for ..a) Damsb) Steel pipesc) Doors and windowsd) Building components

Page 119: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.119 .. Of the following is irrelevent for R.C.C.a) Tor steelb) Waterc) Channel sectiond) Form work

Page 120: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.120 For pointing, plastering, grouting, etc .. Is used.

a) R.C.C.b) P.C.C.c) Mortard) sand

Page 121: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.121 A layer of .. Is used below glazed tile flooring.

a) R.C.C.b) P.C.C.c) Mortard) sand

Page 122: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.122 A prestressing cable consists of ..a) High tensile strength steel wiresb) Optic fibersc) T.M.T. barsd) Tor steel and T.M.T. bars

Page 123: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.123 Precast building blocks are stronger than bricks due to ..

a) Their durabilityb) Their high compressivec) Their size and shaped) Their high tensile strength

Page 124: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.124 Cavity walls and sound proofing is generally done by using ..

a) Stonesb) bricksc) Bricks hallow precast blocksd) Holes in masonary

Page 125: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.125 Hollow precast blocks are useful for ..a) Basementsb) Mezzanine floorsc) Roofd) Partition walls

Page 126: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.126 Precast building blocks manufactured on the site it self do not contain ..

a) Large sized, coarse aggregateb) Sandc) Waterd) cement

Page 127: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.127 Out of the following; .. Is not a building material and not used for walls (masonry)

a) Limeb) Cementc) Clayd) varnish

Page 128: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.128 Ordinary portland cement contains .. Which imports strength to the cement.

a) Limeb) Silicatec) Irond) clay

Page 129: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.129 The constituent known as alumina (AL2O3) serves the purpose of .. For O.P.C.

a) Quick settingb) Imparting grey colourc) Providing finenessd) Imparting binding property

Page 130: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.130 The compounds like lime, silicate, alumina, iron oxide, etc. are burnt and partly fused at very high temperature to get .. , which is then cooled and crushed or ground to required fineness.

a) Cinderb) Cementstonec) Clinkerd) cement

Page 131: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.131 A hissing sound can be heard when cement and water are mixed together because of ..

a) Exothermic chemical reactionb) Endothermic reactionc) Property soundness of cementd) Cement lumps

Page 132: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.132 Slightly irregular edges and surfaces if brick with small hair-line cracks are classified as .. Bricks.

a) class-IIIb) class-Ic) class-IId) fireclay

Page 133: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.133 .. Of the following is not correct use of stones as a building material.

a) Masonryb) Course aggregatec) Roof coveringd) Concrete reinforcement

Page 134: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.134 .. Is obtained from river beds, pits, sea, shores, etc.

a) Basaltb) Artificial sandc) Natural sandd) lime

Page 135: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.135 Natural resources can be partly conserved and preserved by ..

a) Recycline materialsb) Green housesc) Tree plantationd) biodiversity

Page 136: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.136 Advantages of prefabricated or precast concrete members are ..

a) Expected strength and qualityb) Recycling of materialsc) Less consumption of sandd) Multiple uses for buildings

Page 137: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.137 .. Of the following is not a component of R.C.C.

a) Steel barsb) Artificial sandc) Limed) Coarse aggregate

Page 138: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.138 Grade of concrete with nominal mix 1 : 1 : 2 has ultimate strength of about ..

a) 10 N/mm2

b) 12 N/mm2

c) 15 N/mm2

d) 25 N/mm2

Page 139: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.139 For mass concrete and bed concrete generally .. Grade of concrete is used.

a) 1:1:2b) 1:11/2:3c) 1:3:6d) 1:5:10

Page 140: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.140 For concreting in extreme weather conditions, it is essential to use .. In concrete.

a) Coloured cementb) Special admixturesc) Large diameter barsd) Brittle steel bars

Page 141: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.141 For expected strength and durability .. Of concreting is very important for suufficient period.

a) Curingb) Mixingc) Vibrationd) recycling

Page 142: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.142 R.C.C. is used for multistored buildings because ..

a) It is environment friendlyb) Recycling become easyc) It is water proof and sound proofd) It has good strength in tension as well as in

compression

Page 143: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.143 Which of the following is not an eco-friendly material ?

a) Bamboob) Mudc) Glassd) plywood

Page 144: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.144 Recycling of materials helps for ..a) Environmental degradationb) Green house effectc) Maximising available spaced) Energy saving and reduction in green-house

gases

Page 145: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.145 Concrete as a demolished waste material can be recycled for ..

a) Road baseb) R.C.C.workc) Mortard) playgrounds

Page 146: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.146 .. Of various types is reduced by recycling of construction materials.

a) Ecosystemsb) Biodiversityc) Pollutiond) foundations

Page 147: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.147 The left over (excess) materials, repeated renovation works, etc. produce .. Materials, which can be recycled.

a) Organic wasteb) Mixed wastec) Construction and demolitiond) crushed

Page 148: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.148 bricks as a C.and D. material can be recycled and used as ..

a) Brick-batsb) Masonryc) Pavementsd) foundations

Page 149: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.149 C.and D. type of materials from upto .. Percent of solid wastes at residential or commercial sites.

a) 50b) 30 to 50c) 10 to 20d) 70 to 90

Page 150: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.150 There is a considerable decrease in the consumption of natural resources due to ..

a) Recycling of materialsb) Less construction activitiesc) Artificial materialsd) Reduction in manufacturing industries

Page 151: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.151 Economy and protection of natural environment can be simultaneously achieved by ..

a) Smart materialsb) Green constructionsc) Recycling of materialsd) Environmental impact assessment

Page 152: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.152 ..Can be segregated from demolished R.C.C.structures.

a) Cementb) Sandc) Coarse aggregated) reinforcement

Page 153: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.153 Removed or demolished asphalt pavement can be crushed and .. Can be recycled at least partly or wholly.

a) Sandb) Asphaltc) Coarse aggregated) Brick-bats

Page 154: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.154 Asphalt can be recycled from demolished ..

a) Asphalt pavementb) Damp proof coursec) Roofd) flooring

Page 155: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.155 Cost of raw material manufacturing and fuel can be saved by ..

a) Automated plantsb) Recycling the materialsc) Waste treatment plantsd) Using smart materials

Page 156: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.156 Vertical downward movement or displacement of foundation is knowns as .. Of foundation.

a) Angular deformationb) Vibrationc) Settlementd) bearing

Page 157: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.157 Purpose of foundation is ..a) To give strength to the buildingb) To prevent settlementc) To avoid collapse of buildingd) To transfer loads to the subsoil

Page 158: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.158 For shallow foundations, relation between foundation depth D and foundation width B is given as ..

a) D ≤ Bb) D > Bc) D > 1.5 Bd) D ≤ 1.5 B

Page 159: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.159 The incorrect statement of the following is ..a) foundation increases compressive strength of

buildingb) Foundation provides stability and safety for

structuresc) Foundation distributed loads over wider areasd) Foundation provides level surface for the

structure

Page 160: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.160 If the depth of foundation is greater than its width, it is called ..

a) Shallow foundationb) Deep foundationc) Thin foundationd) Isolated foundation

Page 161: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.161 Out of following, .. Is not a type of combined footing (1.e. provided for more than one columns)

a) Sloped footingb) Rectangular combined footingc) Trapezoidal footingd) Mat or raft footing

Page 162: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.162 Typically a .. Foundation is provided for steel column.

a) Cantileverb) Mat or raftc) Steppedd) grillage

Page 163: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.163 For building foundation, IS 6403: 1981 specifies a factor of safety = ..

a) 0.80b) 1.2c) 2.5d) 3.2

Page 164: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.164 The correct relationship out of the following is ..

a) U.B.C.= S.B.C./F.O.S.b) Factory of safety = U.B.C./max. loadc) U.B.C. = (S.B.C.) X (F.O.S.)d) F.O.S. = safe load/ultimate load

Page 165: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.165 B.C. of soil can be determined using .. As a reliable method.

a) Plate load testb) Cone penetration testc) Triaxial compaction testd) Differential settlement test

Page 166: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.166 Foundation settlement is caused primarily by ..

a) Earthquakesb) Lowering of water tablec) Vibrations of the structure (building)d) Sub-soil consolidation under static load

Page 167: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.167 Differential settlement of foundation means ..

a) Settlement at different timesb) Non-uniform settlement of different parts of

foundationc) Settlement under different loadsd) Settlement in different soils

Page 168: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.168 Differential settlement of foundation may occur due to ..

a) Loose or different soil pocketsb) Lowering of water tablec) Bad designd) Increase in loads

Page 169: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.169 Pile foundation is a type of .. Foundation.

a) Shallowb) Isolated columnc) Combinedd) deep

Page 170: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.170 Wall footing is also known as .. Footinga) Strapb) Stripc) Steepedd) sloped

Page 171: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.171 For heavily loaded steel column of a shed, .. Foundation is preferrable.

a) Beltb) Stripc) Slopedd) grillage

Page 172: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.172 Cantilever or strap footing is a type of .. Footing.

a) Combinedb) Isolatedc) Stripd) stepped

Page 173: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.173 .. Foundation has an inverted slab at the foundation level over entire area, combining all columns.

a) Combinedb) Raft or matc) Grillaged) sloped

Page 174: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.174 Combined footing is provided with the main purpose of avoiding ..

a) Uniform settlementb) Uniform displacementc) Eccentric loadingd) Differential settlement

Page 175: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.175 Type of pile foundation knowns as .. Pile has its lower end resting on hard stratum.

a) End bearingb) Frictionc) Caissond) Built in

Page 176: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.176 For .. Pile foundation, load is resisted by means of skin friction.

a) End bearingb) Frictionc) Caissond) Built in

Page 177: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.177 End bearing pile transfers load to the hard strata through ..

a) Its skin frictionb) Impactc) Its lower endd) Its sides and bottom

Page 178: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.178 Two tiers of beams are used in .. Foundation.

a) Combinedb) Mat or raftc) Trapezoidald) Grillage

Page 179: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.179 Strip footing is provided for ..a) Compound wallb) Steel columnsc) Combined columnsd) Mat or raft foundation

Page 180: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.180 For a bridge pier of deep gorge bridge, .. Foundation is provided.

a) Steppedb) Grillagec) Piled) Isolated column

Page 181: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.181 For good B.C. of soil and moderately loaded columns, .. Is provided for each column.

a) Stepped footingb) Isolated column footingc) Piled) Cantilever beam

Page 182: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.182 A square isolated column footing will ideally mean ..

a) The column has square cross sectionb) The column has rectangular cross sectionc) B.C. is poor and column is heavily loadedd) It is for steel column

Page 183: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.183 If all parts of foundation settle by the same amount, it is known as ..

a) Zero settlementb) Uniform settlementc) Differential settlementd) Excessive settlement

Page 184: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.184 Zero uniform settlement will be possible if ..

a) Hard strata like rock is available at foundation level

b) Ground water is not drained outc) Expensive soils such as black cotton soil is

below foundationd) The loads are less on foundation

Page 185: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.185 Excessive settlement of foundation is obvious if .. Exists below the foundation.

a) Isolated soil patchesb) Combined footingc) Vibrationsd) Expansive soil such as black cotton soil

Page 186: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.186 Usual normal range of factor of safety for foundations is ..

a) 0 to 1b) 1 to 2c) 2 to 4d) -1 to 0

Page 187: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.187 If footing occupies more than 50 % of area, foundation is practically more effective.

a) Mat or raftb) Pilec) Combined trapezoidald) strip

Page 188: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.188 Out of the following, maximum settlement of foundation is expected if .. Exists below the foundation.

a) Murumb) Stratified rocksc) Basaltd) Dry sandy soil

Page 189: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.189 For one of the types of combined foudation , two columns are structurally connected by ..

a) Cantilever beamb) Steel beamc) Thick slabd) pile

Page 190: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.190 Out of the following, .. Is not a component of superstructure.

a) Roofb) Beamsc) Footingsd) columns

Page 191: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.191 Brick masonry is generally .. As compared to stone masonry.

a) Cheaperb) Costlierc) As costlyd) heavier

Page 192: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.192 Reduction in live load for building with one floor is ..

a) 30 %b) 20 %c) 10 %d) 0 %

Page 193: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.193 Maximum reduction in live load for a building is ..

a) 60 %b) 50 %c) 40 %d) 100 %

Page 194: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.194 Dead load of R.C.C. is ..a) 16 KN/m3

b) 22 KN/m3

c) 23 KN/m3

d) 25 KN/m3

Page 195: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.195 For residential building, minimum live load is .. Of floor area.

a) 6 KN/m2

b) 5 KN/m2

c) 2 KN/m2

d) 1 KN/m2

Page 196: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.196 Minimum live load for workshops, warehouses is .. KN/m2 of floor area.

a) 10b) 3c) 2d) 1

Page 197: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.197 .. Has maximum dead load (KN/m3).a) R.C.C.b) Stone masonryc) Basaltd) steel

Page 198: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.198 Dead load is nothing but .. Of construction materials.

a) Volumeb) Massc) Self weightd) area

Page 199: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.199 Wind pressure on structures (buildings) is proportional to ..

a) Wind velocity vb) Square of wind speed vc) Square-root of wind speed vd) Cube of wind velocity v3

Page 200: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.200 Immovable, fixed load is termed as ..a) Attached loadb) Live loadc) Superimposed loadd) Dead load

Page 201: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.201 Load bearing structure is effective and economical up to .. Floors.

a) 1 to 2b) 2 to 3c) 3 to 4d) 4 to 5

Page 202: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.203 Unit of wind pressure is ..a) KNb) KN/m2

c) KN/m3

d) KN/m4

Page 203: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.204 Generally accleration due to earthquake in terms of gravitational accleration is taken as .. X g.

a) 1 to 5b) 0.1 to 0.5c) 0.5 to 1d) 0.05 to 0.01

Page 204: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.205 In the flooring, .. Is filled below the bed concrete.

a) Coarse aggregateb) Brickbatc) Murumd) mortar

Page 205: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.206 20 % reduction in the load is for a building with .. Floors.

a) 2b) 3c) 4d) 5

Page 206: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.207 .. Is negligible for buildings with small height.

a) Wind loadb) live loadc) dead loadd) snow load

Page 207: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.208 In a framed structure, .. Merely enclose the space.

a) Wallsb) Beamsc) Slabsd) columns

Page 208: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.209 Most difficult task in stone masonry construction is ..

a) Carrying stone on upper floorsb) Stone jointsc) Dressing of stoned) plastering

Page 209: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.210 Out of the following, .. Need plastering.a) Stone wallsb) Roofsc) False ceilingsd) Brick walls

Page 210: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.211 Vertical joints of a brick masonry are ..a) Continuously verticalb) Staggered c) Very thind) Very thick

Page 211: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.212 Walls of a load bearing construction on the ground floor are always .. Than upper floors.

a) Thickerb) Hallowc) Tallerd) unplasrered

Page 212: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.213 Load transfer for a framed construction is through .. Of beam and columns.

a) Meshb) Networkc) Frame workd) slab

Page 213: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.214 .. Resists earthquake loads more efficiently

a) Framed structureb) Load bearing structurec) Steel structured) Composite structure

Page 214: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q. 215 Large pieces of stones used in construction are called ..

a) Coarse aggregateb) Metalc) Artificial sandd) rubble

Page 215: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.216 Bonding and laying bricks in .. Is known as brick masonry.

a) Plasterb) Brick masonryc) Mortard) cement

Page 216: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.217 Brick masonry generally has .. Horizontal joints.

a) Straightb) Staggeredc) Meshedd) hallow

Page 217: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.218 One of the requirements of brick masonry is ..

a) Dead loadb) Live loadc) Verticalityd) horizontality

Page 218: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.219 Main difference between stone masonry and brick masonry is .. For a building.

a) Plasteringb) Verticalityc) Bondd) mortar

Page 219: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.220 Durability and appearance of wall is improved by ..

a) Jointsb) Curingc) Plasteringd) concreting

Page 220: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.221 .. Should be well soaked in water before using for walls.

a) Bricksb) Concretec) Mortard) reinforcement

Page 221: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.222 Generally .. Construction is slow.a) Compositeb) Load bearingc) Framedd) combined

Page 222: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.223 For large number of floors, load bearing structure is not preferrable because available .. On ground floor keeps reducing with increase in numbers of floors.

a) Built up areab) Plot areac) Live loadd) Carpet (usable) area

Page 223: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.224 Automated and robotized construction systems reduce ..

a) Unemploymentb) Time of constructionc) Speed of constructiond) Factor of safety

Page 224: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.225 Countries with high labour cost and labour shortage generally prefer ..

a) Rental housesb) Unskilled labourc) Old constructionsd) Automated/robotized systems

Page 225: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.226 Improved quality and improved working conditions are the characteristics of .. In construction industry.

a) Automationb) Unemploymentc) Traditionsd) Unskilled labour

Page 226: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.227 Automated drilling, remotely controlled robots are essentials of ..

a) Mining automationb) Building automationc) Manual tunnelingd) Automatic concreting

Page 227: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.228 Concrete manufactured in a factory, brought to the site and pumped in to the formwork for multistoreyed buildings is known as ..

a) P.C.C.b) R.C.C.c) R.M.C.d) P.S.C.

Page 228: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.229 For expressway project; .. Of the following is not used as a part of automation.

a) Contouring softwareb) Asphalt paverc) R.M.C.d) profilometer

Page 229: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.230 For a multistoreyed building, materials are efficiently transported on upper floors by using .. As a part of automation.

a) Liftsb) Unskilled laboursc) Dumpersd) Tower cranes

Page 230: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.231 .. In construction is a machine intensive system rather than labour intensive system.

a) Softwareb) Automationc) Vehiclesd) electronocs

Page 231: Q.1 Speed of mega project can be increased by using.. a)Automation b)Software c)Latest computers d)Latest materials

Q.202 Dead load is obtained by calculating ..a) Unit weight x volumeb) Unit weight/volumec) Mass/volumed) Mass x volume