putzmeister concrete technology

13
Our solutions for economic concrete placing Putzmeister Concrete Technology BP 4200 GB 1 2 3 4 5

Upload: buicong

Post on 03-Jan-2017

249 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: Putzmeister Concrete Technology

Our solutions for economic concrete placing

Putzmeister Concrete Technology

BP 4200 GB

1

2

3

4

5

Page 2: Putzmeister Concrete Technology

2 BP 4200 GB 3BP 4200 GB22 BP 4200 GBBP 4200 GB BP 4200 GBBP 4200 GB

Whether in construction, underground work or civil engineering projects, on a small building site or as part of a large project – Putzmeister concrete pumps and placing systems can be found on construction sites throughout the world.

Truck-mounted concrete pumps with fl ex-ible booms and a wide range of equip-ment options, high-pressure concrete

Putzmeister Concrete Technology

We are specialists in pumping and placing of concrete – worldwide

pumps for extreme applications convey-ing to great heights and over long dis-tances, as well as placing booms and system accessories are able to cope with every kind of demand.

Technical innovations and the very high-est quality standards in manufacturing and service are at the heart of what we do.

Today, Putzmeister offers a broad pro-duct range across the world, featuring machines innovative functions. And, with more than fi ve decades of experience in conveying and placing concrete, our cu-stomers can rely on us as experts for as-sistance with their challenging projects.

innovative

qualitative

future-oriented

economic

We offer a broad range of pumps and placing booms to optimise your fl eet

We lead the way in innovation

We implement strict quality assurance, from development right through to production

We use the highest quality materials and specially designed components

Our machines undergo the harshest tests and fulfi l the high statutory safety standards

Our machine technology pays for itself

We supply a comprehensive range of equipment and options for practical operations

Our service network is very accessible to customers – worldwide

We provide systems engineering and advice for economical complete solutions

8

Page 3: Putzmeister Concrete Technology

Machines and service…

…from Putzmeister„I expect reliability. At all times.“

„I must be able to work effi ciently and safely.“

„The operating costs must be low and readily calculated.“

„I want good service when it’s needed.“

„My job is to place concrete, quickly and to the satisfaction of my customers. That’s why I use a Putzmeister pump.“

The Ergonic® Pump System (EPS) pro-vides optimum control for pumping operations. The Ergonic® Boom Con-trol (EBC) provides, among other things, for the precise, easy control of the end hose. The Ergonic® Graphic Dis-play (EGD) shows the current infor-mation about the machine.

„Burj Khalifa, Dubai 2007: A new high-rise world record with a pumping height of 606 m. 165,000 cubic metres of high-performance concrete. 400 bar concrete pres-sure with an average pumping out-put of 40 cubic metres per hour.“

„Because I don’t want any unpleasant surprises on the con-struction site, I have taken precau-tions: with Putzmeister.“

„What makes good service? Competent, fast help without the need to go far. Full stop.“

Putzmeister has a comprehensive service network, with qualifi ed ser-vice technicians in over 150 countries all over the world. Tested spare parts are used, even in machines that have been used for 20 years.

Assistance systems for supporting the truck-mounted concrete pump, such as OSS (One-Side Support) ensure great-er safety during operations and take up less space on the construction site. The variable-position telescopic support (on large booms) greatly increases its useful working range. Practical equipment and a comprehen-sive range of accessories, e.g. a power-ful high-pressure cleaner helps with work on the construction site.

A project like this demands a truly re-liable technology: high-quality system components, made by leading manufac-turers to the high Putzmeister quali-ty standards. Extensive tests to which Putzmeister machines are subjected beforehand. Top quality parts reduce wear and increase the service life. Good accessibility, e.g. of cylinders, and functions such as the centralized gauge ports make maintenance and servic-ing easier.

Putzmeister has well-conceived solutions for minimising operating costs: The EPS intelligent pump control system, and components that reduce wear and fuel consumption, such as the HLS core pump or a weight-optimised design. A range of packages through to a full service contract ensure that costs can be readily calculated. Competent advice, planning and training are important for successful projects. The i-Daisy fl eet management system en-sures transparency and keeps costs to a minimum.

Comprehensive machine documentation means that the correct spare part can be located quickly. Fault diagnosis on the machine provides rapid assistance during servicing. Manufacturer inspec-tions increase the service life. Cer-tifi ed training and further educa-tion at the Putzmeister Academy ensures greater competence and safety.

9

10

11

12

4 BP 4200 GB 5BP 4200 GB

Page 4: Putzmeister Concrete Technology

� BP 4200 GB �BP 4200 GB

Putzmeister truck-mounted concrete pumps are available for diverse applica-tions and feature placing booms with a vertical reach from 20 m to �0 m, deliv-ery rates of up to 200 m3/h and concrete pressures of up to 130 bar. Our pumps have proven to be resilient and reliable workhorses in long-term usage throughout the world. This is based on 50 years of experience in the development of pumps, booms and base structures. Only through the opti-mum combination of boom length (load torque), boom kinematics, standing weight and support measures is it pos-sible to continuously create success-ful concrete pumps such as the almost legendary Putzmeister M 3�.

Putzmeister offers one of the widest ranges of truck-mounted concrete pumps in the worldStay ahead of the game with Putzmeister truck-mounted concrete pumps

Our comprehensive product range in-cludes suitable machines for meeting country-specific licensing regulations (permitted total weight, axle loads, safety regulations, etc.)

Low operating costs due to low-wear materials and intelligent control sys-tems for reducing fuel consumption

User-friendly and safe due to ergono-mic design and assistance systems for individual functions

n

n

n

Used on construction sites all over the world: Putzmeister truck-mounted concrete pumps with a vertical reach from 20 to �0 m

The type of folding, number of boom arms and joint angles are optimally aligned for specific applications

Maximum stability and net reach with flexible supports

Highest quality thanks to profession-al processing of the best available materials and high-strength steel up to S 9�0

CE marking: more than just a label! At Putzmeister, EU Directives and harmonised standards such as EN 12001 form the basis of development and are applied right the way through to commissioning.

n

n

n

n

1

13

14 15

Truck-mounted concrete pumps

Page 5: Putzmeister Concrete Technology

9BP 4200 GB

Stationary concrete pumps and booms

For the highest demands and economic solutions

Stationary concrete pumps of different output classes get the work done eco-nomically and reliably. They are equal-ly at home with world record projects – such as the Burj Khalifa – and normal construction and civil engineering pro-jects, or as specialists in tunnelling or power plant construction. Putzmeister pumps, placing booms, sys-tems engineering and service combine to give an economic, comprehensive solu-tion.

Large Putzmeister placing booms with reaches of 38 – 50 mu

A BSA 1408 pumps concrete over 150 m to a stationary boom during the construction of the KOPS II pumped storage power plant in the Montafon, Austria

t

Last but not least, our reliable systems engineering with delivery lines, transfer tubes and cleaning gallows, guaranteed record high-rise pumping at the Burj Khalifa site, Dubai

q

A compact stationary concrete pump at workq

High-output concrete pumps for a va-riety of applications – from compact trailer concrete pumps for e.g. fine concrete, liquid screed or shotcrete, through to super-high pressure pumps for extreme delivery rates and distances

Optimised pump control – Ergonic® Pump System fitted as standard – for economic operation

n

n

Modern placing booms on free-standing or auto-climbing tubular columns or on lattice towers, together with proven systems engineering, accessories and components for efficient concrete distribution

Comprehensive advice, economic design and capacity advice, planning and assistance

n

n

1�

1�

18 19

20

Page 6: Putzmeister Concrete Technology

10 BP 4200 GB

„Eine Betonpumpe sollte meine tägliche Arbeit erleichtern“

11BP 4200 GB

PUMI® truck-mixer concrete pumps

The PUMI® – the original by Putzmeister

Flexibility with a capital F: Transporting, pumping, placing – all with one machine and just one machine operator. This saves time and money.

Since 19��, increasing numbers of cus-tomers have been satisfied with the ad-vantages offered by a PUMI®. It is an ad-dition to the fleet of truck-mixers held by service and customer-oriented suppliers

of ready-mixed concrete and significantly extends the range of jobs they can take on. In particular, it can be operated effi-ciently and quickly in small construc-tion sites up to approximately 20 m3. And wherever there is not much space, it comes into its own due to its narrow set-up dimensions. That is, it can be used on cramped construction sites, in cities and in crowded residential areas.

PUMI®s come with flexible placing booms from 21 to 31 m vertical reach

Three different pumping systems for every requirement: rotor pump, CS piston pump and S transfer tube piston pump

n

n

Economic concreting on small construction sites – with the PUMI®

Rotor pump

CS piston pump

S transfer tube piston pump

21

22

23

24

25

2�

Page 7: Putzmeister Concrete Technology

12 BP 4200 GB

„Eine Betonpumpe sollte meine tägliche Arbeit erleichtern“

13BP 4200 GB

Economic solutions for the precast parts industry

Autocor® – quick, clean and fully- automatic concrete placement

Autocor® benefits at a glance:

Ideal for precast concrete parts plants which produce medium or large structural parts and use pumpable normal concrete or self-compacting concrete

Increases the production volume by up to �0 %

Higher quality of parts thanks to continuous concrete placement

Cleaner process thanks to closed system

No expensive and time-consuming lining of the formwork thanks to flexible boom

Formwork can be filled from top or bottom

Separates crane operation from the concreting process

n

n

n

n

n

n

n

Autocor® covers systems for the pump-ing and distribution of concrete in pre-cast parts works. Autocor® is particularly useful in works which use pumpable or self-compacting concrete to produce precast parts.

Autocor® solutions can be rail-mounted, mobile or stationary within the factory shed. Autocor® systems can be made up of different combinations of placing booms (1� – 28 m) and concrete pumps (rotor and piston pumps) to suit your re-quirements.

Autocor® system solutions are available as mobile or stationary variants, for filling from top or bottom, by placing boom, rotary distributor or stationary delivery line. Your individual requirements will determine which proven Putzmeister components you will use to make up your Autocor® system.

2� 28

29 30

31

32

Page 8: Putzmeister Concrete Technology

14 BP 4200 GB 15BP 4200 GB

Real concrete placement specialists

Tunnel constructionInfrastructure projectsLarge-scale projects

Shotcrete in tunnel construction with the high-output Putzmeister pumps and manipulators

Shotcreting is an indispensable process for concreting in modern tunnel construc-tion: with low spray mist, little rebound, low energy consumption and comparably low-cost installation.

Shotcrete manipulators for concrete application rates of up to 30 m3/h with vertical and horizontal reaches of up to 1� m

Compact stationary concrete pumps for manual wet spraying

Concrete application in tunnel construction

Concrete pumps and distribution systems for concreting floors, arches, track bedding and intermediate levels in tunnels, and for lining chambers

Formwork distributor for continuous backfilling

Complete concreting trains for tunnelling

n

n

n

n

n

Putzmeister offers efficient solutions for many other applications, e.g. bored pile foundations with self-driving concrete pumps on a crawler chassis. Just ask us.

1 Tunnel stabilisation with the Sika-PM500PC shotcrete manipulator

2 Slope reinforcement3 Manual shotcrete application 4 Concreting an inner formwork with

concrete pump and Twistip 5 Complete concreting trains for tunnelling� Concrete placing in formwork truck

t

1 2

3

4

5

6

33

34

35

3�

3�

38

39

40

Telebelt® – the mobile belt distrib-utor for the economic placement of concretes and bulk materials

With its telescopic conveyor belt with a horizontal reach of up to 39 m and output of 2�5 m3/h, the Telebelt® is practically unbeatable, for placing concrete quickly and economically. Suitable for all kinds of bulk materials – e.g. gravel, sand, substrate, soil, and of course, all kinds of concrete – it is the real all-rounder of any construction site. The Telebelt® is used, for example, in dam construction, when infilling in pits and track bedding, or constructing green roofs.

With the Telebelt® TBS 130 as a semi-trailer, the tractor unit is also available for other transport operations, making it even more economical.

Page 9: Putzmeister Concrete Technology

1� BP 4200 GB 1�BP 4200 GB

The challenges of a large project

Ambitious construction projects are a challenge for all those involved. Compe-tent advice, economic arrangements and capacity planning, general planning and support during the actual concrete pump-ing and placing are therefore critical fac-tors.

The Putzmeister Concrete Project Divi-sion (CPD) mechanical engineers and construction engineers have specialist knowledge of concrete pumping, the pressure and flow behaviour of concrete, and the calculation and configuration of demanding concrete pumping systems. Details of concrete installation quanti-ties, execution and site plans and details of the construction sequence (time sched-ules, site logistics) enable mutually be-neficial, optimised alternative solutions to be developed.

We plan construction site installa-tions, the set-up sites for placing booms, static specifications for the concrete pumping and placing tech-nology and much more.

We reduce costs and ensure avail-ability

Benefit from our professional support

We advise you on the composition and mixture breakdown of your pumping concrete

We train your employees on site, using the actual machines that they will be operating

n

n

n

n

n

World record delivery height at Burj Khalifa, Dubai · 606 m

World record facts1�5,000 m3 concrete pumped at an output of 40 m3/h – even on reaching the record height this was still 30 m3/h!400 bar maximum concrete pressure!High-performance concrete up to C100!Four stationary MX placing booms in use!

Comprehensive planning and preparation

3D site planning and new delivery line concept Development of the BSA 14000 SHPD super-high pressure pumpPump tests

n

n

n

n

n

n

n

Eagle’s nest tunnel, Hong Kong, China · Jumei-

rah Lake Towers, UAE · Arraya Tower, Kuwait

· Kárahnjúkar pumped-storage power station,

Iceland · Glendoe Water Power Plant, Scot-

land · Jordan Gate Project Amman, Jordan ·

City tunnel, Malmø, Sweden · Eureka Tower,

Australia · North-East MRT Line, Singapore ·

Limberg II Kaprun pumped-storage power sta-

tion, Austria · RWE Tower Dortmund, Germany · Kops II pumped-storage power station, Austria · Köröshegy motorway bridge, Hungary

· New York City Water Tunnel, USA · Doha City Center, Qatar · Twin Towers, Luxembourg · Strelasund crossing, Germany · The First

World, Korea · Montezic pumped-storage power station, France · Riva del Garda pumped-storage power station, Italy · Betzdorf tunnel,

Germany · Burj Khalifa, UAE · Montreal waste water collection system, Canada · Estangento Sallente pumped-storage power station,

Spain · LNG Tanks, Mugardos, Spain · Tunnel, Bangkok, Thailand · Neurath coal-fired power station, Germany · Lainzer tunnel, Vien-

na, Austria · Dubai Pearl, UAE · OpernTurm, Frankfurt, Germany · Le Refrain pressure pipeline, France · New Street, Dublin, Ireland

· Dubai Festival City, UAE · Western Trunk Sewer Project, Australia · Hilton Hotel, Manchester, UK · Upper Eastside, Berlin, Germany

Concrete delivery at the limits

41

42 43

Page 10: Putzmeister Concrete Technology

18 BP 4200 GB BP 4200 GB

Outstanding technology is our strength

Leading the way with innovation – well-designed and thoroughly tested

inside

19

Putzmeister machines and components are subjected to demanding testsq

Test in the cold chamber: a BSF 20-4 was operated in the climatic wind tunnel at minus 25 °C. The test clearly showed that Putzmeister pumps can deliver concrete even at this low temperature.

t

For over 50 years, the user-friendly and efficient pumping of concrete has been closely linked to innovations and ideas from Putzmeister. The Ergonic® systems for the control of placing booms and pumps offer increased placing output, greater safety and easier operation, as well as lower fuel and wear costs.

And to ensure that these innovations also function reliably in the long-term, com-ponents and new developments are sub-jected to numerous tests, such as

Life cycle simulations for placing booms

Wear tests for delivery lines, spectacle wear plates, etc.

Pulse tests and burst pressure tests for delivery and hydraulic hoses

Climate, temperature and spray tests for whole machines and components – ensuring that a concrete pump can be operated between – 15 °C and + 50 °C in accordance with standards.

Performance tests and continuous load tests, etc.

n

n

n

n

n

44

45

4�

Page 11: Putzmeister Concrete Technology

20 BP 4200 GB 21BP 4200 GB

Readily-calculated operating costs and high availability

Putzmeister Services

Our aim is to reduce costs, whether for a scheduled service or during ongoing operation of your machine.

Whenever you need help and advice, we are there for you in over 150 countries worldwide, providing a professional and reliable service. For example, Putzmeister can deliver tested, guaranteed original parts direct to your door, 24 hours a day.

modern, long-lasting filters and training of operatives in the correct servicing procedures. Our own in-house academy offers frequent seminars and courses, at Putzmeister or on site at your premises, teaching theory and practice. For greater safety, competence and efficiency.

You have complete cost transparency and the best possible availability with our full service contracts, in which all mainte-nance work and spare parts are calculated per cubic metre pumped. Alternatively, we also offer service packages covering certain aspects of maintenance and in-spection. Just ask us!

High-quality wear parts: Putzmeister quality adapted for all requirementsp

With our high-performance original wear parts you will ultimately save money. The individual parts of a delivery line, for ex-ample, are matched with one another for optimum replacement. There will be no sudden unpleasant surprises.

An important aspect of economic opera-tions is the oil management of the pump. We help you on the technical side with

We offer training courses and instructions worldwide for greater safety, competence and economic efficiency

t

Regular services and inspections increase availability and minimise operating costsu

4� 48

49

50

51

Page 12: Putzmeister Concrete Technology

22 BP 4200 GB 23BP 4200 GB

If you want to be successful globally, you have to be at home in the world. As well as our headquarters in Aichtal near Stutt-gart, we have numerous subsidi aries, production facilities, branches and deal-ers all over the world. That’s getting close to your customers! It’s only though them that we can really stay in touch with the requirements of in-dividual markets.

Paint centre

Truck-mount-ed concrete pump and

PUMI assembly

Mortar machines assembly

Administration/technologyMortar machines and

Solid pumps Putzmeister Academy

Parts warehousePurchasing/accounts

Goods in/dispatch

Hydraulic systems assembly Stationary concrete pumps

Core pumps, Solid pumps fi nal assembly

Radio testingBoom

assembly

AdministrationParts salesTechnical serviceTesting

Boom test area

Boom test area

Putzmeister products are used in more than 150 countries worldwide

We’re there, wherever you are in the world

China: Putzmeister Shanghai, Machinery Shanghai Co. / Shanghai · Japan: Putzmeister

Japan / Tokyo · Korea: Putzmeister Korea / Seoul · South Africa: Putzmeister South

Africa / Johannesburg · USA: Putzmeister America / Racine, Milwaukee · Tur-

key: Putzmeister Makina San / Cerkezköy · India: Putzmeister India / Goa · Italy:

Putzmeister Italia / San Clemente ·

UK: Putzmeister UK / Chesterfi eld ·

Spain: Putzmeister Ibérica / Madrid · France: Putzmeister France / Vert Saint Denis ·

Russia: Putzmeister RUS / Moscow · Germany:

Putzmeister Concrete Pumps GmbH in Aichtal

· Branches in Berlin-Basdorf, Hamburg-Seeve-

tal, Essen-Kettwig, Munich-Eching, Gera-Kor- bussen, Frankfurt-Gründau · Other international

representatives in Egypt, Algeria, Argenti- na, Australia, Bahrain, Belgium, Brazil, Bolivia,

Bulgaria, Chile, China, Costa Rica, Denmark, Ecuador, El Salvador, Finland, Ghana, Greece,

Guatemala, CIS, Hong Kong, India, Indonesia, Iran, Italy, Japan, Yemen, Jordan, former Yugoslavia, Canada, Qatar, Columbia, Ko-

rea, Cuba, Kuwait, Lebanon, Luxembourg, Malaysia, Malta, Mauritius, Mexico, New Zealand, Netherlands, Norway, Austria, Oman,

Pakistan, Peru, Philippines, Poland, Portugal, Romania, Saudi Arabia, Sweden, Switzerland, Singapore, Slovakia, Spain, Syria,

Taiwan, Thailand, Czech Republic, Turkey, Tunisia, Ukraine, Uruguay, USA, Venezuela, United Arab Emirates, Vietnam, Cyprus.

52

53

54

55

Page 13: Putzmeister Concrete Technology

The Putzmeister Group Concrete Technology PCT · Mortar Technology PMT Pipe Technology PPT · Water Technology PWT Industrial Technology PIT · Belt Technology PBTUnderground Technology PUC

Putzmeister Concrete Pumps GmbH Max-Eyth-Str. 10 · �2�31 Aichtal/Germany P.O.Box 21 52 · �2�29 Aichtal/Germany Tel. +49 (�1 2�) 599-0 · Fax +49 (�1 2�) 599-520 E-mail: [email protected] · www.putzmeister.com

Right to make technical amendments reserved © by Putzmeister Concrete Pumps GmbH 2010 All rights reserved Printed in Germany (2100�Sc)

BP 4200 GB