November 14, 2018 RE: Amendment One – Request for Bid (RFB) 11-28-2018 Ironwood Ridge High School Security Fence Improvements Below are questions/answers and additional information for the above referenced RFB. All other terms and conditions remain the same. (1) Working Hours? Work can be performed while the children are at school. Coordination will need to occur between the contractor, and the school administration. Contractor will be required to provide a barrier between their work and the children and administrators. (2) How to Weld the Fence Panels to the Posts? The Fence Panels need to be welded to the inside of the Fence Posts (3) What are the specifications for the Pickets? Terminate top of pickets 6” above top rail with caps. Except where noted otherwise. Picket Spacing: 5 inches o.c., maximum. (4) Will you assist with blue staking the area? Stake locations of fence lines, gates, and terminal posts. Do not exceed intervals of 500 feet or line of sight between stakes. Indicate locations of utilities, irrigation system, underground structures, benchmarks, and property monuments. The District will assist with irrigation location. (4) Who will locate the existing electric for the parking pole lights and scoreboard? No. The district will assist only but the contractor will need to locate the lines. (5) What is the finish coating? 1. Epoxy Zinc-Rich Primer for Uncoated Steel: Complying with MPI #20 and compatible with coating specified to be applied over it. 2. Intermediate Coat for Uncoated Steel: Epoxy or polyurethane intermediate recommended in writing by primer and topcoat manufacturer. PURCHASING/WAREHOUSE DEPARTMENT Brenda Widugiris Purchasing/Warehouse Manager 1001 W. Roger Road, Tucson, AZ 85705 (520) 696-3713 FAX (520) 696-3709 E-Mail: [email protected] GOVERNING BOARD MEMBERS SUPERINTENDENT Todd A. Jaeger, J.D. Deanna M. Day, M.Ed. President Vicki Cox Golder Vice President 701 W. Wetmore Road Tucson, AZ 85705 (520) 696-5000 www.amphi.com Scott A. Leska Susan Zibrat Scott K. Baker, Ph.D. Amphitheater High • Canyon del Oro High • Ironwood Ridge High Amphitheater Middle School • Coronado K-8 School • Cross Middle School • La Cima Middle School • Wilson K-8 School Copper Creek Elementary • Donaldson Elementary • Harelson Elementary • Holaway Elementary • Innovation Academy • Keeling Elementary Mesa Verde Elementary • Nash Elementary • Painted Sky Elementary • Prince Elementary • Rio Vista Elementary • Walker Elementary • Rillito Center Amphitheater Unified School District does not discriminate on the basis of race, color, religion/religious beliefs, gender, sex, age, national origin, sexual orientation, creed, citizenship status, marital status, political beliefs/affiliation, disability, home language, family, social or cultural background in its programs or activities and provides equal access to the Boy Scouts and other designated youth groups. Inquiries regarding the District’s non-discrimination policies are handled at 701 W. Wetmore Road, Tucson, Arizona 85705 by Anna Maiden, Equal Opportunity & Compliance Director, (520) 696-5164, [email protected], or Kristin McGraw, Executive Director of Student Services, (520) 696-5230, [email protected].

Upload: others

Post on 10-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PURCHASING/WAREHOUSE DEPARTMENT Brenda Widugiris ...€¦ · The Fence Panels need to be welded to the inside of the Fence Posts (3) ... Who will locate the existing electric for

November 14, 2018 RE: Amendment One – Request for Bid (RFB) 11-28-2018 Ironwood Ridge High School Security

Fence Improvements Below are questions/answers and additional information for the above referenced RFB. All other terms and conditions remain the same. (1) Working Hours? Work can be performed while the children are at school. Coordination will need to occur between the contractor, and the school administration. Contractor will be required to provide a barrier between their work and the children and administrators. (2) How to Weld the Fence Panels to the Posts?

The Fence Panels need to be welded to the inside of the Fence Posts (3) What are the specifications for the Pickets? Terminate top of pickets 6” above top rail with caps. Except where noted otherwise. Picket Spacing: 5 inches o.c., maximum. (4) Will you assist with blue staking the area? Stake locations of fence lines, gates, and terminal posts. Do not exceed intervals of 500 feet or line of sight between stakes. Indicate locations of utilities, irrigation system, underground structures, benchmarks, and property monuments. The District will assist with irrigation location. (4) Who will locate the existing electric for the parking pole lights and scoreboard? No. The district will assist only but the contractor will need to locate the lines. (5) What is the finish coating?

1. Epoxy Zinc-Rich Primer for Uncoated Steel: Complying with MPI #20 and compatible with coating specified to be applied over it.

2. Intermediate Coat for Uncoated Steel: Epoxy or polyurethane intermediate recommended in writing by primer and topcoat manufacturer.

PURCHASING/WAREHOUSE DEPARTMENT Brenda Widugiris

Purchasing/Warehouse Manager 1001 W. Roger Road, Tucson, AZ 85705 (520) 696-3713 • FAX (520) 696-3709

E-Mail: [email protected]

GOVERNING BOARD MEMBERS

SUPERINTENDENT Todd A. Jaeger, J.D.

Deanna M. Day, M.Ed. President

Vicki Cox Golder Vice President

701 W. Wetmore Road • Tucson, AZ 85705 • (520) 696-5000 • www.amphi.com

Scott A. Leska Susan Zibrat

Scott K. Baker, Ph.D.

Amphitheater High • Canyon del Oro High • Ironwood Ridge High Amphitheater Middle School • Coronado K-8 School • Cross Middle School • La Cima Middle School • Wilson K-8 School

Copper Creek Elementary • Donaldson Elementary • Harelson Elementary • Holaway Elementary • Innovation Academy • Keeling Elementary Mesa Verde Elementary • Nash Elementary • Painted Sky Elementary • Prince Elementary • Rio Vista Elementary • Walker Elementary • Rillito Center

Amphitheater Unified School District does not discriminate on the basis of race, color, religion/religious beliefs, gender, sex, age, national origin, sexual orientation, creed, citizenship status, marital status, political beliefs/affiliation, disability, home language, family, social or cultural background in its programs or activities and provides equal access to the Boy Scouts and other designated youth groups. Inquiries regarding the District’s non-discrimination policies are handled at 701 W. Wetmore Road, Tucson, Arizona 85705 by Anna Maiden, Equal Opportunity & Compliance Director, (520) 696-5164, [email protected], or Kristin McGraw, Executive Director of Student Services, (520) 696-5230, [email protected].

Page 2: PURCHASING/WAREHOUSE DEPARTMENT Brenda Widugiris ...€¦ · The Fence Panels need to be welded to the inside of the Fence Posts (3) ... Who will locate the existing electric for

Page 2 – Amendment One RFB 11-28-2018

3. Polyurethane Topcoat: Complying with MPI #72 and compatible with undercoat. 4. Finish Coating by Others

(6) What is the hardware for the gates? IVES H.B VR 910-NL US 32D Vandal Pull CS # 251954

Schlage 20-079 626 FSIC Rim Cyl Housing Less Core US26D CS # 214031 Schlage Cyl23-030-626 E Keyway CS #212-365 Schlage 30-016 626 NN Housing Assy Mort. CS#214-072 Von Duprin CD US26D 36” cyc. Dogging CS#130360

(7) In Work Areas #1 and #3 who is responsible for vegetation removal? The contractor is responsible for clearing the vegetation to make space for the new fence. (8) What is the specifications for the perforated metal? Metal, 20 GA, 1/16” Round on 3/32” staggered (9) In Work Areas #1 and #2 what is the clearance requirements between the fence and the fire hydrant and fire sprinkler connections?

A minimum of 4’ clearance is required on all sides. (10) How do you want the fence installed in the wash to prevent it from getting damaged in the event of high water?

Install breakaway pickets below the bottom rail which would allow water and debris to pass through prior to the main fence getting damaged in the event of a high water flow.

Work Zone #8 Clarifications

+ 15’ of 7’ High Chain Link Fence with a 5’Gate

Work Area #1 Clarifications Remove existing swing gate and posts (with concrete) and salvage to back to the owner. On the 2 - 3’6” Gates with Panic Hardware it is okay to plate and bolt into the concrete. For the 2 - 3’6” Gates install Spring Hinges: BHMA A156.17, Grade 1, suitable for exterior use, with Function: 320 - Gate spring pivot hinge. Adjustable tension and Material: Malleable iron; galvanized. On the 2 - 3’6” gates with Center Mullion change to 1 – 5’0 gate with panic hardware and gate closer LCN 4040. New Header Rail must be 2” above gate. Work Area #2 Clarifications Change 15’ service gate to 16’ service gate

Page 3: PURCHASING/WAREHOUSE DEPARTMENT Brenda Widugiris ...€¦ · The Fence Panels need to be welded to the inside of the Fence Posts (3) ... Who will locate the existing electric for

Page 3 – Amendment One RFB 11-28-2018

Change Install 2 - 3’6” Gates with Center Mullion and Panic Hardware to 2 -5’ Gates with Center Mullion and Panic Hardware and gate closer LCN 4040. New Header Rail must be 2” above gate. For the 4 Building Squares on the Eastside of the gym place on the inside of the square a top and bottom rail and pickets to enclose the square. Work Area #3 Clarifications Remove the 1 - 3’6” Gate Place New Wrought Iron Fence 3’ away from Basketball Court For the 1 - 3’6” Gates install Spring Hinges: BHMA A156.17, Grade 1, suitable for exterior use, with Function: 320 - Gate spring pivot hinge. Adjustable tension and Material: Malleable iron; galvanized. Lay Out for Start of Fence Work.

Work Area #4 Clarifications

Page 4: PURCHASING/WAREHOUSE DEPARTMENT Brenda Widugiris ...€¦ · The Fence Panels need to be welded to the inside of the Fence Posts (3) ... Who will locate the existing electric for

Page 4 – Amendment One RFB 11-28-2018

Section A

Install Perforated Metal over front of Gate. Metal, 20 GA, 1/16” Round on 3/32” staggered

Install Gate closer LCN 4040 moveable gates only. New Header Rail must be 2” above gate. Section B

Install Perforated Metal over front of Gate. Metal, 20 GA, 1/16” Round on 3/32” staggered

Place Around the Fence Designs, Safe Edges Install Pickets on Top of Gate. Terminate top of pickets 6” above top rail with caps. Picket Spacing: 5 inches o.c., maximum.

Remove existing Fence Panel, Salvage to Owner, Save Posts and Install New 7’ High Ornamental Iron with Plugged Straight Pickets

Section C Remove existing fence and salvage to owner.

Install + 30’ of 7’ High Ornamental Iron with Plugged Straight Pickets

Page 5: PURCHASING/WAREHOUSE DEPARTMENT Brenda Widugiris ...€¦ · The Fence Panels need to be welded to the inside of the Fence Posts (3) ... Who will locate the existing electric for

Page 5 – Amendment One RFB 11-28-2018

Install a top and bottom rail and pickets to enclose the area above the gate. Install Gate closer LCN 4040 moveable gates only. New Header Rail must be 2” above gate. Work Area #5 Clarifications

Install a top and bottom rail and pickets to enclose the area above the gate. Install Gate closer LCN 4040 moveable gates only. New Header Rail must be 2” above gate.

Page 6: PURCHASING/WAREHOUSE DEPARTMENT Brenda Widugiris ...€¦ · The Fence Panels need to be welded to the inside of the Fence Posts (3) ... Who will locate the existing electric for

Page 6 – Amendment One RFB 11-28-2018

Install a top and bottom rail and pickets to enclose the area above the gate. Install Gate closer LCN 4040 moveable gates only. New Header Rail must be 2” above gate.

For the 4 Building Squares place on the inside of the square a top and bottom rail and pickets to enclose the square.

Remove existing Fence Panel Salvage to Owner, Save Posts and Install New 7’ High Ornamental Iron with Plugged Straight Pickets Install Gate closer LCN 4040. New Header Rail must be 2” above gate. Install Perforated Metal over front of Gate. Metal, 20 GA, 1/16” Round on 3/32” staggered

Page 7: PURCHASING/WAREHOUSE DEPARTMENT Brenda Widugiris ...€¦ · The Fence Panels need to be welded to the inside of the Fence Posts (3) ... Who will locate the existing electric for

Page 7 – Amendment One RFB 11-28-2018

Place Around the Fence Designs, Safe Edges Install Pickets on Top of Gate. Terminate top of pickets 6” above top rail with caps. Picket Spacing: 5 inches o.c., maximum.

Work Area #6 Clarifications

Remove existing Fence Panel Salvage to Owner, Save Posts and Install New 7’ High Ornamental Iron with Plugged Straight Pickets Install Gate closer LCN 4040. New Header Rail must be 2” above gate. Install Perforated Metal over front of Gate. Metal, 20 GA, 1/16” Round on 3/32” staggered Place Around the Fence Designs, Safe Edges Install Pickets on Top of Gate. Terminate top of pickets 6” above top rail with caps. Picket Spacing: 5 inches o.c., maximum.

Page 8: PURCHASING/WAREHOUSE DEPARTMENT Brenda Widugiris ...€¦ · The Fence Panels need to be welded to the inside of the Fence Posts (3) ... Who will locate the existing electric for

Page 8 – Amendment One RFB 11-28-2018

Install a top and bottom rail and pickets to enclose the area above the gate. Install Gate closer LCN 4040 moveable gates only. New Header Rail must be 2” above gate.

Install a top and bottom rail and pickets to enclose the area above the gate. Install Gate closer LCN 4040 moveable gates only. New Header Rail must be 2” above gate. For the 3 Building Squares place on the inside of the square a top and bottom rail and pickets to enclose the square.

Page 9: PURCHASING/WAREHOUSE DEPARTMENT Brenda Widugiris ...€¦ · The Fence Panels need to be welded to the inside of the Fence Posts (3) ... Who will locate the existing electric for

Page 9 – Amendment One RFB 11-28-2018

For the 2 Building Squares place on the inside of the square a top and bottom rail and pickets to enclose the square. Work Area #7 Clarifications

Page 10: PURCHASING/WAREHOUSE DEPARTMENT Brenda Widugiris ...€¦ · The Fence Panels need to be welded to the inside of the Fence Posts (3) ... Who will locate the existing electric for

Page 10 – Amendment One RFB 11-28-2018

Install Perforated Metal over front of Gate. Metal, 20 GA, 1/16” Round on 3/32” staggered Place Around the Fence Designs, Safe Edges Install Gate closer LCN 4040 moveable gates only. New Header Rail must be 2” above gate. Install Pickets on Top of Gate. Terminate top of pickets 6” above top rail with caps. Picket Spacing: 5 inches o.c., maximum. Remove existing Fence Panels, Salvage to Owner, Save Posts and Install New 7’ High Ornamental Iron with Plugged Straight Pickets

The following documents are incorporated into the original solicitation document:

Pre-Bid Sign-In Sheet RFB 11-28-2018.pdf

END OF AMENDMENT ONE FOR RFB 11-28-2018