We are not against Metro as a mode of mass transport. Why Pune Metro project has become a matter of great concern is because despite serious issues, DMRC’s Pune Metro DPR was blindly approved by Pune Municipal Corporation (PMC) without any independent study, transparency and public consultations. Subsequently PMC has also approved a proposal to grant 4 FSI in the Metro influence zone of 500 mtr on either side of Metro corridor. It is necessary that Citizens should have information about the Metro and 4 FSI plans so that they can form own opinion regarding whether they would want these plans to be implemented. This presentation giving basic information about the Metro & 4 FSI plans and related issues & impacts has been prepared in a citizen friendly language & format for public information and awareness. (Updated in September 2014).

TRANSCRIPT

Page 1: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Pune Metro

By Prashant Inamdar A worried citizen

-- You should know about it!

Updated September 2014 http://bit.do/PuneMetro-PrashantInamdar

Page 2: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Pune Metro – why matter of concern?

DMRC (Delhi Metro Rail Corporation) was appointed by Pune Municipal Corporation (PMC) as Consultants for Pune Metro. DMRC submitted DPR (Detailed project report with plan) for Pune Metro in June 2009.

We and other citizen groups / experts studied the Metro DPR and found several serious issues which were informed to PMC and State Government. However PMC totally ignored the issues raised and blindly approved the Metro DPR in great haste in January 2010.

We are not against Metro as a mode of mass transport. Why Pune Metro project has become a matter of great concern is

because despite serious issues, DMRC’s Pune Metro DPR was approved by PMC without any independent study, transparency and public consultations.

This presentation has been prepared for public information and awareness based on our study and interpretation of Pune Metro DPR

Page 3: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Yes, we need a good public transport!

• Traffic in Pune has become a very serious problem due to ever increasing number of vehicles on road

• We definitely need a very good public transport to solve the problem• There are various public transport options available – city bus service,

BRT, Tram, LRT, Monorail, Metro….• Heirarchy must be followed and city bus service should get first priority

– good bus service also a must as feeder service for Metro• The city may need a number of transport modes which should form an

integrated multimodal transport system providing commuters with desired connectivity and convenient interchange facility

• IMPORTANT – Any Transport system we choose must be need based, efficient, affordable, people friendly and fit into the fabric of the city

Page 4: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Metro Metro conjures up a rosy picture, we all feel that Pune should also have

Metro, but simply having Metro will not do - it must be convenient & useful. Metro is a good mass transport system – but not a magic wand which will

make the city’s traffic problem disappear! Metro on a few routes will not be the solution to city’s traffic problem

– Pune being a radial city needs a vast network of public transport routes • Metro is the most expensive mass transport system costing about Rs 250

crores per km (for elevated metro) or more as per metro type and site conditions

• Metro operation, maintenance, security is also a very expensive affair• Metro train has a high carrying capacity – about 1000 to 1500 passengers• Metro needs to have a certain minimum number of passengers per trip - to

make it viable in view of very high capital and operating costs• Metro possible only on limited routes due to high cost, practical constraints • Metro has no flexibility – once constructed, route cannot be changed• Metro is irreversible and permanent - for lifetime of city! • Hence decision about Metro needs to be taken very diligently

Page 5: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Pune Metro routes – Phase I

• Corridor 1 – Pimpri Chinchwad to Swargate • Length - 16.589 km - Elevated 11.570km – PC to Shivajinagar - Underground 5.019km – Shivajinagar to Swargate • Capital cost - Rs.7422 crores (with Central taxes only)

• Corridor 2 – Vanaz to Ramwadi• Length - 14.925 km – Fully ELEVATED• Capital cost - Rs.3447 crores (with Central taxes only) Total cost of Phase I – Rs.10869 crores Total completion cost – Rs.11802 crores (incl State taxes &

interest) Costs revised based on August 2014 prices – Actual cost of execution could be much higher

Page 6: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Pune Metro routes – Phase II

1) Swargate – Katraj 2) Chinchwad – Nigdi (15 km for (1) & (2))3) Deccan – Tilak road – Swargate – Shanker seth

road – Race course – Bund garden (11 km)4) Pataleshwar – University – Aundh – Hinjewadi

(18 km) Total Phase II – 44 Km Total Phase I + II – 75.5 km

Page 7: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

PCMC- Swargate RoutePCMC to Agriculture College – Elevated Agriculture College to Swargate – Underground

PCMC (START) – Old Pune Mumbai highway(service road) – (2) Tukaram nagar – (3) Bhosari – (4) Kasarwadi – (5) Fugewadi – (6) Dapodi – River crossing – (7) Bopodi –

(8) Khadki – (9) Range hill – Agriculture college*– (10) Shivajinagar – Police ground – Shivaji road – (11) Pataleshwar – (12) PMC – River crossing – (13) Budhwar peth – (14) Mandai – (15) Swargate (END) # Numbered locations are 15 metro stations (1 to 9 Elevated and 10 to 15 Underground)

*Metro passes through the Agriculture college campus

Page 8: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Vanaz-Ramwadi Route(1) Vanaz (START) – Paud road – (2) Anandnagar – (3) Ideal Colony – Paud phata – Karve road – (4) Nal stop – (5) Garware college – (6) Deccan – JM road –

(7) Pataleshwar* – Sancheti chowk – (8) Civil court – River crossing – Ambedkar road – (9) Mangalwar peth – (10) Pune Railway station – Railway crossing – Jehangir hospital – (11) Ruby hall clinic – (12) Bund garden – River crossing – Nagar road – (13) Yerawada – (14) Kalyani nagar – (15) Ramwadi (END) # Numbered locations are 15 metro stations

*Pataleshwar is protected ancient archaeological site – Metro proposed within the 100 mtr ‘No construction zone’

Both corridors cross at Barve chowk but not interconnected as one is underground and the other elevated

Page 9: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Karve Road

Mu

mb

ai

– B

an

ga

luru

hig

hw

ay

To Bangaluru

BRTS Phase II Stretch

BRTS Phase I Stretch

BRTS Phase II Stretch ( City Core Area )

Bengaluru Pune Mumbai Highway

Leged

Katraj

Phase1 – Metro line 1 - 16.6 Kms

PCMC

Pataleshwar

Swargate

Hinjewadi

Phase1 – Metro line 2 -14.9

Bund Garden

Vanaz

Deccan Gymkhana

Ramvadi

Phase I

• Metro Line 1 1. Elevated 2. Underground • Metro Line 2

Phase 2

Courtesy : V I T’s PVP College of Architecture – Pune. Project by : IV th year B.Arch. students 2009 -10

Page 10: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Vanaz-Ramwadi Elevated Metro IssuesProject is to be implemented through densely populated areas along highly congested arterial roads – Paud road, Paud phata, Karve road, Jangli Maharaj road, Sancheti chowk, Sangam bridge, Maldhakka, Railway station, Jehangir hospital, Bund garden road…. 1) Metro columns on road Elevated Metro has to run on road at a height of about 10 mtr. There

will be a flyover like structure called viaduct on piers at road median – Reduction in road carriageway width by about 3 mtr.

2) Metro alignment on road Metro will deviate from road centre where obstructions, sharp turns on

road which Metro cannot take, example Paud phata, Deccan corner….3) Metro station on road 35 mtr. wide,140 mtr. long and 23 mtr. (6-7 storey) high Metro station

– road widths inadequate – parking space not possible due to congested locations4) Building demolitions, land acquisition required for (2) & (3) above

Page 11: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Vanaz-Ramwadi Elevated Metro Issues5) Violation of fire safety norms and DC rules in Metro construction Insufficient space for Metro stations - part / full demolition of buildings Metro construction could be very close to existing buildings Rescue in case of emergencies could be severely hampered6) Shifting of surface and under ground utilities required Serious problems in physical shifting, coordination between agencies7) Road blockage / Traffic management during construction 9 mtr of central road portion will be barricaded during construction Suitable roads for traffic diversion not available Severe traffic bottlenecks and mobility will be seriously affected8) Large number of trees on the corridor will be cut (example JM road)9) Visual impact Metro track will be like a continuous flyover on road with huge metro

stations across entire road width10) Inordinate delays and cost escalation due to various reasons

Page 12: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Karve road

Metro on road

Page 13: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

JM road

Metro on road

Page 14: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Metro Alignment – Paud phata to SNDT

Page 15: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Deccan GymkhanaGround

Chitale Bandhu

Janseva Dinning Hall

Deccan Post Office

J. M. Road

Karve Road

F.

C. R

oad

Metro Alignment – Deccan corner

(Reference: DMRC Report)

Lakd

i P

ul

Courtesy : V I T’s PVP College of Architecture, Pune. Project by : IV th year B.Arch. students 2009 -10

Page 16: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

7 StoreyHighStation

TYPICAL METRO STATION (Indicative concept drawing)

4 StoreyHighPlatform

Courtesy : V I T’s PVP College of Architecture, Pune. Project by : IV th year B.Arch. students 2009 -10

Page 17: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Some other important issuesLand for Metro depots not available ??• Corridor 1 - PCMC to Swargate Metro depot proposed within the Agriculture college

– Area required 11.5 hectares – Metro to run inside the college premises for length of about 1 km

• Reported that Agriculture college unwilling to provide land• Corridor 2 – Vanaz to Ramwadi Metro depot proposed at old kachra depot site

– Another project ‘Shivsrishti’ already approved at same site – Area beyond site hilly and under BDP

• Issue not yet sorted outOverlapping of Transport options• Local train route, BRT corridors, grade separated highway, rapid

transit riverside road overlap with Metro corridors – will impact metro ridership, also wastage of public money

Page 18: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Utility for citizens?

Low ridership• Metro capacity is up to 30000 phpdt (peak hour peak direction traffic)

Break-even point between bus transport and Metro is 15,000 phpdt Most likely maximum phpdt for Vanaz- Ramwadi route will be

6203 in 2018, 8519 in 2021 and 10982 in 2031 --- indicates very low ridership. This means that the Metro route is not suitable or convenient for people

in the area considering their origin and destinations Bus connectivity to proposed Metro stations not good With no parking space at Metro stations, commuters will not be able to

use own vehicle to travel up to the station. High passenger density areas not covered example Shivajinagar railway

station and ST bus stand, Pune railway station and ST bus stand. Though Metro route passes through nearby areas, Metro stations are not directly accessible from within the premises.

Due to such reasons utility of Vanaz-Ramwadi Metro will be low and also expected reduction in traffic on road may hence not take place - which means increased congestion on roads with reduced carriageway width

– This defeats the very purpose of having Metro !

Page 19: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

DMRC report- why independent study needed

• DMRC are Metro technology experts • We are not questioning DMRC’s technical competence and capabilities

regarding design and implementation of metro projects – Issues raised are not about metro technology

• What is being questioned is selection of metro route and type in terms of transportation needs, practical feasibility considering site constraints, viability and social impacts

• Issues raised are area specific for Pune – related to Traffic &Transportation• All these vital issues have not been addressed by DMRC at allHence the need for independent review and appraisal of DMRC report # Note - Govt. of India has also given extensive comments on DMRC’s DPR

and advised that the DPR be reworked on realistic basis

Page 20: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Conditions by Govt. of India Some of the conditions for approval of Pune Metro project are -• Integration of various modes of transport• Improvement in city bus service• First and last mile connectivity for Metro• Comprehensive Mobility Plan• Single department at city level for transport issues • Setting up of Urban transport fund• Setting up of Unified Metropolitan Transport Authority (UMTA)• Setting up of Traffic information management control centre• Advertisement policy for funds to public transport• Parking policy where parking fee represents true value of land• Reworking DPR on realistic basis with deliberation on issues raised by

various stakeholders to ensure sustainability of the project

Page 21: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Comments by Govt. of IndiaCentral Government has given extensive comments on Pune Metro DPR• Alternatives analysis needed for other modes of mass transit like BRT,

Light Rail etc. before arriving at the decision of Metro – But not done• Regarding funding pattern not as per policy• Regarding cost escalation factor considered• Regarding land requirement• Regarding land acquisition cost • Regarding disaster management, security measures, cyber security• Regarding basis for choosing smaller width of coach • Regarding basis for selecting standard gauge• Regarding low ridership, over provision of train capacity• And several others………Why so many comments and conditions by GOI – indicative of flaws, deficiencies, discrepancies in the DPR ?

Page 22: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Is PMC/ GOM serious about Pune Metro?Chronology of events - • Final DPR submitted by DMRC – June 2009• Approval by PMC GB – January 2010• Return of proposal by GOM as no approval for Corridor 1 by PCMC • Fresh approval by PMC GB only for Corridor 2 – June 2010• Approval by GOM and submission to GOI – June 2012• Return by GOI as DPR for two corridors and proposal only for one • Fresh approval by GOM for both corridors – October 2013• Submission by GOM for approval to GOI – December 2013• Only conditional ‘in principle’ approval by GOI – February 2014• Extensive comments on DPR by GOI • Submission of reply by PMC / GOM to GOI – August 2014Metro work completion as per original plan – March 2014But even the basic approval for Metro plan still not in hand……

Page 23: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Elevated vs Underground Most of the drawbacks / problems with elevated metro discussed earlier

do not exist in case of underground metro. Some additional points -

• Expected life of elevated metro much less than underground metro – due to above ground steel & concrete structures.

• Safety level less than underground metro – safety of structure, earthquake safety, road safety, safety in view of terrorist threat etc.

• Underground metro need not follow road alignment – can take best and shortest route – useful for many more commuters than elevated metro

• Elevated Metro stations not possible at desired locations eg. within the Railway station with direct access – possible with underground metro

• Interconnectivity of elevated metro route with other routes cannot be done – possible with underground metro

• Basic capital cost of underground metro is higher – however saving due shorter route length, less land requirement and acquisition cost….

Page 24: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Elevated vs Underground Real cost of elevated metro – Certain aspects need to be considered for elevated metro costing… Cost of disadvantages discussed earlier Cost of delays due to various reasons because of elevated type metro Cost per year of life of elevated metro and underground metro should

be compared (Life of underground metro much higher than elevated metro)

Cost of impacts of elevated metro on people and the city should be considered (a) hardships, losses, risks, trauma, health issues, displacement, rehabilitation citizens would face (b) land acquisition, demolitions, reconstruction, litigations (c) increase in traffic holdups, travel time, fuel cost, pollution due to metro route on congested roads (d) tree cutting and environmental impact (e) permanent disfigurement of city (f) fall in quality of life…..

All such costs need to be factored in the cost for elevated metro to know it’s real cost for the city.

Page 25: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Decision regarding Metro - elevated or underground Chapter 4, pg 1 of DMRC report - Underground metro preferable over

elevated on numerous considerations if corridor is on busy roads – means Pune should ideally have underground metro

Direct cost of underground metro is no doubt higher than elevated metro – but cost cannot be the sole criterion for decision

Maximum utility, feasibility, impacts and what fits into the fabric of the city considering ground reality are the most important factors

Any Metro will not do – Metro is a very high cost, long term commitment and only what suits best and most useful for the city should be chosen

Should elevated Metro be chosen simply because it is less expensive – even if such a metro will not be of expected use, will become a permanent burden for the city, will have severe adverse impacts for the city and citizens…..The sensible answer in such case will be NO!

Pune generates very high revenue for the Government. If underground Metro is what the city needs, Pune should get underground Metro irrespective of cost – And if it is absolutely unaffordable, it would be better not to have Metro rather than having a flawed elevated Metro!

Page 26: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Mumbai Elevated Metro scenario Line 1 : Versova – Andheri – Ghatkopar (Elevated) – 11.4 km• Building demolitions, Metro close to standing buildings, Major problems

in shifting of utilities, Fire safety norms & DC rules violated, Great inconvenience and hardships for citizens

• Original estimate – Rs.2356 crores, Actual cost – Rs.4321 crores• Original fares – Rs.9 to 13, Proposed fares – Rs.10 to 40 • Planned completion – July 2010, Actual completion – May 2014

• Delay and cost escalation mainly due to issues related to elevated metro Line 2 : Charkop – Bandra – Mankhurd (Elevated) – 32km • Original estimate – Rs.6376 crores, Revised estimate (Reliance) – Rs.11000 crores• Planned completion – 2015 Work not yet started Line 3 : Colaba – SEEPZ (Underground) – 32.5 km• Estimate – Rs.23136 crores, Planned completion – 2021 Work to start early

2015 Decision reportedly taken to have all future metro lines in Mumbai fully

underground due to problems faced with elevated metro.

Page 27: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Elevated vs Underground Metro costing- Case study for Mumbai

Elevated - Line 1 – 11.4 km• Planned completion – July 2010, Actual completion – May 2014• Delay – 4 years• Original estimate – Rs.2356 crores, Actual cost – Rs.4321 crores• Final cost per km – Rs.379 crores

• Delay and cost escalation mainly due to issues related to elevated metro Underground - Line 3 – 32.5 km• Estimated cost – Rs.23136 crores• Bhoomi pujan done in August 2014• Cost per km – Rs.712 crores

• Delays not expected as experienced for elevated metro Cost per km of underground metro 1.88 times that of elevated metro Ratio will be still smaller if cost of impacts added to elevated metro cost

# Above reality check based on figures reported in the Press

Page 28: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Metro funding

1) SPV model – Central Government - 20%, State Government - 20%, PMC -10% and balance 50% loans

2) Other sources of revenue – burden on citizens?• Sale of 4 FSI proposed for 500 mtr stretch on both sides of

metro corridor • Property development of Govt. land with 4 FSI and

involvement of Developers• Increase of development charges by 100%• 1% surcharge on stamp duty for transactions of sale etc.• 50% cess on tax for registration of vehicles• Surcharge on fuel (petrol, diesel, CNG)• Surcharge on property tax• Professional tax @ 1%• Metro tax @ 2% on pay rolls of all establishments with more

than 100 employees

Page 29: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Why 4 FSI ? DMRC has proposed densification along Metro corridor up to 500 mtr on

both sides by providing 4 FSI at a premium Reason 1 - to increase ridership of Metro

• Basically this proves that Metro ridership is not enough for viability• Densification proposed in areas which are already dense• No assurance that densification along metro corridor will increase

Metro ridership – most probably it will NOT! (Figures in PMC’s Draft DP also show that ridership will not increase because of 4 FSI)

Reason 2 - to raise funds for Metro • Funding plan not finalized by PMC • PMC has no idea about quantum of funds required from 4 FSI premium• No basis for taking decision about 4 FSI which has potential to raise

tens of thousands of crore rupees IMPORTANT - Will it be possible for PMC to provide necessary

infrastructure, services, amenities as per standards for the additional FSI – Answer can only be NO as PMC has not been able to provide basic

amenities for the city even with present lower FSI.

Page 30: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

PMC proposal for 4 FSI

PMC proposal for 4 FSI appears in two documents -

1) Draft DP and DC Regulations for 2007-2027 – yet to be approved

2) Public Notice No. 1/167 dt. 11-07-14 (for modification in 1987-2007 DCR)

There are discrepancies between same provisions in both documents

Basic proposal (in Public Notice)• No construction zone up to 10m on both sides of Metro corridor• 4 FSI up to 500m on both sides of Metro corridor (Metro influence zone)• Metro influence zone shall vary as per actual final alignment of Metro – ?? • NOC of Metro SPV must for development in Metro influence zone – Why?• Minimum plot area for grant of 4 FSI – 0.2 hectares (about 21500 sq.ft.)• FSI utilization less than total permissible 4 FSI not allowed – Why?• Special powers to Municipal Commissioner to relax provisions of building

bye laws to facilitate utilization of full 4 FSI – Why?• Rules shall be applicable for all future Metro corridors – ??

Page 31: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

PMC proposal for 4 FSI Premium for additional FSI – will be collected by Metro SPV

Congested area with basic FSI 2 As per Draft DC rules – 1.25 times the rate of Ready reckoner As per Public Notice – 1.25 times the rate of Ready reckoner

Non-congested area with basic FSI 1 As per Draft DC rules – 1.50 times the rate of Ready reckoner As per Public Notice – 1.25 times the rate of Ready reckoner Cess for non-utilization of 4 FSI – Why? As per Draft DC rules – Cess at the rate of 5% of Ready reckoner rate

will be charged extra if any plot/land kept vacant after period of 5 years from commencement of Metro work

- Definition of ‘commencement of Metro work’ not given

- Meaning of ‘plot / land kept vacant’ not clear

- Whether cess is one time or to be paid every year - not clear As per Public Notice – No mention of cess – ??

Page 32: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

PMC proposal for 4 FSI

Milestone for applicability of 4 FSI regulations

Present corridors• As per Draft DC rules – applicable after sanction of regulations• As per Public Notice – applicable on commencement of Metro

construction work (Exact definition of ‘commencement’ not given)

For future corridors• As per Draft DC rules – applicable after 5 years from sanction of

regulations• As per Public Notice – applicable to every corridor sanctioned in due

course (No specific time line given)

----------

Some estimated figures regarding 4 FSI proposal – Metro influence zone area in PMC – about 2600+ hectares Possible additional FSI – about 70 crore sq.ft. (actual used could be less) Premium amount – Tens of thousands of crore rupees

Page 33: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

PMC proposal for 4 FSI Impact on smaller properties ?• NOC required from Metro SPV for development• Minimum plot area for availing 4 FSI at premium – 21500 sq.ft.• FSI utilization less than total permissible 4 FSI not allowed• Cess to be paid for non-utilization of 4 FSI What happens to properties with plot area less than 21500 sq.ft. ?

Whether above rules applicable ? - No clarity about this vital matter Which rules will be finally implemented

Different provisions in Draft DCR (2007-27) and Public Notice Not clear which rules will be finally implemented by PMC –

(1)As per Draft DCR or (2) As per Public Notice or (3) Stringent of the two

------------ A BIG question mark on the 4 FSI proposal – why required, how will it be

implemented, when will implementation begin, what impacts…??

– Most likely 4 FSI proposal will prove disastrous for the city!

Page 34: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Now some pictures of Delhi, Mumbai, Bangalore Elevated Metros during execution…

Page 35: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

DELHI METRO- Station close to bulding

Courtesy : Ar. Nitin Killawala

Metro station

Existing building

Metro station

Existing building

Page 36: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

DELHI METRO

Page 37: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

MUMBAI METRO – Station under construction

Courtesy : Ar. Nitin Killawala

Page 38: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

MUMBAI METRO – shifting of utilities

Courtesy : Ar. Nitin Killawala

Page 39: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

MUMBAI METRO STATION – very close to building

Courtesy : Ar. Nitin Killawala

Page 40: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

MUMBAI METRO STATIONS – very close to existing buildings

Courtesy : Ar. Nitin Killawala

Metro station

Existingbuilding

Metro station

Existingbuilding

Metro station

Existingbuilding

Page 41: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Report in Mumbai newspaper (6-04-10) - Fire safety norms and Development Control rules violated by Mumbai Metro

Metro station

Existingbuilding

Page 42: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

BANGALORE METRO – snaking on the road

Courtesy : Ar. Khandekar

Page 43: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Massive station construction blocking entire road

BANGALORE METROCourtesy : Ar. Khandekar

Page 44: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

BANGALORE METRO

Massive pillar and construction on road

Courtesy : Ar. Khandekar

Page 45: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Barricading on road

BANGALORE METRO

Courtesy : Ar. Khandekar

No space left for traffic

Page 46: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

BANGALORE METRO

Work on near houses, day and night !

Courtesy : Ar. Khandekar

Page 47: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

BANGALORE METRO

- Bulldozing it’s way

Courtesy : Ar. Khandekar

Page 48: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Same type of Elevated Metro has been

approved by PMC for Pune

One can imagine what the situation on the narrow congested Pune roads would be once Metro construction begins and continues for years… And after enduring all this, we may find - Metro we have got is not of expected use at all!

Do we want all this to happen in Pune?

Page 49: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Pune Metro – Important issues

• Elevated Metro despite implementation problems and adverse impacts• Metro stations at inconvenient congested locations • Building demolitions and land acquisition• High passenger density areas not covered• Interconnectivity with future routes not possible• Overlapping with other mass transport modes and rapid transit corridors• Delays due to hurdles in permissions, litigations, commercial issues• Metro costing – Large cost escalation possible• Funding pattern - not known• Financial burden to be put on citizens - not known• 4 FSI proposal - several serious issues• Low ridership - means less utility and higher fares, higher taxes - no reduction in traffic and increased congestion?Big Question mark on Pune Metro - utility, feasibilty, viability?

Page 50: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

What needs to be done • There are serious issues regarding Pune Metro plan• Metro is irreversible and permanent - for lifetime of city! • Decision proved wrong later would be disastrous for the city Govt. of India has already advised PMC to rework Pune

Metro DPR on realistic basis with deliberation on issues raised. However PMC has ignored the advice!

What is needed: (Metro already delayed, better late than wrong) • Rework the Pune Metro DPR for following - a) Underground metro - to overcome various problems b) Route/alignment modification – for better utility to majority

of people and maximizing ridership • NGOs /experts who have raised issues be consulted during

the reworking process and their suggestions considered• Final decision about Metro type, route should be taken only

on the basis of deliberations, public consultations and above reworking

Page 51: Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 2014) By Prashant Inamdar

Thank you