pulling the flow in it, what to expect? by emmanuel richard, bnp paribas at the lean it summit 2014
DESCRIPTION
Discover the amazing operational improvements an IT team obtained when it started pulling the flow in this presentation by Emmanuel Richard from BNP Paribas. More Lean IT stories on www.lean-it-summit.comTRANSCRIPT
![Page 1: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/1.jpg)
Pulling the flow in an IT environment.
What to expect ?
1
![Page 2: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/2.jpg)
Where do we start from ?
Our clients are unhappy
2
We are delivering programs that enable servers to
exchange files automatically
![Page 3: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/3.jpg)
3
The Quality is not satisfying the Lead Time is unbearably long
![Page 4: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/4.jpg)
OK, we have to see this
4
![Page 5: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/5.jpg)
Gemba
5
Request Qualification Assignment Assignment Coding
TT = 1’ TT = 8’ TT = 1’ TT = 20’ LT = 23 Days
Wait Wait Wait Wait
TT = Touch Time LT = Lead Time
Efficiency= 30’ / 23d = 0.2%
![Page 6: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/6.jpg)
What do we want to do about it ?
6
![Page 7: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/7.jpg)
7
We want to restore customer satisfaction
by delivering within 1 day a fully functional program
![Page 8: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/8.jpg)
Performance achieved within 2 months
8
![Page 9: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/9.jpg)
Fine, but is that an improvement ? We humbly don’t know
The quality is measured
9
![Page 10: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/10.jpg)
The Lead Time is divided by 20
10
![Page 11: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/11.jpg)
The Stock of requests is eliminated
11
![Page 12: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/12.jpg)
And Customer Satisfaction climbs above our target
12
![Page 13: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/13.jpg)
13
How do we go about it ?
![Page 14: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/14.jpg)
Cell
Andon
Red bins
Pull flow
Problem solving
14
Roadmap
![Page 15: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/15.jpg)
15
First we have to build the cell
![Page 16: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/16.jpg)
Cell
Andon
Red bins
Pull flow
Problem solving
16
Roadmap
![Page 17: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/17.jpg)
We decide to move from this …
17
Request
Customer
Qualifica on Assignment Coding
Distantcoworkers
![Page 18: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/18.jpg)
… to this !
18
1 Team Leader 1 qualifier 2 coders
Crea on
Customer
Qualifica on&Coding
Colocatedcoworkers
![Page 19: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/19.jpg)
19
First Month
Workshop
Sounds easy, right ? Well …
Co workers switched
Vacation
No network
No Desk
No laptop Process changed
Borrowed laptop does not function
Accident
Workflow not installed
![Page 20: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/20.jpg)
20
First Month
And meanwhile, obviously …
Workshop
![Page 21: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/21.jpg)
21
But finally… We are getting there !
![Page 22: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/22.jpg)
22
And it immediately pays off …
![Page 23: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/23.jpg)
23
Request
Clients
Qualification Assignment Assignment Coding
Wait Wait Wait Wait
… by simply removing the wait due to the disconnection of the qualification and coding processes
![Page 24: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/24.jpg)
24
But ultimately, is everything ok ?
![Page 25: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/25.jpg)
The situation is still very confusing
We still have no clue of today’s requests, the work in progress, stock, lead time, quality of coding and productivity.
So first of all, we need to :
1 – make the activities visible
2 – drive the activities
25
![Page 26: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/26.jpg)
26
1 – Make the team activities visible
![Page 27: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/27.jpg)
Benefits
We immediately know what is going on
– Today’s workload
– Coming days workload as long as there is stock to deal with
– Client incomplete requests awaiting further information
We can make informed decisions
– Not much to do today, I can take requests out of the stock
– Too much to do today, I know I have to ask for help
27
![Page 28: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/28.jpg)
28
2 – Drive the team activities
Quality
Lead Times
Stock
Indicators are updated every day at 5pm
Customer satisfaction
Problem solving
![Page 29: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/29.jpg)
Benefits
We have an impact on Lead Time
– show in real time if the team succeeds in fulfilling today’s requests
– quickly identify why and what problems to solve
We have an impact on Quality
– identify the causes of bad quality
29
![Page 30: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/30.jpg)
30
Now our activities are manageable,
let’s activate the cell
![Page 31: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/31.jpg)
Cell
Andon
Red bins
Pull flow
Problem solving
31
Roadmap
![Page 32: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/32.jpg)
32
Stock
Qualification Assignment
Request fullfilled
Coding
Stock
Stock
Request
Client
Previously, we had a pushed flow …
![Page 33: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/33.jpg)
33
Requests
Client Qualification
Co localized cell
Coding
… now we are setting up a pulled flow
Rule #1 : address today the requests arrived yesterday Rule #2 : do not qualify (and send to code) throughout the day, 10:30 am is the limit Rule #3 : only code requests from the stock if today’s requests are fully addressed
![Page 34: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/34.jpg)
34
That’s how it materialized Equipe de
Production
Team Leader
Création
Client
Tableau de production
de la journéeProcessus : Date :
Prévu Réalisé Commentaire
8h-10h
10h-12h
13h-15h
15h-17h
TOTAL
Tableau de Production
x40 / jour
Rythme : 10 pièces
toutes les 2 heures
1 par 1
1 par 1
1 par 1
Production de la journée
Demande du jour
Client
Donnez-moi
30 pièces
tous les jours.
Simples
Complexes
x12 / jour
Stock
10.00 12.00 15.00 17.00
10.00 12.00 15.00 17.00
C
C C
S
C
C
S
C
C
C
x30 / jour
Ce qu’il faut produire
aujourd’hui
(40 slots)
S
S
S
S
S
S
S
S
C
C
Today’s request
X 30 / day
Creation
Simple
Today’s production board
X 40 / day Takt is 7 hours / 40
= 10 mn
Production team
What must be produced today (40 slots)
1 by 1
Today’s production
Give me 40 pcs every
day
Complex
1 by 1
1 by 1
x 10 / day
![Page 35: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/35.jpg)
35
All we need to do now is to allow the flow to, well … flow
![Page 36: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/36.jpg)
Cell
Andon
Red bins
Pull flow
Problem solving
36
Roadmap
![Page 37: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/37.jpg)
Production is still difficult
37
Pulling the flow without any further action yields no result at all. Our main concern is that the team complains about impossible goals and get demotivated quickly.
We need to help the team produce : 1 – Andon : stop at first difficulty, and call for help 2 – Set up a Problem Solving Flow by using red bins
![Page 38: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/38.jpg)
1 – Andon, where did we use it ?
38
Production
team
Team Leader
Creation
Customer
Today’s production
boardProcessus : Date :
Prévu Réalisé Commentaire
8h-10h
10h-12h
13h-15h
15h-17h
TOTAL
Tableau de Production
x40 / day
Rhythm : 10 parts
every 2 hours
1 by 1
1 by 1
1 by 1
Today’s production
Red bins
Red bins
Red bins
Red bins
Requests
of the day
Customer
?
I don’t know how to do that- Training at the workstation- Standards- Dojo for practicing
J’ai un problème technique
Daily meeting :Today’s goalWhat strategy to achieve it ?
Give me
30 parts
every days.
Simples
Complexes
x12 / day
?
Stock
10.00 12.00 15.00 17.00
10.00 12.00 15.00 17.00
C
C C
S
C
C
S
C
C
C
x30 / day
What to produce today
(40 slots)
S
S
S
S
S
S
S
S
C
C
I have a technical problem
![Page 39: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/39.jpg)
39
1 – Andon, what did we use it for ?
For different reasons, an operator may be unable to code requests. “ I cannot do it ”
Security device forbid access to the server The requests asks for transfers circulating information to or from non secured environments Server names are unknown or non existent, I need to find that information …
“ I don’t know how to do it ”
This particular transfer requires a specific configuration, which I am not familiar with This is a mainframe environment, I have no training on it …
“ I don’t understand what is required ”
This request has too many inconsistencies, I cannot figure out what is required This requests asks for the modification of a transfer that does not exist, what do I do ? …
![Page 40: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/40.jpg)
40
Andon – Asking the Team Leader for help
- Stop the production when something goes wrong - Solve problems immediately - Train at the workstation : the expert helps and shows - Fill the red bins for up-to-the-root-cause problem solving
1 – Andon, how did we use it ?
?
C
![Page 41: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/41.jpg)
41
The team is being helped – No one fights to resolve a problem on his own
Co workers gain competence
– They train at the workstation – They write working standards
Benefits
![Page 42: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/42.jpg)
42
Since we decided to solve problems immediately, productivity increases
At project start
At the end
4
12
x3
![Page 43: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/43.jpg)
43
Production
team
Team Leader
Creation
Customer
Today’s production
boardProcessus : Date :
Prévu Réalisé Commentaire
8h-10h
10h-12h
13h-15h
15h-17h
TOTAL
Tableau de Production
x40 / day
Rhythm : 10 parts
every 2 hours
1 by 1
1 by 1
1 by 1
Today’s production
Red bins
Red bins
Red bins
Red bins
Requests
of the day
Customer
?
I don’t know how to do that- Training at the workstation- Standards- Dojo for practicing
J’ai un problème technique
Daily meeting :Today’s goalWhat strategy to achieve it ?
Give me
30 parts
every days.
Simples
Complexes
x12 / day
?
Stock
10.00 12.00 15.00 17.00
10.00 12.00 15.00 17.00
C
C C
S
C
C
S
C
C
C
x30 / day
What to produce today
(40 slots)
S
S
S
S
S
S
S
S
C
C
2 - Set up a Problems Solving Flow
![Page 44: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/44.jpg)
Benefits
Red bins unveil problems where and when they arise
– This focuses the Team Leader’s energy on real problems
– Solving them makes production smoother
“ Oobeya + Kaizen = Deep Thinkers ”
– Solving problems where they are in order to produce builds up competence
(Within 2 months, our “rookie” was able to answer other experts’ questions about technical issues, and judged the way we were using the file transfer technology within our IT)
44
![Page 45: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/45.jpg)
45
That provides us with generous amounts of problems we can
solve
![Page 46: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/46.jpg)
Cell
Andon
Red bins
Pull flow
Problem solving
46
Roadmap
![Page 47: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/47.jpg)
47
Example: protect the coding phase
Initial situation • 60% of the incoming request forms are incomplete and require
correction and rework - Forms are complicated and uneasy to fill in - Customers don’t know how to go about it
• The cell has to stall the request, because they cannot understand it
Actions • Write a working standard to help the requester to correctly
formulate his request • TWI training for 10 requesters at their workstation
Results • The application of the standard increases the compliance of the
request forms Compliance of the request form
87%
40%
![Page 48: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/48.jpg)
48
More examples
![Page 49: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/49.jpg)
49
In conclusion
![Page 50: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/50.jpg)
Pulling the flow in IT, what to expect ?
Your team will develop ground breaking performance
The system will fight back
People you involve will renew their interest in the lean journey
50
![Page 51: Pulling the flow in IT, what to expect? by Emmanuel Richard, BNP Paribas at the Lean IT Summit 2014](https://reader033.vdocuments.mx/reader033/viewer/2022060106/548fe803b479597a588b4fe6/html5/thumbnails/51.jpg)
Thank you for your attention
Any questions ?