Puget Sound Gateway Program SR 167 Completion and SR 509 Completion Projects Joint Steering Committee December 7, 2016 CRAIG J. STONE, PE GATEWAYPROGRAM ADMINISTRATOR STEVE FUCHS, PE SR 167 PROJECT MANAGER OMAR JEPPERSON, PE SR 509 PROJECT MANAGER

Upload: others

Post on 24-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Puget Sound Gateway ProgramSR 167 Completion and SR 509 Completion Projects

Joint Steering CommitteeDecember 7, 2016

CRAIG J. STONE, PE GATEWAY PROGRAM ADMINISTRATORSTEVE FUCHS, PE SR 167 PROJECT MANAGEROMAR JEPPERSON, PE SR 509 PROJECT MANAGER

Page 2: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Agenda

1

• Welcome & Introductions• Process Review• Project Scenarios and Traffic Analysis Results• Review Forward Compatibility • Review Updated Cost Estimates• Discuss FASTLANE Grant Application• Recommend Preliminary Preferred Scenario• Conclusion and Next Steps

Page 3: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Practical Design

• WSDOT Executive Order 1096:- WSDOT will design transportation infrastructure related solutions that

are targeted to address the essential needs of a project, not every need. In doing so, designs are developed with criteria that achieve stated performance for the least cost…

• ESHB 2012: - (1)(a) For projects identified as Connecting Washington projects…The

legislature encourages the department to continue to institutionalize innovation and collaboration in design and project delivery with an eye toward the most efficient use of resources. In doing so, the legislature expects that, for some projects, costs will be reduced during the project design phase due to the application of practical design

2

Page 4: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Puget Sound Gateway Program Guiding Principles

3

1. Support regional mobility to provide efficient movement of freight and people

2. Improve local, regional, state and national economic vitality

3. Provide a high level of safety

4. Support local and regional comprehensive land use plans

5. Minimize environmental impacts and seek opportunities for meaningful improvements

6. Create solutions that are equitable, fiscally responsible, and allow for implementation over time

7. Support thoughtful community engagement and transparency

Page 5: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Total funding is $1.87 billion; this amount assumes $310 million local match and tolling funding.

Puget Sound Gateway Program

4

$2b

$1.5b

$1.0b

$0.5b

$0.0b

Total$1.87b Local contribution of $130 million

Toll funding of $180 million

Connecting Washington funding of up to $1.57 billion

Page 6: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Joint Steering Committee Work Plan

5

Determine Needs

Define Performance

Metrics

Develop & Refine

Scenarios

Review & Environmental

Check-in

We are here

Recommend Const. & Imp.

Plan

December 2015

February

June - October

December

April 2017 September 2017

Recommend Preliminary Preferred Scenario

Page 7: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Scenario Refinement Process

6

1

2

3

4

5

2A

3A

4A

2A

2B

4A

Preliminary Preferred Scenario

1

2

3

4

5

SR 509 Process SR 167 Process

3A

4A

2C

4A

2D

CLOSE THE GAP

EIS EIS+

CLOSE THE GAP

$712M

$1897M

$973M

$1933M

Page 8: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

SR 167 Scenario Comparison Table

7

Page 9: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

SR 509 Scenario Comparison Table

8

Page 10: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Key Questions

9

1. How many lanes are included on SR 167 and SR 509? 2. What level of tolling is considered?3. How are lanes managed?4. What degree of forward compatibility should be

included in the design?5. Degree of potential impact to I-5?6. Where are connections most important?7. How is south access to the airport accommodated?

(SR 509)8. How is access to the Port of Tacoma best

accommodated? (SR 167)

Prog

ram

Le

vel

Proj

ect L

evel

Page 11: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

SR 167 Scenarios & Traffic Analysis

10

Page 12: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

11

Scenario 2C: Full Connectivity at I-5 with Split Diamond Interchange at Valley Avenue and Meridian Avenue

Page 13: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Scenario 2C: Full Connectivity at I-5 with Split Diamond Interchange at Valley Avenue and Meridian Avenue

12

Other Items Total • Interurban Trail• RRP & Wetland

Mitigation

Highlighted features:• ½ SPUI at 54th Ave

interchange• Service level Diverging

Diamond interchange at I-5• ½ Diamond interchange at

Valley Avenue • ½ SPUI interchange at

Meridian Avenue

Page 14: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

13

Scenario 2D: Limited Connectivity at I-5 with Split Diamond Interchange at Valley Avenue and Meridian Avenue

Page 15: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Scenario 2D: Limited Connectivity at I-5 with Split Diamond Interchange at Valley Avenue and Meridian Avenue

14

Highlighted features:• ½ SPUI at 54th Ave

interchange• Service level Diverging

Diamond interchange at I-5 with connections to/from north only

• ½ Diamond interchange at Valley Avenue

• ½ SPUI interchange at Meridian Avenue

Other Items Total • Interurban Trail• RRP & Wetland

Mitigation

Page 16: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Scenario 4A: Moderate Connectivity at I-5 with Full Connectivity at Meridian Avenue

15

Page 17: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Scenario 4A: Moderate Connectivity at I-5 with Full Connectivity at Meridian Avenue

16

Highlighted features:• ½ Diamond with SB cloverleaf

at 54th Ave interchange• System level interchange

to\from the north at I-5• NB I-5 auxiliary lane• No interchange at Valley

Avenue• Full SPUI at Meridian

interchange• Widen NB Puyallup River

Bridge• N. Levee to Valley Connector

Other Items Total • Interurban Trail• RRP & Wetland

Mitigation

Page 18: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Scenario 2C/2D/4A Comparison

17

Legend:Scenario 2CScenario 2DScenario 4AShared Component

Page 19: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Refined Traffic Analysis Results

18

• Presents only analysis for PM peak• Used Dynamic Traffic Assignment

(DTA)/Mesoscopic tools

2025

2045

I-5 Travel Times

Page 20: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

PM Peak Projected Travel Times for Selected South End Routes: 2025

% Travel Time Savings:2C/3A 4A/4A

• EB 33% 33%• WB 39% 43%

% Travel Time Savings:2C/3A 4A/4A

• EB 36% 36%• WB 27% 27%

19

Page 21: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

PM Peak Projected Travel Times for Selected South End Routes: 2045

% Travel Time Savings:2C/3A 4A/4A

• EB 40% 40%• WB 40% 44%

% Travel Time Savings:2C/3A 4A/4A

• EB 32% 32%• WB 38% 38%

20

Page 22: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

PM Peak Period Speeds: 2025

21

Page 23: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

PM Peak Period Speeds: 2045

22

Page 24: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

SR 509 Scenarios & Traffic Analysis

23

Page 25: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Scenario 3A

24

Page 26: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Scenario 3A

25

Page 27: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Scenario 4A

26

Page 28: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Scenario 4A

27

Page 29: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Scenario 3A/4A

28

Legend:Scenario 3AScenario 4AShared Component

Page 30: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Refined Traffic AnalysisResults

29

• Presents only analysis for PM peak• Used Dynamic Traffic Assignment

(DTA)/Mesoscopic tools

2025

2045

I-5 Travel Times

Page 31: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

PM Peak Period Travel Times: 2025

30

% Travel Time Savings:2C/3A 4A/4A

• NB 23% 31%• SB 26% 29%

% Travel Time Savings:2C/3A 4A/4A

• NB 17% 17%• SB 16% 16%

Page 32: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

PM Peak Period Travel Times: 2045

31

% Travel Time Savings:2C/3A 4A/4A

• NB 32% 37%• SB 33% 36%

% Travel Time Savings:2C/3A 4A/4A

• NB 20% 20%• SB 27% 27%

Page 33: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

PM Peak Period Speeds: 2025

32

Page 34: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

PM Peak Period Speeds: 2045

33

Page 35: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

SR 167 Forward Compatibility

34

Page 36: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Forward Compatibility Considerations on SR 167

35

What degree of forward compatibility should be included in the design?

• At the I-5/SR 167 Interchange• Construct initial narrower project footprint• Plan for full build out• Right of way acquisition for remainder of corridor

Page 37: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Forward Compatibility at I-5 interchange

36

Page 38: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Forward Compatibility at I-5 interchange

37

Page 39: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Forward Compatibility at I-5 interchange

38

Page 40: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Forward Compatibility at I-5 interchange

39

Page 41: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Forward Compatibility with Footprint

40

Page 42: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Forward Compatibility with Footprint

41

Page 43: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Right of Way Consideration at Valley Avenue

42

Page 44: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Right of Way Consideration at Valley Avenue

43

Page 45: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

SR 509 Forward Compatibility

44

Page 46: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Forward Compatibility Considerations for SR 509

45

Considerations for deferring forward compatible components in Phase 1:• 2045 modeling does not show a need for 6 lanes unless other major

infrastructure investments are made to I-5 and existing SR 509. • A 6 lane facility and the connections to I-5 are roughly twice the allocated

budget with risk and inflation.• All forward compatibility components would cost an additional $28m.• Forward compatibility was identified at a contextual need and not an essential

need.

Considerations for building forward compatible components in Phase 1:• Sound Transit is constructing FWLE in 2019 – 2022; need to construct

efficiently while minimizing impacts.• Don’t want to build infrastructure that needs to be reconstructed.• Reconstructing some elements may have significant traffic impacts in the

future.

Page 47: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Forward Compatibility Considerations:SR 509 Single Roadway Prism

46

Page 48: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Forward Compatibility Considerations: SR 509 Section at Undercrossing

47

Page 49: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Forward Compatibility Considerations Locations:

48

Page 50: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Forward Compatibility Considerations: I-5

49

Page 51: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Forward Compatibility Cost Considerations

50

Page 52: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Updated Cost Estimates(CEVP)

51

Page 53: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

52

Program Cost Results: 2C/3A

0%

2%

4%

6%

8%

10%

12%

14%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

1,400 1,650 1,900 2,150 2,400 2,650

Prob

abili

ty

(for I

ndiv

idua

l Ran

ges)

Perc

entil

e(C

umul

ativ

e Pr

obab

ility

)

Program Cost (Escalated $M)

60%: $2.029 B

50% $1.989b

60% $2.029b

Page 54: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

53

Program Cost Threats

25.1

10.2

9.7

9.5

8.0

7.4

7.1

6.1

6.1

5.3

5.0

4.4

3.9

3.4

3.3

2.9

2.8

2.7

2.1

1.9

0% 5% 10% 15% 20%

0.0 5.0 10.0 15.0 20.0 25.0 30.0

CTR 40.1. Market conditions at time of advertisement differ from those…

STG 30.2. Changed seismic design criteria (for new structures)

PSP 30.1. Additional local street / intersection improvements due to traffic impacts

CTR 10.1. Changed project delivery method and/or packaging

PSP 30.2. Additional mitigation for impacts to local infrastructure during…

Extended overhead cost of project delay (contractor, compensable) / Program

STG 30.1. Seismic retrofit / replacement of existing structures

Identified Minor Risks (aggregate) / Program

Unidentified Risks (aggregate) / Program

PSP 30.3. Inclusion of weigh stations

CTR 50.1. Extraordinary material price changes: fuel

SOLDIER PILE WITH TIE BACK RETAINING WALL (Base Uncertainty)

ENV 50.1. Midway Landfill impacts

ROADWAY EXCAVATION INCL. HAUL (Base Uncertainty)

DES 60.2. Design changes / additional scope due to maintenance considerations

STG 20.1. Changed ground improvement methods required (due to regulatory…

ENV 70.3. Changed flow control / detention requirements

Extended overhead cost of project delay (agency) / Program

Preliminary Engineering: SR 167 (Base Uncertainty)

Preliminary Engineering: SR 509 (Base Uncertainty)

% Contribution to Total Mean Cost Risk

Mean Cost Risk (Current $M)Risk Event or Base Uncertainty

Page 55: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

54

Program Cost Opportunities

38.5

12.0

5.5

3.7

3.6

3.1

1.1

1.1

0.7

0.6

0.5

0.2

0.1

0.1

0.0

0% 5% 10% 15% 20% 25%

0.0 10.0 20.0 30.0 40.0 50.0

DES 10.1. Opportunity for design/ATC optimization ofroadway/interchange alignment

STG 10.1. Changed design of other bridge structures (incl. DBATCs)

PSP 10.6. Sound Transit contribution to project cost

Identified Minor Opportunities (aggregate) / Program

Unidentified Opportunities (aggregate) / Program

CNS 70.2. Re-use of cut materials as fill

CNS 70.3. Import fill material from adjacent project

STG 20.2. Changed foundation system design due to soilconditions

UTL 10.2. High-pressure gas line relocations

GRAVEL BORROW INCL. HAUL (Base Uncertainty)

GEOSYNTHETIC RETAINING WALL (Base Uncertainty)

PS CONC. GIRDER WIDENING (Base Uncertainty)

TEMPORARY ACCESS BRIDGE (Base Uncertainty)

SPLICED PT GIRDER (Base Uncertainty)

PS CONC. GIRDER WIDENING (Base Uncertainty)

% Contribution to Total Mean Cost Opportunity

Mean Opportunity (Current $M)(values are savings)

Opportunity Event or Base Uncertainty

Page 56: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Gateway Funding

55

2015-2017

2017-2019

2019-2021

2021-2023

2023-2025 2025-2027 2027-2029

2029-2031

$70m

$180m

Local Funding

Toll Funding

Connecting WA

$2.5m $58m $235m $335m $302m $313m $300m $20m

$60m

TOTAL $2.5m $58m $305m $395m $302m $313m $300m $200m

Page 57: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

56

Program Cost Results: 2C/3A Unconstrained

0%

5%

10%

15%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

1,300 1,550 1,800 2,050 2,300 2,550

Prob

abili

ty

(for I

ndiv

idua

l Ran

ges)

Perc

entil

e(C

umul

ativ

e Pr

obab

ility

)

Program Cost (Escalated $M)

60%: $1.907 B

50% $1.866b

60% $1.907b

Page 58: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

57

Program Cost Comparison: Constrained vs. Unconstrained

$1.866 $1.989

Page 59: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

SR 167:Scenario 2C

58

$84m

Other Items Total $180m• Interurban Trail• RRP & Wetland

Mitigation

$1,065m

$26m

$91m

$315m

$65m

$44m

$74m

$186m

Page 60: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

SR 167:Scenario 2D

59

$1,045m

$84m$26m

$91m

$295m

$65m

$44m

$186m

$74m

Other Items Total $180m• Interurban Trail• RRP & Wetland

Mitigation

Page 61: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

SR 167:Scenario 4A

60

$1,512m

Other Items Total $180M• Interurban Trail• RRP & Wetland

Mitigation

$84M$37M

$120M$91M

$555M

$65M

$207M

$173M

Page 62: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

SR 509:Scenario 3A

61

Page 63: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

SR 509:Scenario 4A

62

Page 64: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

CEVP Cost Estimates

63

$2b

$1.5b

$1.0b

$0.5b

$0.0b

Total Gateway Funding$1.875b Total Connecting

Washington Funding$1.57b

$2.607b

$1.989b

$2.5b

$1.969b

2C/3A

(SR 167/SR 509)

4A/4A2D/3A

Page 65: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

CEVP Cost Estimates with Additional Project Elements

64

$2b

$1.5b

$1.0b

$0.5b

$0.0b

Total Gateway Funding$1.875b

2C/3A

Total Connecting Washington Funding$1.57b

(SR 167/SR 509)

4A/4A

$2.607b

$1.989b

$2.5b

2D/3A

$1.969b

$28m$203m

Forward Compatibility

Other potential elements:167 NB Aux. Lane (+$120m)509 NB Aux. Lane (+$33m)509 NB 2-Lane C/D ($50m)

$28m$203m

$28m

Page 66: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Cost Review

65

$1,750b

$1,548b –$1,915b

$1,745b

$1,989b

Page 67: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

FASTLANE Grant Update

66

Page 68: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

FASTLANE Grant Application

67

• New Federal grant program focused on freight projects

• $4.5B program through 2020

• $800M awarded in FFY 2016 to 18 Recipients(212 applications received totaling almost $10B)o South Lander Street Grade Separation (Seattle) - $45M of $140Mo Strander Boulevard Extension (Tukwila) - $5M of $38M

• $850M Notice of Funding Opportunity for FFY 2017 announced on Oct 28th, with applications due Dec 15th

• Grant pursuit: Letters of Support from partners and stakeholders

Page 69: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

FASTLANE Grant Application – Letters of Support

68

• Governor Jay Inslee• City of Des Moines• IBEW Local 76• Kent Chamber of Commerce• Northwest Seaport Alliance• Premier Transport• Puget Sound Regional Council• Puyallup Tribe of Indians• Puyallup/Sumner Chamber of

Commerce• City of Puyallup

• South County Area Transportation Board (SCATBd)

• Port of Tacoma• Washington State Transportation

Commission• Washington Trucking Association• City of Burien (pending)• City of Fife (pending)• FIMSIB (pending)• City of Kent (pending)• Port of Seattle (pending)

Page 70: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

69

2016 FASTLANE GrantsState Project Project

SizeGrantAmount

Project Cost

Share

VA Atlantic Gateway Large $165M $905M 18%

DC Arlington Memorial Bridge Large $95M $166M 54%

OK US 69/75 Bryan County Large $62M $120.6M 51%

LA I-10 Freight CoRE Large $60M $193.5M 31%

AZ Interstate 10 Large $54M $157.5M 35%

CA SR 11 Segment 2 & SB Connectors Large $49M $172.2M 29%

WA South Lander St Large $45M $140M 32%GA Port of Savannah Large $44M $126.7M 35%

MA Conley Terminal Intermodal Imp. Large $42M $102.9M 41%

WI I-39/90 Corridor Large $32M $1,195.3M 3%

NY I-390/I-490/Rt. 31 Interchange Large $32M $162.9M 20%

WA Strander Blvd Ext & Grade Separation Small $5m $38M 13%

Total for 18 FASTLANE Projects $759.2M $3,612.4M 21%

Note: Does not show 6 smaller projects that received grants

Page 71: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Preliminary Gateway Construction Staging

70

Page 72: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Preliminary Preferred Scenario

71

Page 73: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

SR 167 Performance Evaluation Results

72

Page 74: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

SR 509 Performance Evaluation Results

73

Page 75: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Key Takeaways

74

SR 167:• Scenario 2C & 2D operate well, slightly better NB I-5 performance

with 2C, slightly better SB I-5 performance with 2D. • Need further analysis to understand best overall performance

between the two scenarios.• Scenario 4A operates well but is cost prohibitive.

SR 509:• Scenarios 3A and 4A function and rate similarly.• Scenario 4A is cost prohibitive.

I-5

• NB I-5 improvements will be carried forward for further analysis.

Page 76: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

Discussion

75

Page 77: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

76

2016 2017Dec Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

SR 509 Steering Committee

SR 167 Steering Committee

Program Schedule to Construction and Implementation Plan

Public OutreachJoint Steering Committee

SR 509 Open House

SR 167 Open Houses

Executive Committee

Environmental ReviewPractical Design

SR 509Kick-off

1SR 509 Method Review

2Preliminary scenarios & evaluation results

3

SR 167Kick-off

1SR 167Method Review

2Preliminary scenarios & evaluation results

3

SR 509Kick-off

1SR 167Kick-off

1

Refined scenarios

4Review updated modeling information

5Recommend

Construction & Implementation

plan

7

Review scenarios and alignment tour

2Endorse Preliminary Preferred Scenario

3Approve

Construction & Implementation Plan

4

Recommend Preliminary Preferred Scenario

6

Public outreach

Public outreach

Public Engagement

EJ outreach

5Review updated modeling info

Page 78: Puget Sound Gateway Program...2005/06/03  · HAUL (Base Uncertainty) DES 60.2. Design changes / additional scope due to maintenance considerations STG 20.1. Changed ground improvement

77

More information:

Craig J. Stone, PEPuget Sound Gateway Program Administrator(206) [email protected]