publication

4
everything remotely possible ROVDRILL

Upload: siriuslot

Post on 18-Jul-2016

13 views

Category:

Documents


0 download

DESCRIPTION

SUBSEA

TRANSCRIPT

Page 1: Publication

everything remotely possible™

ROVDRILL™

Page 2: Publication

ROVDRILL CAPABILITIES•Providescompetent,accurateandreliablegeotechnical services,throughstrongpartnershipswithwell-respected Forumbrandsandexternalindustryspecialists

•Viabletechnicalandeconomicalternativetodrillshipand otherseabedequipmentandoperationsforgathering highqualityseabedmeasurementsandcoresamples

•DeliveryandschedulingofRovdrillandrelatedservices areclientdriven,ratherthansupplierdriven,sinceRovdrill utilizesvesselsandROVsystemsofopportunity

ROVDRILL EQUIPMENT•Rovdrill3:Third-generationRovdrilldesign,withfull geotechnical capabilities

•Customdesignedinterchangeablefoundationoptionsto suitproject/seabedrequirements

•Workingdepth=depthratingofsupportROV(to maximum4000m)

•Coring/samplingdepth=90mstandard,expandableto 200m,corediameter=2.87”(73mm)

•Wirelinerotary,pushsampling,CPTasstandard

•Interchangeablefoundationassembliesforawiderange ofseabedconditions:

»Suctioncaisson–softtomediumstiffsoils

»4-leggedselflevelingjack-up–stiffsoils/rock

ROVDRILL 3 SURFACE CONTROL SYSTEM•UtilizesICEhardwareandsoftware,thelatestgeneration ofPerrycontrolsoftware

•IntuitiveHMIdrivenbytouchscreencontrols

•Singlesurfacecomputer

•Graphicaluserinterfacewithuserconfigurablepages

•Subseamanifoldwithlocalvalvecontroller

•Fullmissionsimulation,personnelsystemtraining andcustomscenariosavailablethroughForum’s VMAXsoftware

Today’sapplicationsforoffshoregeotechnicalinvestigationsand mineralexplorationdemand robustandproventechnologies– Rovdrillistheanswer.

ABOUT FORUM ENERGY TECHNOLOGIES

In the challenging global offshore oilandgasindustry,Forum SubseaTechnologies’continues toleadthewaybyprovidingourcustomerswithanextensive rangeofworldclass,mission criticalproductsandservices.Workingtogether,wedeliverEverything Remotely Possible.

For more information, please visit www.f-e-t.com.

Page 3: Publication

ROVDRILL 3 BASIC OPERATIONAL REQUIREMENTS

•Vesselofopportunityincluding: • 150HPWorkclassROVSpread:

»Subseahydraulicpower:59gpm)at207 bar (3000psig)fromtheROVauxiliarypump

» Subsea electrical power: Single phase power, 20 amps at 120 volt

»AccesstoasinglemodefiberintheROV umbilical

»AccesstotheROV’stelemetrysystemfor datatransfer

•DeckmountedoffshorecraneorA-frame,60TeSWL, minimum for SS6 operations

• Fastdeploymentwirewinch(preferablyheave compensated)orcranewithsimilarcapability

•Interchangeablefoundationassemblies–suction caisson/skirtedmudmator4-leggedjack-up assemblies,suppliedaspartofRovdrillspread

•ROVinterventionkitincludinginterventionbasket, hydraulicandelectricalhotstabassemblies,docking latchesandelectrical/hydraulicinterfacekit

•PersonnelrequiredandavailablefromForum:

• Rovdrilldriller/operators

• RovdrillTechnicians

• GeotechnicalEngineers

•Additionalpersonnel,equipmentandservicesare availableforadvancedoperations:

• Offshoresampleanddatatestingandanalysis

• Onshoresampleanddatatestingandanalysis

• Finalgeotechnicalreport

• Additionalspecializedgeotechnicalequipmentand support personnel

ROVDRILL 3 DEPLOYMENT / FOOTPRINT DIMENSIONS

ASSEMBLYWIDTH DEPTH HEIGHT MASS(IN AIR)

Ins Meters Ins Meters Ins Meters Lbs Kg

Drill Module 86 2.2 96 2.4 221 5.6 19,600 8,890

Jack-up Legs(Set of 4) 40 1.0 40 1.0 221 5.6 14,000 6,360

Caisson 144 3.7 102 2.6 99 2.5 21,000 9,525

2 x Spare & Work-shop Containers (Each)

238 6.0 96 2.4 102 2.6 18,000 8,160

Soils Lab. 238 6.0 96 2.4 102 2.6 15,000 6,800

Page 4: Publication

For a complete list of all of our locations please visit: www.f-e-t.com www.f-e-t.com/contact-us/

CONTACT US

Rovdrill 10642 West Little York, Suite 100 Houston, TX 77041-4014 1 713 329 8230 [t]