public participation in government programs...
TRANSCRIPT
Synchronisation
Con
sist
ency
UKP4, BAPPENAS &
MoF
Action Plan 369 Action Plans (2010) >400 Action Plans (2011)
PDU MAINTAINS CONSISTENCY AND SYNCHRONISATION FOR EFFECTIVE DELIVERY OF GOVERNMENT PROGRAMS
Reporting
3
Implementation
Monitoring and Verification
Cabinet MeetingCheckpoint
• 2010 selected annual action plans in Presidential Directive No. 1/2010
• Each Ministry/Agency is responsible for implementing action plans supported by related agencies
• Each P010 Action Plan has a measurement of success at bimonthly checkpoints on 4th, 6th, 8th, 10th and 12th
1
34
2
PDU REGULAR REPORTING AND MONITORING CYCLE
MONITORING GOVERNMENT PROGRAM WITH GPS COORDINATES
(P100H-P13A1)
Kupang Community Based Clean Water and Sanitation 10.17385 LS, 123.9773 BT
Pacitan Steam Coal-Fired PowerPlant 8 15’30’’ LS, 111 22’30’’ BT
10.000 MW
East Nusa Tenggara Steam Coal-FiredPower Plant 10.23872 LS, 123.49213 BT
(N8P43A1)
Cimanggis Market6,50538 LS 106,77531 BT
(P100H-P23A3)
Double Tracking of SerpongRailroad6 20’27,88’’ LS, 106 36’06,62’’ BT
(N6P29A3)
Road Maintenance in Banda AcehLambaro (road to the airport)
N6P28A1
Lampulo Banda Aceh Fishing Port 5.586 LU, 95.318 BT
(P100H-P13A10)
Porong – Sidoarjo Toll Road07°30.362’ LS, 112°41.960’ BT
Trans Java Toll Road
PB Abd. Rahman Saleh Malang Quick Response Unit 07°55.3509’ LS, 112°42.4924’ BT
(P100H-P44A2)
EXAMPLE OF MONITORING: CONSTRUCTION OF DOUBLE TRACK RAILWAY TO IMPROVE PUBLIC TRANSPORT
5
Tanah Abang Station
Tanah Abang Station
Parungpanjang
Serpong
Maja
• Double track railway construction Serpong-Maja (18.85 km)
• On-site monitoring 27 May 2010
Existing track
Under construction
1
2
Train heading to Cisauk station (6°19’31.04” LS, 106°38’23.69”BT)
1
Building formation for railway (6°20’27.88” LS, 106°36’06.62 BT)
2
THE THIRD WAVE OF OPENNESS IN INDONESIA
6
DEMOCRATIZATION DECENTRALIZATION OPEN GOVERNMENT
Enhancing transparency and public participation in governance
Strengthening the role of regions (provinces and districts) to determine their own fate
Opening up the opportunity for political participation
(~1998) (~2004) (~2010)
MOBILE PHONE AND INTERNET PENETRATION
Indonesia mobile phones penetration rates almost triple that in 2005, at 85.874% over a population.
7
“
Nearly half of consumers intend on buying a smart phone in 2011, with access to Internet and e-mail.....the Nielsen Company ”
Internet penetration rate has jumped from 14.1 percent in March 2011 to a roaring 21%
8
INTRODUCING LAPOR! (LAyanan Pengaduan Online Rakyat): ANYONE CAN SEE, CHECK AND REPORT NO MORE LIES….
Social Networkshttp://lapor.ukp.go.id
SMS/MMS: 1708
PUBLIC ACCESS AND PARTICIPATION IN LAPOR!
http:// lapor.ukp.go.id/downloadStatistic Objek coordinate Forum
Lapor! website
Mobile Application
Transparent
LAPOR! OBJECTIVES
10
ParticipationCollaboration
PUBLIC TRUST
TransparansiPartisipasi
EFFICIENT, EFFECTIVE, AND ACCOUNTABLE GOVERNMENT
1. Improve the transparency, accountability and inclusiveness of government institutions and processes
2. Increase public participation and collaboration
3. Improve public service quality
4. Be more responsive government
FLOW OF INFORMATION IN LAPOR!
11
Object + note was recorded in smart-phone with GPS feture
1 Send it through public network
2 Object + note was verified in Lapor! data center
3
In a minute the stake holders will be informed
4
11
Water pipe leakingStatus: being repaired
Bina Graha
Lapor! communites
HANDLING MECHANISM
12
Verify issue
Incoming issues from- Website Lapor- SMS Gateway- Mobile Apps
Publics Line Ministry / State institutions
Take actionssent disposition
Evaluate the claim
Claim achievement
Objection
Closed issues
Monitor the service quality
PDU
Accept
EXAMPLE CASE: THE BROKEN BRIDGE - ACEH, SINGKIL (1/2)
+6285277227xxx :“ jembatan gosong telaga kec singkil utara dar tahn 2006 yg
rusak karena gempa nias tdk pernah diperbaiki karena tdk adaanggota dewan asal gosong padahal jembatan itu sangat d
perlkan dan vital. ”
Saturday, 12 September 2011
Monday, 14 September 2011
• PDU Office, as a Lapor! Operator, communicates with the SMS Sender, to verify and get more detail information regarding the broken bridge.
• The information was disposed to the Aceh Province Office.
Incoming SMS through Lapor!
Loka
siob
yek:
ari2
011L
okas
o
Gasong Telaga Bridge, Singkil, Aceh
Field Monitoring Date: 18 September 2011
Note: The bridge was broken cause of earthquake in 2006 but not yet being reconstructed.
• Based on the information, the Aceh Province Office conducts a study visit to the broken bridge, make a detailed design to reconstruct the bridge, and allocate fund in year 2012.
Friday, 18 September 2011
EXAMPLE CASE: THE BROKEN BRIDGE - ACEH, SINGKIL (2/2)