Public participation A RE YENG LINE 2C 19 March 2020

Upload: others

Post on 27-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

Public participation A RE YENG

LINE 2C

19 March 2020

Page 2: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

A Re Yeng alignment

Soshanguve

(Kopanong)

Rainbow

Junction

Pretoria Central

Business

District

Hatfield

Menlyn

Denneboom

(Mamelodi)

Akasia

vLine 2A

(7 km)

Dec 14Line 2B

(10 km)

2020

Line 2C

(11 km)

2020

Line 1C

(13 km)

2021 Mahube Valley

(Mamelodi)

Line 2D

(9 km)

2020Line 1B

(10 km)

2021

Line 1A

(9 km)

2016

LEGEND

- Line 1

- Line 2Pretoria Station

Page 3: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

Route

January Masilela Drive

Lynnwood Road

Simon Vermooten Road

Denneboom Link

Line 2C route

Page 4: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

Proposed station positions

L P B

amb

oD

rive

Shabangu Avenue

Line 2C and 2D

Page 5: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

History of Line 2C

The engagement commenced on 10 November 2014.Public meetings were held on the following dates:• 15 March 2016 • 19 March 2017

The environmental studies were completed in 2015.

A traffic impact assessment was completed in 2017.

The promulgation of Simon Vermooten Road and the Mamelodi section of Line 2C was completed in June 2016.

Page 6: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

Environmental impact assessment specialist studies

Wetland delineation: Exigo3

Geo-hydrological investigations: Exigo3

Socio-economic impact assessment: Demacon

Air quality studies: Rayten Engineering Solutions

Noise impact: Enviro Acoustic Research

Heritage assessment: Nzumbululo Heritage

Page 7: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

Summary of findings

The diversion to alternative lower-order roads is already takingplace.

- Lane acquisition

- This results in a large unserved demand along JanuaryMasilela Drive and Lynnwood Road that cannot practicallybe accommodated on alternative routes.

- There is gross oversaturation at several key intersectionsalong diversion routes on alternative routes.

- Lane acquisition is not feasible and, therefore, is notrecommended.

- Lane addition is recommended.

- Minor road network upgrades are recommended.

Traffic impact assessment

Page 8: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

Line 2C traffic impact assessment– Intersection improvements

- The following intersections are to be upgraded:- January Masilela Drive and Atterbury Road- January Masilela Drive and Glenwood Road- January Masilela Drive and Twig Street- January Masilela Drive and Lynnwood Road- Lynnwood Road and Lizann Avenue- Lynnwood Road and Jacobson Drive- Lynnwood Road and Rubida Street

Page 9: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

January Masilela Drive

• Existing lane configuration maintained

There are two mixed traffic lanes in each direction.

• Add two bus rapid transit lanes

There will be one bus rapid transit lane in each direction.

• Non-motorised transport

There is a two-metre sidewalk and a two-metre cycle lane.

Page 10: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

January Masilela Drive

• One station at Glenwood Road• One water course crossing• Two properties affected (parking areas)• Bus or taxi bays remain• No accesses affected• One additional traffic signal

Page 11: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

January Masilela Drive

Page 12: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

January Masilela Drive

Page 13: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

Lynnwood Road

• Existing lane configuration

There are two general traffic lanes in each direction.

• Future lane configuration

There will be two general traffic lanes in each direction. The median is wide enough to accommodate the construction of one new bus rapid transit lane in each direction.

• Non-motorised transport

There is a two-metre sidewalk and a two-metre cycle lane.

Page 14: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

Lynnwood Road

Station positions

• Ascott Street – Jacobson Drive• Botterklapper Street• Simon Vermooten Road

Page 15: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

Line 2C OverviewLynnwood Road

Page 16: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

Line 2C OverviewLynnwood Road

Page 17: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

Line 2C OverviewLynnwood Road

Page 18: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

Line 2C OverviewLynnwood Road

Page 19: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

Line 2C OverviewLynnwood Road

Page 20: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

Line 2C OverviewLynnwood Road

Page 21: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

Line 2C OverviewLynnwood Road

Page 22: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

Simon Vermooten Road

Lane configuration

- This road has recently been upgraded and the upgrade has accommodated the future bus rapid transit lanes.

- It has two general traffic lanes in each direction and one bus rapid transit lane in each direction.

Page 23: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

Simon Vermooten Road

Station positions

• Simon Vermooten Road and Griffiths Street

• Simon Vermooten Road and Bronkhorstspruit Road

• Simon Vermooten Road and Alwyn Street

Page 24: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

Simon Vermooten Road

Page 25: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

Simon Vermooten Road

Page 26: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

Denneboom Link

• Existing lane configuration

There is one general traffic lane in each direction.

• Future lane configuration

There will be one general traffic lane in each direction and the construction of one new bus rapid transit lane in each direction.

• Non-motorised transport

There is a two-metre sidewalk and a two-metre cycle lane.

Page 27: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

Line 2C OverviewDenneboom Link

Page 28: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

Denneboom Intermodal Facility

Mamelodi to CBD

45 Buses/hr.

Page 29: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

Promulgation process

Notice of intent – Mid April 2020

Comment period – 21 days

Closing date for comments – May 2020

Report to Council for final decision

Promulgation in Provincial Gazette

Page 30: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

For more information

Call centre: 012 358 4848

Email: [email protected]

Website: www.areyengtshwane.co.za

Twitter: https://twitter.com/A_Re_Yeng

Facebook: www.facebook.com/A Re Yeng

Page 31: Public participation - Tshwane › sites › areyeng › Stakeholders... · History of Line 2C The engagement commenced on 10 November 2014. Public meetings were held on the following

Thank you