public notice & agenda - san diego · page2 ray robinson january 7, 2009 i. required...

23
1 Skyline/Paradise Hills Planning Group 6610 Potomac Street San Diego, Ca 92139 (619)470-0179 PUBLIC NOTICE & AGENDA February 10, 2009 MEETING AGENDA ITEMS: Correspondence is available in the Rec. Center office prior To meetings. Be sure to initial Routing Slip -MEETING OF COMMITTEE ON CORRESPONDENCE 6:30PM -CALL TO ORDER 7:00PM -AGENDA ADDITIONS- 7:02PM -SET UP/TEAR DOWN REMINDER 7:03 PM -ANNOUNCEMENTS 7:05PM -APPROVAL OF MINUTES 7:10PM -TREASURER’S REPORT 7:11PM Treasurer Rep ort: $455.00 -PRESENTATIONS BY CITY/COUNTY/STATE 7:12PM -POLICE/FIRE COMPACT, CPC BOARD COMMITTEES INFORMATION ITEM 1. 1050 Cardiff Tentative Map to create two parcels from a 6.86 acre site at 1050 Cardiff St. Project # 160421. Presenter: Ray Robinson ACTION ITEM 1. Creation of subcommittee for March Elections to Planning Group 2. Guy Preuss is presenting a mission statement for consideration by the Planning Group “We are fighting for things that make these homes Worthwhile; a yard big enough to raise a garden; a Paved street in front; sidewalks to walk on; sewers that Don’t stop up; garbage cans emptied weekly; decent Playgrounds for the children; a tax bill we can afford to Pay.” - Harley Knox

Upload: others

Post on 21-Sep-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PUBLIC NOTICE & AGENDA - San Diego · Page2 Ray Robinson January 7, 2009 I. REQUIRED APPROVALS/FINDINGS -Yourproject ascurrentlyproposedrequires the processingof; Rcquired approvals:

1

Skyline/Paradise Hills Planning Group

6610 Potomac Street

San Diego, Ca 92139

(619)470-0179

PUBLIC NOTICE & AGENDA

February 10, 2009 MEETING

AGENDA ITEMS: Correspondence is available in the Rec. Center office prior

To meetings. Be sure to initial Routing Slip -MEETING OF COMMITTEE ON CORRESPONDENCE 6:30PM

-CALL TO ORDER 7:00PM

-AGENDA ADDITIONS- 7:02PM

-SET UP/TEAR DOWN REMINDER 7:03 PM

-ANNOUNCEMENTS 7:05PM

-APPROVAL OF MINUTES 7:10PM

-TREASURER’S REPORT 7:11PM Treasurer Report: $455.00

-PRESENTATIONS BY CITY/COUNTY/STATE 7:12PM

-POLICE/FIRE COMPACT, CPC BOARD COMMITTEES

INFORMATION ITEM

1. 1050 Cardiff Tentative Map to create two parcels from a 6.86 acre site at 1050 Cardiff St. Project # 160421.

Presenter: Ray Robinson

ACTION ITEM 1. Creation of subcommittee for March Elections to Planning Group

2. Guy Preuss is presenting a mission statement for consideration by the Planning Group

“We are fighting for things that make these homes

Worthwhile; a yard big enough to raise a garden; a

Paved street in front; sidewalks to walk on; sewers that

Don’t stop up; garbage cans emptied weekly; decent

Playgrounds for the children; a tax bill we can afford to

Pay.”

- Harley Knox

Page 2: PUBLIC NOTICE & AGENDA - San Diego · Page2 Ray Robinson January 7, 2009 I. REQUIRED APPROVALS/FINDINGS -Yourproject ascurrentlyproposedrequires the processingof; Rcquired approvals:

THe; C,TY OF' SAN 0"';"'0

January 7, 2009

Ray RobinsonKappa Surveying8707 La Mesa BILa Mesa, CA 91941

Dear Ray:

Subject: 1050 CardiffTentalive Map Assessment Letter; Project No. 160421; Job Order No.431886; Skyline/Paradise Hills

The Development Services Department has completed the initial review ofthe project referencedabove, and described as Tentarive Map to create two parcels from a 6.86 acre site located at 1050Cardiff Street in the CC·2·3 Zone within the Skyline Paradise Hills Community Plan. CouncilDistrict 4.

Enclosed is a Cycle Issues Report (Enclosure I) which contains review comments from staffrepresenting various disciplines, outside agencies and the conununity planning group. Thepurpose of this assessment letter is to summarize the significant project issues and identify acourse of action for the processing ofyour project.

If any additional requirements should arise during the subsequent review of your project, we willidentify the issue and the reason for the additional requirement. To resolve any outstandingissues, please provide the information that is requested in the Cycle Issues Report. [fyou choosenot to provide the requested additional information or make the requested revisions, processingmay continue. However, the project may be recommended for denial if the remaining iSSUCl;cannot he satisfactorily resolved and the appropriate findings for approval cannot he made.

As your Development Project Manager, I will coordinate all correspondence, emails, phone calls,and meetings directly with the applicants assigned "Point of Contact." The addressee on thisletter lias boon designated as the Point ofContact for your project. Please notify me if you shoulddecide to change your Point ofContact while I am managing this project.

639ljd TL£b0Lb6T9T NIjIllIM 92:2T 6002-20-20

Page 3: PUBLIC NOTICE & AGENDA - San Diego · Page2 Ray Robinson January 7, 2009 I. REQUIRED APPROVALS/FINDINGS -Yourproject ascurrentlyproposedrequires the processingof; Rcquired approvals:

Page 2Ray RobinsonJanuary 7, 2009

I. REQUIRED APPROVALS/FINDINGS - Your project as currentlyproposed requiresthe processingof;

Rcquired approvals:

o Process 3 tentative Map to subdividean existing parcels into two lots

All actions will be consolidatedunderthis application and processedconcurrently, pursuantto the Consolidationof Processingregulationscontained in Municipal Code Section112.0103. The decision to approve, conditionallyapprove, or denythe project will he madeby the City Council

Required Findings; In order to recommend approval of yourproject, certain findingsmust be substantiatedin the record. Enclosure2 contains the requiredfindings.

U. SIGNIFICANT PROJECT ISSUES: The significant projectissues are summarizedbelow. Resolution of these issues could affect your project. Additional explanation isprovided in the Cycle Issues Report.

);> Public Rlght-<lf-Way Vacation Recommendation; LOR-Engineering and LDR­Transportation are recommending that the CKCesS public right-of-way alongJamachaRoad, adjacent (0 the site, be vacated as part ofthe proposedTentativeMap. This action is a Process5 City Council action and wouldrequire additionaldisciplines to review the project. The proposed projectmay vacateup to SlK feetof-the existing PublicRight-of-Way of Jamacha Road to allow for" 36-footcenter line to property line distance. If the owner/applicant is interested inacquiring the additional land for private use please througha Public Right-ot~Way

vacation processplease contact the ProjectManager. Or indicateon the nextsubmittal cover letterthat youare not interestedin vacatinga portion of JamachaRoad with this application.

» Parking outside of project boundary: It appears parking spaces existoutsideof the project's boundarieswithin the futurepublic right-of-way for JamaehaRoad (northeastportionof the site). LOR-Engineering andLDR-Tral1sportationare requesting documentation be provided whichallows the parkingarea to exist.If no such documentation exists then theparking spaceswill need to be removedfrom the Tentative Map exhibit and parkingcalculations revised (See Enclosure1,Cycle Issues Report, LDR-Engineering and LOR-Transportation comments).

,.. Adequate Water Services: The existing water mainmay be providinginadequate service to the existing commercial development. Please provide therequested information as identifiedwithin WR-Water's review (See Enclosure I,Cycle Issues Report, LDR-Watercomments). If it is determined that inadequate

1LZb0Lb6191 W~IllIM L2:21 6002-20-20

Page 4: PUBLIC NOTICE & AGENDA - San Diego · Page2 Ray Robinson January 7, 2009 I. REQUIRED APPROVALS/FINDINGS -Yourproject ascurrentlyproposedrequires the processingof; Rcquired approvals:

Page 3Ray RobinsonJanuary 7, 2009

then new water service may be required to be installed as II condition oftheTentative Map.

» Driveways: In accordance with San Diego Municipal Code (SDMC) section141.0!l(1I., 30 -foot separationsare required between driveways (See Enclosure 1,Cycle Issues Report, LDR-Tfll1lSPortation comments). A reduction or closure ofsome of the driveways may be required for lot 1 in order to comply with currentstandard and to improve safety and access.

>- Infrastructure Upgrade: The proposed project will require the construction,repair, or reconstructionofcurb, gutter, sidewalks and driveways adjacent toCardiffStreet to meet current code requirements (See Enclosure I, Cycle IssuesReport, LOR-Engineering comments), In addition, there will be a conditionwithin the Tentative Map requiring the construction ofa City standard bus stoppad adjacent to the site on CardiffStreet and Jamacha Road.

m. STUDIESIRii:PORTS REQUIRED: A number ofdocuments have been identified asnecessary to theproject's review. Reference the attached Submittal RequirementsReport (Enclosure 3)_ Below arc the Studies/Reports required for the next submittal:

Q Biolo~ ReSOUl"ces Letter Report (See Enclosure 1, Cycle Issues Report, LDR­Environmental comments).

[J Geotechnical Investigation Report (See Enclosure 1, Cycle Issues Report, LDR­Geology comments)

[J P1"eljminary Assessment fnr Coutaminated Drinking Water (Case No.H05363-00I) information(See Enclosure I, Cycle Issues Report, LOR­Environmental Comment no. 6).

[J Prellmlnary Title Report Items No.4, S, 7, 10, and n (See Enclosure 1, CycleIssues Report, tDR-Engineering Comment no. 8).

[J Sewer Laterallnfonnation or CC&.R's for the existing development (SeeEnclosure J, Cycle Issues Report, LDR-W/lJlte water C-Omment no. 8).

[J Underground Waiver RllIIUe8t Letter (See Enclosure 1, Cycle Issues Report,LDR-Engineering comments),

IV. PROJECT ACCOUNT STATUS; Our current accounting system does not provide torreal-time information regarding account status, however, our records show approximately$2,000 billed to date. During the processing of your project, you will continue to receivestatements with the break-down of staffcharges to your account. Should you havequestions about those charges, please feel free to contact me directly.

V. TIMELINE:

,LZv0Lv5,9, W~IllIM L2:2, 5002-20-20

Page 5: PUBLIC NOTICE & AGENDA - San Diego · Page2 Ray Robinson January 7, 2009 I. REQUIRED APPROVALS/FINDINGS -Yourproject ascurrentlyproposedrequires the processingof; Rcquired approvals:

Page 4Ray RobinsonJanuary 7, 2009

Upon your review of the attached Cycle Issues Report, youmay wish to schedule ameeting with staff and your consultantsprior to resubmitting the project. Pleasetelephone me if you wish to schedule a meeting with staff. During the meeting, we willalso focus on key milestones that must be met in order to facilitate the review ofyourproposal and to project a potential timeline for a hearing date. Your next review cycleshould take approximately 20 days to complete.

MunicipalCode Section 126.0114requires that a development permit application beclosed if the applicant fails to submit or resubmit requested materials, information, fees,or deposits within 90 calendar days. Once closed, the applicatioa, plansand other datasubmitted for review may be returned to the applicant or destroyed. To reapply, theapplicant shall be required to submit a new development permit application with requiredsubmittal materials, and shall be subject to all applicable fees and regulations in effect onthe date the new application is deemed complete.

If you wish to continue processing this project, please note that delays in resubmittingprojects and/or responding to City staff's inquiries negatively impact this Department'.ability to effectively manage workload,which can lead to both higher processingcostsand longer timelines for your project.

VI. RESUBMITTALSINEXT STEPS: When you are ready to resubmit, please telephone(619) 446·5300 andrequest an appointment for a "Submittal-Discretionary Resubmittal."Resubmitals may also be done on a walk-in basis, however you may experience a longerthan desirable wait time. In either case, please check in on the third floor of theDevelopment Service Center (1222 First Avenue) to be placed On the list for thesubmittal counter. At your appointment,provide the following:

A. Plans and Reports: Provide thenumber of setsofplans and reports as shown on theattached Submittal RequirementsReport. The plans should be foldedto an approximate8 v,. x 11 inch size.

0. Cycle Issues Report resJ)onsy letter: Prepare a cover letter that specifically describeshow youhave addressed each ofthe issues identified in the Cycle Issues Report and anyissues identified in this cover letter, ifapplicable, Or, you may choose to simply submitthe Cycle Issues Report, identifying within the margins how you have addressed theissue. If the issue is addressed on one or more sheets ofthe plans or the reports, pleasereference the plan, sheet number, report Orpage number as appropriate. If it is notfeasible to address a particular issue, please indicate the reason. !nclude a COPY of thisAssessment Letter, Cycle Issues Report and your response letter ifapplicable, with eachset ofplans.

2T391:id T~[b0~b5T9T NI:iIllIM ~2:2T 5002-20-20

Page 6: PUBLIC NOTICE & AGENDA - San Diego · Page2 Ray Robinson January 7, 2009 I. REQUIRED APPROVALS/FINDINGS -Yourproject ascurrentlyproposedrequires the processingof; Rcquired approvals:

Page 5Ray RobinsonJanuary 7,2009

Vll. COMMUNITY PLANNING GROUP: Staff provides the decisionmaker with therecommendation from your locallyrecognized communityplanninggroup. If YOIl havenot alreadydone 00, please contact William Penick, Chairpersonof the Skyhne/ParadiseHills CommunityPlanning Group, at (619)470-0179 to scheduleyourproject for arecommendation from the group. If you have already obtaineda recommendation fromthe communityplanninggroup, in your resubmittal, ifapplicable, please indicatehowyour project incorporates any input suggestedto you by the community planning group.

Information Bulletin 620, "CoordinationofProject Managementwid. CommunityPlanning Committees" (availableat http://www.sandiego.gov/development-services),providessome valuable infurmationabout the advisory role the CommunityPlanningGroup. CouncilPolicy 000-24 providesstandardoperating proceduresandresponsibilitiesof recognizedCommunityPlanningCommittees and is available athttp://clcrk:doc.sannet.govlWebh'ite/council-P9licy.

vm. STAFF REVIEW TFAM: Should you requireclarificationabout specificcommentsfromthe staff reviewing team, please contactme, or feel free to contactthe rev1cwerdirectly. The names and telephone numbers ofeach reviewer can be fOW1d on theenclosed Cycle Issues Report.

In conclusion,please note that information forms and bulletins, project submittalrequirements,and the Land DevelopmentCode may be accessed on lineathttp://www.sandiego.gov/development-serviecs. Many land use plans for the variouscommunities throughout the City ofSan Diego are now available on line athttp://www.sandiego.gov/planning!comml;!!Ii.ty!I!ll!fil~.§!index.shlml

For modificationsto the project scope, submittal requirements or questions regarding any of theabove, please contactme prior to resubmittal. [may be reached by telephone at (619) 687-5942or via e-mail at [email protected]

Sincerely,

William ZounesDevelopment Project Manager

CT38bd ,LCb0Lb6,9, WbIllIM 82:2, 6002-20-20

Page 7: PUBLIC NOTICE & AGENDA - San Diego · Page2 Ray Robinson January 7, 2009 I. REQUIRED APPROVALS/FINDINGS -Yourproject ascurrentlyproposedrequires the processingof; Rcquired approvals:

Page 6Ray RobinsonJanuary 7, 2009

Enclosures:J. Cycle Issues Report2. Required Findings3. Submittal Requirements Report

cc: FileWilliam Penick, Chairperson of the Skyline/Paradise Hills Community Planning GroupReviewing StaffMyles Pomeroy, City Planning Community Investment Department

TLZv0Lv6T9T W~IllIM 82:2, 6002-20-20

Page 8: PUBLIC NOTICE & AGENDA - San Diego · Page2 Ray Robinson January 7, 2009 I. REQUIRED APPROVALS/FINDINGS -Yourproject ascurrentlyproposedrequires the processingof; Rcquired approvals:

L64A-003A

THE CITY OFSAN DIEGODevelopmentServlC6S

1222 Rrst Avaoue:, Solin Olego, CIA 92101-4154

Enclosure 1Cycle Issues Report

lm09 8;51omPag.l of 14

Project InformationProjoel Nbr: 1611421ptoject: Mgr: Zounes, Will

Tille: 1050CARDIFFTENTATIVEMAP(S1a) 887-5942

fie.i.... lnformatlon

2 Submitted (lIItJItWIs<;jilfinO)

lOR..planning ReviewTripp,Bm(1l1$)"",~n

4.00

Submitted (Mulfi.olsclpline)Hou,... of Review:

Next Review MllltItod:

CyclefyP'"

R""e""t1llpi""lpline:Revle",er:

S..bm_; 11/13J2008 Deemed Complete "0 11/2412008

Cl"'le Distributed: 11124/2008

A$i\lnGd; 11121l12OO8SlartGd: 1212312008

Review Due: 01/1312009Compl"llod: 0110712009 COMl'l.ETED ON TIME

Glo....d: 01107/2009

Thl\l re'\li(MI dus dF,lte was el\8nged to 0,111312009 from 01/06/2009per agreementwith cllstomer.Themviavw;,r- has indicatad ttlay I.Yf.Iint 1Q review'(his proJem ~n. Reasonohosen by thereviewer. FirstR:~ 1$$t.Ie$,

. W. reQ"""''' ~M ",""lllete submittal for LDR·Plaml!1ll Revlewon til;" pro)oot as; Subm_ (MuIU-Olscipilne).

. Ttl6 reviewerhas requestedmom oocumentsbe submitted,, Your project still has 4 outstandingreviewlssuas with LDRDPlannfng Revfsw(all of whldl are f\QW)., The reviewer ha~ not5igned off 1 job,_ Last month LDR·Planrdng R9v!:e'VIf performed 106 ravleYJ&,73.8% IIVSre en-arne.ant;l4S.4%were on projectsat leu than < 3 oompJete Submittals.

l!!ue TutA T-entative Map,deciSiOn Prooeu 3) is required to subdIVide- th&parcallnt.oMOM than ana fot. prcceee 3decitirons aremade by a Hearing Officer~ dF:Qi!Jlon may be appealed to' the Planning Commi$~,don.

e Pr<>looIScope

~Cl.<m:!ll! lIYm~ 1

IHuwToxtThe 6,8Ei~cre project site Is addressedas 002 CardlffSt., enciloea.teO at ttte$OtJthwes.terty comer ofJamachaRd. andCardiffSl. within tne-ec.2·3 {Communlty~Commel'Cial) zone, S~p$(acll';eHillscommun'ty Plan Area, and is noted liI:Sc ccntaining sensitiveand potentiallysel'll!lJtive vssetatil:m (Oil a: westerlyportionot thl;l Bite),wl'tich is regulated under the:ElWiroflmentalty Sensitjva lands (ESl) reg:ulat/l:)I'1& Q1 the LandOevelopmentCode (tDe) Sections. 143.0101 through 143.0160sa 6pplic.abte. (NewIssUQ)

2: Submitted:plaflt; and mcords indiCldC the &ftchu been developed withD::uTlm~1 uses wlthln detached:buildings, including an automobileSeMce station, UqUOt i!;b;)t$, mtaurant, ~nd ~rip mall. (New Issue)

3 The project proposes to subdividethe existing parCAI Intotwo parO!tls, Patcell' beingO.496-acre and contaInInsan existing automobileseMoe statton,aDdParoet2 being 6.369-ecm anti containingthe feff'\3lning

: commarciaJ buildings/useson tbe SItB. (Haw issue)e """"illl R..Q ..I....d

IHl!iCleam? t!ImI

D 4

Rel\" toweSeot;on.125.0410 and 125.0430. (New Issua)IliI 5 lDC Sootlon 1~e.o5Ol!(d)(3) "",ut,... a Sit. Development Panni! (SOP), docl<lon_. 4, loreubdlvi.ion 01

a p,..mlsea containing ESl-

Howa""" cDC S80\"'" 14~.0110(O)(2)ototeo Ihot a SOl' Is NOT required for 'OEIIEl.Of'MeNT mot10 limilad 10Intl!t(ior modffjcatiO"~ Of re~f&. or any exterior reperrs, alterations or maint6n<in'" that does not increasethefootplint at an existingbUIldIng or accessorystructureand WiD not em::,oaoh Into theESt dUring or aft8toonstruction".

See Comment No. 28.(New 1&"5Ut9)

!iJ 6 TM $uJ)dlvi$lon d p~ (dMdmg a parcel of rand into two Of moreparools)is Int:JudL!td In lh1!l definitionofOEIlELOPME"T In lDC seetcn 11M1;n.

A$ p<olllded ~y Soetlon 143,0110(OX2) no DEvelOPMeNTle, p"'f'O'lO(! no,will00"", with thi. p",j$ot, there '"no iru::n3~ in the foo(pnrnaf en axi$ijhg i)l,likilli9 Or'~atny structureand 00 IMlCfQachn'l$l"lllnto the ESL.

Thllilflilfof&. a Site Developrn:enr Permit is not requif,$Q for thl$- p,opoul, (N8W Issue)e Dovelopment Regulations

lilil....Cleantd? 1iw:D. I,Qui Taxi

IiiI 1 1'toIo, to t.DCSeollon131.0531 .no Tabl.,31·05<-C·

cc-z-s """" (Now t...e)

For q......,n. _"''''9 tho 'tOR·PIOnning FlavloW' "'lIl$W, pl.... 00" B'" Tripp et (0'$) 44<H;273. Proi6clNbr: 1604.21/ Cy<:le; 2

.P2kV02.01.61

£T39dd TLZb0Lb6T9T WdIiiIM 82:21 6002-20-20

Page 9: PUBLIC NOTICE & AGENDA - San Diego · Page2 Ray Robinson January 7, 2009 I. REQUIRED APPROVALS/FINDINGS -Yourproject ascurrentlyproposedrequires the processingof; Rcquired approvals:

THE CITY OF SAIIl PlEaDDevelopment S....-

L64A-003A 1222 FIrs, A"""UO, Son [);"lIO, CA .2'"14154

tssueClernd? NUiji IssY! TBt

m S Ma.ximum pennitted residentialdensity· one dwellingunaper 1,500$q_ ft,

l'e$idcnti~ dGVttlopmsnt 1& nO!; PtopO$$d, theretorethis regulation does not apply.(New bJ;il,le)rEI 9 SuppleM£lntalrasJdentlall'l!\StJtatiol1$ ·

I"Sl!Iidential development /$notproposea', therefOUl this regUlatIon coes fi(lt tlPply,(New($Sue)I!l ,0 LotArea - minimull'nf$quired is 5;000 sq. ft

ptOject complieS

maximum lot Mea - no maXImum (New ISGl,Ie}iii 11 lot dlrnatUll(ll1PJ -

mll,lmum lOt width := 100 Il11mil' h!ef - Pltlject complies

minimum!l:tree1 frQnUlQe "'l 100 linearfeet ..projecteompftti.

minimum/mSXlmum lOt depth ::;. no minimumor maximum ..doesnot apply {Nevt 1$$0")o 12 Setback l'aqUil'l!H'nel'it6-

minimum/maximum frontand &ttHelsidesetbacks- a minimum10'-0"front andstreetside yal'da.etbaclt W88estabUsMd with I'ffeordatlon afMap No. :0::$96 and ~hall remain. In addition. access rlght$ W$1'ewaived on theportionof the prop&rty abutrJng .Jamacna Rd.

demonstratecompJIanC8 and consbitencv wfth this l'$(Iuitement on plans (New Issue)13 Sftfbact< requirements •

minimumt;;lde $$tbaCk. =; 10-1't

project complies(NewIssue)14 Setback requirements •

minimumrear setback -10·ft

projecl """""ies (lIlew '..uo)Il!l l' Mio><imum stIUclure height=45-ft

thISrequirement ooe&not $pply to tft$ PItlUQ&ed. prQject. (New lesue}I!:I HI Minimum lot covatagQ :::.

nominimum

project compliell (Now I..",,)Cl 17 Maximum ftoaf area ratio ft

0.75

Parcel 1 =; 21,605,76sq. ft. x 0,75 "'16,204.32 sq. fl maximum

demonstratecomplianC& on plans

Par""'2" ;;m,433.6Hq. ft.'0.75. 2ll8,ll75.23"'l. ft. maximUm

demonstratecomplianceon plans (New Issue)tiS 1a F!O(Ir el:rei r"tio bOOIJ6 •

noes not.$ipply (New Issw)19j 19 Pedestrian pethEJ·

.... not apply to !h;' p(ojocl (New,.....)I!l ZQ Tranal:)arency-

(1(1$$ not apply to this project (New '~e)

IE 21 Buik;jing artiCUlation. ~

d... nol ""ply to!hI. proioet (Now I$$uo)

For questions rBgsrding the 'LOR-Planning ~BVIBw' mview, please call am TriPP at ($19) 44&-5273. Project Nbr: 160421 JCycle: 2.P2kv ll2.01.61 Will Zoun.. 687-5ll<C1

9T391:1d

Page 10: PUBLIC NOTICE & AGENDA - San Diego · Page2 Ray Robinson January 7, 2009 I. REQUIRED APPROVALS/FINDINGS -Yourproject ascurrentlyproposedrequires the processingof; Rcquired approvals:

L64A..u03A

THECITYOFSANDIEGODevollOl'ment Serviool!

1222 Fil1iitAwmue, S~ Dieg<l, CA 92101-4154

mu' 1'extParkinglot orientation ~

IHueTextOemomllt1lJting 'Compliance - where GOmpilahce with a mqutret'l'\flntcan be damQlistrlited witf'la Simj)l.& note onthe plans..a: noteon ttteplans.rtaUautfLoe {fot Vfltel., heigtlt. groG$. floor af$(l ~n(1 Cireumat8nces- n!QuiringspecifIC measurement}. The intentis to ¢r)!\V@Y (he "'fOfm~iOl'\$0 tntl,tOQm))USnee with LDCrequirements canbe deteimined. Please contect ttl~ Planning Rev~r at (61'S)440~73 fot f1.frthel' diteCtll;mtf needed: (New10o",,)

DdOi!-s not apply to thi$ pl'l)jeet (Nc9W Issue)

23 PleaH re labAIthe existing structureon proposedParoel1 from 'snack ston!' to 'automobile servICe station' toaccurately f'3fled: the pe.rmmed use of the site.·The,use of a portionof the stl'l)C(l,Ir1;l {or accessory retail sale of

, ~mlllt$;a is permitted, (New IMoue)~ Slll:JDlelTllitntat RSQulations

ICloamd'1=""'lit Toxt1!9 24 Please note the ESl regulationsoontaiAed in LDC Sections 143.0101 through 143,0160as applicabte. (New

I Issue)

IIE ,25 Provide addltlon\!llinform.~on related to ESl as required by LOC St1Qtion.s143,011:? snd 143.0113.

The subdIVtslOn of thef $itS 15 InCluded wlthJnlha de-nnltlo1) ot'develop~ as noted In lDC $&etion 11::.t0103.(No" 1...0)

11'?1 Notes on Plans" !!I!l!!!

Cleared? Hum

\ ~ 26

I

For questionsregardingthe '1..0R~Planning Review' revIeW. plea$~ csll BmTripp a\ (5"19} 446-5273. ProjectNbr~ 1004211 Cycle: 2

.P2k v 02.01.61 Winzeeoee 687-5942

LT39~d TLZb0Lb6T9T W~IllIM 62:2T 6002-20-20

Page 11: PUBLIC NOTICE & AGENDA - San Diego · Page2 Ray Robinson January 7, 2009 I. REQUIRED APPROVALS/FINDINGS -Yourproject ascurrentlyproposedrequires the processingof; Rcquired approvals:

L64A·OO3A

THE CITY OF SAN DIEGODevelopmentServiCElS

1222 FlrstAvooue. San Diego. CA9Z1Q1-41!)4

Review Infonnation

2 Submitted(Multl.f>lsoIpllno)

LOR.-Envtronmental

JiIIlrqU6,MM

(619) 687-15961

6.00Submtttecf (MUIII-DlSclll!lno)

Hours of Review:Next Review Method:

Cycle TYI""Reviewing Disoipline:

Reviewer:

Submitted: 11/1312008 0--0"" CompletetlI1 11/2412008Cycle P!"trIbu\:e<I: 1112412008

AsSigned: 11/24/2008

Starh;d: 12/0212008Review C.... : 01/08/2000Comp",ted: 12/29t.1000 COMPLETEl) ON TIME

CI""ed: 0110712009ThenMlI!fWI8r has Indicatedthey want toI'$Vlew thl$ projectagain. f(eason ehQse:o by then;M$W$r; A~tReviewIssues.

· We requesta 2nd ccDlPle.te eubmittalforLOR~Envil'Qnm$n~1 en thil;lprojecl:B1i: SubmitteQ (Multi--Ofaclpllne),· Thereviewer has requestedmom documents be submftted,· Yourprojeot""" tes 6 oulslarnllng reviewIs...es with LDR·ErNironmental(all of wIlIch "'" now).· The reviewar' has not signedoff 1 job,, Last month LOR~Environmental performed92: reviews, 54.3"11, were on.time, and 58.0% Vdero on pl'(ljeetsat le9$than < 3 completesubmlttafs.

1M... Ie1rtCAS will coordI.- with LOFt·TlaflSportatlon DevelopmentReviewto d....rmine ~ the project wouldo",.t.potBntiaity slgnlllOllnttransportation Im'-lhal a", roIObld but nolllmited to 0.'1'09" doily trips, vehicularcirculation. visibility triangles. requiredpaOOng, and access. Referto lO~~rraMj:lortatton DevelopmentReviewccmmente. {New f8sue}

~ Human HeeithlPublic SafetY (Ha

lml!Clea[fd? l1WD ':till! Text

o G The project silla lIS listed Qn the County's EnvirQnmental case L..istfng (case No. H05363..ot)1. IGrEx~Gas)for having a preliminary al5$l!l&&m"nt t'otcontaminated dtlnkirlij' 'lVtIWrfaqulfer. Provfde the status (op&nfdO$$d)of theCS$Qandanytechnical assessments prepared, Theinformation proWdedwill Included in 1h&environmental document preparll!ld for the pr'O;itd aM lA'fh be useddetar'r'l'tlne potentialhuman healthand publicsafety'Impactsas .a result of the hazmat ease. (NI!W Issue)

161U9 TtxtTho> ....j.ct oil' 10 "'''''led within Geologlo Ii"""'" Category7J (SIido-Prone formation) and 52 lOthe< lev.,'I'll"", ganlly ai<Jp"'s to 1lIJo"" to",ln, low risk). In coordlnOllon with GeOlO\lY ataff. CAShas lIlViow<ld .....GoologlcRe<:onnalssa""" (leighton Consulting. OCt 2008). An Go"""'bnleOl,..,..tlgaliOn is requiredtodemonstrate that the site wtll have a factor-of-safety of 1,5 0( greater with resMd: to- theglVfi and eurflCial

i .Iopo stabilily, EAS ..,;n ""nUnu> In..,rI< with flDI'M,,,,,1OflY '" """""'ine Wpotentiallyolgnfficon.!l<'ol<>\lioI im.- have tolen Ildequotoly """........ and/or mitigatod. fNewI..ue)Ia T",n""",rtatiolllParkiml

i lml!CleaRtd? J:!!!!!!.

o 5

I.",TextTbe project sUe notloCOUld within tho City.. Muffi·Habllal PIonningArea (MHPA),bot conto"'. een••Ivebiofogieal resourceswfthInthe und6vetopedeastern portionof the site that Is mapp$(f ati Valley ~nd FoothlUGrasslandswhich is considered environmentally sensitive- fands(ESl). AJthOOgh no eanstJ"l.fctiQllldevelopmentis oroPQs-ett wtthtile Temtotive MliIP, a biological resourceslet1er report, preparedIn acc.aroa,'Cl!' with the Cfty'BJOlogleal R4!l8.oufClS$ Guich!tlio$$ i$ /"Il!I:qUir'$d to (luaftty th$ llabitat tyPil and quantifyany direct, Indil'i!lct, orcum"IaNve impact< .........~ of !he p""",""" projocl. (New 1_)

o 3 In accord"""" with land o..-prntOnt Codoo (LOC)So<tlon 142.04152; ""y """ainirl\ll""d. conUnUlng ESL, shaU·bE1 placed In a covenantof ~Bment «(lpr$I'l $paee"_mel'lt) to be preservedin perpetuityas openi .space. The biological ruoutc&S r'$POtt$MU representtM b¥eIII'II!1 eundition-lQ delineate the open space

IeasementcontainingESL.Theeasement shall be ddlneated and shown 01\ tlileTantlilitive Map, Recordation ofthe ....mont will 00 ""lulrett a. a condition of !he SiloDe",,1opm8nt Pe1mltITOOlalivO Map. (New I..ue)

Ia GeolOllYlSolieIbAA

C!aa!l!d7 f!.vm

o •

issuo foxtThe EnvironmentalAnalys!$S~km (EAS) has nwlewed submittal In aeeoi'd$f1ce With the CaliforniaEnviron",*ntal Qualily Ad (CEQA). The following 1••uesl11!O<i tob. add"'.."" and t"" rollowirl\lleohnl"'"reportsneed tobe providedIn your next submittal. The project will f6maln in E:xtended Inlij"" Study (XIS)andthe-CEQAprocesaing tlmerme wUt be held ill abeyanceI.lntTI the required infonnatioo Is providlltCt and ananwonmll!trttel detsnnlnation on Itu!lapPr'cpriat& envimnmel'ttBl docul'l'l8nt can be mede. (NewIssue)

e BloIOAlcal Resources

I !nl!!C!earud? l:ium

10 2

I

l?1R..vl.... 1212008

!!llIl!I!Cleared? Num

o 1

For questions. regarding the 'LDR..e;nvfranmentar review,please call Anne Jarque at (619)567·5961. Project ~br: 160421 [Cycte~ ~.P2k v 02.01.61 WID Zou",," 687-5942

BT39bd TLZbOLb6T9T WbIllIM 62:2T 6002-20-20

Page 12: PUBLIC NOTICE & AGENDA - San Diego · Page2 Ray Robinson January 7, 2009 I. REQUIRED APPROVALS/FINDINGS -Yourproject ascurrentlyproposedrequires the processingof; Rcquired approvals:

L64A·003A

THE CITY OF SAN DIEGOD_opmonl Stl1'Vlcos

1222 First A"""uo, SonDiogo, CA 92101-4164

Reviaw information

2 Submilt9d {MultJ.Dlsdpl"e)

LDR·Eng"'oring R_w

Torres. S!r.:II'lI181~1M$-S305

'2.00Submitted IMulti-Dlsoipli",,)

Hou.... of Review:Next Review Meth.od:

Cycle Type'Reviewing Discipline:

Reviewer:

Submittal!: '",mooS Deem"" Compte" on 1112412000

Cycle OistributDd: 111<412OOl1

.......'gnoo: "/24/2008SllIrtsd: 1211612008

R&view l)u9: 12/24/l'ooaCompleted: 12/2412OOl1 COMPLETED ONTIlliE

Clesod, 0110712OOll

· The te\liew due date was Ohanged to0111312009 from 01/0612009 per agreementwith cusiome._ Ther~h~ int,Sieated they want to l'EMew \h1$ proIoctagain. Reason chosen by 1henNiewar: F~t Review\SSU6$,, We requesta 2nd oomplet65Ubmttml fur I.DR-E:nglntmting Reviewon tnJs projeC1lU>: Submitted (Mulu..Dlsciplil'l.a).· TherevieWsr hasf8QU$$lt'ld mere dooxnMt! besubmitted.· Your Protectsttll I1as 34 outstanding t8VlswIssues¥Ath lDR~Engfneeling Revtew' (aftof whichere new).· Tho rovIowerhas notsignori off 1 job,· test lUOI1th·LOR..engil1fJl;lIing R6Viewl)eriormlild1!12 f$I.lWNs, 81.7% WIiIf&on-tlm8, and 48.0% W8'(& 00 projectsat la$$ ~hi';\n or :3 eompl$la l\it.bmitl.al~,

Isl!itJQ raxtThem are existingoverheadf1J¢iijt;jE;tS il1thl;!liIbuttiogPUbliC right-of-way, whleh Qt$I'eqUlred to bE) placedunderground. If youbelieve yow qualffy fOr a Waiver, tll,Ibtrtjt a loUer~eq~ awaiver in ecccrcance withCouncil Policy 600-25. (New 1_)(1 of 2) The engincMring nMlJW 86Ctlatl~mends that thQ1!IlCCl!l&S nght..(lt~wa'!l.Il)ng Jamacha Road.adjacont tothe site,be vacated tiS pertof this. disctetiQm.uy oeUM, Please seetheTransportationOe'Je.lopmem. Section f$9an;iing: \heiultimate ritJht~o'f~Y wl(ith fOr Jama<:h$ Ro$!;l. (New $\JI;!)(2 of 2) The YllcaUon of Slm'" ",Q_ite$ Counellaw"",ot (Pmeos!; 5)TOO Mapping sectiOn aM Roal EouoresAssets Department(READ) neE!(! to be includEid in tile l'$viewP1'l)~s. rl'l&~t wilt bevacated at the fairmarl<et valueas dolomll_ by /lEAD. (N<>w t.....j(1 of 2) Please revise the T8nl~live Pilt~l Mat:' to show me street lights. naarMt the project i1il:t$, inbothdl<eOli<>na and on both ,hi... of CaMIfl $'",01 and Jamaella Rosd. Include the spaelng_n lhost"",llig!>tsend ....1'fOii>'" alto. ~ a _Ilghi is within !he abulIlng projoot -II", IncltJmo thotypo 01 Ilgm"oMo"',wattage and" type ot lumlnail'8: (lowlhighpressure sodium).A determination wllJ be made tfthe proJeot Is InoompUatloo withCiUtrent street tightstanda~e according to the City OfS~O 01* sfreet Design Manual.tmdCo_nell Policy 2QO.18. (IIew I....)

5 (2 of 2) The subdlwlder may be requiredto. but not be limited to, installa new stteet light(s)+ upgradetheIUmlnaitefmm low pressureto high pressure sodium vapor ,nd/or upgrtlde ~he IlJrninail'& wattage. {New (SSUI!li)

a Pkt.H&PfO\rid.8 documentationthat snowstM existing parking: spaces Iooated at '\hencrmeest cornerof thaaubjad.site, within me public right~of-way, ·It dOO\lmentation can not be providedthese spacesmust be",mo""d from theTentative Map endlho off-Weel pOI1<ing totelmuSl be "'vised, acooRlingly. (NewIssue)

1 Please clarify the 6xistittg and proposed number Qf loti, It "WOim ttlat there are 2 exi61ing lots, currently,withan additional lot proposed,resulting in a total of 310m, PleaseprovidebearingsanddIStances for all lotsproposed and a mutua!access ~reement to.in$Uft!' thl\\t: tt'l(t Jia~l fAPN577~) l'l3$ acceasto til; pUblic!IlIhI-ol-weyand .. not IandJockod. (Now I..ue)

8 p"","" prov<l.eccles of item. 4, 5, 7, 10, oM11 "fthe Prolimillllryni. RotOM. Show I"""tion. o!t~o.eitem. on ltJe Tentetivo Mop, Wappl"'." (New lo.ue)

9 There witl be a requirementfOrtful! CQI\$tJ'l,ldion ()f' City Standaf(teuri),gutter, iU"I(J ;idewalf(, adjacentto the siteon C~rdjff Street, Pleeeen;nti$9 the plSI'm to n:fll!lct this (~ulffl:ment

oD

D

D

u

e 1lit Review~188ue.

j ~Ict"Omd? NU~

I: :1

0 4

I!

(Now I..",,)o 10 TherE!- wUI b$a I'$qulnament for the reconstructionof all remaining drivewaysto current CityStandards,

"rolllding sletawalk transitIonsper G-14A. adjacent to the site on Cardfffstreet. Please revise the'plal1$lOI'$fiacl; fhie; f1:Iql....rem$"t. (New Issue)

o 11 There wiH b&a requirementtor too repair of damagedportions(If City StandardcUJb, 9ul18r. sidewalkanddriveways,adjacent to the 'Site Oli cardiff street. P1silS$' rev;$$1;h$ plan& to retleet ttlt$. requltement.(NewIssue)

o .12 The'" will... "'Quiremont fortho eonOlruet!on OfCil\'SlOndord bu. 'ion .od, adlooonttoin. M. on C."'lffStreet and JamaehaRolid, Pt$B&B mViSlf tM f'lattt. to t@lflset thls.fequlr$mant (NEIW l$alJrII)

~ CommentslCorreetionse T"ntetiw Percel Map

I ~. Cleared? N.wn tHUD Text

Forq"".llo"" regarding 1!le 'LDR-Engi"",rlng Rav"'" ,..low,._....11 Soan T.".. s1 (619) 446-5306. Projoot Nl>e 160421 1Cycle: 2

.P2kV02_01_61 WIlIZOUMS687-5942

6T38tJd TL£b0Lb6T9T WtJIllIM 62:2T 6002-20-20

Page 13: PUBLIC NOTICE & AGENDA - San Diego · Page2 Ray Robinson January 7, 2009 I. REQUIRED APPROVALS/FINDINGS -Yourproject ascurrentlyproposedrequires the processingof; Rcquired approvals:

THE CITY OF SAN DIEGOtI<Mllopmen! _

1222 Mn'itAvenue, San Diego,CA 92101"4154

18&Uf hxtRevisethe Tel'lta.tlllB Map, a$ follows:

IssUQtex:[CompllanoaWith all QQrnfitiQfl8 shan bG aasured,to the satj~otIon of th.e city Enginoor,prior to the teoorttatiooof the Parcel Map, l.Inle$$ otheMi$e noted, (New Issue)A ParcelMap shall be meoided in the Office of the County Recorder, priorto the Tentative Parcel MapexpiratIondatis,(Nt';w l$$lJe}Prior to tha recordationof the Parcel Map, taxes must be paid on thisPt'Operty pUnJtJsnt to ~etlon 66492 of theSubdivision Map Ad:. A talc eMfffloate. J'$oorded in the offic6 1)f (be CountyRecorder,must be ptO\li(ll';t(f to...fiofy this condition. (New Issee)

31 The $l,Ibdiutder shall constR.let CitY Standardcum, gutter, .and sidewalk, adjacent to the site on CardiffStrel;lt,(_lo.ue)

32 Tne $tlDdivi.der shall f8'C0Mtruetall remllll'Ut!981l:iStirtg tflivewaY1 toct.lmIntCity Standards.providingsidewalktt'II'1$:itions per G-14A. adjacent to the site on CQtdlf'f Street (New Issue)

3:'3 Th~ subdlvid.er Shall repair the damaged portions of City StanCfard eUIti, gutter. sidewalkand dliveways,.d)aoont tothe .ite onClIfdiff street. (New Isoue)

34 Th8 Subdivider'-hall construct a City Standardbus \fitnp~, a<tjat'Ant to the sits.on Canilft' Streetand Jamach-$Road. (NewI..ue)

oo

o

noon

use 608684 for the Teniatlve Mapnumbi$rami reviee allTentlitiv5Map number headings accordingly.(Newl..u.)PNWldea utility labIellsttng .11 e><lstlng fronch". ulililioo Ii.e, _ie, lelephone, ""ble) thai .e",.1ho P<O)e<:lalteenddNcfibes the utility's current statusa$ eftherovetttead (J( underground. (N$WIS$ue)SIlow "'0 callout the visilility area triaI1gle., per SOMe Sec. 11S-0273, Diagram 11S-02RR. for the d.........)t$lOcated en CmdiffStreet, No structures mlIily be locatedwithin a visibilityareaunl_ (It''''lWfee provided by triaapprteSbla :«InEI Of the regulationsin Chapter 14, ArUela.2 (Gl!Il'tBrsl DevelopmentRegulatloRl;;), (New Issue)

16 Please provide- a dimenlJonect~s :a:ection for !hill abuttingpUblJe rights.ot..way(JamecoeRoact and GaJdfflstreet). In addition. please "Sh(lW'iU;'1(j callout the location of the gradB braal!; fOrthe $tree'!fronl::$g~ alongCardiff street. A Iiold Hamlds AgreeJmli!tnt will be required if it is detetmimd that th&aubjed:alb) i'$(:$1ve6oullHcw""'''' from the CardiffS_ right-of-way, (New Issue)

17 sease revise theplans toMow thf! rPMbOundary encasing the entll'$ s.UbdMsion and Itt& prop¢$$d 10\$ withinthe TPM boundory. (Now I.,uo)

18 P1ea.M showt~ 6xl&l!11g slngf8family n!!lsidence and all existing: prlvatft ImprD'Iilill'na$located on 8331J.mocha Road (APN (f/7-$52-<l9OO). nort_ of the project .1... (Nsw i.....)

19 Using arrows. indiQt:8 the dratnag$pattern fer the entire site. Drainage fanot anowed to flow to ad;aOl!tf1tproperties. (New Issue)

CI 2Jl Show the """'lion of the e><illllng ""'rm dtaln pipe, per dr_g 11Al25·L. (Now 'SS.8)CJ 21 Sl'ltm and call cut the sewer easement along tha t'Q,Qr'propBny linl;t('WeSterly end otSlte). {New Issue}o 22 _ .hOWthe locations of tho utility "'"M''' \II~hln 111<> ""''"1''9 .iiY8WayIl. (New lo....)o 2:3 P1ealle providebenchmarkinforma&n U&ed to estabfishtheexisting elevatlQI'l$ SAown, (NewIssue)o 24 Pie... """ 200-'76' forthe temb8rt C<>orQ;natesINAD 27 Coordl.a",", and 1841-6322 for the NAll83

Coordinates. (New Issue)o 26 Please pro,ldo • detail of thoP'_Od "",,,ping procedure. (NewIssuo)Cl 26 Plea•• p""""•• pro)",,,.¢Eo .dcress, (New I.sue)

I [:J 27 The owner mU$.t 5~n 1heTentJative Map, (New 1S$tH'l)12> I)raft Will Condltlons

!lIlIII!lClsared? Hum

n 28

o 28

Cl 30

T~:! Cl 15I

I

For quMtlol"d; n3garding the "'lOR-engineering Revlew'revh. "please call Sean Torres at (619)446-5305. Prqje:ot Nbr: ·100421 / Cycle: 2

0238tJd TL[b0Lb5T9T WtJIllIM 0[:2T 5002-20-20

Page 14: PUBLIC NOTICE & AGENDA - San Diego · Page2 Ray Robinson January 7, 2009 I. REQUIRED APPROVALS/FINDINGS -Yourproject ascurrentlyproposedrequires the processingof; Rcquired approvals:

L64A-003A

THE CITY OFSANDIEGODlMolopmont S""""",

1222 FirstA\tef\ue. San Dl8g0,CA92101-4154

RevkNvlnforrn.Uon

2 SUbmitted (Mulfl·Ois<:iplinelLOR-Transportation Dev

khaligtJ.~r8i"(e1t»~357

11.00

Sllllmitied (Mufti.tlisoipllne)Hours of Ilevlew:

1oIex! Review Method:

Cycle Type:

Reviewing Disciplln..:_war:

llubmlU&d; ",1312008 Doomod Complete on 11/2412008

Cycle Dllltrlbuled, 11/24/2008

AMigned: 1112412008

Started; 12/22/2008

Review Due, 12/2412008Complflted; 011061200ll COMPl-I;TEI> !..ATE

CI""ed: 01/0712009

· Tht"","ow due date was changed to 01/1312009 from 0110612009pOf_onlwith "'.lOm....· TheteVI~ has Indicated thElY \lVflnl torev~ thi$ projeel again. R~l$(ln chosen bythe reviewer: First Review Issues.• W. requ..la 2Ild compkltest.ll>mittlll fO( LOR-rtansporllltiOnO"".n ttl'" proJedliS: Submltied (Mt>1i-OIoclplln<ll-· Th. ,""'...... has "",u,..ted m"", <locum..,,,, be oubmflted.• v""' proJed sUI! !laS 9 .utslandlng leview issees will' LDI'!-r .......""rIation Dev (all of ","1m are now)._ The ftWleNef has not slgnod off 1 lob,· Last month LDR-Traf\.liportation DevperfomJed 73 revfews, 69.91t/Qwereon..tkne, and4,2.6% weI'$"on projecl$ at lessthffil 0:: 3 complete submittal!.

IDue TextGENERAL-Please submit: Ii copy of the original permhs. andplans INith yournextiWtm:'ilttat, ThiG matorialohould ldentify I"" si<e andu" .feilCh of I"" bUlldill9S on this .ito. It.hould alsostate \he roQ.....d palWng(I_ding Ihe reqllired p"rI<1ng rote ~ , ..IIOb"'), 'ndlne p_n_ 01 poli<1ng sP"""o !I>r o.Chbuildillga& p$R'nntedpmi~ tmd lhEt entire eite.~e also inoorpooate most ofthis retl!vant Info~n andInolud. ff on the propooo<l proJoc\ pl.".. $ape..te ilo<ger scae pia"" """"Id also be provid<ld lor e""" '" I""j:ll'Optl$ed p~:ur~I$. ('N4W'laalle)

2 PARKIN1HI>apropoooci lot $1lllt sh....ld dem........ lhOIOdeqlJOl<> porkingwould!>o provided wilhin..chporcol, ond lite entl'" site. TM perkingdeta on "'" pions ""ould be """"Oded lProferably In a lab.. fo"""t) f<lidentify tl'te required ana provided numberof parklng SpaCM aM the parkingra" baaedOilthe orlg~Aal

permits. Ifthe current parking ruts, lindmqulrements wettt MOSSI1 to be uaedfo demonsttat.& theadequaey 0(pariting. theR calculatioo:s $houkt show the appUcabIEl parking ra*> and ~1!)11b5 fQf eactl usewithin eachparcef. and theenttr0 sitewith mfemnces to SOMe. (New ISSU6)

3 PARKING-Some of the pa,ndng spaces (spliOllS numbfll1fd 17$ throUgh 185)Qpf:1ear te be notIilntil'8ly within th&sil•• bul parllywithin tho".",rued Mull> lightaf way...... Pl.... "''''''y Ihlsmottet./ItOoldlngly,lit .... sp.....maynotbe oount.ed towards the proWted numbetof 1;J1'Mi"" parking .v.pacea, Anyexieting accels to thesespecesoffo-f CardiffStreet meyal80be requiJed to be romlM!ld and·tePl;~eetd withcurb, gytWr, undsidewalk.(Newl..ue)

• PARK'NG SPACESANDOR'Ve AS'LES·P8"dngap.""" and drive.101•• shoUld be dtm.""_ on tooplans. The minimum width of thedrive aisies andany new parking stat. $hOl.lld comply with theSDMCsection142.0660.Ac.c:ordingly, thedrive aJSle width fur thepark(ng spaces within parcel 1~$ flot $pIle8;r to hlllvesufficienldepth. PIe.... cenect. (New ,..".,)

~ FRONTAGE_ns sho\Jl<l,'- sndcel\ out all -1nIl and pf<l\lOSed <:IJIb. gUIW. _lk, d_V_h.curt> toproperty linedistance. curb to centerline distan~~ full width oftheStfatltS. fitripjng andeurb painting3 onboth flonling.treets,.nd 1M ,nlel'll<letlon Of"""'aehs Rood and CardIflSln>ot. Add~lo..1ftontog.""__ond rlglrt-ol-way dOd_ mOy be required 00"" frontageinIormatlon 10 p.."K/od. (New I....)

Ii FRONTAGE-Pio......1M En9....."ng ROView Sedf.n" comment> flI9.tdlnilvaca\in9 "'" """"OSrlgh\-d_y .""'g Jom'''M RClld. P'Ojoct mayv,"",", up t. 6 teet01"'" existing Iigh\-lJI.way '" J __ '".'1oW :\61001""".... ,~.. '" propel1Y lif\e dlot..... (wh.... the.....ng Is 30 ....l.'ong Ihls tOod .. allowtor fuW", ~ike lane inthis OIl!!O. (NeW I""",,)

7 SITS ACCESSlDRIVEWAyg.,TM minimum Bnd maximum two-way drMwmY wktlhfor a non-msld8l'ltisl projectar. 24 and ~O fool_OIiVll!Y (po<SPfIlC r.l>I. 142-«;L). FroJeot otivawoyr> llI10uld be """,,,y marl<ed and.hown on the pfano wfthIh.l, widthcafled.... (Nowlooue)

8 SITEACCESSIORIVEWAVS-NumbO<' .rand !he opocl"ll be " Ihodrivowoys should comply with SOMeseotIon 142.0560for ..CIl "'the pr_ pereols. For"..,.,1 1 the SOc:llOll141.0ll01 whlohwouldrequire a 30100• ..,paratlon-., th..... dt;\ltlWaY". P"'Joci drivowoyo .hould "" .diu.bod or lOfliaced to<:omply with current standards andbe within the-above range, Redud:l:on or (j;!c.UI'$ of GOtnEl of thedrtvewaysmay al.o ~e requiredto complywilll ou"ent standard and 10 Imp,......"'ty and_. (New I..uo)

9 STREETL'GliI1l-This projee\.hOlIcomplywithall ""rren' ot.... lIgllllng ....nd.llI. aceollling ..1fleClly01S.n Ologo Stleel OeoltlnMonual (O<>eument No.297a76, ftled N<l'4e<tIber 25, 2002).nd tho ''''''ndmont toCoun"" """"Y zoo,I8 _""" \l;' CIIyCouncil00 F""....fl' 25, 2002(Re""",Uon R~1l6141) ..ti_ry 10thoCitY Engm..,. mil; moy"",",to (bulnolbe limited to) In.I.II'lion ofnewotn>eillghl(s). upgrading IIghl from lowp"""", to high p",esu", .""Iumvapo,ond/or Upgrading wattago. (Now","ua)

CI

a

o

a

Cl

Cl

~ 1lOt ReIfi....,

I IiIwi'1 CIElamd1 .Iiwn

l:l 1

Ii

II

• p2J<" 112.01,61 WUI zounes 687-5942

T238tJd TlZb0lb6T9T WtJIllIM 0Z:2T 6002-20-20

Page 15: PUBLIC NOTICE & AGENDA - San Diego · Page2 Ray Robinson January 7, 2009 I. REQUIRED APPROVALS/FINDINGS -Yourproject ascurrentlyproposedrequires the processingof; Rcquired approvals:

L64A-<J03A

THECITY OFSANDIEGO~l'rtent Services

1222FirstA\IIlI\ue. $ao Diogo.CA82101-4164

Revl&w InfonnatJon

2 SUbmitted (MuIti·Dilroipline)

Fire-Plans Offlc8r

MGdan,6<tb

(6191 :Q\l-82ll2

0.60SUbmlt~ (MUlij·D1"';Pllne)

HOuf'Sof Review:Next Review M.thod~

CyeleType,R.eviewing Discipline:

Ri;tvitri!lltlr;

Submitted: 11113/2008 Deemed compte.. on 11124/2000

Cycle- OlstriblMd; 1112412006

Assigned: 1112412000

Sla""d: 111W2006

Review Due; 1212412006

Completed: 11124/2ll0B COMl'I.ETED 011 TIME

CI(I$$<I: 01107/2_· Then:MEWV due-date'WaS changed to 0111312009 from 0110612009 pm' agl1$lnent with customer.• We request a 2nd complale submittal "" Flr<>-P1eno omce on 111I0 project as: Submitted (Multl.OI""plln$).

· Therelli~ hasrequested mote d¢eum$l'lt'$" bill ilil.lbl'flltt$d.· Lastmonth FlnrPlans O~r pormrmed ao reviews, 100.0%ware o""t1me, and.48.0% IMJfe on Projects at Ia$$ than <- ~ oompletE! submittals.

e. Am Dept. is"u"" /1,,1.....,1_1I !Wli

IClMmd? Num Is!!iUB TaN

f!I 1 We> ObJttetktns bl1$lkl on thilS $ubrrd~j Ctontativo- rrmp only), (N6W Issoo)

j:0l'questions regarding t~ 'Flra.Plan$ Offi(lar' raVll!lW, pleMacall aOl) Madan at (619}~~626:2, Project Nbr~ HI04:211 Cycle: :2

2239I:Jd 'LZv0LV6,9, WI:JIllIM ,Z:2, 6002-20-20

Page 16: PUBLIC NOTICE & AGENDA - San Diego · Page2 Ray Robinson January 7, 2009 I. REQUIRED APPROVALS/FINDINGS -Yourproject ascurrentlyproposedrequires the processingof; Rcquired approvals:

L64A-003A

THE CITY OF SAN DIEGOOQveJopmoot SetvlO$$

1222 FirstAvenue.San DiegO, C!l92'O'''4'54

Review Information

2 SUbmitted (Multl-Disolplinoj

Plan-Foeilltl•• F1nonclng

Burg$Ht VictOria(8' 9)m-e2\l2a.50

SubmiW lMvlti-DIOti~"...)Hoursof Review:

Next Review Method:

Cyclefype'Reviewing Oillcipli....:

Reviewer;

Submi_, "11312008 DeemedComplot. '"' "'2412008Cycle Distributed, ,.t.W2008

Assigned: 1\/2412008

Started: 1112812008

Review DUG: 1212412008ec"'P'etlld, 111:l812OO8 COIiIPlElfID ON TIlliE

Cl""gd, 01107/2009. Therevlew duedate was cbanged to 01J13J2009 from 01106f1009 petagreement withQLll;;tomar.

, W<J f'OqU<lSt a 2nd compl.te SlJbmlttoll<>' PI.n-Fooilitio. Flnond"ll 00 this p,ojoct ae: Submitted (Multl-DlsoIpllnej., ThereViewer ha$ reques1Bd. moredocuments be submitted.. Lastmonth Plan--FadIlVC& rlmlnt';f11Q peI'1Ofmed ~ re\lUlW&, 91.2%were on--tlme. 8ntJ 61.5%were On projects at '"' than <:3 etJmpte1e submlttafs.

e Impact F"""

!!!I!!I!ctpred1 Mum

Il9 1,!SUO TextImpact Fees-are aSS8gs&d al thfltiml!t ofbuilding eeenn Is,sUattlla. faBS ere~ onnumber ()fff;I~dentjSlrunfts, or commercial square feet. Contad~ Vtd<l8urges&, FaclliUas Flnatl~ll1g, B11).$33g3684. (New I:lSSU8)

Forqeesnces regarmng the 'ptan~Facmties Financing' review. please call Victoria Burge&a at (61S) 2.J6w6262, Project Nbr: 160421 f Cycle; 2

£23eJtld TL£p0LP6T9T WtlIllIM ,,:::2T 6002-20-20

Page 17: PUBLIC NOTICE & AGENDA - San Diego · Page2 Ray Robinson January 7, 2009 I. REQUIRED APPROVALS/FINDINGS -Yourproject ascurrentlyproposedrequires the processingof; Rcquired approvals:

L64A-l103A

i1iE CITY OF SAN DIEGOOevelopment ServiO$$

1222 First A_ue. San 1Ji000o. CA 92101-4154

Revlew InfOl'lllation

2 Submitted (Mul'-lll.clpline)

LOR-Water Review

Kah~! Mahmood(619t 33:;.461)2

5.00Sullmltta<l(Multl·D1s<;lpllne)

Ii""", of Review:Ne"t flevl_ Method:

Cycle Type:Reviewing Dlsclpll",,:

Reviewer:

Submilted: 1111moOll DeemedComplotoon 1112412008

Cycle Di.tribu!etl: 1112412000

Assigned: 11/26/2000

Started: 1211el2000

Review Due: 1212412009Completed: 1212412009 COMPLETED ON TIME

Cl""ed: 011071200.

• Therevt"'" dUO <loll> woo ChMgOO to 0,113/2009 iTO'" 0110912009 per "g(E$'l\ont "'111 ....""" er.The reviewerhas indicated they want to nMSW this projectagain, Reason chosen by the reviewer. FIrstRevl8W Issues.w. request. 2nd compl.'o submittai It>'LDR"W..... Roviow OIIlhls projectas' sullmllta<J (MI'I~"Ol sciplin.).

· The reviewerhas requested more documents be submitted.· Your proJect still has 11 ol.detendlng reviewIssues \"11th LOR-WaterReview(",If of which are new),· Ther~vlewer has notsigned ott 1 JOb.

last month LDR~Wate:f' Reviewperformed 64 reviews. 76.6%wereon-t:lme. and 57.4% wereon projects at less than « ~ oomp1ete eubmittati.

CI

o

!!!Y!C1"r'fId? &!m

CJ 1

CJ

o

1"!Jtf'regPublic Wilterfadlitle$ lleCeAary toPI"IWkk:t nvvQ to the PfOI;lOSet'l projomexist within the GardlffStreet1I\J1rt-al_y edje""nt to tl\e projecteito. (New 10"".)

.2 Reylse and label the Site philO to 001111 out th<l G)<l$ting wat$t meln, di$r'lietel' Ii~e andCityDrawing numberto be10"nch Olo"",lO' wolO' mom on" 103:l4-L """ootivoly within Cer<lll'l at,"," (NOW l.oUe)

3 If II if; detennl""dlh.1 tho..lilting ""to, ...",Ieo ionot of edequete $Izeto serveIhe proposed p~cl. thoappllc:snt Willbe n;Jqulred to rem0\f9(Idll)any8Xt8tlng unusedwatltl' a&l'IAea$ "'f1d fnatflQ flew waterservlce(s)and m&l.l!lt whkm must t:N!llocat&d outsideof anydrlV8Way or vehieular lJ$fI areel, (New Issue)

.4 Water capacitycharges wilt be due at the time of boilding pam'\lt. lt$uanetl. Capacity ehBt'gB.$, Ill$wen as; lervice:and meter sze, am determined by the Water Meter Data 'card whieh is cornp4eted duringthe bulltflngplanreview process... AnyquesUofU!. regardingwaterC3p8cityfees shoutdbe addMsMd to lnformat~ endApplication S"",Ieeo (6t9-44e..5000). (New I"""e)

5 All water servicesto the site. including rJome'citic, irrigationand fire, will requireprlvat8,abovegl'QI,md baCk flowpJeVeJltion devices (BFPDtJ), aFPOs are typically located en private property. iflllm~ wilh the smvice andImmo<liOlOIy 0<110"""1 to the fighl-of-WOY. Ttl<> W_ Pep_ent will notpermRthe required Bf'POo 10belocatedbelow grade or within the structure, (New Issue)

e AU Proposed public water 'faelltl:le" lneludh'9$ervica endmetera. must be dealgnedand construetBd In!ilecortiam:;e with eatabfis.hetl CfIt:e1ia in ttle mQlJt currented""Ition of the City of san D\e:go Water FaoUlty t:MsignGuldo._ and Cify "",ulotiOn., .tondO"'$ ond ...._ pOrtoiI\Ing IMroto. (New I..uo)

o 7 IIyou no"", any q_n. "'90rding lheWotor R,,\IlOW SOOlton CO""""""'. ple"". <:onto<:! MoeKeshevaIZiatI 819·533-4892. (Now'..ue)I":> Orenm Conditions

il"'J 1e' Review Commento

I

1"00woW!1 jjjjjji Ill...'" TO!!t

o 8 Prio-rto Uu;t&$uanO$ ofany bUflding pel'mits, the SubdMd$f"hall $$$ur$, by ponnitandbond, thedesignandcoll$tl'Uetlon Of.any new.water$$lVlee(s) owld& of any drlvl$Way, and thedl&COnnection at the watermain ofthe existIng unused WAter ael'VlCfi adjacent to the project slta, in 5. manl'leteatfsTsdQry to tile OireGtor of PublicU~UtJal; ondtheCityEngineer. (Now 1$$00)

CI 9 Priortolholsouo""" ofony building pormlto. the Sul>dlllldOl ohallOPPIY lor a pillml>lng petmtt !of the 1l1$tB~at1on

ofaflproprlataprIVata backflow l)l"8V8l1tJon MvlM{tI), on ea¢t's wti~t ii8J'\1ie8 (dOmeatic, I1re ~rId irrigation}, in iiimanner satisfactory to the:Directorof Publicutnltles and the City Engineer.(New Issue)

o 10 Prier te the is.'/tuance of any wrtlflCUtn of Qct;a.!lnmcy, all public water fac'!\ttieB shall be completeandaparatiOJla.I in a manner satisfacwry to the Directorof Public utititie5 and the City Engineer. (New Issua)

o 11 TheSubdiVider li/Igte&$to dE!$lgrt t!l'ldc=QnWUd. anproposed pubueWQt&r 1acilltie$ toaocordance Vtrith....0.."00:1 olite"o in tho JJIOOl """,,nt oo:Ittion of the City of Son Diego WO." FooiJity DesignGuideline. andCity regulations., standards. Md p~¢tf*pertainingtnerEflo. Publicwaterfacilities. and associated 8Bsemenl::&,1I~ shown on BppfD1lBd e",hibil "A" shelt be mod~ at final $lQl,.OO9 to wmply with ~tand8Jds. (New I'&sue)

ForClU$$tJI)t'l$ l'$gaKfll1g 'the'LDR-Wsmf RSi!i8W r@vtaw. pleas! call ManmoodKeShBvlrxl at (61Q) 533,.46Q~. Pl'OjW Nbr: 160421/ Cyd8: 2

WigZlJUl16S 687-5942

b238I:Jd 1LEb0Lb6191 WI:JIllIM 1E:21 6002-20-20

Page 18: PUBLIC NOTICE & AGENDA - San Diego · Page2 Ray Robinson January 7, 2009 I. REQUIRED APPROVALS/FINDINGS -Yourproject ascurrentlyproposedrequires the processingof; Rcquired approvals:

L64A-<J03A

THE CITY OF SAN OIE:GODeV8lopmant Services

1222 FifO' A""""e, san 01"90. CA92101-4154

R"",lewlnfonnatlotl

2 SubmlUod (MulU-Dlsciplino)

CommlJrHty Planning GtoIJP2<>_$, Will(619) 11I\7_1,00

Submlttoo (MUlU·OlsdplinelHours of RevitJw~

Ne>rt Rl>view Method:

Cy"l" Type:!l&viewil'lglJisclpllne;

Reviewer:

Submitted: 11/13/2008 O...med Compl... on 1112412008

Cyole Ol"triboo.d: 1112412008

Asalgn,.g; 0110512009

Started: 0110512OO9R&view Due, 1212412008COInpleto>d; 0110512008 COMPLETED lATE

Cl"....d' 0110712008, The reviewdued&te was changed to 01/1312009 from 0110612009 peragN9$'t'l@ntWfth eIJ!!ltomer.

, The,_hasindl<:atod !haywant to ",_thl. pmj<rot agoin. Rea""n chosen by"'" reviewer. Par!I.1 ResPo"". '" CmntolRegs._ We request a 2ndoompte!tl $Ubmittat torCOmmunllY Planning Group on this project .a5l: Submitted (Mtlltt-DJsclplln@).· Thereviewer has requested moreeoccrnents be submitted.· Yourproject stijl has 1 ouf!!Jtanding r&VI&w Issues YJtth CommunIty Planning Group (a" of IM'Ileh ere new).· Last mt;ml.tl CQmmunitY Planning Groupperformed 73reviews, 53.4% well' on-tlme, and47.2% were on projeets at lessthan« 3 c:omptete sUbmittal!>,

1'!@ugTpt1"1ease coma," the Chair lor the Skyline- ParadlseHillePlanning Cemmill••, WI""'" poniCl<, at (619)470--0179 to make arrangements topresent yourpr-ojeet forreview at theirnextavail.abUt meeting, ThisCommunity PklIrming Groupi:9 offiCUJlly recognized by theCityas it repte~litatiVtl of thOcomml,lftfty, andanadvisorto theCityinactions that would &ffect the community. Tho o.velopmt)(ltSetvi(:$$ Oep$rtrnent hasootffiect the group ofyourrequest andhassentthemtilcopyof yourprojtlct planeanddccemente. (NewIMue)

1I:Illl<v1I...-Parldl, ItDl, cpcl2IllI

Cl...",d? .M!1!llo 1

For qUl!'Il!iUoAS tl6'gardlng the: 'Community Planning Group' .review, pleasecalt Will Zounaa at (619)687..5942, Proia," Nbr: 160421/ Cyclo: 2

~"Zoun•• 667-6942

S239tJd TLZb0Lb6T9T WtJIllIM 2Z:2T 6002-20-20

Page 19: PUBLIC NOTICE & AGENDA - San Diego · Page2 Ray Robinson January 7, 2009 I. REQUIRED APPROVALS/FINDINGS -Yourproject ascurrentlyproposedrequires the processingof; Rcquired approvals:

l64A-003A

THE CITY OF sAN DIEGODewIopl'tlBnt SEll'ViClali

1222 F..tAvonu.,San Diego, CA 92101-<1154

Ravi..w Infomoallon

2 S"bm'""~ (Multi-DisCipllne)

I.DR-G""logy

Thomas.Patrick(S'O) ",,-5_

4.00SUbmitted(MuIll-Dio<JjpIlne)

HOUI\Il of ReviOw:Next Revl<lw _hoa,

CycleType:~evi_i"ll Di$oIplltle:

Reviewer.

Submitted; 1II131200B Do.modComplete"" 1112<1121l08CycIt>1JIs1flbuted: 111:!4r.1OO8

Asoigned, 111241<0089ta""d, 1112512008

Ravi.", 0...: 12124120011Completed: 1212412008 COIIIPLETED ON TIlliE

Cl""'ld: 011011200ll

• Tl1<> reviewdue <lat._ ch""S"d to01l1312oo~ from01/0612_ per agreement witheustemer., The~ hasIrlI1k:al$d they want tofflView this projoot .again. Reason chosen bythe r..,viewer: F"irst R€Mew Issues.· W. requesta 2nd",,"pl.te submittalfor LDR-GeoIogy on 1hI. project as, Su!>mi_ (Multi-Dlsdpllne)., The re.vivwer hasrequestJ!iJd fflOf't\l doeumlMts be$ubmitlsd. '· Yourproject still has3: Qutstmdlng reviaw issues with lDR-Qeology (allofwhich are new).· Thef&\fliMlllal' hasMt signed off1 job.• l.astmonth l..DR-Geology performed 65 reviews. 7e,5%were on-lime, and 1,)e.2%,wereon projects at toss than -c3 eGmplefe submittalS.

IpueToxtTheGeology Section hasdeteJrrnned thata geotecnnloallnwstlgation n!lport must be submitted tormview mthbpropQJlie'd projm, The geotechniQit1 IDveslig'ation report mustdemcmstrat$- thattheSfte will haveafactor-of-sehrty 011.5 orgl1!l'S1mr With f"BSP8d: togtoSs and 611rficia! slope stabUky Ill! the eolt!J)letion of theproject. Thogeot<ochniool report moot be~ in_.""" withlh. CitY'. "GUIIlOIl"""f<Jr GeoIechnlcalR;!p_." iN.... I..",,)

l!'; 1st Revlew/Cyele 2 Information

J!!!I!l!Cl@aOld? .I!llIlll

C! 1,"u, IutTheproJect Bite 1$locaied within gwotoglc: hanlrdG eenee 27 and52 ass.hown on11'1,," City's SeiSmic SafetyStudy Geotoglc Hamrd& MapS. ZQht; :rt 15 ohBrec;:te~e<i bythe otay andSweetwater ForMlrtklO5, The Ota)'

Iend ~8.mr Formations areconsidered tobe .11d&-ptO~ fOrmation&. Zone52 it. cllaradftrlUKl byotherleVflll'ln!l~, g&ntly $I~ing to steeptemain with favorabht geologic Sh'UGtut$, lowli$k. (NewIssue)

l!'; 1st R.v1o>wlCvcfe :.I Ref"",n"""

i lbm!

IClHrod?Num IBM T@M

C! 2 Tenla""" Map, can:liff Street, prep.1e<! by Kapil" Surveying. Inc.. dated MAy 28, 2008.

Geologia-.,........nee Study. 10~P Cotdlff seeer, Son Diego, California: Pf'IPorod by Leilth!lm Consultil\ll., Inc.. dated0_,31.. 20081_ ptOjeot no. 002401.(01).I (New tSS:U0)~ 1al ReviO""Cvcf"2 Comment..

!mitC!eallld? .!ll!m

C! 3

9239ljd ,~ZbO~b6,9, WIjIllIM

Page 20: PUBLIC NOTICE & AGENDA - San Diego · Page2 Ray Robinson January 7, 2009 I. REQUIRED APPROVALS/FINDINGS -Yourproject ascurrentlyproposedrequires the processingof; Rcquired approvals:

L64A-l103A

THECIT\' OF SAN=0Development services

1222 FlNitAvanue, San otego. CA92101-4154

I'lIIView Infonllsll""

2 SUbmlttod (Muld-Dlsclpllno)I..ORsWastewateF

Ileghori. Hamid(!rlU)5'3-423U3.00

Submitted (MultJ..Olldplin<l)Heu.... of Review:

NeKtReviewMolt/lod:

CvoleType:Reviewing Illllclpllne:

Ft..vlewe.:

Submi_: 1111:lt.1OO8 Deem"" Complet. on 11/24/2005

Cycle O",trlbuted: 11124/2008

A$$lgned' 1112412.008

Starle<l: 1212212000ReviewCue, 12124t:!OOaCompleted: 01106t:!OOa CO..,PLETED LAn;

Closed: 01/0712009

rue review due date was changed to 0111312009 from 0110612009 per .agraam~t with CUliwrner,· The reviewer naejndjcated they want to ravtaw this projectagain. Reasof) -chOSen by1hereviewer: Fll'$t Review !S3U6S,.. We request a 2nd oom~te submlltal for l,M-W$lStawabElr on th\$PfQject as: Submitted(Mutti-Ol&ciplina).• The AWfew8fhas 1'8qOO$1(Iod more d'ocyments be :submitted.· Your project stili has 12 outstanding fQVil'JWi$~ea with L.DR-W~~ter (ailof which are nQW).· Tho>"- nes not.igned off 1 job.· l..astm-onth l.DR-WastalMafsr par{onnilld 54 reviews, 90.7% were on..{jme, and51.5% ware Or'! projectsat less thane; :3 complete.submittals,

'"vTg;texisting PQbliC weetewaterfacilities necessary to eerve the project are toceted wtthlntoo Cardl! Streetrlght~of..way and public $8W(I:r t:l6y:bb!lt'nS loeated ,ttdjlj1Q1i!nl to the propertyto rha southandweat ofthe proP6rty.(NQW Issue)

:2 f{eylse the TentativeMapto show the &»s'ting public$8W$!' facflitieG andtheir refeMnce 0 tihttB[ l1umbers,(New ..."")

s On yournext 9ubm~lI, pteue shQW how youare planning to~r~heH twoproposed parcells. (Naw1$$1,1$)4 All propoBSd pufJoliC. sewerfucfiifies are to be designed.and constluctedIn acecmencewithestabllshf!ld (:titsria

In!he mostou,""'t CIIyof san Diego __ design guldo. Propoood 1acI1lti<o$lhai do nol~ Ill. ourrent....ndotd. Shall be privalll or m-de"lIlnoo. (Haw Issuo)

5 AU proposed prlvate.ewer facllltie.s that SeNemora thanOM lQt$1$ to be designedandCOn:ltruet$d inaccordance with ,,=s(~lisher:f Cliteri~ in (tie mostcurrentCity of SBnDlt&go $4$WE!r designguide. (New 1$$l.le:)

e AU OM~ltfi Wtc$\ew.atErf $ySten't$ areprivate. (New laue)7 AU ptopoaed pliva~eeeer faclfilles $Oc&ted wittljn a slngie tot aft: to be desigtie4 to meet the JequiRlfl'B!nn. of

tha Ca';/omla linltMI1 Plumbing CO<Ie and winbe _ .. part of the bUilding ..,nnn plan ohe<:/<.• (_Issue)

8 The 4eveloPeratlanprovtde flidenoa. utisf.I.<.:tDry to the MetI'C)POlitan Waetem1ter Depan:mMtDirI!tCtQr,hldicallngthet eecn lOt/coodominium wilt haveits own SQwaf Iatl!Iral orprOvide CC&R's frJrtheop&taUon .andmalntemu1<:e of on siteprivate sewermains that SCl'Wl~ than oneI6tfeondominium, (New1$$UEl)

9 Sewer capacity fBes wiH bI!l due and coJl8el8d at theluuenoe of buildingpermits. ThMefei:$ ate determinedas.Plrt of thebuildingpermit Pl'Ooest;. Qu~ ebQut cv.pacity fees sl'loutd be direClte.«::I tl) Ut'formation andAI>olioaiion Servlco> (619-446-5000).(New I..u.)

10 No tnM$ e-shrubs tlxceed'ing three feet in f\elg'ht at maturityshall~ ln$1GllEld wfthlnten feet of any publiC....... _ea. (New lo""oi11 Contact lrin~ Itkins (619533 4248) of the Wilstewater Section for informationon how to obtain a win$9fVff.lliillef

and fees involved with tl1~ service. (New ~ua) [RaCMlrnendedl12 UpOn reviewof the nextSUbmittal, U\8. Wa$1:l!IWater SectiQO may have8l1ditlonal comm&Ns and Will pnwide

draft. permit conditions. If you hava any quootkmc, mgatdmg th$ W~(\r SediDn oomments • pklleM caMH.om;o Ba9~ori at (619)53~239. (New Issue)

D

ooc

nDo

[J

CJ

c

e MWWO/DSD-WlI8tewaler Comments

!WItCIoaIl!!dl' !!l!llll

o 1

For question&rogar<;ling the 'lOR-Wastewater' review. please call Hamid Bagheri at ((ji9) 533-t1.239. Project Nbr: 160421/ Cycle: ::2,

L238~d ,LZb0Lb6,S, W~IllIM 2Z:2, 6002-20-20

Page 21: PUBLIC NOTICE & AGENDA - San Diego · Page2 Ray Robinson January 7, 2009 I. REQUIRED APPROVALS/FINDINGS -Yourproject ascurrentlyproposedrequires the processingof; Rcquired approvals:

L64A-003A

THE CITY OFSAN DIEGOOevakipmant services

1222Flfst Ave",,.. san DIego. OA92101-\154

2 Submlttad (MuIi1-DlooJpllne)

Po'"& ReoHarkn••• ..Jeff{619lI!3U695

0.50Submitted (MuIU.QIsclpll"'l)

H"".. of Rev!_:Next Review Method:

Cycle Type:RB"I_lng DI$.lplin..:

Reviewer:

SubmitfEd: 11/1312008 Deem.d Co",_ on 11/24"000Cycle Oielrlbuwd: 11/2412008

......lgned: 12f01/2008SlOl'!9d: 12117/2OOlj

Revi.w Duo: 12/241200llCompleted: 12/1912008 COMPLETEP ON TIME

Cloeed: 01107/2000· The mvlewdue dateINa5 changed to01/1312009 from0110612009 peraarcemem with customer., Wa request a 2nd complete submltt:ll rorPark& Reconthis project 3S; Submitted (Muftl..oisclpllne).· The reviewer has requested mOf'l!l doeuments be submitted,• La$t month POll< & Reo I)Oilctm0<l20 ,...,;_. 85.0% wore'"""time. and72.2%"""" onproJe<:l$.' I... lllOn< 3 complete ""bmlltllls,

IflUB tetTlt$ra arefloQ1:l$n $p$(:S (lrpc:Jpulation based park lssu9& with thep~ TM to creete2 P$I'Qti!!I$, (NewIssue)

e Review 12-24-08l!i!!Il

Crsl'!ld1 lIu,"IB 1

Forqueetlono regaltlin9 lhe 'P.", & Reo' review. plOa$$ ""II Jofl H."'""", at (ale) 533-<1595. p"*,,, Nbr. 180421/ CyoIe: 2

.P2kV02.01.a1

8239~d TL£bOLb5T9T W~IllIM [£:2T 5002-20-20

Page 22: PUBLIC NOTICE & AGENDA - San Diego · Page2 Ray Robinson January 7, 2009 I. REQUIRED APPROVALS/FINDINGS -Yourproject ascurrentlyproposedrequires the processingof; Rcquired approvals:

Enclosw:e2Required Findings

Required Findings for 1050 CllJ"diffTentative MapProject No. 160421

Tentative Man Findings

I. TIle proposed subdivision and its designor improven!$"'t are consistentwith the policies,goals, and objectives ofthe applicableland use plan (Land Development Code Section125.0440.aand State MapAction Sections66473.5, 66474(a), and 66474(b».

2. The proposedsubdivision complies with the applicable zoning and developmentregulations of the LandDevelopmentCode(Land Development Code Section125.U440.b).

3. The site is physicallysuitable for the typeand density ofdevelopment (LandDevelopment Code Section I25.0440.e and StateMap Ad Sections 66474(e)and66474(d».

4. The designof the subdivision or the proposed improvementsare not likely to causesubstantial environmentaldamage or substantially and avoidableinjure fish or wildlife ortheir habitat (Land Development Code Section I25.0440.d and State Map ActSection66474(e».

5. The design ofthe subdivision or the typeofimprovements willnot be detrimental to thepublic health, safety, and welfare (Land DevelopmentCode Section 125.0440.e and StateMap Act Section 66474(1).

6. The designofthe subdivision or the typeof improvements will not conflict witheasement. acquired by the public at largefor access through or useofproperty within theproposedsubdivision (Land Development Code Section 125.0440.fand Slate Map ActSection66474([';».

7. The designof the proposed subdivisionprovides, to the extent feasible, for future passiveor natural heating and cooling opportunities (Land Development Code SectionI25.0440.gand State Map Act Section 66473.1).

8. The decision maker has considered the effectsof the proposedsubdivisionon the housingneeds ofthe region and that those needs are balanced against the needs tor public servicesand the available fiscal and environmental resources(Land Development Code Section125.0440.h and State Map Act Section66412.3).

9. The requestedunderground waiver of the existingoverhead facilities, qual ines under theguidelinesof Council Policy No. 600-25 Underground Conversion <II Utility Lines atDevelopers Expense in that:

Page I of I

623EJI:Jd ,1£b01b6,9, NI:JIllIM ££:2, 6002-20-20

Page 23: PUBLIC NOTICE & AGENDA - San Diego · Page2 Ray Robinson January 7, 2009 I. REQUIRED APPROVALS/FINDINGS -Yourproject ascurrentlyproposedrequires the processingof; Rcquired approvals:

Submittal Requirements 111100 8;38 em

Page- 1 of1

lIIilililllllllllD

THE CITYOFSAN DIEGOOI!Wak:Jpmeot Servleee

1222 FirstAvenue, SanDiego, CA 921014154

TItle: 1050CARDIFF TENTATIVE MAP(619)ll87-S942

Projoet Nbr: 160421~mJOetMgt: zecnee. WIll

L64A..Q01

Project Information

Rlwiew Cycle Information

Review eyef.; 7 SUbmitted rMLJlti-Disoiptfne) O""ned: 0110712000 8:2eomOiJll;l'l

Su""'lllod:CloMd:

Requi_ DCCllmen""Packagll T~Q"Geot&cTtnleal Reports

Development P1ans.

"0*""",,,,,1 R&port.AppjKiafltCorresPlJntJaMe

Uridet9Touhdins waiver Requast

BiolOgy N Con&uhant Submittals

~ Document ~ype3 Geological A:f.lQO"nsissalice R",port

8 TentativeMap

3 Ceoteehnicat Inveatigauoo Report

8 Applicant COrrGsponden¢e

2 Undergrounding WaiverRequest

2 Siology SurveyReport· lette'

t:l P....llmlnary As""""I'Ilent for Contaminated Drinking Watlilr (Case No, H05363-001)information (One copy for LOR-Environmental and One copy for DPM).

1:1 Preliminary Title Report Ilems No.4, 5, 7, 10; and 11 (One copy for LDR-Engineeringandone copy,for DPM).

t:l Sowor Laterallmormatlon or CC&R's fer tho .I<i81inll de"elopm""f (On copyfor LDr­Waste Water and one copy for DPM),

Z

2

2.

0£39t1d 1LZb0Lb619T W~IllIM ZZ:2T 6002-20-20