Deer Creek TunnelMunicipal Engagement

June 13, 2013

1

AgendaWelcome and please sign in

MSD mission

Project Clear defined– Clear priorities

– Clear communications

– Clear water

Deer Creek Tunnel

Question and Answers2

MSD MissionProtect the public’s health and the natural environment through effective wastewater and stormwater management strategies

3

Welcome to Project Clear

Schedule driven by consent decree with US EPA

23-years in total (started in 2012)

Project Clear is about three central goals: Clear Priorities, Clear Communications and Clear Water.

4

Clear PrioritiesOverflows and Backups Being Addressed

Separate Sewer Areas

– Get the Rain Out – Stormwater Disconnects

– Public System Rehab and Upgrades

– Treatment Plant Enhancements

Combined Sewer Areas

– Gray/Green Infrastructure (Rainscaping)

– Cityshed5

Stormwater Disconnection

6

7 7

Project Areas

Clear Communications

Stakeholders Engaged Early in Program

Communities are Vital Partners

Synergies Identified and Developed

Website and Social Media Leveraged

Transparent Communications Key

8

9 9

Website

Learn about all Project Clear initiatives on our website:

www.ProjectClearSTL.org

Clear Water – Deer Creek Watershed

10

**REPLACE NAME AND MAP WITH YOUR NEIGHBORHOOD.DELETE THIS MESSAGE.

Greg Exhibit

Deer Creek Tunnel Corridor

Conceptual Data

– 3.8 Miles

– 18 Foot Diameter

– 5 Municipalities

11

Deer Creek Tunnel Project Timeline

Phase I Phase II Phase III

Preliminary Design and

Geotech Investigation

Final Design, Construction Bid

and ROW Acquisition Documents

Construction of the

Project

Estimated Time: 60+ monthsEstimated Time: 18 months Estimated Time: 18 months

Land Acquisition BeginsWe Are Here

12

Phases of Project

Planning Effort

Preliminary Design

Final Design

Construction

13

Borings

Why are they necessary?

– Tunnel Design

• Verify elevation of strong rock

• Set the depth for tunnel and shaft design

– Identify any geological issues

14

Boring Section

15

Borings

How are they performed?

– Schedule

• Work day based on each city’s regulations

• 1-2 weeks at each site (4-6 months duration)

– Not a blasting operation, very little disturbance

16

Borings

What will the public see?

17

Tunneling

18

Tunnel Shafts

Surface Construction

Number of shafts required

Locations

19

Shaft Construction

20

Shaft Completion

21

Deer Creek Tunnel Project Timeline

Phase I Phase II Phase III

Preliminary Design and

Geotech Investigation

Final Design, Construction Bid

and ROW Acquisition Documents

Construction of the

Project

Estimated Time: 60+ monthsEstimated Time: 18 months Estimated Time: 18 months

Land Acquisition BeginsWe Are Here

22

Thank you!

23

www.ProjectClearSTL.org

@ProjectClear-Deer Creek

Project Clear-Deer Creek

MSD Project Manager: Jeff Smith(314) [email protected]

Parsons Project Manager: Ed Sweet(314) [email protected]