public meeting - ftp.dot.state.tx.us · city of el paso, el paso county, texas csj: 0001-02-059...

1

Upload: haphuc

Post on 01-Nov-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

PUBLIC MEETING Mesa Street – State Highway (SH) 20 Corridor Study From Doniphan Drive to Texas Avenue City of El Paso, El Paso County, Texas CSJ: 0001-02-059

Tuesday, August 2, 2016

4:00 p.m. to 6:00 p.m. El Paso Community Foundation – Foundation Room

333 North Oregon St., El Paso, TX 79901

WELCOME! · Sign in

· Review handouts

· Visit each station

· Ask questions

· Share your thoughts

· Provide comments Written comments must be received or postmarked on or before Monday, August 15, 2016 to be included in the Public Meeting Summary.

Mail: Gus Sanchez Project Manager Re: Mesa Street TxDOT El Paso District 13301 Gateway Blvd. West El Paso, TX 79928-5410

Email: [email protected]

STATION GUIDE

Station 1: Sign in Station 5: My Issues

Station 2: Study Area, Goals & Phases Station 6: My Vision

Station 3: Constraints Maps Station 4: Accident & Traffic History

Station 7: Survey & Comment

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S. Code (U.S.C.) 327 and a Memorandum of Understanding dated December 16, 2014, and executed by the Federal Highway Administration (FHWA) and TxDOT.

Thank you for attending today’s Public Meeting. The Texas Department of Transportation (TxDOT) welcomes you! Today’s Public Meeting is about the Mesa St. – SH 20 Corridor Study. The purpose of this Traffic Engineering and Planning Study is to identify and evaluate all the various transportation aspects associated with the Mesa Street - SH 20 corridor and to develop a master plan of recommended short-, mid- and long-term transportation solutions to upgrade and improve the 12-mile corridor from Doniphan Drive southward to Texas Avenue. The Public Meeting purpose is to provide information about the study and gather input from the public. No formal presentation will be given.

See Station Location Map on back

Page 2: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

Augu

st 2

, 201

6 Pu

blic

Mee

ting

Stat

ion

Loca

tion

Map

N

ot to

Sca

le

El P

aso

Com

mun

ity F

ound

atio

n –

Foun

datio

n Ro

om F

loor

Pla

n

Sign

in

Ente

r

Stud

y M

ap

Purp

ose

& N

eed

Gen

eral

Info

G

oals

Ph

ases

Co

rrid

or

Cons

trai

nts

Dow

ntow

n

Cons

trai

nts

Tim

elin

e

Stat

ion

2 St

atio

n 3

Build

ing

Entr

ance

fro

m

Oreg

on

Stre

et

Study Board

Tr

affic

Vi

deo

My Vision

Stat

ion

6 Ae

rial R

oll P

lot /

My

Visi

on T

able

s

Accident History Tr

affic

H

isto

ry

My

Issu

es

Stat

ion

5 St

atio

n 7

Stat

ion

1 Co

mm

ents

Su

rvey

s

Stat

ion

4

Page 3: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

PUBLIC MEETING Mesa St. – State Highway (SH) 20 Corridor Study

From Doniphan Drive to Texas Avenue City of El Paso, El Paso County, Texas

CSJ: 0001-02-059

Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m.

El Paso Community Foundation – Foundation Room 333 North Oregon St., El Paso, TX 79901

(PLEASE PRINT) NAME: _________________________________________________________________________________ ADDRESS: ______________________________________________________________________________ REPRESENTING: ________________________________________________________________________ (Texas Transportation Code, §201.811(a)(5)): check each of the following boxes that apply to you: ❑ I am employed by TxDOT ❑ I do business with TxDOT ❑ I could benefit monetarily from the project or other item about which I am commenting

COMMENT FORM This form is provided to receive your comments regarding the Mesa St. – SH 20 Corridor Study. Please use the space below, attaching additional pages if necessary. Your comments can be deposited in the comment box tonight, mailed to the address provided below, or emailed to [email protected]. All written comments must be received or postmarked by Monday, August 15, 2016 in order to be included in the Public Meeting Summary. Thank you for your comments. HOW DID YOU HEAR ABOUT THIS MEETING?__________________________________________

COMMENTS:_____________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________ Comments must be received or postmarked on or before Monday, August 15, 2016 to be included in the

Public Meeting Summary and sent to:

Gus Sanchez Project Manager Re: Mesa Street TxDOT El Paso District 13301 Gateway Blvd. West El Paso, TX 79928-5410 Email: [email protected]

Page 4: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

----------------------------------------------------------Fold Here--------------------------------------------------------------

----------------------------------------------------------Fold Here--------------------------------------------------------------

Place Stamp

Here

GUS SANCHEZ PROJECT MANAGER RE: MESA STREET TXDOT EL PASO DISTRICT 13301 GATEWAY BLVD WEST EL PASO TX 79928-5410

Page 5: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

REUNIÓN PÚBLICA Estudio del corredor de la Calle Mesa (SH 20) Desde la calle Doniphan Drive hasta la Avenida Texas City of El Paso, El Paso County, Texas CSJ: 0001-02-059

martes, 2 de agosto de 2016

4:00 p.m. a 6:00 p.m. El Paso Community Foundation – Foundation Room

333 North Oregon St., El Paso, TX 79901

¡BIENVENIDO! · Regístrese

· Revise los folletos

· Visite cada estación

· Haga preguntas

· Comparta sus pensamientos

· Proporcione comentarios Comentarios por escrito deben tener el sello postal a más tardar el lunes, 15 de agosto de 2016 con el fin de ser incluidos en el Resumen de la Reunión Pública.

Dirección de envió: Gus Sanchez

Project Manager Re: Mesa Street TxDOT El Paso District 13301 Gateway Blvd. West El Paso, TX 79928-5410

Correo electrónico:

[email protected]

GUÍA DE ESTACIÓN

Estación 1: Registro Estación 5: Mis Cuestiones

Estación 2: Área de Estudio, Objetivo y fases Estación 6: Mi Visión

Estación 3: Mapa de limitación Estación 4: Historial de Accidentes y Tráfico

Estación 7: Estudio y comentario

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S. Code (U.S.C.) 327 and a Memorandum of Understanding dated December 16, 2014, and executed by the Federal Highway Administration (FHWA) and TxDOT.

Gracias por asistir a la reunión pública de hoy. ¡El Departamento de Transporte de Texas (TxDOT) le da la bienvenida! La Reunión Pública de hoy es acerca del Estudio del corredor de la Calle Mesa (SH 20). El propósito de este estudio de Ingeniería de Tráfico y Planificación es identificar y evaluar todos los aspectos y modos de transporte asociados con el corredor SH 20 de la calle Mesa, y para desarrollar un plan maestro que recomiende soluciones de transporte a corto-, medio- y largo-plazo para actualizar y mejorar las 12 millas del corredor, desde la calle Doniphan Drive hasta la Avenida Texas. El propósito de la Reunión Pública es para proporcionar información sobre el estudio y obtener la opinión del público. No habrá presentación formal.

Mapa de Ubicación de estación de tras de pagina

Page 6: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

Reun

ión

públ

ica

2 de

ago

sto

de 2

016

Map

a de

ubi

caci

ón d

e la

est

ació

n N

o a

la e

scal

a

El P

aso

Com

mun

ity F

ound

atio

n –

Foun

datio

n Ro

om P

lan

del p

iso

Regi

stro

Entra

r

Map

a de

l

Estu

dio

Prop

ósito

y N

eces

idad

In

form

ació

n G

ener

al

Met

as

Fase

s Li

mita

cion

es

del C

orre

dor

Lim

itaci

ones

de

l Cen

tro

de

La C

iuda

d

Cron

olog

ía

Esta

ción

2

Esta

ción

3

Entr

ada

del

edifi

cio

de la

ca

lle O

rego

n

Estudio

Mí Visión

Esta

ción

6

Mes

as d

e Im

agen

Aér

ea /

Mí V

isió

n

Mis

Cue

stio

nes

Esta

ción

5

Esta

ción

7

Esta

ción

1

Com

enta

rios

Encu

esta

s

Esta

ción

4

Vi

deo

del T

ráfic

o

Historial de Accidentes

His

toria

l de

Trá

fico

Page 7: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

REUNIÓN PÚBLICA Estudio del corredor de la Calle Mesa (SH 20)

Desde la calle Doniphan Drive hasta la Avenida Texas City of El Paso, El Paso County, Texas

CSJ: 0001-02-059

martes, 2 de agosto de 2016 El Paso 4:00 p.m. a 6:00 p.m.

El Paso Community Foundation – Foundation Room 333 North Oregon St., El Paso, TX 79901

(POR FAVOR USE LETRA DE MOLDE) NOMBRE: _______________________________________________________________________________ DIRECCIÓN: _____________________________________________________________________________ REPRESENTANDO: ______________________________________________________________________ (Código de Transporte de Texas, §201.811(a)(5)): marque cada uno de los siguientes que apliquen a usted: ❑ Yo trabajo con TxDOT ❑ Hago negocios con TxDOT ❑ Seria beneficiado monetariamente a causa de este proyecto u otros detalles sobre los que estoy comentando

HOJA DE COMENTARIOS Esta hoja ha sido proporcionada para recibir sus comentarios con respecto al Estudio del corredor de la Calle Mesa (SH 20). Por favor utilice el espacio proporcionado abajo, e incluya páginas adicionales en caso necesario. Sus comentarios se pueden depositar en la “Caja de Comentarios” o ser enviados por correo a la dirección indicada abajo o por correo electrónico a [email protected]. Comentarios por escrito deben tener el sello postal a más tardar el lunes, 15 de agosto de 2016 con el fin de ser incluidos en el Resumen de la Reunión Pública. Gracias por sus comentarios. ¿CÓMO SE ENTERO DE ESTA REUNIÓN?_____________________________________________

COMENTARIO:____________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________ Todos los comentarios por escrito enviados por correo deben tener el sello postal a más tardar el lunes, 15 de agosto de 2016 y enviados a: Gus Sanchez Project Manager Re: Mesa Street TxDOT El Paso District 13301 Gateway Blvd. West El Paso, TX 79928-5410 Email: [email protected]

Page 8: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

----------------------------------------------------------Doble Aquí---------------------------------------------------------

----------------------------------------------------------Doble Aquí---------------------------------------------------------

Coloque Estampilla

Aquí

GUS SANCHEZ PROJECT MANAGER RE: MESA STREET TXDOT EL PASO DISTRICT 13301 GATEWAY BLVD WEST EL PASO TX 79928-5410

Page 9: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

PUBLIC MEETING Mesa Street – State Highway (SH) 20 Corridor Study From Doniphan Drive to Texas Avenue City of El Paso, El Paso County, Texas CSJ: 0001-02-059

Wednesday, August 3, 2016

5:00 p.m. to 7:00 p.m. Mesita Elementary School – Multi-Purpose Room

3307 North Stanton St., El Paso, TX 79902

WELCOME! · Sign in

· Review handouts

· Visit each station

· Ask questions

· Share your thoughts

· Provide comments Written comments must be received or postmarked on or before Monday, August 15, 2016 to be included in the Public Meeting Summary.

Mail: Gus Sanchez Project Manager Re: Mesa Street TxDOT El Paso District 13301 Gateway Blvd. West El Paso, TX 79928-5410

Email: [email protected]

STATION GUIDE

Station 1: Sign in Station 5: My Issues

Station 2: Study Area, Goals & Phases Station 6: My Vision

Station 3: Constraints Maps Station 4: Accident & Traffic History

Station 7: Survey & Comment

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S. Code (U.S.C.) 327 and a Memorandum of Understanding dated December 16, 2014, and executed by the Federal Highway Administration (FHWA) and TxDOT.

Thank you for attending today’s Public Meeting. The Texas Department of Transportation (TxDOT) welcomes you! Today’s Public Meeting is about the Mesa St. – SH 20 Corridor Study. The purpose of this Traffic Engineering and Planning Study is to identify and evaluate all the various transportation aspects associated with the Mesa Street - SH 20 corridor and to develop a master plan of recommended short-, mid- and long-term transportation solutions to upgrade and improve the 12-mile corridor from Doniphan Drive southward to Texas Avenue. The Public Meeting purpose is to provide information about the study and gather input from the public. No formal presentation will be given.

See Station Location Map on back

Page 10: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

Augu

st 3

, 201

6 Pu

blic

Mee

ting

Stat

ion

Loca

tion

Map

N

ot to

Sca

le

Mes

ita E

lem

enta

ry S

choo

l – M

ulti-

purp

ose

Room

Flo

or P

lan

Sign

in

Stat

ion

1

Stud

y Map

Pu

rpos

e

&

Nee

d G

ener

al In

fo

Goa

ls

Phas

es

Tim

elin

e

Stat

ion

2

Tr

affic

Vid

eo

My Vision St

atio

n 6

Acci

dent

H

isto

ry

Traf

fic

His

tory

M

y Is

sues

Co

mm

ents

Su

rvey

s

Stat

ion

5 St

atio

n 7

Room Entrance from Hallway / Parking Lot

Aeria

l Rol

l / M

y Vi

sion

Tab

les

Aeria

l Rol

l / M

y Vi

sion

Tab

les

Ente

r

Stat

ion

4

Stud

y Bo

ard

Corridor Constraints

Downtown Constraints

Stat

ion

3

Page 11: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

PUBLIC MEETING Mesa St. – State Highway (SH) 20 Corridor Study

From Doniphan Drive to Texas Avenue City of El Paso, El Paso County, Texas

CSJ: 0001-02-059

Wednesday, August 3, 2016 5:00 p.m. to 7:00 p.m.

Mesita Elementary School – Multi-Purpose Room 3307 North Stanton St., El Paso, TX 79902

(PLEASE PRINT) NAME: _________________________________________________________________________________ ADDRESS: ______________________________________________________________________________ REPRESENTING: ________________________________________________________________________ (Texas Transportation Code, §201.811(a)(5)): check each of the following boxes that apply to you: ❑ I am employed by TxDOT ❑ I do business with TxDOT ❑ I could benefit monetarily from the project or other item about which I am commenting

COMMENT FORM This form is provided to receive your comments regarding the Mesa St. – SH 20 Corridor Study. Please use the space below, attaching additional pages if necessary. Your comments can be deposited in the comment box tonight, mailed to the address provided below, or emailed to [email protected]. All written comments must be received or postmarked by Monday, August 15, 2016 in order to be included in the Public Meeting Summary. Thank you for your comments. HOW DID YOU HEAR ABOUT THIS MEETING?__________________________________________

COMMENTS:_____________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________ Comments must be received or postmarked on or before Monday, August 15, 2016 to be included in the

Public Meeting Summary and sent to:

Gus Sanchez Project Manager TxDOT El Paso District 13301 Gateway Blvd. West El Paso, TX 79928-5410 Email: [email protected]

Page 12: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

----------------------------------------------------------Fold Here--------------------------------------------------------------

----------------------------------------------------------Fold Here--------------------------------------------------------------

Place Stamp

Here

GUS SANCHEZ PROJECT MANAGER RE: MESA STREET TXDOT EL PASO DISTRICT 13301 GATEWAY BLVD WEST EL PASO TX 79928-5410

Page 13: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

REUNIÓN PÚBLICA Estudio del corredor de la Calle Mesa (SH 20) Desde la calle Doniphan Drive hasta la Avenida Texas City of El Paso, El Paso County, Texas CSJ: 0001-02-059

miércoles, 3 de agosto de 2016

5:00 p.m. a 7:00 p.m. Mesita Elementary School – Multi-Purpose Room

3307 North Stanton St, El Paso, TX 79902

¡BIENVENIDO! · Regístrese

· Revise los folletos

· Visite cada estación

· Haga preguntas

· Comparta sus pensamientos

· Proporcione comentarios Comentarios por escrito deben tener el sello postal a más tardar el lunes, 15 de agosto de 2016 con el fin de ser incluidos en el Resumen de la Reunión Pública.

Dirección de envió: Gus Sanchez

Project Manager Re: Mesa Street TxDOT El Paso District 13301 Gateway Blvd. West El Paso, TX 79928-5410

Correo electrónico:

[email protected]

GUÍA DE ESTACIÓN

Estación 1: Registro Estación 5: Mis Cuestiones

Estación 2: Área de Estudio, Objetivo y fases Estación 6: Mi Visión

Estación 3: Mapa de limitación Estación 4: Historial de Accidentes y Tráfico

Estación 7: Estudio y comentario

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S. Code (U.S.C.) 327 and a Memorandum of Understanding dated December 16, 2014, and executed by the Federal Highway Administration (FHWA) and TxDOT.

Gracias por asistir a la reunión pública de hoy. ¡El Departamento de Transporte de Texas (TxDOT) le da la bienvenida! La Reunión Pública de hoy es acerca del estudio del corredor de la Calle Mesa (SH 20). El propósito de este estudio de Ingeniería de Tráfico y Planificación es identificar y evaluar todos los aspectos y modos de transporte asociados con el corredor SH 20 de la calle Mesa, y para desarrollar un plan maestro que recomiende soluciones de transporte a corto-, medio- y largo-plazo para actualizar y mejorar las 12 millas del corredor, desde la calle Doniphan Drive hasta la Avenida Texas. El propósito de la Reunión Pública es para proporcionar información sobre el estudio y obtener la opinión del público. No habrá presentación formal.

Mapa de Ubicación de estación de tras de pagina

Page 14: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

Reun

ión

públ

ica

3 de

ago

sto

de 2

016

Map

a de

ubi

caci

ón d

e la

est

ació

n N

o a

la e

scal

a

Mes

ita E

lem

enta

ry S

choo

l – M

ulti-

purp

ose

Room

Pla

n de

l pis

o

Regi

stro

Map

a de

l stu

dio

Prop

ósito

y N

eces

idad

In

form

ació

n G

ener

al

Met

as

Fase

s

Limitaciones del Corredor

Limitaciones del Centro de

La Ciudad Cron

olog

ía

Mí Visión

Mis

Cue

stio

nes

Com

enta

rios

Encu

esta

s

Mes

as d

e Im

agen

Aér

ea /

Mí V

isió

n

Mes

as d

e Im

agen

Aér

ea /

Mí V

isió

n

Estu

dio

Esta

ción

1

Esta

ción

6

Esta

ción

5

Esta

ción

7

Sala de entrada de pasillo / estacionamiento

Entra

r

Esta

ción

2

His

toria

l de

Acci

dent

es

His

toria

l de

Trá

fico

Esta

ción

4

Vi

deo

del T

ráfic

o

Esta

ción

3

Page 15: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

REUNIÓN PÚBLICA Estudio del corredor de la Calle Mesa (SH 20)

Desde la calle Doniphan Drive hasta la Avenida Texas City of El Paso, El Paso County, Texas

CSJ: 0001-02-059

miércoles, 3 de agosto de 2016 5:00 p.m. a 7:00 p.m.

Mesita Elementary School – Multi-Purpose Room 3307 North Stanton St, El Paso, TX 79902

(POR FAVOR USE LETRA DE MOLDE) NOMBRE: _______________________________________________________________________________ DIRECCIÓN: _____________________________________________________________________________ REPRESENTANDO: ______________________________________________________________________ (Código de Transporte de Texas, §201.811(a)(5)): marque cada uno de los siguientes que apliquen a usted: ❑ Yo trabajo con TxDOT ❑ Hago negocios con TxDOT ❑ Seria beneficiado monetariamente a causa de este proyecto u otros detalles sobre los que estoy comentando

HOJA DE COMENTARIOS Esta hoja ha sido proporcionada para recibir sus comentarios con respecto al Estudio del corredor de la Calle Mesa (SH 20). Por favor utilice el espacio proporcionado abajo, e incluya páginas adicionales en caso necesario. Sus comentarios se pueden depositar en la “Caja de Comentarios” o ser enviados por correo a la dirección indicada abajo o por correo electrónico a [email protected]. Comentarios por escrito deben tener el sello postal a más tardar el lunes, 15 de agosto de 2016 con el fin de ser incluidos en el Resumen de la Reunión Pública. Gracias por sus comentarios. ¿CÓMO SE ENTERO DE ESTA REUNIÓN?_____________________________________________

COMENTARIO:____________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________ Todos los comentarios por escrito enviados por correo deben tener el sello postal a más tardar el lunes, 15 de agosto de 2016 y enviados a:

Gus Sanchez Project Manager Re: Mesa Street TxDOT El Paso District 13301 Gateway Blvd. West El Paso, TX 79928-5410 Email: [email protected]

Page 16: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

----------------------------------------------------------Doble Aquí--------------------------------------------------------------

----------------------------------------------------------Doble Aquí--------------------------------------------------------------

Coloque Estampilla

Aquí

GUS SANCHEZ PROJECT MANAGER RE: MESA STREET TXDOT EL PASO DISTRICT 13301 GATEWAY BLVD WEST EL PASO TX 79928-5410

Page 17: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

PUBLIC MEETING Mesa Street – State Highway (SH) 20 Corridor Study From Doniphan Drive to Texas Avenue City of El Paso, El Paso County, Texas CSJ: 0001-02-059

Thursday, August 4, 2016

5:00 p.m. to 7:00 p.m. El Paso Police Department West Side Regional Command Center – Conference Room

4801 Osborne Dr., El Paso, TX 79922

WELCOME! · Sign in

· Review handouts

· Visit each station

· Ask questions

· Share your thoughts

· Provide comments Written comments must be received or postmarked on or before Monday, August 15, 2016 to be included in the Public Meeting Summary.

Mail: Gus Sanchez Project Manager Re: Mesa Street TxDOT El Paso District 13301 Gateway Blvd. West El Paso, TX 79928-5410

Email: [email protected]

STATION GUIDE

Station 1: Sign in Station 5: My Issues

Station 2: Study Area, Goals & Phases Station 6: My Vision

Station 3: Constraints Maps Station 4: Accident & Traffic History

Station 7: Survey & Comment

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S. Code (U.S.C.) 327 and a Memorandum of Understanding dated December 16, 2014, and executed by the Federal Highway Administration (FHWA) and TxDOT.

Thank you for attending today’s Public Meeting. The Texas Department of Transportation (TxDOT) welcomes you! Today’s Public Meeting is about the Mesa St. – SH 20 Corridor Study. The purpose of this Traffic Engineering and Planning Study is to identify and evaluate all the various transportation aspects associated with the Mesa Street - SH 20 corridor and to develop a master plan of recommended short-, mid- and long-term transportation solutions to upgrade and improve the 12-mile corridor from Doniphan Drive southward to Texas Avenue. The Public Meeting purpose is to provide information about the study and gather input from the public. No formal presentation will be given.

See Station Location Map on back

Page 18: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

Goa

ls

Corridor Constraints

Downtown Constraints

Accident History

Traf

fic

His

tory

Surv

eys

Traffic Video

Stat

ion

6

Sign in Study Map

My

Issu

es

My Vision

Augu

st 4

, 201

6 Pu

blic

Mee

ting

Stat

ion

Loca

tion

Map

N

ot to

Sca

le

EP P

olic

e D

ept.

Wes

tsid

e Re

gion

al C

omm

and

– Co

nfer

ence

Roo

m F

loor

Pla

n

Aeria

l Rol

l Plo

t / M

y Vi

sion

Tab

les

Aeria

l Rol

l Plo

t / M

y Vi

sion

Tab

les

Ente

r

Stat

ion

5

Comments

Stat

ion

1

Build

ing

En

tran

ce fr

om

Park

ing

Lot

Stat

ion

7

Study Board

Station 3 Stat

ion

4

Stat

ion

2

Page 19: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

PUBLIC MEETING Mesa St. – State Highway (SH) 20 Corridor Study

City of El Paso, El Paso County, Texas CSJ: 0001-02-059

Thursday, August 4, 2016

5:00 p.m. to 7:00 p.m. El Paso Police Department West Side Regional Command Center – Conference Room

4801 Osborne Dr., El Paso, TX 79922

(PLEASE PRINT) NAME: _________________________________________________________________________________ ADDRESS: ______________________________________________________________________________ REPRESENTING: ________________________________________________________________________ (Texas Transportation Code, §201.811(a)(5)): check each of the following boxes that apply to you: ❑ I am employed by TxDOT ❑ I do business with TxDOT ❑ I could benefit monetarily from the project or other item about which I am commenting

COMMENT FORM This form is provided to receive your comments regarding Mesa St. – SH 20 Corridor Study. Please use the space below, attaching additional pages if necessary. Your comments can be deposited in the comment box tonight, mailed to the address provided below, or emailed to [email protected]. All written comments must be received or postmarked by Monday, August 15, 2016 in order to be included in the Public Meeting Summary. Thank you for your comments. HOW DID YOU HEAR ABOUT THIS MEETING?__________________________________________

COMMENTS:_____________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________ Comments must be received or postmarked on or before Monday, August 15, 2016 to be included in the

Public Meeting Summary and sent to:

Gus Sanchez Project Manager Re: Mesa Street TxDOT El Paso District 13301 Gateway Blvd. West El Paso, TX 79928-5410 Email: [email protected]

Page 20: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

----------------------------------------------------------Fold Here--------------------------------------------------------------

----------------------------------------------------------Fold Here---------------------------------------------------------------

Place Stamp

Here

GUS SANCHEZ PROJECT MANAGER RE: MESA STREET TXDOT EL PASO DISTRICT 13301 GATEWAY BLVD WEST EL PASO TX 79928-5410

Page 21: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

REUNIÓN PÚBLICA Estudio del corredor de la Calle Mesa (SH 20) Desde la calle Doniphan Drive hasta la Avenida Texas City of El Paso, El Paso County, Texas CSJ: 0001-02-059

jueves, 4 de agosto de 2016

5:00 p.m. a 7:00 p.m. El Paso Police Department West Side Regional Command Center – Conference Room

4801 Osborne Dr., El Paso, TX 79922

¡BIENVENIDO! · Regístrese

· Revise los folletos

· Visite cada estación

· Haga preguntas

· Comparta sus pensamientos

· Proporcione comentarios Comentarios por escrito deben tener el sello postal a más tardar el lunes, 15 de agosto de 2016 con el fin de ser incluidos en el Resumen de la Reunión Pública.

Dirección de envió: Gus Sanchez

Project Manager Re: Mesa Street TxDOT El Paso District 13301 Gateway Blvd. West El Paso, TX 79928-5410

Correo electrónico:

[email protected]

GUÍA DE ESTACIÓN

Estación 1: Registro Estación 5: Mis Cuestiones

Estación 2: Área de Estudio, Objetivo y fases Estación 6: Mi Visión

Estación 3: Mapa de limitación Estación 4: Historial de Accidentes y Tráfico

Estación 7: Estudio y comentario

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S. Code (U.S.C.) 327 and a Memorandum of Understanding dated December 16, 2014, and executed by the Federal Highway Administration (FHWA) and TxDOT.

Gracias por asistir a la reunión pública de hoy. ¡El Departamento de Transporte de Texas (TxDOT) le da la bienvenida! La Reunión Pública de hoy es acerca del Estudio del corredor de la Calle Mesa (SH 20). El propósito de este estudio de Ingeniería de Tráfico y Planificación es identificar y evaluar todos los aspectos y modos de transporte asociados con el corredor SH 20 de la calle Mesa, y para desarrollar un plan maestro que recomiende soluciones de transporte a corto-, medio- y largo-plazo para actualizar y mejorar las 12 millas del corredor, desde la calle Doniphan Drive hasta la Avenida Texas. El propósito de la Reunión Pública es para proporcionar información sobre el estudio y obtener la opinión del público. No habrá presentación formal.

Mapa de Ubicación de estación de tras de pagina

Page 22: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

Met

as

Limitaciones del Corredor

Limitaciones del Centro de

La Ciudad

Historial de Accidentes

His

toria

l de

Trá

fico

Encu

esta

s

Esta

ción

6

Registro Mapa del Estudio

Mis

Cue

stio

nes

My Vision

Reun

ión

públ

ica

4 de

ago

sto

de 2

016

Map

a de

ubi

caci

ón d

e la

est

ació

n N

o a

la e

scal

a

EP P

olic

e D

ept.

Wes

tsid

e Re

gion

al C

omm

and

– Co

nfer

ence

Roo

m P

lan

del p

iso

Mes

as d

e Im

agen

Aér

ea /

Mí V

isió

n

Mes

as d

e Im

agen

Aér

ea /

Mí V

isió

n

Esta

ción

5

Comentarios

Esta

ción

1

Esta

ción

7

Estudio

Entra

r En

trad

a de

l ed

ifici

o de

es

taci

onam

ient

o Video

de Tráfico

Estación 3 Esta

ción

4

Esta

ción

2

Page 23: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

REUNIÓN PÚBLICA Estudio del corredor de la Calle Mesa (SH 20)

Desde la calle Doniphan Drive hasta la Avenida Texas City of El Paso, El Paso County, Texas

CSJ: 0001-02-059

jueves, 4 de agosto de 2016 5:00 p.m. a 7:00 p.m.

El Paso Police Department West Side Regional Command Center – Conference Room 4801 Osborne Dr., El Paso, TX 79922

(POR FAVOR USE LETRA DE MOLDE) NOMBRE: _______________________________________________________________________________ DIRECCIÓN: _____________________________________________________________________________ REPRESENTANDO: ______________________________________________________________________ (Código de Transporte de Texas, §201.811(a)(5)): marque cada uno de los siguientes que apliquen a usted: ❑ Yo trabajo con TxDOT ❑ Hago negocios con TxDOT ❑ Seria beneficiado monetariamente a causa de este proyecto u otros detalles sobre los que estoy comentando

HOJA DE COMENTARIOS Esta hoja ha sido proporcionada para recibir sus comentarios con respecto al Estudio del corredor de la Calle Mesa (SH 20). Por favor utilice el espacio proporcionado abajo, e incluya páginas adicionales en caso necesario. Sus comentarios se pueden depositar en la “Caja de Comentarios” o ser enviados por correo a la dirección indicada abajo o por correo electrónico a [email protected]. Comentarios por escrito deben tener el sello postal a más tardar el lunes, 15 de agosto de 2016 con el fin de ser incluidos en el Resumen de la Reunión Pública. Gracias por sus comentarios. ¿CÓMO SE ENTERO DE ESTA REUNIÓN?_____________________________________________

COMENTARIO:____________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________ Todos los comentarios por escrito enviados por correo deben tener el sello postal a más tardar el lunes, 15 de agosto de 2016 y enviados a:

Gus Sanchez Project Manager Re: Mesa Street TxDOT El Paso District 13301 Gateway Blvd. West El Paso, TX 79928-5410 Email: [email protected]

Page 24: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

----------------------------------------------------------Doble Aquí---------------------------------------------------------

----------------------------------------------------------Doble Aquí---------------------------------------------------------

Coloque Estampilla

Aquí

GUS SANCHEZ PROJECT MANAGER RE: MESA STREET TXDOT EL PASO DISTRICT 13301 GATEWAY BLVD WEST EL PASO TX 79928-5410

Page 25: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

FACT SHEET Mesa Street – State Highway (SH) 20 Corridor Study

From Doniphan Drive to Texas Avenue City of El Paso, El Paso County, Texas

CSJ: 0001-02-059

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S. Code (U.S.C.) 327 and a Memorandum of Understanding dated December 16, 2014, and executed by the FHWA and TxDOT.

What is the Mesa Street – SH 20 Corridor Study? A Texas Department of Transportation (TxDOT) Traffic Engineering and Planning Study that will support the following TxDOT goals and objectives: § Safety; § Congestion relief; and § Transportation reliability.

With these goals in mind, this study will develop a master plan of recommended short-, mid- and long-term transportation solutions to upgrade and improve the Mesa St. – SH 20 corridor from Doniphan Drive southward to Texas Avenue. Who is involved in the study? Agency coordination includes the City of El Paso, the El Paso Metropolitan Planning Organization, the University of Texas at El Paso, stakeholders and other local transportation and corridor-related offices. Where will the study’s recommended improvements (master plan) be published? View all the study updates and postings at www.txdot.gov (search “Mesa Street”). What will the study recommendations involve? § Accident history locations § Safety § Signalization and signage § Mass transit accommodation § Forecast travel demand through year 2040 § Access management § Design solution alternatives § Agency, stakeholder and public involvement

and input

How can the public get involved? All of the Study’s recommended solutions to the region's transportation needs will reflect input from stakeholders and the general public. Our process is driven by continuous outreach to engage the community throughout the study development process. Initial public meetings will be held on:

Tuesday, August 2, 2016 El Paso Community Foundation –

Foundation Room 333 North Oregon St., El Paso, TX 79901

4:00 p.m. to 6:00 p.m.

Wednesday, August 3, 2016 Mesita Elementary School –

Multi-Purpose Room 3307 North Stanton St., El Paso, TX 79902

5:00 p.m. to 7:00 p.m.

Thursday, August 4, 2016 El Paso Police Department West Side Regional

Command Center – Conference Room 4801 Osborne Dr., El Paso, TX 79922

5:00 p.m. to 7:00 p.m. Questions or comments may also be submitted throughout the study via the following: Email: [email protected] Mailing Address: Gus Sanchez Project Manager

Re: Mesa Street TxDOT – El Paso District 13301 Gateway Blvd. West El Paso, TX 79928-5410

Page 26: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

STUDY LOCATION MAP

MAPA DE UBICACIÓN DEL ESTUDIO Mesa Street – State Highway (SH) 20 Corridor Study

From Doniphan Drive to Texas Avenue

Page 27: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

HOJA DE HECHOS Estudio del Corredor de la Calle Mesa (SH 20)

Desde la calle Doniphan Drive hasta la Avenida Texas City of El Paso, El Paso County, Texas

CSJ: 0001-02-059

La revisión ambiental, consultas y otras acciones requeridas por las leyes ambientales federales aplicables para este proyecto están siendo o han sido, llevado a cabo por TxDOT - en virtud de 23 USC 327 y un Memorando de Entendimiento fechado el 16 de diciembre del 2014, y ejecutado por laFHWA y el TxDOT.

¿Qué es el Estudio del Corredor de la calle Mesa? Un estudio de Ingeniería de Tráfico y Planificación del Departamento de Transporte de Texas (TxDOT) que apoyará los siguientes objetivos y metas de TxDOT: § Seguridad; § Aliviar la congestión del tráfico; y § Confiabilidad del transporte

Con estos objetivos en mente, este estudio desarrollará un plan maestro que recomiende soluciones de transporte a corto-, medio- y largo-plazo para actualizar y mejorar la calle Mesa, desde la calle Doniphan Drive hasta la Avenida Texas. ¿Quién está involucrado en el estudio? Coordinación de las agencias incluye la ciudad de El Paso, la Organización de Planificación Metropolitana de El Paso, la Universidad de Texas en El Paso, grupos de interés y otros medios de transporte locales y oficinas relacionadas con el corredor. ¿Dónde se publicarán las mejoras recomendadas del estudio (plan maestro)? Todas las actualizaciones y publicaciones del estudio pueden ser vistas en www.txdot.gov (escriba “Mesa Street” en el área de búsqueda). ¿Cuáles serán las recomendaciones y evaluaciones del estudio? § Localización histórica de accidentes § Seguridad § Señalización de tráfico y carretera § Accesso al transporte público § Pronóstico de demanda de viajes hasta el año

2040 § Gestión de accesos § Soluciones de diseño de alternativas

§ Participación y contribución de Agencias, grupos de interes, y el público en general

¿Cómo puede el público involucrarse? Todas las soluciones a las necesidades de transporte de la región reflejarán las aportaciones de las partes interesadas y el público en general. Nuestro proceso es impulsado para la difusión continua para involucrar a la comunidad en todo el proceso de desarrollo del estudio. Reuniones públicas iniciales se llevarán a cabo en:

martes, 2 de agosto de 2016

El Paso Community Foundation – Foundation Room

333 North Oregon St., El Paso, TX 79901 4:00 p.m. a 6:00 p.m.

miércoles, 3 de agosto de 2016

Mesita Elementary School – Multi-Purpose Room

3307 North Stanton St., El Paso, TX 79902 5:00 p.m. a 7:00 p.m.

jueves, 4 de agosto de 2016

El Paso Police Department West Side Regional Command Center – Conference Room 4801 Osborne Dr., El Paso, TX 79922

5:00 p.m. a 7:00 p.m.

Las preguntas o comentarios también se pueden enviar a lo largo del estudio a través de: Correo electrónico: [email protected] Dirección de envió: Gus Sanchez

Project Manager Re: Mesa Street TxDOT – El Paso District 13301 Gateway Blvd. West El Paso, TX 79928-5410

Page 28: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

STUDY LOCATION MAP

MAPA DE UBICACIÓN DEL ESTUDIO Mesa Street – State Highway (SH) 20 Corridor Study

From Doniphan Drive to Texas Avenue

Page 29: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

Take this Survey, add Postage, and mail. Tome esta encuesta, añade estampilla y

envíe por correo.

www.txdot.gov (keyword “Mesa Street” ) or contact [email protected]

Your insight and input can assist a TxDOT Mesa St. - SH 20 Traffic & Planning Study

Su visión y aporte pueden ayudar al estudio del tráfico y planificación de la calle Mesa – SH 20 de TxDOT

Gus Sanchez Project Manager Re: Mesa Street TxDOT El Paso District 13301 Gateway Blvd West El Paso, TX 79928-5410

TxDOT Survey Card / Encuesta Coloque Estampilla

Aquí

Place Stamp

Here

Page 30: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

1 What is your normal mode of travel along Mesa Street? (check one box) ¿Cuál es su modo normal de viaje a lo largo de la calle Mesa? (marque una casilla) Walk Bike Bus Car I typically avoid Mesa Street due to its traffic congestion Caminar Bicicleta Autobús Carro Por lo general evito la calle Mesa debido a su congestión de tráfico 2 What is your primary purpose in travelling along Mesa Street? (check one box) ¿Cuál es su propósito primario de viajar a lo largo de la calle Mesa? (marque una casilla) Work Shopping Business Personal School Other Trabajo Compras Negocio Personal Escuela Otro 3 What segments of Mesa Street do you feel are congested or experience repeated delays? (briefly explain) ¿Qué segmentos de la calle Mesa siente que están congestionados o padecen de retrasos repetidos? (explique brevemente) 4 What is your No. 1 “problem spot” or concern involving Mesa Street? (briefly explain) ¿Cuál es lugar más problemático o su preocupación con la calle Mesa? (explique brevemente) 5 Prioritize these potential Mesa Street improvements (from 1 to 8 where 1 is most important): Prioriza estas mejoras potenciales de la calle Mesa (de 1 a 8 donde 1 es el más importante): _ Safety _ Vehicular Congestion _ Transit _ Access Control _ Flooding _ Walkability _ Bikeability _ Aesthetics/Landscaping Seguridad Congestión vehicular Tránsito Control de acceso Inundaciones Caminable Andar en bicicleta Estética/Paisajismo 6 Should transportation funds be pursued and expended to improve Mesa Street? (check one box) ¿Deben fondos de transporte ser proseguidos y utilizados para mejorar la calle Mesa? (marque uno casilla) Yes (Sí) No My zip code is_________ I am a: Business Owner Interested Individual Other (check one box) Mi código postal es Soy: Propietario/a de negocio Individuo interesado Otro (marque uno casilla)

Page 31: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

You are invited to a Public Meeting

Está usted invitado a una Reunión Pública

The Texas Department of Transportation – El Paso District is hosting three public meetings for the Mesa Street – State Highway (SH) 20 Corridor Study. The purpose of the public meetings is to provide information about the study and gather input from the public. A study area map can be found on the other side of this page. Identical study information will be presented at each meeting. All meetings will be conducted in an open house, come and go format. No formal presentation will be given.

El Departamento de Transporte de Texas - Distrito de El Paso está organizando tres reuniones públicas para el estudio del corredor de la Calle Mesa – Carretera Estatal (SH) 20. El propósito de las reuniones públicas es para proporcionar información sobre el estudio y obtener la opinión del público. Un mapa de la zona del estudio se puede encontrar al dorso de esta página. Información idéntica del estudio se presentará en cada reunión. Todas las reuniones se llevarán a cabo en un formato informal. No habrá presentación formal.

Tuesday, August 2, 2016 El Paso Community Foundation –

Foundation Room 333 North Oregon St., El Paso, TX 79901

4:00 p.m. to 6:00 p.m.

martes, 2 de agosto de 2016 El Paso Community Foundation –

Foundation Room 333 Norte Oregon St., El Paso, TX 79901

4:00 p.m. a 6:00 p.m.

Wednesday, August 3, 2016 Mesita Elementary School –

Multi-Purpose Room 3307 North Stanton St., El Paso, TX 79902

5:00 p.m. to 7:00 p.m.

miércoles, 3 de agosto de 2016 Mesita Elementary School –

Multi-Purpose Room

3307 North Stanton St, El Paso, TX 79902 5:00 p.m. a 7:00 p.m.

Thursday, August 4, 2016 El Paso Police Department West Side

Regional Command Center – Conference Room

4801 Osborne Dr., El Paso, TX 79922 5:00 p.m. to 7:00 p.m.

jueves, 4 de agosto de 2016 El Paso Police Department West Side

Regional Command Center – Conference Room

4801 Osborne Dr., El Paso, TX 79922 5:00 p.m. a 7:00 p.m.

Ask Questions! Get Information!

Provide Comments!

¡Haga preguntas!

¡Obtenga información!

¡Proporcione comentarios!

For more information or to arrange for special needs, contact [email protected] or Gus Sanchez of TxDOT at (915) 790-4233. For more information about the project, please visit www.txdot.gov, keyword “Mesa Street”.

Para más información o para necesidades especiales, póngase en contacto con [email protected] o Gus Sanchez de TxDOT en (915) 790-4233. Para más información sobre el proyecto por favor visite www.txdot.gov, palabra clave “Mesa Street”.

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S. Code (U.S.C.) 327 and a Memorandum of Understanding dated December 16, 2014, and executed by FHWA and TxDOT.

La revisión ambiental, consultas y otras acciones requeridas por las leyes ambientales federales aplicables para este proyecto están siendo o han sido, llevado a cabo por TxDOT - en virtud de 23 USC 327 y un Memorando de Entendimiento fechado el 16 de diciembre del 2014, y ejecutado por la FHWA y el TxDOT.

Page 32: PUBLIC MEETING - ftp.dot.state.tx.us · City of El Paso, El Paso County, Texas CSJ: 0001-02-059 Tuesday, August 2, 2016 4:00 p.m. to 6:00 p.m. ... Metas Fases Limitaciones del Corredor

STUDY LOCATION MAP

MAPA DE UBICACIÓN DEL ESTUDIO Mesa Street – State Highway (SH) 20 Corridor Study

From Doniphan Drive to Texas Avenue