Page 1: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m
Page 2: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

Public HearingReceive Input for Proposal Submitted to Build a New

Intermediate School

Preparing All Students to Thrive in a Dynamically Changing World

Page 3: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

Public Hearings

Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m.

Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m.

Wednesday, September 26 Highland View 1405 Eads Street 6:00 p.m.

Thursday, September 27 Stonewall Jackson 2045 Euclid Avenue 6:00 p.m.

Page 4: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

History of Schools

• Highland View was built in 1937

• Stonewall Jackson was built in 1948

• Washington-Lee was built in 1968

Page 5: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

5

History of Two Elementary School Model Plan• Discussions since Fall of 2011 when the Board had an

independent consultant conduct a facility study

• Found Highland View building to be “functionally obsolete” due to age of building, the site topography and the internal circulation limitations.

• Board 2013-14 Focus Goal #4

• Pursue a two-elementary school facilities plan that alleviates overcrowding, better utilizes current faculty and staff, and provides the best possible learning environment for our students.

Page 6: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

Questions To Be Answered Tonight

• Why?

• Where?

• How?

• What?

• How much?

• Who?

• Why Now?

• Why Not?

• Your Questions

Page 7: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

Why?

• Asbestos• Moisture infiltration• Radon• Air quality • Energy inefficiency• Handicap inaccessibility• Outdated infrastructure

including electrical, plumbing, fire protection, restrooms, and HVAC

• Kitchen areas in need of repairs and have limited space

• Lack of storage• Unsafe bus loading and car

rider areas• Limited parking• Sidewalks, stairs, etc. do not

meet code• Elevator and intercom

systems are no longer serviceable

• Functionally obsolete• Renovation costs are

unaffordable and unfinanceable

Page 8: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

Where?

Reviewed properties > 10 acres in City

Selected thirteen (13) properties to evaluate

Toured Saturday, November 18, 2017

Sixteen (16) staff completed evaluation

Board narrowed to five properties at December 5th board meeting

Page 9: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

Van Pelt

Owner: City of Bristol, VirginiaAcreage: 32Topography: Mostly flatPrice: $0Utilities: On siteNumber students within three mile radius: 814

(74%)

Page 10: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

Van Pelt

1 Mile –250

3 Mile –814

5 Mile –1,077

Page 11: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

How? Process

• Began discussions

• Identified potential sites

• Held four public hearings and numerous other opportunities for input

• Received an unsolicited bid

• Board accepted unsolicited bid for review

• Board requested competing proposals

• Board contracted with outside advisors to assist in review

• Received two conceptual proposals

• Board requested detail proposals from both

• Board received detailed proposals• Board accepted proposal from

J. A. Street• Next steps:

• Public hearings• Board approval of

comprehensive agreement• Council must approve

entering of a comprehensive agreement

Page 12: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

What? New School Characteristics

• Learning spaces designed with collaboration in mind

• 2 enrichment labs

• One story; 85,684 square feet

• Normal classroom size –800 square feet

• Full-size gym

• 1360 ft. access road from Suncrest Drive

• Separate automobile and bus traffic drop-offs

• Total ADA accessibility

• Heating and cooling –rooftop units

• Fire alarms, sprinkler system, motion sensitive lighting, LED fixtures

• Designed for 50-year life expectancy

Page 13: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

What? New School Characteristics

• 1 – full size music room with storage

• 1 – full size art room with storage

• 2 – designated speech therapy rooms

• 3 – resource rooms• 2 – full size special education

classrooms with equipment storage and restrooms

• 1 – full size occupational therapy/physical therapy room with storage

• 8 – PreK/2nd grade classrooms with inclusive restrooms for each two rooms

• 2 – teacher workrooms with staff toilets nearby

• 9 – 3rd grade classrooms (projected to need 8)

• 9 – 4th grade classrooms (projected to need 8)

• 9 – 5th grade classrooms (projected to need 8)

• 2 – enrichment labs

Also includes office space for CIS, Day Treatment and SRO in addition to normal administrative office space, media center, gym and cafeteria.

Page 14: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

Floor Plan

Page 15: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

Footprint

Page 16: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

21st Century Learning Center

Page 17: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

How Much? Annual Cost

• Proposal offers a 30-Year triple net lease• Proposed annual lease payment: $1,254,500• Lifetime Cost: $37,635,000• Includes cost of issuance and underwriters

discount• Excludes any savings from consolidation

– $8,479,848

• Final financing plan to be negotiated and may differ from proposal

Page 18: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

Renovation Comparison

8,479,847.91

42,005,678.00

31,740,871.90

33,373,831.90

27,079,251.90

-

5,000,000.00

10,000,000.00

15,000,000.00

20,000,000.00

25,000,000.00

30,000,000.00

35,000,000.00

40,000,000.00

45,000,000.00

New School UtilizingPPEA Process and Van

Pelt Renovation

Renovate All ElementarySchools

Renovate Three; CloseOne; Consolidate withWing Addition to Van

Pelt

Renovate Three; CloseOne; Move 5th to VMS;8th to VHS with Wing

Addition at VHS

Renovate Three; CloseOne; Move 5th to VMS;

8th to VHS withRepurpose of Existing

Space

Lifetime Cost Netted with Savings

Page 19: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

Annual Savings

Personnel 865,859

Operational 121,798

Total Anticipated Savings 987,657

2017-2018 Appropriation (excludes debt service) 6,986,010

2018-2019 Appropriation 6,686,010

2020-2021 Requested Appropriation 6,936,010

Restoration of $250,000 of FY 2019 Budget Reduction Plus Savings

1,237,657

Page 20: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

Who? Personnel Impact

Description Number of Staff

Administration 1

Teacher 5

Teacher PE 1

Media 1

Counselor 1

Clerical 1

Nurse 1.6875

Custodial 3

Page 21: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

Why Now?

• Senator Stanley– Internet sales tax

– Civil Rights

• Delegate Edmunds– Tax similar to NOVA transportation tax

• Either of these will cause significant competition

• Should not wait until we HAVE to do it

• Opportunity costs

Page 22: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

Cost of 1 Year DelayAnnual Payment

$1,254,500.00

$1,480,000.00

$1,535,000.00 $1,637,000.00

$0.00

$200,000.00

$400,000.00

$600,000.00

$800,000.00

$1,000,000.00

$1,200,000.00

$1,400,000.00

$1,600,000.00

$1,800,000.00

Current 4.55% Plus .25 Plus .50 Plus 1.0

Annual Payment

Page 23: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

Cost of 1 Year DelayTotal Cost

$37,635,000.00

$44,400,000.00$46,050,000.00

$49,110,000.00

$0.00

$10,000,000.00

$20,000,000.00

$30,000,000.00

$40,000,000.00

$50,000,000.00

$60,000,000.00

Current 4.55% Plus .25 Plus .50 Plus 1.0

Total Cost

Page 24: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

Cost of 1 Year DelayOpportunity Cost

$6,765,000.00

$8,415,000.00

$11,475,000.00

$0.00

$2,000,000.00

$4,000,000.00

$6,000,000.00

$8,000,000.00

$10,000,000.00

$12,000,000.00

$14,000,000.00

Plus .25 Plus .50 Plus 1.0

Opportunity Cost

Page 25: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

Brown vs. Board of Education?

One of the criterion laid out in the decision was “the physical condition of the school plant.” In this ruling, which is commonly referred to “Brown II,” the underlying factor is race, but can that provision be applied more broadly in today, in 2018, even in localities that have overwhelmingly white student populations?

Page 26: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

Poverty Data

65%

59%

74%76%

85%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

District Van Pelt Washington-Lee Stonewall Jackson Highland View

Poverty

50 yrsold

70 yrsold

81 yrsold

43yrsold

Page 27: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

Minority Data

19% 19%20%

28% 28%

0%

5%

10%

15%

20%

25%

30%

District Stonewall Jackson Van Pelt Highland View Washington-Lee

Minority

Page 28: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

Why Not?

Risk

• Effect on debt capacity

• Effect on bond rating

• Looming Falls payment

• Need to cut education budget further

• Traffic

• Small vs. Large

Reward• Improved learning

environments• Equity for all students• Long term savings• Energy efficiency• Attractive to business and

industry• Attractive to home buyers• Increase in property values• Potential for revenue

generation• $6,000,000 City Surplus• No current need for tax

increase

Page 29: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

Recent Philosophy on Projects

• Think big or go home.

• Think long term and not short term.

• We are only asking for consent to move forward (no City obligation other than appropriation).

• This will be a private project with Street Team accepting all risk.

• This is a game changer and it will be a game changer for decades.

• This has tremendous potential to have a positive impact on local economy.

• If not this, what? If not now, when?

Page 30: Public Hearing - Edl · Public Hearings Wednesday, September 19 Washington Lee 900 Washington Lee Drive 6:00 p.m. Monday, September 24 Van Pelt 200 Springhill Terrace 6:00 p.m

21st Century School