1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 SLMP-G-1Procurement of soyabean seed for intercropping with maize
1,380.00 Direct contract 1/1/2010 1/10/2010 No NA NA 1/10/2010
2 SLMP-G-2Procurement of beans, peas and pintoi as green manuring seeds
200.00 Direct contract 7/5/2009 7/15/2010 No NA NA 7/15/2010
3 SLMP-G-3Improvement of soil ferlity through support of FYM Shed construction
4,950.00 Direct contract 8/1/2009 8/31/2009 No NA NA 9/15/2009
4 SLMP-G-4Farmers training on heap composting shed support
4,200.00 Direct contract 10/12/2009 10/31/2009 No NA NA 11/15/2009
5 SLMP-G-5 Farmers training on composting 780.00 Direct contract 10/19/2009 10/31/2009 No NA NA 11/15/2009
6 SLMP-G-6 Supply of plastic for cow shed 1,100.00 Direct contract 7/19/2009 8/31/2009 No NA NA 11/15/2009
*PP 7 SLMP-G-7 Supply of breeding Jersy/Mithun bulls 1,320.00 Direct contract 8/1/2009 10/31/2009 No NA NA 12/31/2009
*PP 8 SLMP-G-8 Supply of seeds Cereals and Oil seeds 2,600.00 Direct contract 9/1/2009 10/31/2009 No NA NA 10/31/2009
*PP 9 SLMP-G-9Procurement of Horticultural Plants, like Walnut, Arecanut Citrus Mango, Guava, Peach Plum and other species
17,420.00 Direct contract 4/1/2010 5/30/2010 No NA NA 5/30/2010
*PP 10 SLMP-G-10 Farmers training on Orcard Management 900.00 Direct contract 4/1/2010 5/30/2010 No NA NA 12/1/2009
*PP 11 SLMP-G-11 Supply of fruit trees for schools and BHU's 120.00 Direct contract 4/1/2010 5/20/2010 No NA NA 5/30/2010
*PP 12 SLMP-G-12Community Forest Establishment- Supply of seed/Seedlings and fencing materials
9,000.00 Direct Contact 0/01/2009 2/28/2010 No NA NA 2/28/2010
13 SLMP-G-13Supply of Breeding bulls to reduce pressure on grazing ( to facilitate breed improvement
320.00 Direct contract 9/1/2009 10/31/2009 No NA NA 2/10/2010
WBR NoDate of
Completion
Bank's No Objection
to contract Award (Date)
Contract signed
(Date/value/currency
)
Contrct NoName of
Contract & Nationality
Contract award decided (Date/value/c
urrency)
Estimated Cost (USD)
Method of Procurement
ICB/NCB
Design/Investigation
completed (Date)
Estimate prepared & sanctioned
(Date & Value)
Preparationof bid
document (Date)
Bank's No Objection to bidding document
(Date)
S.N
o.
Pack
age
No.
Description of goods
PROCUREMENT PLANT FOR GOODS SUSTAINABLE LAND MANAGEMENT PROJECT
(WB GRANT NO. 055967 BHU)
1ST JULY 2009 TO 30TH JUNE 2010 CHUKHA DZONGKHAG ( Bongo & Lokchina Geog)
Bids
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
14 SLMP-G-14 Supply of Fodder Seed Seedlings 880.00 Direct contract 7/1/2009 31/07/209 No NA NA 6/30/2010
*PP 15 SLMP-G-15 Pasture group Establishment- through sup 1,380.00 Direct contract 4/1/2010 5/30/2010 No NA NA 6/30/2010
*PP 16 SLMP-G-16 Training on fodder conservation 300.00 Directo contract 4/1/2010 5/30/2010 No NA NA 6/30/2010
16 SLMP-G-17Facilitating SLM investment through supply of cash cropping.
10,280.00 Directo contract 8/1/2009 9/30/2009 No NA NA 9/30/2009
17 SLMP-G-18Vegetable group Establishment ( Farmers group formation)
280.00 Directo contract 10/10/2009 10/31/2009 No NA NA 11/15/2009
18 SLMP-G-19Training on Kitchen gardening- Farmers training
900.00 Directo contract 4/20/2010 5/31/2010 No NA NA 6/30/2010
19 SLMP-G-20Construction of ambient store for marketing purpose
1,000.00 Direct contract 1/1/2010 3/31/2010 No NA NA 4/30/2010
20 SLMP-G-20Procurement of Corn flake at geog centre for income generation
1,200.00 Direct contract 2/1/2010 2/20/2010 No NA NA 2/20/2010
21 SLMP-G-21 Supply of Agro forestry- seed seedlings 640.00 Direct contract 4/1/2010 5/30/2010 No NA NA 5/30/2010
*PP 22 SLMP-G-22Afforestation by introducing forest nurssary at geog centres
3,440.00 Direct contract 2/15/2010 5/30/2010 No NA NA 6/30/2010
*PP 23 SLMP-G-23Supply of improved bee hive boxes for bee keeping activities
1,220.00 Shopping 10/3/2009 12/10/2009 No NA NA 12/15/2009
24 SLMP-G-24 Training on Bee Keeping 300.00 Direct contract 11/10/2009 12/20/2009 No NA NA 12/31/2009
25 SLMP-G-25 Training on Cattle Management 400.00 Direct contract 1/1/2010 2/3/2010 No NA NA 2/20/2010
26 SLMP-G-26
Sustainable land development & management through hedgerow establishment, chhuzhing terracing, Kamshing terracing and contour bounding with stones
23,460.00 Direct contract 7/1/2009 8/1/2009 No NA NA 8/1/2009
27 SLMP-G-27 Training on SLM Bio-engineering 3,200.00 Direct contract 8/8/2009 9/30/2009 No NA NA 10/30/2009
28 SLMP-G-28Supply of Agriculture tool sets ( For community Schools & BHU's
3,400.00 Direct contract 9/9/2009 10/10/2009 No NA NA 10/20/2009
29 SLMP-G-29 Food Security- Supply of improved seeds li 2,000.00 Direct contract 3/3/2010 5/10/2010 No NA NA 6/30/2009
30 SLMP-G-30Training & Study tours on SLM for NFE students
400.00 Direct contract 7/1/2009 8/30/2009 No NA NA 8/30/2009
31 SLMP-G-31Improving water management through renovation of irrigation Channels
29,000.00 Shopping 3/3/2010 5/10/2010 No NA NA 6/30/2010
32 SLMP-G-32Conservation and protection of natural resources ( By Planting trees log check dam and stone walls
9,500.00 Direct contract 8/1/2009 8/31/2009 No NA NA 9/30/2009
33 SLMP-G-33 Farmers Study tours 6,400.00 Direct contract 1/1/2010 3/31/2010 No NA NA 3/31/2010
34 SLMP-34 Monitoring & Evaluations 1,650.00 Direct contract 6/6/2010 6/30/2010 No NA NA 6/30/2010
35 SLMP-G-35Operating Expenses ( Miscellanious purchases)
3,200.00 Direct contract 7/7/2009 6/30/2010 No NA NA 6/30/2010
GRAND TOTAL 148,720.00
Note: Procurement Plan is prepared based on the budget proposal & work plan of 2009-2010 fiscal year for individual Pilot Dzongkhag and most importantly the dates are reflected as starting dates and completion dates of activities/programs.
Invitation (Date)
Opened on (Date)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
√ 1 SLMP-G-1Furniture for Up Scaling Pilot Geog Office & Head Office NSSC, Semtokha
18,000.00 Shopping 6/30/2009 7/20/2009 7/27/2009 No 7/31/2009 9/1/2009
No
2 SLMP-G-2Office Equipments- Fax machine,& Photocopier, for Up scaling Geogs
6,000.00 Shopping 6/30/2009 7/20/2009 7/27/2009 No 7/31/2009 9/1/2009
No
3 SLMP-G-3
Solar equipment for SUGs + Laptops and other accessories including the batteries & AC Converter.
10,000.00 Shopping 6/30/2009 7/20/2009 7/27/2009 No 7/31/2009 9/1/2009
Yes
4 SLMP-G-4
Field equipment for Dzongkhags like ( grain moisture metre, augers & pH kits)
70,000.00 Int'l shopping 6/30/2009 7/20/2009 7/27/2009 No 7/31/2009 9/1/2009
Yes
√ 5 SLMP-G-5Plant & equipment for laboratory,
56,000.00 Int'l shopping 6/30/2009 7/20/2009 7/27/2009 No 7/31/2009 9/1/2009No
6 SLMP-G-6 Computers & peripherals 21,000.00 Shopping 6/30/2009 7/20/2009 7/27/2009 No 7/31/2009 9/1/2009 No
√ 7 SLMP-G-7Extension of field measurement kits, clinometre, campass altimetre & GPS
6,400.00 Shopping 6/30/2009 7/20/2009 7/27/2009 No 7/31/2009 9/1/2009No
√ 8 SLMP-G-8 Consultation meetings 4,000.00 Direct
contract No
√ 9 SLMP-G-9
Stationaries, printing & publications, all types of stationaries items including cartridge & toners for head office & other Up scaling geogs
34,000.00 Shopping 6/30/2009 7/20/2009 7/27/2009 No 7/31/2009 9/1/2009
No
√ 10 SLMP-G-10Vehicle maintainance (maintainance & fuel costs)
11,280.00 Direct
contract No
√ 11 SLMP-G-11Procurement of Equipments for Spal (laboratory equipments)
15,000.00 Int'l shopping
No
*PP 12 SLMP-G-12Procurement of field gear for field staffs
6,500.00 Shopping 6/30/2009 7/20/2009 7/27/2009 No 7/31/2009 9/1/2009No
13 SLMP-G-13Local transportation costs for Up Scalling geogs)
18,500.00 Direct
contractNo
PROCUREMENT PLANT FOR GOODS SUSTAINABLE LAND MANAGEMENT PROJECT
(WB GRANT NO. 055967 BHU)
1ST JULY 2009 TO 30TH JUNE 2010
Preparationof bid
document (Date)
Estimated Cost (USD)
Description of goods
Pack
age
No.
S.N
o.
Design/Investigation
completed (Date)
Method of Procurement
ICB/NCB
Estimate prepared & sanctioned
(Date & Value)
Date of Completion
On need Base
Regular activities
As and when required basis
Contrct No
Name of Contract & Nationality
WBR No
Bank's No
Objection to
bidding docume
nt (Date)
Bank's No Objection
to contract Award (Date)
Contract signed
(Date/value/currency)
Bids
Contract award
decided (Date/value/currency)
√ 14 SLMP-G-14Masters Degree, two ongoing + 2 additional slots
88,340.00 Direct
contractNo
*PP 15 SLMP-G-15 Intn'l regional study tours 60,000.00 Directo contract No
16 SLMP-G-16 Intn'l workshops/conference 30,000.00 Directo contract No
17 SLMP-G-17 Short training course, Intn'l 20,000.00 Directo contract No
18 SLMP-G-18Bio-engineering training (up scalling geogs)
12,000.00 Directo contract
NoNo
19 SLMP-G-19Basic computer training for new scallng up geogs staff
7,000.00 Direct
contractNo
No
20 SLMP-G-20Participatory/intersectoral SLM planning (Geog & Chewog level)
6,000.00 Direct
contractNo
21 SLMP-G-21SLMP-Annual review workshop , seminars & six monthly meetings
16,000.00 Direct
contractNo
*PP 22 SLMP-G-22Mintainance of property bulding repair works parking & drainage system
10,000.00 Shopping 6/30/2009 7/20/2009 7/27/2009 No 7/31/2009 9/1/2009Yes
*PP 22 SLMP-G-23Printing & Publication of documents ( Technical reports)
10,000.00 Shopping
No
GRAND TOTAL 536,020.00
Note:- The procurement plan is prepared based on budget proposal for 2009-10,if any changes occur in between will intimate you immediately for your information. The proposed dates as reflected in the formats are tentative dates for tender and quotations which could change either few weeks early or later depending on management requirement.
On need base
Tentatively July / August 2009
On-going Programme
On need base
On need base
As and when required basis
1st October 2009 to 31st December 2009
Invitation (Date)
Opened on (Date)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 SLMP-G-1Procurement of soyabean seed for intercropping with maize
660.00 Direct contract 11/1/2009 12/31/2009 No NA NA 1/31/2010
2 SLMP-G-2Improvement of soil ferlity through support of FYM Shed construction
5,560.00 Direct contract 11/1/2009 12/31/2009 No NA NA 1/31/2010
3 SLMP-G-3Farmers training on heap composting shed support
Direct contract 8/1/2009 8/31/2009 No NA NA 9/15/2009
4 SLMP-G-4 Farmers training on composting
300.00 Direct contract 10/12/2009 10/31/2009 No NA NA 11/15/2009
*PP 5 SLMP-G-5Supply of seeds Cereals and Oil seeds
560.00 Direct contract 10/19/2009 10/31/2009 No NA NA 11/15/2009
*PP 6 SLMP-G-6
Procurement of Horticultural seed seedlings supply Plants, like Walnut, Arecanut Citrus Mango, Guava, Peach Plum and other species
11,300.00 Shopping 10/19/2009 10/31/2009 No NA NA 11/15/2009
7 SLMP-G-7Farmers training on Orcard Management
11,300.00 Direct contract 8/1/2009 10/31/2009 No NA NA 12/31/2009
*PP 8 SLMP-8Community Forestry Establishment
9,000.00 Direct contract 9/1/2009 10/31/2009 No NA NA 10/31/2009
9 SLMP-9Farmers training on Walnut plantation
100.00 Direct contract 4/1/2010 5/30/2010 No NA NA 5/30/2010
4/1/2010 5/30/2010 No NA NA 12/1/2009
10 SLMP-10Supply of Improved Fodder Seed Seedlings
2,200.00 Direct contract 4/1/2010 5/20/2010 No NA NA 5/30/2010
4/20/2010 5/31/2010 No NA NA 6/30/2010
11 SLMP-G-11Facilitating SLM investment through supply of cash cropping seed seedlings
6,040.00 Direct contract 9/1/2009 10/31/2009 No NA NA 2/10/2010
12 SLMP-G-12Training on Kitchen gardening- Farmers training
300.00 Directo contract
4/20/2010 5/31/2010 No NA NA 6/30/2010
1ST JULY 2009 TO 30TH JUNE 2010
PROCUREMENT PLANT FOR GOODS SUSTAINABLE LAND MANAGEMENT PROJECT
(WB GRANT NO. 055967 BHU) ZHEMGANG DZONGKHAG ( Bardo & Goshing Geog)
S.N
o.
Pack
age
No.
Description of goodsEstimated Cost (USD)
Method of Procurement
ICB/NCB
Design/Investigation
completed (Date)
Estimate prepared & sanctioned
(Date & Value)
Preparationof bid
document (Date)
Bank's No Objection to bidding document
(Date)
BidsContract award
decided (Date/value/cu
rrency)
WBR NoDate of
Completion
Bank's No Objection
to contract Award (Date)
Contract signed
(Date/value/currency
)
Contrct NoName of
Contract & Nationality
13 SLMP-G-13Farmers training on mushroom cultivation
960.00 Direct contract 4/1/2010 5/30/2010 No NA NA 6/30/2010
14 SLMP-G-14Training on vegetable production
840.00 Direct contract 4/1/2010 5/30/2010 No NA NA 6/30/2010
15 SLMP-G-15 Training on post harvest loses 180.00 Direct contract 8/1/2009 9/30/2009 No NA NA 10/31/2009
*PP 16 SLMP-G-16Afforestation by introducing forest nurssary at geog centres
3,440.00 Shopping 10/10/2009 10/31/2009 No NA NA 11/15/2009
17 SLMP-G-17
Sustainable land development & management: through hedgerow establishment, chhuzhing terracing, Kamshing terracing and contour bounding with stones
26,040.00 Direct contract 4/20/2010 5/31/2010 No NA NA 6/30/2010
18 SLMP-G-18Food Security- Supply of improved seeds like maize & paddy seeds
2,120.00 Direct contract 1/1/2010 3/31/2010 No NA NA 4/30/2010
19 SLMP-G-19Training on pest & disease management
240.00 Direct contract 2/1/2010 2/20/2010 No NA NA 2/20/2010
20 SLMP-G-20Improving water management through renovation of irrigation Channels
32,860.00 Direct contract 4/1/2010 5/30/2010 No NA NA 5/30/2010
21 SLMP-G-21
Conservation and protection of natural resources ( By Planting trees log check dam and stone walls
6,780.00 Direct contract 2/15/2010 5/30/2010 No NA NA 6/30/2010
22 SLMP-G-22Afforestation through planting with tree seedlings
1,020.00 Direct contract 10/3/2009 12/10/2009 No NA NA 12/15/2009
23 SLMP-G-23Planting ornamental trees to BHU's Schools, Dratshang and geog administration offices
1,620.00 Direct contract 11/10/2009 12/20/2009 No NA NA 12/31/2009
24 SLMP-G-24Supply of fire fighting equipments & training on fire fighting
1,420.00 Direct contract 1/1/2010 2/3/2010 No NA NA 2/20/2010
25 SLMP-G-25
Geog level intervention support through demonstration & planting of bamboo awareness campaign and poultry farming
5,800.00 Direct contract 5/5/2010 6/30/2010 No NA NA 12/15/2009
26 SLMP-G-26 Farmers Study tours 6,400.00 Direct contract 8/8/2009 9/30/2009 No NA NA 10/30/2009
27 SLMP-27Procurement of silo bean through post harvest unit
2,000.00 Direct contract 9/9/2009 10/10/2009 No NA NA 10/20/2009
28 SLMP-G-28 Training on silo bin handling 360.00 Direct contract 3/3/2010 5/10/2010 No NA NA 6/30/2009
GRAND TOTAL 139,400.00 3/3/2010 5/10/2010 No NA NA 5/20/2010
Note: Procurement Plan is prepared based on the work plan of individual Pilot Dzongkhag and most importantly the dates are reflected as starting dates and completion of individual activities/programs.
Invitation (Date)
Opened on (Date)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 SLMP-G-1 Improving Soil Fretility : Procurement of soyabean seeds for intercropping with maize
920.00 Direct contract 11/1/2009 12/31/2009 No NA NA 1/31/2010 No
2 SLMP-G-2Procurement of beans, peas and pintoi as green manuring seeds
100.00 Direct contract 11/1/2009 12/31/2009 No NA NA 1/31/2010 No
3 SLMP-G-3Improvement of soil ferlity through support of FYM Shed construction
4,000.00 Direct contract 9/1/2009 9/30/2009 No NA NA 10/15/2009 No
4 SLMP-G-4 Farmers Training on Soil Fertility 600.00 Direct contract 10/12/2009 10/31/2009 No NA NA 11/15/2009 No
5 SLMP-G-5Farmers training on heap composting shed support
400.00 Direct contract 10/19/2009 10/31/2009 No NA NA 11/15/2009 No
6 SLMP-G-6 Farmers training on composting 600.00 Direct contract 10/19/2009 10/31/2009 No NA NA 11/15/2009 No
7 SLMP-G-7 Supply of plastic for cow shed 100.00 Direct contract 9/1/2009 9/30/2009 No NA NA 10/31/2009 No
*PP 8 SLMP-G-8 Supply of breeding Jersy/Mithun bulls 320.00 Direct contract 10/1/2009 11/30/2009 No NA NA 11/30/2009 No
*PP 9 SLMP-G-9 Supply of seeds Cereals and Oil seeds 520.00 Direct contract 4/1/2010 5/30/2010 No NA NA 5/30/2010 No
*PP 10 SLMP-G-10
Procurement of Horticultural Plants, like Walnut, Arecanut Citrus Mango, Guava, Peach Plum and other species ( Druk Seed Corporation)
30,680.00 Direct contract 1/1/2010 5/30/2010 No NA NA 12/1/2009 No
11 SLMP-G-10 Citru group Establishment 600.00 Direct contract 4/1/2010 5/20/2010 No NA NA 5/30/2010 No
*PP 12 SLMP-G-11 Training on Walnut Plantation 600.00 Direct contract 4/20/2010 5/31/2010 No NA NA 6/30/2010 No
*PP 13 SLMP-G-12Community Forest Establishment- Supply of seed/Seedlings and fencing materials
7,000.00 Direct contract 4/1/2010 6/30/2010 No NA NA 6/30/2010 No
PROCUREMENT PLANT FOR GOODS SUSTAINABLE LAND MANAGEMENT PROJECT
(WB GRANT NO. 055967 BHU) TRASHIGANG DZONGKHAG( Lumang & Thrimshing Geog)
1ST JULY 2009 TO 30TH JUNE 2010
S.N
o.
Pack
age
No.
Description of goodsEstimated Cost (USD)
Method of Procurement
ICB/NCB
Design/Investigation
completed (Date)
Estimate prepared & sanctioned
(Date & Value)
Preparationof bid
document (Date)
Bank's No Objection to bidding document
(Date)
Bids Contract award decided (Date/value/c
urrency)
Bank's No Objection
to contract Award (Date)
Date of Completion
Contract signed
(Date/value/currency
)
Contrct NoName of
Contract & Nationality
WBR No
14 SLMP-G-13Improving grazing/ fodder resources : through supply of improved pasture seeds/seedlings
20,860.00 Direct contract 4/20/2010 5/31/2010 No NA NA 6/30/2010 No
15 SLMP-G-14Facilitating SLM investment through supply of cash cropping.
25,340.00 Direct contract 4/1/2010 5/30/2010 No NA NA 6/30/2010 No
16 SLMP-G-15
Sustainable land development & management through hedgerow establishment, chhuzhing terracing, Kamshing terracing and contour bounding with stones
40,240.00 Directo contract 4/1/2010 5/30/2010 No NA NA 6/30/2010 No
17 SLMP-G-16Improving water management: through renovation of irrigation channels at geog level
14,020.00 Directo contract 8/1/2009 9/30/2009 No NA NA 10/31/2009 No
18 SLMP-G-17Conservation and protection of natural resources ( By Planting trees log check dam and stone walls
52,720.00 Directo contract 10/10/2009 10/31/2009 No NA NA 11/15/2009 No
19 SLMP-G-18Awareness campaign on Social Forestry day
900.00 Direct contract 4/20/2010 5/31/2010 No NA NA 6/30/2010 No
20 SLMP-G-19 Training on general Environment 300.00 Direct contract 1/1/2010 3/31/2010 No NA NA 4/30/2010 No
21 SLMP-G-20 Training on Teak Plantation 420.00 Direct contract 5/1/2010 5/20/2010 No NA NA 6/20/2010 No
*PP 22 SLMP-G-21 Farmers Study tours 3,200.00 Direct contract 1/1/2009 12/31/2009 No NA NA 12/31/2009 No
*PP 23 SLMP-G-22 Procurement of Chilli drying Machines 400.00 Direct contract 2/15/2010 5/30/2010 No NA NA 6/30/2010 No
24 SLMP-G-23 Participatory Chiog M & E 1,680.00 Direct contract 10/3/2009 12/10/2009 No NA NA 12/15/2009 No
25 SLMP-G-24 GSPT Monitoring & Evaluation 160.00 Direct contract 11/10/2009 12/20/2009 No NA NA 12/31/2009 No
26 SLMP-G-25 GYT MEETING 400.00 Direct contract 1/1/2010 2/3/2010 No NA NA 6/30/2010 No
GRAND TOTAL 207,080.00
Note: Procurement Plan is prepared based on the work plan of individual Pilot Dzongkhag and most importantly the dates are reflected as starting dates and completion of individual activities/programs.