pttme cadworx plant professional in plant engineering

Upload: johnzrw

Post on 14-Apr-2018

243 views

Category:

Documents


1 download

TRANSCRIPT

  • 7/27/2019 PTTME Cadworx Plant Professional in Plant Engineering

    1/14

    CADWorx Plant Professional in Plant EngineeringChayan Srisawat

    PTT Maintenance and Engineering Company Limited

    May 9, 2013

  • 7/27/2019 PTTME Cadworx Plant Professional in Plant Engineering

    2/14

    PTT Maintenance and Engineering Company Limited

  • 7/27/2019 PTTME Cadworx Plant Professional in Plant Engineering

    3/14

    PTT Maintenance and Engineering Company Limited

  • 7/27/2019 PTTME Cadworx Plant Professional in Plant Engineering

    4/14

    PTT Maintenance and Engineering Company Limited

  • 7/27/2019 PTTME Cadworx Plant Professional in Plant Engineering

    5/14

    PTT Maintenance and Engineering Company Limited

  • 7/27/2019 PTTME Cadworx Plant Professional in Plant Engineering

    6/14

    CADWorx Plant Professional in Plant Engineering

    PTT Global Chemical Public Company Limited, spin offengineering team working mainly to plant modification and

    small capital project (less than 30 Million Baht)

    Small modification in plant will be add more pipeline

    connect from one location to another, temporarily or

    permanent, tie in works.

    Small CAPEX will be new equipment such as spare pump,

    new cooler or new unit.

    Some of these work need to be completed with the limited

    of time, to solve plant operation problem.

  • 7/27/2019 PTTME Cadworx Plant Professional in Plant Engineering

    7/14

    CADWorx Plant Professional in Plant Engineering

    In the past, I-Sketch(now SmartPlant Isometrics) wasimplemented and used as a tools for generating isometrics

    drawing from sketch with plant piping specification.

    Limited on design review. Change of work depend on the

    quality of the sketch (piping design work) and experience

    of designer.

    Most of the work need field adjustment, change order and

    more man hour spent on As Built.

    Change raised from the operation during construction

    even the drawings were approved for construction.

    Number of small modification increase

  • 7/27/2019 PTTME Cadworx Plant Professional in Plant Engineering

    8/14

    CADWorx Plant Professional in Plant Engineering

    Need Improvement? Reducing the re-work, reduce the field change, eliminate

    change from operation.

    Solution

    SEE BEFORE BE BUILT idea -> need 3D Model review

  • 7/27/2019 PTTME Cadworx Plant Professional in Plant Engineering

    9/14

    CADWorx Plant Professional in Plant Engineering

    Communication between designer and operation start with3D Model review. Discussion between party eliminate the

    change during construction after agreed on such review.

    Model can be used as communication tool for construction

    contractor. They can see and make better construction

    planning based on 3D model.

    Even engineering cost may increase, but job execution

    was quite smooth. 3D model could be shared not only the

    operator but also for safety and maintenance, collecting

    concerned issue and reduce the re-work.

    They love to SEE BEFORE BE BUILT

  • 7/27/2019 PTTME Cadworx Plant Professional in Plant Engineering

    10/14

    Sample of Work done and In progress

  • 7/27/2019 PTTME Cadworx Plant Professional in Plant Engineering

    11/14

    Sample of Work done and In progress

  • 7/27/2019 PTTME Cadworx Plant Professional in Plant Engineering

    12/14

    Sample of Work done and In progress

  • 7/27/2019 PTTME Cadworx Plant Professional in Plant Engineering

    13/14

    Sample of Work done and In progress

  • 7/27/2019 PTTME Cadworx Plant Professional in Plant Engineering

    14/14

    CADWorx Plant Professional in Plant Engineering

    Question and Suggestion