pt. puma jaya utama. pju company... · profile and history . 2 pt. puma jaya utama mining,...

10
` PT. PUMA JAYA UTAMA PT. PUMA JAYA UTAMA Jl. Ebony Raya D 1 / 11, Soroako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected] Total Solution for Drill Rig HEAD OFFICE Jl. Ebony Raya D 1 / 11 Sumasang, Sorowako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia Phone: (62-475) 322009 Fax: (62-475) 322009 E-mail: [email protected] Secondary Email: [email protected] [email protected] COMPANY PROFILE PT. PUMA JAYA UTAMA Mining, Exploration and Drilling Services

Upload: others

Post on 07-Feb-2020

143 views

Category:

Documents


0 download

TRANSCRIPT

`

` 1

PT. PUMA JAYA UTAMA Mining, Exploration and Drilling Services

PT. PUMA JAYA UTAMA

Jl. Ebony Raya D 1 / 11, Soroako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected]

Total Solution for Drill Rig

HEAD OFFICE

Jl. Ebony Raya D 1 / 11 Sumasang, Sorowako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia Phone:

(62-475) 322009 Fax:

(62-475) 322009

E-mail:

[email protected] Secondary Email: [email protected] [email protected]

COMPANY PROFILE

PT. PUMA JAYA UTAMA Mining, Exploration and Drilling Services

`

` 1

PT. PUMA JAYA UTAMA Mining, Exploration and Drilling Services

PT. PUMA JAYA UTAMA

Jl. Ebony Raya D 1 / 11, Soroako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected]

Total Solution for Drill Rig

PT. PUMA JAYA UTAMA was formed in August 2008, which previously named CV. JAYA UTAMA performed in March 2003. PJU which was established to address drilling services, supply, and maintenance in Mines and Exploration. By the current of management representing are : Director : I Dewa Putu Mandra General Manager : Gede Sandhy I Operational Manager : Fickry Amier Baso Since established in 2008, management and all employees remain committed to providing the best service of total solutions in the sustainable drilling for customer satisfaction, so we can provide the best possible service to our clients. PJU was performed, with the aim to answer the needs of businesses in the drilling sector, particularly in the drilling and maintenance services and supply. The company is expected to grow and evolve as the company's operations and maintenance services of leading, and able to carry out drilling activities with international standards. We focus on continual improvement in safety, equipment, a variety of drilling services, training, customer service, for quality achievement and develop relationships on the ground with customers, through innovation, solid hard work, sheer determination and empowerment of our local employees, that resolve is a key element of our corporate culture. We will be united by our commitment to our core values of PJU stands for : Financial Discipline: Our decisions will be made to ensure long-term growth for the benefit of employees and customers. Integrity and Honesty: Our actions will be conducted following the highest standard of ethics, honesty and personal integrity. This will foster and maintain trust and confidence of our employees, customers and suppliers. Respect for Employees, Customers and Suppliers: Our employees will be developed and motivated to meet the challenges ahead. Individuality and diversity will be valued and performance recognized. We will provide our customers with unsurpassed value-added service. Our relationship with suppliers will reflect respect, understanding and sound business practice. Safety: Personal safety and employee health is our greatest responsibility, followed by the protection of our environment and company property. Technical Leadership: Our competitive advantage is based on continually improving our processes and finding innovative solutions to the technical challenges in meeting the needs of our customers. Risk management be applied in every business process will be undertaken PJU to predict, identify, and prevent potential risks that could hinder the achievement of targets that have been set.

Profile and History

2

PT. PUMA JAYA UTAMA Mining, Exploration and Drilling Services

PT. PUMA JAYA UTAMA

Jl. Ebony Raya D 1 / 11, Soroako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected]

Total Solution for Drill Rig

Chart of Organization

BOARD OF DIRECTOR

GENERAL MANAGER

ADMINISTRATION

INFORMATION TECHNOLOGY

OPERATION

LOGISTIC & WORKSHOP

FIELD SUPERVISOR

HRD

FINANCE

SAFETY

PT. PUMA JAYA UTAMA

Jl. Ebony Raya D 1 / 11, Soroako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected]

Total Solution for Drill Rig

3

PT. PUMA JAYA UTAMA Mining, Exploration and Drilling Services

We are committed to:

1. Ensure Occupational Health & Safety (OHS) for all employees including contractors, suppliers, and visitors in the

workplace.

2. Ensure control over the environmental impact of Company’s operations.

3. Meet all applicable laws and regulations relating to OHS.

4. Perform continues improvement in order to improve Company’s OHS performances.

Work within the scope of the mining / drilling, PJU realize the critical importance of health and safety for all workers, for these purpose our company created an integrated system in compliance with occupational safety and health with indonesian legislation and international code requirement. By considering the factors of health and safety of workers, we realize that they will be able to make a major contribution to all activities and companies. Safety is the most critical quality we provide to our customers. It is woven throughout every decision made at every job site. Safety is always at the forefront of all of our efforts. We have high expectations for our suppliers with the safety of our equipment. It is important for us to spend the time, resources and energy required to make sure that crews go home safely at the end of their shift.

Common goal: to create workers who have a full awareness of the meaning of health & safety, which contributes to self, family, companies, and countries, by providing maximum productivity capabilities and efficient in work.

Specific objectives: creating a workplace environment that provides security, comfort & safety for workers and guests in performing duties, with reference to the Zero accident.

To achieve our commitments, we shall:

1. Develop and maintain continuously Occupational Health and Safety Management System (OHSMS).

2. Arrange OHS Organization within Company’s Management.

3. Identify and control all hazard sources and environmental aspects of Company’s operation.

4. Provide OHS training for all employees in order to improve Company’s OHS behavior.

5. Encourage all employees to participate in improvement of Company’s OHS performance.

6. Promote and carry out operations that are responsible for the environment and benefit the stakeholders including

local communities based on the applicable legal norms.

Safety is everyone’s responsibility! No job is so important not is any task so difficult that it cannot or should not be performed safely!

HSE Commitment

PT. PUMA JAYA UTAMA

Jl. Ebony Raya D 1 / 11, Soroako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected]

Total Solution for Drill Rig

4

PT. PUMA JAYA UTAMA Mining, Exploration and Drilling Services

Our Services Include : 1. Exploration and Development Core Drilling

Nickel

Coal

Mineral 2. Geotech Drilling

Piezometer Drilling

Monitoring Well

Down Hole Surveys

Environmental Drilling

SPT and UDS Sampling 3. Water Well

4. Blast Hole 5. Large Diameter Drilling (LDD) 6. Manpower Supply for Mining and Exploration 7. Manpower Supply for Sample Preparation:

Data Processing

Core Preparation

Pulp Preparation

Sample Analyzing 8. Exploration Equipment Supply and Maintenance

Services 9. Sales services for Drilling Equipment

Rig Equipment

Rig Unit Drill Rods Core Diameter (mm) Hole Size (mm)

PQ 85

122.6

HQ 63.5 96

NQ 47.6 75.7

PUMA 3500

PUMA 3000

PUMA 2500

PUMA 2300

PUMA 2200

2 units

12 units

13 units

11 units

4 units

150 meters

50 meters

20 meters

15 meters

12 meters

400 meters

150 meters

100 meters

80 meters

60 meters

800 meters

350 meters

200 meters

150 meters

100 meters

Depth are depend on lithology and other condition

Service, Equipment and Facilities

PT. PUMA JAYA UTAMA

Jl. Ebony Raya D 1 / 11, Soroako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected]

Total Solution for Drill Rig

5

PT. PUMA JAYA UTAMA Mining, Exploration and Drilling Services

Workshop and Facilities PJU facilitate a full support for our project site operation with quality technology, along with complete mechanical, hydraulic and electrical assembly services and guarantee spare part availability to drilling operation on site. Support Facilities 1. Office and Workshop in Sorowako 2. Light Vehicles:

4x4 Toyota Land Cruisher

4x4 Mitsubishi L200 Strada

4x4 Toyota Hi-Lux

4x4 Toyota D-Max 3. Toyota Dyna Truck 4. Dozer D3K LGP Caterpillar 5. Dozer D6R LGP Caterpillar 6. Rubber Crawler Carrier (Bombardier)

Service, Equipment and Facilities

PT. PUMA JAYA UTAMA

Jl. Ebony Raya D 1 / 11, Soroako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected]

Total Solution for Drill Rig

6

PT. PUMA JAYA UTAMA Mining, Exploration and Drilling Services

Clients and Projects

NO. CLIENT TYPE OF WORK UNIT PROVIDE LOCATION PERIOD OF

COMPLETION

1. PT. INCO Diamond Core Drilling PUMA 2300 (5 Unit) Sorowako, South

Sulawesi 2004

2. PT. INCO Diamond Core Drilling PUMA 2300 (7 Unit) Sorowako, South

Sulawesi 2005

3. PT. INCO Jacro Drilling Service

and Maintenance PUMA 2500 (13 Unit)

Sorowako, South Sulawesi

2006 to 2008

4. PT. INCO Drilling Service for

Inclinometer Installation PUMA 2300 (1 Unit)

Sorowako, South Sulawesi

2007

5.

PT. CITRA LAMPIA MANDIRI JV PT.

ASIA PASIFIC MINING

Diamond Core Drilling PUMA 2300 (2 Unit) Lampia , South

Sulawesi 2007

6. PT. INCO Core Drilling for

Malindaue Limestone HPAL-FEL

PUMA 2500 (4 Unit) Malindaue, South

Sulawesi 2008

7. PT. INCO Drill Rig Supply,

Maintenance & Support PUMA 2300 (6 Unit)

Soroako, Mahalona, Towuti & South East

Sulawesi 2009

8. PT. INCO Latouw Core Drilling

Services PUMA 2300 (3 Unit)

Latouw, South East Sulawesi

2009

9. PT. INCO Maintenance & Support

of EMD Jacro Drill Rig PUMA 2300 (6 Unit)

Soroako Project Area, Soroako Outer Area &

Sulawesi Coastal Deposit

2009

10. PT. INCO Lasusua Limestone Core

Drilling PUMA 2300 (5 Unit)

Ranteangin, South East Sulawesi

2009

11. PT. INCO Sample Preparation,

Services and Manpower Supply

- Soroako, South

Sulawesi March 2010 to

April 2012

12. PT. INCO Rig Exploration Support PUMA 2300 (6 Unit) Soroako, South

Sulawesi March 2009 to February 2010

13. PT. BINTANG

DELAPAN MINERAL Drilling Nickel

Exploration PUMA 2300 (8 Unit)

Bahodopi, Central Sulawesi

February 2011 to May 2012

14. PT. GENBA MULTI

MINERAL Core Drilling Exploration

for Nickel PUMA 2300 (10 Unit)

Genba – Mahoni , Central Sulawesi

March 2011 to May 2012

15. PT. SUMBER

PERMATA SELARAS Lambolo Core Drilling

Project 2011 PUMA 2300 (10 Unit)

Kolonedale , Central Sulawesi

February 2011 to December

2012

16. PT. INCO Infilll Drilling SPA 2011 PUMA 2300 (8 Unit) Soroako, South

Sulawesi October 2011 to March 2012

17. PT. INCO 2nd Phase Latao

Directional Core Drilling PUMA 2300 (3 Unit)

Latouw, South East Sulawesi

October 2011 to February

2012

PT. PUMA JAYA UTAMA

Jl. Ebony Raya D 1 / 11, Soroako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected]

Total Solution for Drill Rig

7

PT. PUMA JAYA UTAMA Mining, Exploration and Drilling Services

Clients and Projects

NO. CLIENT TYPE OF WORK UNIT PROVIDE LOCATION PERIOD OF

COMPLETION

18. PT. MASMINDO

DWI AREA (AWAK MAS)

Re Drill Program Awak Mas Project

PUMA 3000 (1 Unit) Ranteballa, South

Sulawesi

February 2012 to October

2012

19. PT. VALE

INDONESIA

Sample Preparation, Services and Manpower

Supply -

Soroako, South Sulawesi

April 2012 to May 2013

20. PT. CERINDO Drilling Nickel

Exploration PUMA 2500 (6 Unit)

Wolo/Pao-pao, South East Sulawesi

Mei 2012 to October 2012

21. PT. VALE

INDONESIA Drilling Petea East 2012

PUMA 2500 (12 Unit), Dozer D6 (2 Unit), Dozer D3 (1

Unit)

Lampesue, South Sulawesi

June 2012 to December 2012

22. PT. VALE

INDONESIA Drilling Petea East 2012

PUMA 2500 (12 Unit), Dozer D6 (2 Unit), Dozer D3 (2

Unit)

Lampesue, South Sulawesi

January 2013 to April 2013

23. PT. MASMINDO

DWI AREA (AWAK MAS)

Re Drill Program Awak Mas Project

PUMA 3000 (2 Unit) Ranteballa, South

Sulawesi February 2013 to June 2013

24. PT. VALE

INDONESIA Drilling Petea East 2012

PUMA 2500 (19 Unit), Dozer D6 (2 Unit), Dozer D3 (2

Unit)

Lampesue, South Sulawesi

April 2013 to July 2013

25. PT. VALE

INDONESIA

Sample Preparation, Services and Manpower

Supply -

Soroako, South Sulawesi

July 2013 to June 2014

26. PT. VALE

INDONESIA Drilling Petea D 2013

PUMA 2500 (21 Unit), Dozer D6 (2 Unit), Dozer D3 (2

Unit)

Lampesue, South Sulawesi

July 2013 to December 2013

27.

PT. GEOTECHNICAL & ENVIROMENTAL

SERVICES INDONESIA

(GOLDER ASSOCIATES)

Landfill geo-Hydrology Study at Inalahi and

Develop Closure Plan (At Konde and Asuli)

PUMA 2500 (3 unit), Excavator (1 unit)

Sorowako, South Sulawesi

January 2014

28. PT. VALE SOA Exploration Drilling

2014

PUMA 2500 (14 unit), Dozer D6 (3 Unit), Dozer D3 (2

Unit)

Sorowako (Petea), South Sulawesi

April 2014 to December 2014

29. PT. MASMINDO

DWI AREA (AWAK MAS)

Re Drill Program Awak Mas Project

PUMA 3000 (2 Unit) Ranteballa, South

Sulawesi

June 2014 to September

2014

PT. PUMA JAYA UTAMA

Jl. Ebony Raya D 1 / 11, Soroako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected]

Total Solution for Drill Rig

8

PT. PUMA JAYA UTAMA Mining, Exploration and Drilling Services

Clients and Projects

NO. CLIENT TYPE OF WORK UNIT PROVIDE LOCATION PERIOD OF

COMPLETION

30. PT. VALE

INDONESIA

Sample Preparation, Services and Manpower

Supply -

Soroako, South Sulawesi

September 2014 to Present

31.

PT. GEOTECHNICAL & ENVIROMENTAL

SERVICES INDONESIA

(GOLDER ASSOCIATES)

MEP Geotechnical & Environmental

PUMA 2500 (3 unit), Excavator (1 unit)

Sorowako (Plant Site area PT. Vale

Indonesia), South Sulawesi

October 2014 to December

2014

PT. PUMA JAYA UTAMA

Jl. Ebony Raya D 1 / 11, Soroako Kec. Nuha, Kab. Luwu Timur South Sulawesi – Indonesia email: [email protected]

Total Solution for Drill Rig

9

PT. PUMA JAYA UTAMA Mining, Exploration and Drilling Services

Galleries

PROJECT ACTIVITIES