Page 1: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting

PT Nusantara Tunnel Indonesia™Integrated Infrastructure Development

herlan
1/30
Page 2: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting

LEGAL NOTICE

All ideas, concepts, and notions in this document are protected by law.None of the aforementioned in the broadest sense can be reproduced,developed, or implemented in any form or by any means without prior

written permission from PT Propenta Persisten Indonesia.

herlan
2/30
Page 3: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting

PT NUSANTARA TUNNEL INDONESIA(NUSTI)

www.nusantaratunnel.co.id

PT NUSANTARA TUNNEL INDONESIA(NUSTI)

www.nusantaratunnel.co.id

President & CFO: Sindur P. Mangkoesoebroto, Ph.D.(Finance, Bussines Development, Investment)

Chairman of the Board: DR. Felix O. Soebagjo, SH, LLM(Legal Affair, Long-term Strategy)

Member of the Board: DR. Ir. Komang Bagiasna(Director of Technology)

President & CFO: Sindur P. Mangkoesoebroto, Ph.D.(Finance, Bussines Development, Investment)

Chairman of the Board: DR. Felix O. Soebagjo, SH, LLM(Legal Affair, Long-term Strategy)

Member of the Board: DR. Ir. Komang Bagiasna(Director of Technology)

herlan
3/30
Page 4: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting
herlan
4/30
Page 5: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting

CHALLENGES

Ferry system crossing the Sunda Strait

Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting time in some cases)

Subject to weather condition

Bottle neck; especially in peak season (13 million passengers & 2 million cars, 1999)

Soon will be physically unmanageable

Need better alternative

Facts about existing transportation systembetween Java -Sumatera

herlan
5/30
Page 6: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting

ALTERNATIVES of LINKAGE INFRASTRUCTURE BETWEEN JAVA - SUMATERA

Immersed Tunnel(Catenary reinforced concrete pipe)investment: US$ 700 million ⇒ reliability of this system need be questioned

Suspension bridgeself-weight to payload ratio: 30investment: US$ 7.4 - 24 billion ⇒ high capital investment

Underground tunnelinvestment: US$ 3 - 4 billion⇒ reliability is field proven: Seikan Tunnel,

Dover Strait Tunnel

TECHNICAL/ FINANCIAL PROBLEMS

herlan
6/30
Page 7: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting

COMPARISON

Suspension Bridge Catenary Pipe

The Nusantara Tunnel

US$ 7.4 ∼ 24 billion(w/o railway)

US$ 0.7 billion US$ 1.5 ~ 2 billionCost Estimate

Description

Construction

Operation Cost

Life Time

10 ∼ 15 years 10 ∼ 15 years 8 ~ 10 years

Low Higher Higher

Long with maintenance Virtual infinite lifetime

Wind Excitation Sensitive NA NA

Maintenance Cost Significant & continuous Potential Problem Almost free

Structural stiffness Flexible: sens. to vibration Rigid: almost no vibration

Uncertain

Flexible: sens. to vibration

Fatigue Fatigue problems Fatigue problems No fatigue problems

Navigation Unpreferable for SomeMilitary Vessels

NAPotential Problem

from Ship’s Anchors

herlan
7/30
Page 8: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting

OUR CONCEPT

Lower capital investment for a reliable systemUNDERGROUND TUNNEL

More stakeholders to participateMULTI PURPOSE underground tunnel

Tunnel linkage integrated with a regional development plan

herlan
8/30
Page 9: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting

CRITERIA

CAPEX

BENEFIT

RISK (TECHICAL / NATURAL)

MOR

CRITERIA

CAPEX

BENEFIT

RISK (TECHICAL / NATURAL)

MOR

WHY TUNNEL ?WHY TUNNEL ?

herlan
9/30
Page 10: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting

Most suitable mode for mass rapid transportationELECTRIC CAR TRAIN(this system performs well in Seikan & Dover Strait Tunnels)

Multi purpose tunnel Electric car train for passengers, vehicles, & containers

Oil & gas pipelines

Coal slurry pipeline

Extra high power transmission lines

Telecommunication lines

TECHNICAL CONCEPTSOF THE NUSANTARA TUNNELTM

herlan
10/30
Page 11: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting
herlan
11/30
Page 12: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting
herlan
12/30
Page 13: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting
herlan
13/30
Page 14: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting
herlan
14/30
Page 15: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting
herlan
15/30
Page 16: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting
herlan
16/30
Page 17: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting
herlan
17/30
Page 18: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting
herlan
18/30
Page 19: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting

TECHNICAL DATAOF THE NUSANTARA TUNNELTM

Single / Double track

Total length: 32.88 km

Undersea portion: 26. 3 km

Underground portion:2.06 km (in Lampung) and 1.5 km (in Banten) = 3.56 km

Depth: 40 m below seabed

Inclination: maximum 2%

Cross section: 50 m2 / 87 m2

Minimum radius of horizontal alignment: 3,000 meters

herlan
19/30
Page 20: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting
herlan
20/30
Page 21: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting
herlan
21/30
Page 22: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting
herlan
22/30
Page 23: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting

REGIONAL DEVELOPMENT CONCEPT

Considering the existing setting of land use and operational facilities

Generate the economy in Java & Sumatera to level never imagined previously

In the long run, to be an integrated part of an uninterrupted railway system from Beijing in the north to Bali in the south

herlan
23/30
Page 24: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting
herlan
24/30
Page 25: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting

OPERATION of TERMINAL

herlan
25/30
Page 26: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting

OPERATION SCHEME

IN BANTEN AND LAMPUNG TERMINALS

N

TRAIN TRACK TO DEPOT

228.5 m

77 m

150

m

50

m

30

m

77 m

440 m 77 m 55 m 39 m

28.8 m

100 m 440 m 1320 m

3310 m

1258 m

END OF TUNNEL

TUNNEL 1

TUNNEL 2

LINE OF

QUEUING FOR

VEHICLESLOADING AND UNLOADING

TERMINAL

EXIT

1

2

4

5

PASSENGER TERMINAL

150 m

100

m

440 m144 m

6 m

58 m 25 m 5 m

TRUCK / TRUCK ¾

TRAILER AND TRUCK COMBINATION

WAGON FOR DRIVERS

BUS

1

2

3

4

5

CARS

TRUCK / TRUCK ¾

TRAILER AND TRUCK COMBINATION

WAGON FOR DRIVERS

BUS

1

2

3

4

5

CARS

17

.51

7.5

17

.51

7.5

17

.51

7.5

17

.51

7.5

228.5 m

1

2

4

5

herlan
26/30
Page 27: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting

CAPACITY OF THE NUSANTARA TUNNELTM

(SINGLE TRACK)

Standard operation6,000 pcu per day ⇒ 30,000 passengers per day or10.8 million passengers per year

Maximum operation12,500 pcu per day ⇒ 62,500 passengers per day or22.5 million passengers per year

Special operation15,500 pcu per day ⇒ 77,500 passengers per day or30 million passengers per year

herlan
27/30
Page 28: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting

FINANCIAL ANALYSIS

Capital investment: US$ 1.5~2 billion / US$ 3~4 billion

Maintenance and operation cost: US$ 4 million pa /US$ 8 million pa

Toll fee: US$ 20 per pcu

Pay back period: 35 years

herlan
28/30
Page 29: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting

Existing Ferry System The Nusantara Tunnel

Toll Fee

Loading/

Unloading Time

Waiting Time

Travelling Time

US$ 8.5 (car + 5 passenger)

60 minutes

60 minutes ∼ 24 hours

120 minutes

US$ 20 (car + 5 passenger)

30 minutes

60 minutes / 30 minutes

30 minutes

Transportation mode

Roll-on-roll-off ships(No Train nor 40-ft Container)

Roll-on-roll-off Electric car train

Capacity 13 million passengers

2 million cars (in 1999)

30 million passengers / 60 million passengers

Description

General Comparisonbetween Existing Ferry Systemand The Nusantara Tunnel

herlan
29/30
Page 30: PT Nusantara Tunnel Indonesia™CHALLENGES Ferry system crossing the Sunda Strait Travelling time: min. 2.5 hours over 25 km distance (can take more than 24 hours including waiting