    Param Shakti Peeth

    PSP-Uttarakhand-Relief-Rehabilitation-

    Development (RRD) Program

    26 August, 2013

  • 7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program

    2/24

    The purpose of lifeis a life of purpose.

  • 7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program

    3/24

    Uttarakhand Disaster

    Dev-Bhoomi : a place of immense beauty that

    inspired harmony & tranquility is today a picture

    of gloom and misery, of losses beyond

    comprehension, of trauma beyond healing

  • 7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program

    4/24

    Uttarakhand Disaster - Snapshots

  • 7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program

    5/24

    Uttarakhand Disaster - Painful Facts

    S. No. Name of District Total No. of Villages

    1. Chamoli 11662. Pithoragarh 1579

    3. Rudraprayag 658

    4. Uttarkashi 682

    All the 13 districts in Uttarakhand have been affected by the floods of which 4 districts

    are the worst affected. These are:

    Of the above, Rudraprayag is the worst hit district. The most affected blocks in

    Rudraprayag are Ukhimath and Agastyamuni

    Name of District Total No. of Villages

    Chamoli 1166Pithoragarh 1579

    Rudraprayag 658

    Uttarkashi 682

  • 7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program

    6/24

    Uttarakhand Disaster - Painful Facts

    As per official data released, a total of 653 people are still missing in Rudraprayag

    Many families have lost earning members; some have lost houses and life savings

    There are villages that have lost significant number of youths in this tragic event and the

    young wives, old parents now remain in the families to fend for themselves

    There are substantial losses to livelihoods, notably livestock and agricultural land & crops

    Vast amount of agricultural land for which no current estimates are available are fully or

    partially submerged by the surging floodwater

    Estimates suggest that more than 700 buildings that include houses, hotels, shops,

    schools and other facilities have been completely washed away in Rudraprayag

    The villages of Kendarnath, a tourist and religious pilgrimage site situated just below the

    lake, were completely washed away

    Reports estimate that in some villages in Rudraprayag all men above age 14 have been

    killed leaving a number of widowed families

  • 7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program

    7/24

    Introspect

    ?Should we just remain mute spectators to a tragedy simply

    because we are unharmed and safe miles away, but a tragedy that

    has otherwise changed the lives of thousands..thousands of our

    fellow citizenschanged their lives forever

  • 7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program

    8/24

    PSP responds

    This is a SERIOUS CRISIS!

    As a humanitarian organization

    working for and with the under-served communities

    for over 20 years now,

    PSP had to take notice and respond to the crisis.

    AND THAT WE DID

  • 7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program

    9/24

    PSP Survey Visit

    Pujya Didi Maa, along with Yugpurush

    Swami Parmanandaji Maharaj and Sanjay

    Bhaiyya, personally visited the affected

    regions to gain first-hand information

  • 7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program

    10/24

    PSP Survey Visit

    Pujya Didi Maa met with the local fellow-citizens to share

    their grief and hear out their horrific stories of the tragedy

    She also met with and had discussions with the local

    officials to assess the on-ground situation and identify

    possible interventions

  • 7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program

    11/24

    PSP Relief Operations

    Without wasting any time, PSP commenced relief operations in different parts of the

    region with distribution of relief kits (containing rations, utensils, clothes, torch, tarpaulin,

    etc.) and generic medicines.

  • 7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program

    12/24

    PSP Relief-Rehab-Development (RRD) Program

    PSP is thinking beyond temporary relief

    It proposes to undertake and implement `Integrated Village Relief, Rehabilitation &

    Development (RRD) Project in a phased manner with long-term approach

    With the objectives of saving lives, alleviate sufferings, maintain human dignity during

    and in the aftermath of the calamity, and consequently restore normalcy

    Phase I Immediate initial relief works and short-term rebuilding

    Phase II Medium to long-term recovery and rehabilitation

    Phase III Long-term development and improvement in socio-economic indicators

  • 7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program

    13/24

    PSP RRD Program - Proposed Activities

    Indicative works & activities proposed to be undertaken at the on-ground level in the

    intervened villages (over and above need-based):

    Aid & Relief

    Relief works incl. financial aid

    Supply solar lanterns

    Supply non-electrical water filters

    Other extempore activities aligned with

    on-ground conditions / community

    anticipation on need-basis (rations, aid,

    medicines, etc.)

    Rehabilitation

    Create provisional dwellings

    Undertake restoration/repair work

    wherever viable

    Set-up Shelter Homes for affected

    children & women to provide basic

    necessity & welfare package for inmates

    Deploy Multi-utility Vehicle for

    transportation, ambulance & carriage

  • 7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program

    14/24

    PSP RRD Program - Proposed Activities

    Skill Development & Livelihood

    Establish VT-Centres to undertake skill

    development / up-gradation of young girls

    & women in different vocations (such as

    Tailoring & Stitching, etc.)

    Impart functional literacy and other life-

    skills to young girls (school dropouts) &

    women of project / neighbouring villages

    Conduct periodic activities for

    improving ones self-perception, self-

    confidence and outlook

    Education

    Repair / renovate school building

    wherever and to whatever extent possible

    Distribute school-bags and other

    stationery amongst school-children

    Establish library-cum-reading room

    Supply sports kits / materials

    Celebrate 4 events (Independence Day,

    Republic Day, Teachers Day & Childrens

    Day) for positive engagement

  • 7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program

    15/24

    PSP RRD Program (Phase I)

    As part of the long-term plan, PSP has already set-up two relief centres in the region,

    as below, from where our team will dedicatedly & selflessly continue to serve in the

    region to bring more victims under the ambit of this program

    Vatsalya Sewa

    Kendra-1

    Tehsil Ukhimath,

    Dist. Rudra Prayag

  • 7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program

    16/24

    PSP RRD Program (Phase I)

    Vatsalya Sewa

    Kendra-2

    Village Korkhi,

    Via. Fata,

    Dist. Rudra Prayag

    PSP is in the process of identifying another location as we have plans to set-up

    three centres to conclusively cater to the villages in Rudraprayag, one of the worst-

    hit areas

  • 7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program

    17/24

    PSP RRD Program - Relief Activities

    Distribution of relief kits and generic medicines shall continue for some more time

    Propose to distribute solar lamps and non-electric water filters to ensure availability of

    electricity and drinking water amongst the villages we are serving

    The existing centres and those to be set-up shall also serve as `Shelter Homes for the

    children who have lost their parents and women who have been widowed

    Legal formalities are underway to adopt such identified children and bring them under

    VATSALYA care

    Some existing structures in the region identified for starting 10 vocational training centres

    for the local women to help them `learn-and-earn and gradually overcome the trauma that

    this tragedy has brought along

    Going forward, a full-fledged `VatsalyaGram' in Uttarakhand planned to serve on the

    lines ofVatsalyaGram-Vrindavan

  • 7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program

    18/24

    PSP RRD Program - Mobilization Activities

  • 7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program

    19/24

    PSP RRD Program - Child Welfare Activities

  • 7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program

    20/24

    PSP RRD Program - Vocational Training Centres

  • 7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program

    21/24

    PSP RRD Program - Quick Facts

    2 Shelter Homes set-up : UKHIMATH & FATA

    2 Project Offices-cum-Relief Material Stores established

    86 Children brought under VATSALYA care at FATA Centre

    40 Children identified for bringing under VATSALYA care at UKHIMATH Centre

    70 Children identified for giving VATSALYA scholarship

    3 Vocational Training Centres established:

    - Badasu village (current enrollment : 40 women)

    - Rampur village (current enrollment : 46 women)

    - Triyugi Narain village (current enrollment : 32 women)

    18 Stitching Machines (with material) provided in the VT Centres

  • 7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program

    22/24

    PSP RRD Program - M&E & Reporting

    Monitoring & Evaluation

    The implementation of the project shall be monitored at two levels. At the first

    level it shall be monitored at the project level by the Project Head and at the

    second level it shall be monitored by the team of senior management ofPSP

    Reporting

    The project will be tracked and all activities / works / impacts will be shared

    through:

    Monthly Magazine Vatsalya Nirjhar;

    Quarterly Newsletter Vatsalya Sparsh; &

    Special Communication / Bulletin

  • 7/30/2019 PSP Uttarakhand Relief Rehabiliation Development Program

    23/24

    Your support is invaluable

    It will assist us to

    reach out to more people in need

    reduce the daily struggle of children, women & other community

    members of the villages

    help these members overcome the trauma and gain greater control of

    their lives

    regain normalcy in the region and re-build Dev-Bhoomi