Forums Search/Statistics. Track Forum 25/06 20:59 Brainstorming for 2nd Phase Track Modernisation 24/05 22:38 Rly Bridge Forum 18/06 21:40 General Forum 25/06 09:39 Works Forum 24/06 08:44 Track Machine Forum 24/06 16:02 ROB/RUB/LXING Forum 08/06 16:51 Track Procurement Forum 23/06 16:38 How to use RSS Warning: Cannot modify header information headers already sent by (output started at /var/www/html/IRICEN1/themes/fisubsilversh/theme.php:138) in /var/www/html/IRICEN1/includes/sessions.php on line 249 Warning: Cannot modify header information headers already sent by (output started at /var/www/html/IRICEN1/themes/fisubsilversh/theme.php:138) in /var/www/html/IRICEN1/includes/sessions.php on line 250 Indian Railways Institute of Civil Engineering: Forums Warning: Cannot modify header information headers already sent by (output started at /var/www/html/IRICEN1/themes/fisubsilversh/theme.php:138) in /var/www/html/IRICEN1/includes/page_header.php on line 477 Warning: Cannot modify header information headers already sent by (output started at /var/www/html/IRICEN1/themes/fisubsilversh/theme.php:138) in /var/www/html/IRICEN1/includes/page_header.php on line 479 Warning: Cannot modify header information headers already sent by (output started at /var/www/html/IRICEN1/themes/fisubsilversh/theme.php:138) in /var/www/html/IRICEN1/includes/page_header.php on line 480 Steel girders Vs PSC girders Goto page 1, 2 Next Indian Railways Institute of Civil Engineering Forum Index » Rly Bridge Forum Author Message G. Radhakrishnan Shared Documents Joined: May 11, 2010 No. of Replies: 488 Posted: Sat Sep 24, 2011 9:38 am Though steel girders are required to be maintained periodically, those are far better in view of safety when compared with PSC girders. Those who are creating assets are not bound to maintain the same in our system, like Open line & Construction. Quality of works differs from contractors to contractors, Engineers to Engineers, Place to Place etc even though the Specifications, Codes, Manuals to be followed are same. The main advantages in steel girders viz, problems like corrosion can be overcome with protective coating, possibilities of strengthening wherever or whenever or whatever required, easy replacement by steel girders if it warrants, temporary girders of similar spans available in case of emergencies etc The span of PSC girders mostly are not matching with the conventional steel girder span of 12.2, 18.3, 24.4, 30.5 etc. If any PSC girder fails the alternate arrangement is not confined but we know failure in PSC will be a sudden. In our Zone, concept of providing PSC girders in place of steel girders during GC is 100% implemented resulting steel girder bridges in MG have been rebuilt with PSC in BG. Within short period of time, we are facing leaching problems in PSC girders (water is coming from the deck slab to bottom of PSC solid girders) which will lead to corrosion in tendons also and failure in near future. Due to non availability of bridge staff (No intake for a quite long period) SSE/Bridges are engaging contract system for inspection also. (I have seen such tenders in SWR) Noticing the problems itself now becoming a question mark At this juncture, what are the precautions to be taken in case of

Upload: abhilash-kumar

Post on 05-Sep-2015

309 views

Category:

Documents


15 download

DESCRIPTION

PLEASE READ CAREFULLY

TRANSCRIPT

  • 6/26/2015 IndianRailwaysInstituteofCivilEngineering

    http://iricen.indianrailways.gov.in/IRICEN1/modules.php?name=Forums&file=viewtopic&t=3645 1/8

    ForumsSearch/Statistics.

    TrackForum 25/0620:59Brainstormingfor2ndPhaseTrackModernisation

    24/0522:38

    RlyBridgeForum 18/0621:40

    GeneralForum 25/0609:39

    WorksForum 24/0608:44TrackMachineForum

    24/0616:02

    ROB/RUB/LXINGForum

    08/0616:51

    TrackProcurementForum

    23/0616:38

    HowtouseRSS

    Warning:Cannotmodifyheaderinformationheadersalreadysentby(outputstartedat/var/www/html/IRICEN1/themes/fisubsilversh/theme.php:138)in/var/www/html/IRICEN1/includes/sessions.phponline249Warning:Cannotmodifyheaderinformationheadersalreadysentby(outputstartedat/var/www/html/IRICEN1/themes/fisubsilversh/theme.php:138)in/var/www/html/IRICEN1/includes/sessions.phponline250

    IndianRailwaysInstituteofCivilEngineering:Forums

    Warning:Cannotmodifyheaderinformationheadersalreadysentby(outputstartedat/var/www/html/IRICEN1/themes/fisubsilversh/theme.php:138)in/var/www/html/IRICEN1/includes/page_header.phponline477Warning:Cannotmodifyheaderinformationheadersalreadysentby(outputstartedat/var/www/html/IRICEN1/themes/fisubsilversh/theme.php:138)in/var/www/html/IRICEN1/includes/page_header.phponline479Warning:Cannotmodifyheaderinformationheadersalreadysentby(outputstartedat/var/www/html/IRICEN1/themes/fisubsilversh/theme.php:138)in/var/www/html/IRICEN1/includes/page_header.phponline480SteelgirdersVsPSCgirdersGotopage1,2Next

    IndianRailwaysInstituteofCivilEngineeringForumIndexRlyBridgeForum

    Author Message

    G.Radhakrishnan

    SharedDocuments

    Joined:May11,2010No.of

    Replies:488

    Posted:SatSep24,20119:38am

    Thoughsteelgirdersarerequiredtobemaintainedperiodically,thosearefarbetterinviewofsafetywhencomparedwithPSCgirders.Thosewhoarecreatingassetsarenotboundtomaintainthesameinoursystem,likeOpenline&Construction.Qualityofworksdiffersfromcontractorstocontractors,EngineerstoEngineers,PlacetoPlaceetceventhoughtheSpecifications,Codes,Manualstobefollowedaresame.

    Themainadvantagesinsteelgirdersviz,problemslikecorrosioncanbeovercomewithprotectivecoating,possibilitiesofstrengtheningwhereverorwheneverorwhateverrequired,easyreplacementbysteelgirdersifitwarrants,temporarygirdersofsimilarspansavailableincaseofemergenciesetc

    ThespanofPSCgirdersmostlyarenotmatchingwiththeconventionalsteelgirderspanof12.2,18.3,24.4,30.5etc.IfanyPSCgirderfailsthealternatearrangementisnotconfinedbutweknowfailureinPSCwillbeasudden.

    InourZone,conceptofprovidingPSCgirdersinplaceofsteelgirdersduringGCis100%implementedresultingsteelgirderbridgesinMGhavebeenrebuiltwithPSCinBG.

    Withinshortperiodoftime,wearefacingleachingproblemsinPSCgirders(wateriscomingfromthedeckslabtobottomofPSCsolidgirders)whichwillleadtocorrosionintendonsalsoandfailureinnearfuture.

    Duetononavailabilityofbridgestaff(Nointakeforaquitelongperiod)SSE/Bridgesareengagingcontractsystemforinspectionalso.(IhaveseensuchtendersinSWR)Noticingtheproblemsitselfnowbecomingaquestionmark

    Atthisjuncture,whataretheprecautionstobetakenincaseof

  • 6/26/2015 IndianRailwaysInstituteofCivilEngineering

    http://iricen.indianrailways.gov.in/IRICEN1/modules.php?name=Forums&file=viewtopic&t=3645 2/8

    failureoremergenciesinPSCgirderbridges?Also,whataretheremedialmeasuresbeingadoptedincaseofsuchleachingproblemsanywhere?G.Radhakrishnan...240911

    NarasimhaMurtyGannavarapuDy.General

    Manager(civil)/RVNL

    SharedDocuments

    Joined:May14,2007No.of

    Replies:838

    Posted:SatSep24,20116:01pm

    Inthegoodoldendays,forhigherspans,steelgirderswerepredominantlyused.Aftertheadventofprestressedconcrete,itsuseinhigherspanbridgesincreasedtremendously.MainreasonbehinduseofPSCgirdersisduetoitsinitialeconomicalcostMainreasonsfornotpreferringsteelgirderbridgesare:(i)Itsinitialcostismore.(ii)Itrequiresrecurringexpenditureinpainting.IncontrarytothatitisbelievedthatPSCgirdersarecheaperanddoesnotrequireanytypeofmaintenance.OnemoremeritofPSCGirderBridgeisaboutitsfacilityofprovidingthesametrackstructurelikeinapproaches.Demerits:AsfarasdemeritsofthePSCgirdersareconcerned,theseare(i)Brittlefailurenature.(ii)Lesslife.(iii)Verydifficultstrengthening/repair/restorationConcreteisbrittleinfailure.Itfailsallofasuddenwithoutgivinganywarning.FailureofMondoviBridgeatGoaisaburningexample.Contrarytothis,steelgirderswhichareductileinnaturegivesamplewarningsbeforefailure

    Sinceconcreteisverystrongincompression,PSCconstructionhasgainedmomentum.ButunlikeRCC,PSCrequireslotofqualitycontrol.Highdurabilityhastobemaintainedduringconstruction.Thegirdershouldbeimpervious.otherwisewaterwillpercolateintothemember.Sincethecablesareheavilystressedtheywillpronetocorrosionatafasterrateduetoingressedwater.SriRadhakrishnanhasquotedthatthegirdersareleakingheavilyindicatesthepoorqualityinconstructionwhichwillspoilthegirderswithinshortperiod.Remedies:(i)Observingthecamberatregularintervalsinordertoknowthesoundnessofthegirder.(ii)Ifsubstantialdecreaseincamberisnoticed,externalprestressingistoberesortedthroughfuturecablels.(iii)Ifanylossofprestressistakenplace,itcanbenoticednearendblocksintheformofshearcracksat45angle.Henceendblockshavetobeobservedcperiodically.

    RailwayBoardvidetheirletterNo.2005/CE1/BR11/8dtd28.05.2009hasinstructedtoadoptsteelgirdersforspansmorethan24.40m.ThereasonsasmentionedintheBoard,sletterare(1)TherearenodetailedguidelinesforinspectionanddefectsidentificationofPSCgirders(ii)Incaseofanyeventualityonsuchbridges,Rly.donothaveanyimmediatetemporaryrestorationmeasuresavailbleupto80ft.temporaryspanarrangements.(iii)AtthesametimesteelbridgesareknowntohavelongerlifethanothersandIRhavemanynumberofexamples.NarasimhaMurtyGannavarapuEXECUTIVEENGINEER(CON)...240911

  • 6/26/2015 IndianRailwaysInstituteofCivilEngineering

    http://iricen.indianrailways.gov.in/IRICEN1/modules.php?name=Forums&file=viewtopic&t=3645 3/8

    G.Radhakrishnan

    SharedDocuments

    Joined:May11,2010No.of

    Replies:488

    Posted:MonSep26,20118:50am

    Regrettedtohighlightthatwithoutdevelopingsuitableguidelinesforinspection&maintenance,wehaveswitchedovertoPSCgirders!andmostofthesteelgirderbridgeshavebeenconvertedintoPSC.

    GeneralcommentduringinspectionisWhatistheretoseeinPSCwhencomparedwithsteelwithoutconsideringtheconsequences!!

    RecentlyconstructedPSCgirderbridgesduringGChavestartedgivingsymptomsabouttheirhealth.NextgenerationwillhavetofacealotofproblemswithpoorqualityPSCgirders.Atthattime,anewtechnologymaybeimplementedinlieuofPSCandlikeourearlysteelgirdersallPSCgirdersconstructedbeforexxxxxshallbereplaced!!!G.Radhakrishnan...260911

    RAMKUMARSINGHDyCVO

    (Engg)/SECR

    SharedDocuments

    Joined:No.of

    Replies:20

    Posted:TueSep27,201112:19pm

    Railwayhasrealisedtheproblemsoonandhasagainshiftedtosteelgirdersforspanmorethan24.4m.RAMKUMARSINGHDy.CE/BR/Splworks/SECR/BSP...270911

    G.Radhakrishnan

    SharedDocuments

    Joined:May11,2010No.of

    Replies:488

    Posted:WedSep28,20115:53am

    Good.

    InthemeantimeanumbersofPSCgirdershavebeenerectedwithspansmorethan24.4m

    Specificguidelinesarerequiredtobeframedandcirculatedforinspection,maintenance,monitoringthenoticeddefects,methodofrecordingcamber,temporaryarrangements,actionincaseofemergenciesincludinglossofcamber,methodofreplacementincaseoffailureintheexistingPSCgirdersG.Radhakrishnan...280911

    NarasimhaMurty

    Posted:FriSep30,201112:38pm

    Anarticleon"INSTRUMENTATIONTECHNIQUESTOMONITORLOSSOFPRESTRESSANDCORROSIONOFSTEELINPRESTRESSEDCONCRETE"canbeseeninthislinkwhichisusefulforbridgemaintenancewing:

  • 6/26/2015 IndianRailwaysInstituteofCivilEngineering

    http://iricen.indianrailways.gov.in/IRICEN1/modules.php?name=Forums&file=viewtopic&t=3645 4/8

    GannavarapuDy.General

    Manager(civil)/RVNL

    SharedDocuments

    Joined:May14,2007No.of

    Replies:838

    http://www.rdso.indianrailways.gov.in/uploads/files/1296817034676bs_36.pdfNarasimhaMurtyGannavarapuEXECUTIVEENGINEER(CON)...300911

    G.Radhakrishnan

    SharedDocuments

    Joined:May11,2010No.of

    Replies:488

    Posted:SatOct01,20113:09pm

    FromtheabovequotedArticle,thefollowingsentencesarereproducedhere.

    Concretestructuresaresupposedtogivetroublefreeandmaintenancefreeservice,ifconstructedproperly.Normally,durabilityaspectsareusuallylostsightof.Becauseofwhich,manytimes,concretestructuresdevelopdefectsduringtheirservice.

    Itwillbeworthwhiletonotethatnodirectmethodisavailabletomeasurelossofprestress.

    ItcanbenotedthatV.W.loadcellsystemissuitablefornewconstructionandnotforexistingbridge.

    VibratingWireStrainGaugeissuitableforuseonnewaswellasexistingbridges.NotmuchofliteratureonactualuseofaboveinstrumentationsystemisavailableeitherinIndiaorabroad

    Noinstrument/techniqueisavailable,atpresent,whichcanmeasuretheextentofcorrosionofsteel

    ItwillnotbeincorrecttostatethattheinstrumentationofbridgesisstillataprimitivestageinIndia.

    Hence,wecannotgoforinstrumentationofeachbridgeduetocostaffair,SERCorothersimilarorganizationtobeinvitedandalsoinstrumentationalonewillnotsolveourproblems.Wemayhavetogoforrehabilitation,strengtheningorreplacementafterinstrumentation.

    Duetoleachingdefect,thereinforcementsincludingtendonswillcorrodewithaperiodoftimewhichwillleadtolossofprestress.Noinstrumentationisfurtherrequiredforcorrosionorlossofprestress.Whatwillbetheremedialaction,oncecorrosionstarted?

    Insteelgirders,themainproblemiscorrosionwhichcanbecontrolled.Even,camberlossgirdersarestillsurvivinginothertopicsofthisforum.G.Radhakrishnan...011011

    Posted:SunOct02,20119:16am

    Therearefewthingstobeconsidered:

    1.ThePSCgirdersarenotasfragileastheyarenormallypresumedtobe.Thesearedesignedasductilestructuresasthenormalsteel/RCCstructuresareandthecrackswillbethereinstructurefor

  • 6/26/2015 IndianRailwaysInstituteofCivilEngineering

    http://iricen.indianrailways.gov.in/IRICEN1/modules.php?name=Forums&file=viewtopic&t=3645 5/8

    V.B.SoodDirector(B&S)

    SharedDocuments

    Joined:No.of

    Replies:1674

    longtimebeforeactualcollapsetakesplace,exceptinthecasewhenthePSCtendonsarenotgroutedproperlyandsnapduetocorrosion.

    2.Yes,theunderstandingofPSCgirdersisonlowersidetodesired,partlybecauseoflackoftrainingandpartlybecauseoflackofdifficultnatureofsubject.ButitcannotbesaidthatthesewereintroducedwithoutpreparationsasthewillhavetheproblemofchickenandeggsituationwhethertofirstconstructPSC,whichisamaterialofchoiceworldover,orfirstcreateawarenessandinspectionmethodology.IwouldsaythattheapproachwasOKthatwayandiftheorganizationcannotgetpeopletolearnthethingsin30years,thereisnoexcuseaboutanything.

    3.Ourbridgemanagementisnotinthatgreatshape.Exceptforthesteelgirderinspectionandmanagement,whichtomeistheeasiesttolearnandmaster,wearelackinginalmostallaspects.Thefloodsandscourisaverymuchneglectedfield,substructureinspectionisajoke,underwaterinspectionshaveassumedsomesortofpriorityonlyafterkillingscoresofpeopleonthisaccount.AndthelesssaidaboutmodernfieldslikeNDT,thebetteritis.IhadanopportunitytoinspectsomeoldarchesandIsawoldinspectionrecordsfor25yearsorsoandwasastonishedtoseethedivergingviewsthatlearnedengineershavetakenovertheyearsandalmostnonehadgivenasolutionthatcouldrestorethebridgestoarespectableshape.Thismuchfortheoldesttypeofthebridgesthatweareusing.So,theissueofPSCisnotthatdirewhenseeninlightwithitsolderpeers.

    4.TheproblemintheparticularcaseappearsduetotheslabconnectingtheIgirders.Theseslabsarethelastitemofconstructionandthetimeconstraintscancausetheproblemsmentioned.ButtheproblemwillmostlikelybeinRCCandnotPSCcomponents.Ifthisisthecase,youcancheerupasRCCisloteasiertomaintainandrehabilitatethanPSC,andalsothewatermightnotbeaffectingthetendons.WehaddealtwithsomesuchcasesonWRandIhadmadeafilmonthesamewhichcanbeseenhere:

    http://wiki.iricen.gov.in/doku/doku.php?id=training_films

    Iftheproblemisdifferent,pleaseletusknow.V.B.SoodDirector(B&S)...021011

    G.Radhakrishnan

    SharedDocuments

    Joined:May11,2010No.of

    Replies:488

    Posted:WedOct05,201112:18pm

    Inmycaseisdifferent.PSCsolidgirdersof10spansof9.14meachinabridgeconstructedduringtheyear1998,arehavingleachingdefect(fromthetopofdecktobottom)inalmostallthegirders.Seepageofwater,afterraining,canbevisuallyseen.Also,atthejunctionofretainingwallconnectingdeckslabinsomanybridgesincludingROBssuchleachingdefectswerenoticedG.Radhakrishnan...051011

    Posted:WedOct12,20117:33am

    InPSCboxgirders,theopenspacesaremisusedbypublic.IfoundthatonePSCboxgirderROBisusedasminiBAR.Shallweclosetheopeningsprovidedintheboxgirders.

  • 6/26/2015 IndianRailwaysInstituteofCivilEngineering

    http://iricen.indianrailways.gov.in/IRICEN1/modules.php?name=Forums&file=viewtopic&t=3645 6/8

    G.Radhakrishnan

    SharedDocuments

    Joined:May11,2010No.of

    Replies:488

    Onseeingsuchmischievouswegetwarningas"dangerahead!"G.Radhakrishnan...121011

    A.P.MALIKCPM1

    SharedDocuments

    Joined:No.of

    Replies:118

    Posted:WedOct19,20111:52pm

    Therearemanyfactorsthatgointodecidingthematerialtobeusedinconstruction.Firstandforemostoftheseistherealityandfactsastheyexist,insteadofwhatwethinktheyshouldbeorassumethemtobe.Ourassumptionsmustasclosetorealityaspossible.

    Andthefactis,PSCisnotthematerialforourbridges.Ourqualitycontrol,handlingequipments,maintenanceresourcesarenotfitforPSCgirders.Forspansof9.15mandabove,weshouldsticktosteelgirders,thetried,thetestedandtheelegantelements.ForsleepersoverthemwemayapproachSCtoallowtimbers,asvolumewouldbemuchlessnow,asforeverythingelsewehaveswitchedovertoPSCsleepers.

    Unlikeroad,wecannotdiverttrafficatwill.Wegetverylimitedtimeforrepairsandreplacement.Anyfailures,unlikeinaroadbridge,arepotentialdisasterforus.Oursitesarewhereitisverydifficulttotakecranestohandletheweightsinvolved.Justtogiveyouanidea,totalweighttobehandledincaseofPSC9.15mspanis82tonnes(minimumcomponentweightbeing20/30T,dependingonwhetherpreorposttensioned)asgainstabout9tonnesfora9.15msteelspan.A.P.MALIKDyCPM/C/III...191011

    AvijitMujumder

    SharedDocuments

    Joined:Dec21,2009No.of

    Replies:15

    Posted:TueOct25,20113:14pm

    Apartfromabovedefficiencies,theheightofdeckincaseofPSCgirderisanotherdetrimentalfactorwhichcannotbeignoredastheapproachofbridgesistoberaised.Incaseoftallpiers,seismicloadsonheaviersuperstructure(PSCgirders)hasconsiderableeffectonsubstructure&it'sfoundation.AvijitMujumder...251011

    Posted:MonNov21,20117:23am

    ThetwomeritsmentionedbyEXECUTIVEENGINEER/CONfortheuseofPSCgirdersalsohavingthefollowingdisadvantages

  • 6/26/2015 IndianRailwaysInstituteofCivilEngineering

    http://iricen.indianrailways.gov.in/IRICEN1/modules.php?name=Forums&file=viewtopic&t=3645 7/8

    G.Radhakrishnan

    SharedDocuments

    Joined:May11,2010No.of

    Replies:488

    (i)TheMainreasonbehinduseofPSCgirdersisduetoitsinitialeconomicalcostisapplicablefornewconstructiononly.Inopenline,replacementofsteelgirderwithPSCgirderwillcostmoreduetoexpensivelaunchingscheme,prolongedspeedrestriction&megalineblock

    (ii)OnemoremeritofPSCGirderBridgeisaboutitsfacilityofprovidingthesametrackstructurelikeinapproaches.But,withoutadheringthemanualprovisions,thesametrackstructureofapproach(LWR)hasbeencontinuedonthePSCgirderbridges.Ifanythinghappensthenonlyresponsibilitywillbefixedandalsocircularswillcome.So,PSCgirderfacilitatesformisleadingtheLWRmanualprovisionsG.Radhakrishnan...211111

    NarasimhaMurtyGannavarapuDy.General

    Manager(civil)/RVNL

    SharedDocuments

    Joined:May14,2007No.of

    Replies:838

    Posted:MonNov21,20114:52pm

    Mr.Radhakrishnanhasexpressedviewinthemaintenancepointofview.Apartfromcertaindisadvantages,PSCgirdershavenumerousadvantagesalsoundoubtedly.Sincesteelgirdershadlonghistoryandstoodforthetestoftimeandmoreoverthesteelismanufacturedatsteelplantswithhighestqualitycontrol,nodoubttheyaresuperiorandstrongertoPSCgirders.Butthedisadvantagewiththemisthemaintainabilityoftrackoverthosegirders.LastdecadePWayEngineerssufferedalotonthatscore.ThenonlyPSCgirdershavecomeintopicture.RegardingreplacementofsteelgirderswithPSC,itisrestrictedupto6.10monlyandoverandabovetheywillbecastinsituonly.AsfarascontinuingofLWRoverPSCgirderbridgesareconcerned,certainRailwayshaveofficiallyundertakenthesameontrialbasisandaregivingbetterresults.OffcourseKonkanRailwayhasalreadycontinuedtheirallLWRsongirderbridgesprovidedwithbearingsandnoanyuntowardincidentshavebeennoticed.Manualsaresuggestiveonlyanddoesnotrestrictthebetterments.Duetothisflexibility,correctionslipsarebeingissuedasandwhenneeded.Afterallwethescientificandengineeringcommunityshouldalwaysthinkforbetterchangesandaccordinglyexperimentshavetobecontinued.GapsbetweensinglerailshavebeenprovidedforseveralyearswithaviewthatlinearexpansionwillcreateproblemsuntilLWRshavebeendiscoveredandproveditwaswrong.RutherfordsquantumtheoryregardingelectronsrevolvingroundthenucleuswasprovedwrongtillBohrsexperimentrevealedthattheywillrevolveinfixedorbitsafter60years.Thatissscienceandchangeswillalwaystakesplace.AsfarasPSCgirdersareconcerned,themainproblemwiththemiswiththequalityatsite.Theyrequirehighstandards.Veryfewcontractorsawareofthesameandtheythoughtthatqualityistheresponsibilityoftherailway.Unlikesteel,concreteisaheterogeneousmixandhastobemadeatsite,maintainingqualityandachievinguniformqualityisatoughesttaskfortheConstn.Engineers.Knowingallthesefacts,RailwayBoardhasrestricteditsuseupto24.40mgirders.NarasimhaMurtyGannavarapuEXECUTIVEENGINEER(CON)...211111

  • 6/26/2015 IndianRailwaysInstituteofCivilEngineering

    http://iricen.indianrailways.gov.in/IRICEN1/modules.php?name=Forums&file=viewtopic&t=3645 8/8

    G.Radhakrishnan

    SharedDocuments

    Joined:May11,2010No.of

    Replies:488

    Posted:MonNov21,201110:58pm

    Ihavefocusedinmaintenancepointofviewonly.

    InPambanBridge,wehavereplacedthePSC(MG)girderswithsteelgirdersbygantrymethod.

    Steelgirderspansabove6.10marebeingconvertedintoPSCbyadoptingsuitablelaunchingschemeintrafficcondition.

    PSCgirdersitselfmayrequirereplacement!

    Betterchanges(inthematerialofconstruction)arealwayswelcome.Atthesametime,technologyformaintainingthesamealsotobedevelopeddulyconsideringthevulnerablefactorssuchasqualityofconstruction,environmentalcondition,workmanshipetc.,

    Betterunderstandingisessentiallyrequiredwhenwechangeovertoanewsystem

    Asmentionedthatveryfewcontractorsaretakingcareofquality,veryfewEngineersareworriedaboutqualityandhenceveryfewbridgesareingoodcondition

    Concretestepsarerequiredtobetakentosafeguardourassetsofconcretebridges

    Steelgirders>>>Concretegirders>>>Compositegirders>>>?G.Radhakrishnan...211111

    Displaypostsfromprevious: AllPosts OldestFirst Go

    IndianRailwaysInstituteofCivilEngineeringForumIndexRlyBridgeForum