IAEA International Atomic Energy Agency Prospect and Challenges in the Development and Deployment of Small and Medium-sized Reactors (SMRs) Dr. M. Hadid Subki Technical Lead, SMR Technology Division of Nuclear Power Department of Nuclear Energy Consultants Meeting on SMR Technology for Near Term Deployment, 2 4 May 2011

Upload: lamkhanh

Post on 09-May-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA International Atomic Energy Agency

Prospect and Challenges in the

Development and Deployment of

Small and Medium-sized Reactors (SMRs)

Dr. M. Hadid Subki

Technical Lead, SMR Technology

Division of Nuclear Power

Department of Nuclear Energy

Consultants Meeting on SMR Technology for Near Term Deployment, 2 – 4 May 2011

Page 2: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

Outline

• Global Status of SMR Deployment and

Development

• Status of SMR designs

• Perceived Advantages and Challenges

• Key Issues in Licensing & Design Certification

• Developing Countries’ Expectations

• Lessons-Learned from the Fukushima Event

• Economics of SMRs

• Conclusions

2

Page 3: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

Numerous SMR Designs at Various stages

3

AHWR

LWRs LWRs LWRs LWRs

FRs FRs

iPWRs

PHWRs GCRs

Page 4: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

Definitions

• IAEA: • Small-sized reactors: < 300 MW(e)

• Medium-sized reactors: 300 700 MW(e)

• Regardless of being modular or non-modular

• Covers all reactors in-operation and under-development with power < 700 MWe

• Covers 1970s technology 2000s innovative technology

• Several developed countries: • Small-sized reactors: < 300 MW(e)

• Emphasize the benefits of being small and modular

• Focus on innovative reactor designs under-development

4

«

Page 5: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

IAEA Definitions of Advanced NPPs

• Advanced nuclear plant designs - designs of current interest for

which improvements over their predecessors or existing designs are

expected

• Evolutionary designs - advanced designs that achieve improvements

over existing designs through small to moderate modifications, with a

strong emphasis on maintaining design proveness to minimize

technological risks.

• Innovative designs - advanced designs which incorporate radical

conceptual changes in design approaches or configuration in

comparison with existing practice. Substantial research and

development efforts, feasibility tests, and a prototype or demonstration

plant are probably required prior to the commercial deployment

Reference: • IAEA - Terms for describing new advanced nuclear power plants, TECDOC-936 (1997)

5#

Page 6: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

Global Development and Deployment

• Dozens of concepts for innovative SMRs are under development in many IAEA Member States: • Argentina, Brazil, Canada, China, France, India, Japan, Republic of

Korea, Russia, South Africa, USA, and some emerging countries.

• A number of companies are developing SMRs; each has unique features and varying megawatt capacity.

• Many SMRs (with 1970s, 1980s technologies) have long been in operation and many are under construction

• None of the innovative SMRs are commercially available

In Operation 125

Under construction 17

Number of countries with SMRs 28

Generating Capacity, GW(e) 57.1

6

Page 7: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

Contemporary SMR designs represent

evolution from designs of the

70s, 80s, 90s…

IRIS GT-MHR

NuScale

mPower

KLT-40

7 «

SMART

Page 8: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

Status of SMR Designs

8

Page 9: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

SMRs for Immediate Deployment Name

Design Organization

Country of Origin

Electrical Capacity, MWe

Design Status

1 Pressurized Heavy

Water Reactor (PHWR-220)

NPCIL India 220 16 units in operation

2 Pressurized Heavy

Water Reactor (PHWR-540)

NPCIL India 540 2 units in operation

3 Pressurized Heavy

Water Reactor (PHWR-700)

NPCIL India 700 4 units under construction

4 KLT-40S OKBM

Afrikantov Russian

Federation 70 2 units under construction

5 HTR-PM (Reference

HTR-10) Tsinghua

University China, Republic

of 250

Detailed design, 2 modules under construction

6

Central Argentina de Elementos Modulares

(CAREM-25)

CNEA Argentina 27 Detailed design,

prototype construction in 2012

7 Prototype Fast Breed Reactor (PFBR-500)

IGCAR India 500 Under construction –

Commissioning

in 2012

8 Enhanced CANDU 6

(EC-6)

Atomic Energy of Canada Limited

Canada 700 Detailed design

9 CNP-300 CNNC China, Republic

of 300

2 units in Operation as

Chasnupp-1 and -2 in Pakistan

Page 10: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

SMRs for Near-term Deployment

Name Design

Organization

Country of Origin

Electrical Capacity,

MWe Design Status

1 System Integrated Modular Advanced Reactor (SMART)

Korea Atomic Energy Research Institute

Republic of Korea 100 Detailed design

2 NuScale NuScale Power United States of

America 45/module

Detailed design, to apply for certification in January 2012

3 mPower Babcock & Wilcox United States of

America 125/module

Detailed design, to apply for certification later in 2012

4 VBER-300 OKBM Afrikantov Russian

Federation 300 Detailed Design

5 SVBR-100 JSC AKME Engineering Russian

Federation 100

Detailed Design for Prototype Construction

6 ABV6M OKBM Afrikantov Russian

Federation 11 Detailed Design

7 Super-Safe, Small and Simple (4S)

Toshiba Japan 10 Detailed Design

8 Westinghouse

SMR Westinghouse

United States of America

200 Conceptual Design

Page 11: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

SMRs for Long-term Deployment

Name Design

Organization Country of

Origin

Electrical Capacity,

MWe Design Status

1 Pebble Bed Modular

Reactor (PBMR) PBMR Pty South Africa 100

Detailed Design; Development discontinued

2 AHWR300-LEU BARC India 220 Conceptual Design

3 Power Reactor

Innovative Small Modular (PRISM)

GE Hitachi United States of

America 311 Detailed Design

4 Integrated Modular

Water Reactor (IMR) Mitsubishi Heavy

Industries, Ltd. Japan 350 Conceptual Design

5 Flexblue DCNS France 50-250 Conceptual Design

6 VK-100/300 RDIPE Russian

Federation 100/300 Conceptual Design

Page 12: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

Advantages Challenges

Tech

no

log

ical Is

su

es

• Shorter construction period

(modularization)

• Potential for enhanced reliability

and/or safety

• Reduced complexity in design and

human factor

• Suitability for non-electricity

application (i.e. process heat and

desalination)

• Tolerance to grid instabilities

• Licensability (delays due to design

innovation)

• Non-LWR technologies

• Impact of innovative design and fuel

cycle to proliferation resistance

• Operability

• Spent fuel management and waste

handling policies

No

n-T

ech

no

log

ical

Issu

es

• Fitness for smaller electricity grids

• Options to match demand growth

by incremental capacity increase

• Site Flexibility

• Lower upfront investment capital

cost per installed unit

• Easier financing scheme

• Reduced emergency planning zone

• Economic competitiveness (impact

of economy of scale)

• Regulation for fuel or NPP leasing

• Limited market opportunities

• First of a kind cost estimate

• Availability of design for newcomers

• Infrastructure requirements

Perceived Advantages and Challenges

12

Page 13: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

Answers Needed Prior to Deployment

• What are the pathways to licensing?

• How soon will a commercial product be available?

• How to prove economic competitiveness?

• What are projected benefits against large plants? (multi-modules

SMR vs single large unit)

• What are projected benefits against fossil power plants with the

same power output?

• What will be the realistic $/kWe delivered?

• Are the grid requirements in developing countries

understood and can the technology being offered meet

them?

• What operational issues are expected and how will they be

addressed?

13

Page 14: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

Key Issues in Licensing & Design Certification

• First of a kind engineering

• Viability of multiple-modules station (post-Fukushima)

• Proliferation resistance and physical security

• Ergonomics and control room staffing

• Emergency planning zone

• Mechanistic source term

• Risk-informed licensing

• Standardization and licenses for manufacturing

• Technology transfer and proprietary design protection

• Users and Owners issues

14

Page 15: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

Modularization has been around for

decades – just more of it now

Haiyang

350 modules -

150 Structural 200 Mechanical

15

Page 16: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

Status of NPP Introduction in New-comer

Countries

Type Status and Category of

Nuclear Energy Program

Countries Current Installed

Capacity (GWe)

A New NPP under construction Iran 44.2

United Arab

Emirates

15.7 B New NPP being ordered

Turkey 38.8

C Invitation to Bid submitted -

Egypt 23.4

Indonesia 24.6

Jordan 2.1

Lithuania 4.7

Malaysia 23.3

D Decided to introduce NPP and

started preparing infrastructure

Vietnam 11.3

Morocco 5 E Active Preparation for possible

NPP programme Thailand 29.9

Kazakhstan 18.7 F Considering NPP Programme

Kuwait 10.9

Saudi Arabia 33.5 G Not planning, but may consider

in the future Singapore 10.1

16 «

Page 17: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

Developing Countries Expectations

17

Introduction of the first Nuclear Power Plant

Nuclear Energy Policy

Domestic Industry

Participation

Proliferation resistance &

physical protection

Public acceptance

Safety

Radwaste Management

Viable financing scheme

Economic Competitive

ness

Affordable electricity

cost (cent/kWh)

Security of Supply

Page 18: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

SMR Booklet – Supplementary to ARIS

• Contained status, design

description and main features

of 35 selected SMR designs

• Sorted by type/coolant: iPWR,

PHWR, GCR, and LMFR

• Sorted by Country of Origin

• Included:

• PHWR-220

• PFBR-500

• CAREM

• KLT-40

• 4S

• SVBR-75/100

• BREST

• SMART

• NuScale

• mPower

• HTR-10/PM

• PBMR

• IRIS

• PRISM 18

Page 19: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

Lessons Learned from the Fukushima Event

• Issues to be addressed for innovative SMRs deployment:

• Multiple external initiating events and common cause failures

• Station Black-Out

• Reliability of emergency power supply

• Enhanced containment seismic/hydrodynamics strength

• Hybrid passive and active engineered safety features

• Safety viability of multi-modules – first of a kind engineering

• Direct containment heating

• Wider scenario of Beyond Design Basis Accident (DBA)

• Accident management/Emergency response capability and costs

• Spent fuel pool seismic and cooling provision

• Hydrogen generation from steam-zirconium reaction; recombiner system

• Environmental impact assessment and expectation

• Waste handling and policy

• Public Acceptance

19

Page 20: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

Economics of SMRs

Economics of SMRs

Replication: multi-modules SMR → learning

economies

Scalability: adaptability in timing, siting and sizing with respect to certain

market conditions

Reversibility: ability to cope with certain conditions, to reduce the economic risk

of investment

Standardization: Standardized components → reduction of investment

and operating costs

Economies of Multiples

as a response to Economies of Scale

20

Page 21: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

Development of Approaches to Assess

Competitiveness of SMR

• Objectives:

To assist existing and potential stakeholders in the

definition of competitive approaches regarding design and

deployment of SMRs

To provide a framework for assessment of the investment

attractiveness of nuclear energy projects with SMRs

• Potential Markets:

Countries with small electricity grid/with remote areas

Countries with infrastructure constraints

Small generating companies or utilities

Non-electrical applications (process heat and desalination)

21

Page 22: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

IAEA Analytical Tools

• MESSAGE: Model for Energy Supply Systems

and their General Environmental Impacts

• FINPLAN: Model for Financial Analysis of

electric sector expansion Plans

Models applicable to assess the role and

competitiveness of SMR and can be used

interactively by treating SMR as

one of the energy options

22

Page 23: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

IAEA Response to the Global Trend

• Project 1.1.5.5: Common Technologies and Issues for

SMRs (P&B 2010 – 2011, and 2012 – 2013)

• Objective: To facilitate the development of key

enabling technologies and the resolution of enabling

infrastructure issues common to future SMRs of

various types

• Expected outcome: Increased international

cooperation for the development of key enabling

technologies and the resolution of enabling

infrastructure issues common to future SMRs of

various types

23

Page 24: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

IAEA’s Project 1.1.5.5 (2010 - 2011)

• Research Coordination Meeting for the CRP on “Development of Advanced Methodologies for the Assessment of Passive Safety System Performance in Advanced Reactors (I31018)” • Date/place: 26 - 28 April 2011 in IAEA – Vienna (DONE)

• Consultancy Meeting on "Status of Innovative SMR Designs with a Potential of Being Deployed by 2020" • Date/place: 2 - 4 May 2011 in IAEA – Vienna

• TC - Workshop on Advanced Nuclear Reactor Technology for Near Term Deployment • Date/place: 4-8 July 2011 in IAEA – Vienna

• 3rd Technical Meeting on “Options to Incorporate Intrinsic Proliferation Resistance Features to NPPs with Innovative SMRs” • Date/place: 15 - 18 August 2011 in IAEA – Vienna

• CM on "Options to Enhance Energy Supply Security with NPPs based on SMRs“ • Date/place: 3 -6 October 2011 in IAEA – Vienna

• Workshop on “Technology Assessment of SMR deployable by 2020” • Date/place: 5 – 9 December 2011 in IAEA – Vienna

• Extra-budgetary from Republic of Korea

24

Page 25: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

IAEA’s Project 1.1.5.5 (2012 - 2013)

• Develop roadmap for technology development, assessment and deployment

• Review newcomer countries requirements, regulatory infrastructure and business issues

• Define operability-performance, maintainability and constructability indicators

• Develop guidance to facilitate countries with planning for SMRs technology implementation

• Coordinate CRP on development of methodologies

• Provide education and training

• Improve economic competitiveness evaluation methodology

25

The Projects are to be Discussed in this Consultants Meeting

Page 26: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

IAEA’s Publications on SMR

Status Report of Innovative SMR Designs:

• Design features, safety approaches, and

R&D trends

• SMR with Conventional Refuelling

• SMR without On-Site Refuelling

26

Page 27: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

IAEA’s Publications on SMR

Selected Common Areas of Technology and

Infrastructure Development:

• Design options to cope with External Events

• Design features to achieve Defense-in-Depth

• Neutronic characteristics, emergency

planning, and development scenarios

27

Page 28: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

New! Advanced Reactor Information System (ARIS)

• A web-accessible database of comprehensive and balanced

information about all reactor designs and concepts: http://aris.iaea.org/

• Based on the information provided by the developers of each reactor

design/concepts

• Harmonized to result in an unbiased and easy to use source of

information.

3

2

Heat exchanger of

PRACS

Secondary

sodium loop of

PRACS

Seismic

isolator

Top dome

(Containment

vessel)

RV & GV

(GV - containment

vessel)

RVACS

(Air flow

path)

Secondary

sodium

loop

Shielding

plug

IHX

EM pumps

(Two units in

series) Fuel subassembly

(18 fuel

subassemblies) Radial shielding

Movable reflector

(6 sectors):

- Upper region:

cavity

- Lower region:

reflector

Ultimate

shutdown rod &

fixed absorber (the

central

subassembly)

Coolant inlet

module

28

Page 29: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

To be published in 2011

1. Approaches to Assess Competitiveness of Small

and Medium-sized Reactors

2. Framework for the Application of Assessment

Methodologies for Proliferation Resistance of

Innovative SMRs

3. Booklet on 2011 Status of Innovative Small and

Medium-sized Reactors with Potential Near Term

Deployment

• Supplementary to Advanced Reactor Information

System (ARIS)

29

Page 30: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

Conclusions (1)

• 58 plants under construction (as of early 2011)

• give many different signals for the future

• Future will offer a variety of different options

• Is there “right size” to address global energy needs?

• Each country will adopt different strategies

• Build-own-operate is available – UAE, Jordan, Turkey,

Vietnam, …

• Domestic industries participation play a major role

• SMR reactor designers aiming for substantial portions of

market

• Some countries already have SMRs – lesson-learned.

30

Page 31: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

Conclusions (2) • SMRs - an attractive nuclear power option for developing

countries with small electricity grids and less-developed

infrastructure

• High potential for deployment in mid-term (2020 – 2025),

but much work yet to be accomplished by reactor

designers, national nuclear regulators, and electric utilities.

• Innovative SMR concepts have several common

technology development challenges: licensability,

competitiveness, actual electricity cost, financing schemes, energy

policy in new-comer developing countries

• Economic: $ per kWe to construct? $ per kWe-hr to operate?

• Moving lessons-learned from the Fukushima Accident into

the design, safety, economic, financial, licensing, and public

acceptance considerations for SMRs

31

Page 32: Prospect and Challenges in the Development and … · Prospect and Challenges in the Development and Deployment of ... definition of competitive approaches ... • Research Coordination

IAEA

For inquiries, please contact:

Dr. M. Hadid Subki <[email protected]>

THANK YOU

32