Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
INDEPENDENT, INNOVATIVE, RELIABLE TRANSMISSION MANAGEMENT SERVICES
Welcome
TranServ International
Overview
Kevin BurnsStakeholder Workshop
July 18, 2006
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Introduction and Overview
Agenda
Welcome & TranServ Overview – Kevin Burns, President, TranServ International
Stakeholder Process Overview – Paul Sorenson, Director,TranServ International
MidAmerican Perspectives on TSC & Continuation of TP Role –MidAmerican Energy Representatives
Planning Process – Jagjit Singh, Director, TranServ International Tariff Administration – Paul Sorenson, Director, TranServ International Verification Plan for TranServ’s Readiness for Cutover – Darrel
Gunst, Manager Transmission Services, MidAmerican Energy Q & A Adjourn at 5:00 PM
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Mission
TranServ International’s mission is to provide Innovative, High Quality, Reliable, Competitively Priced Transmission Management services to the energy industry
While demonstrating:• Independence• Flexibility• Transparency• Cost Efficiency
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Corporate Structure
TranServ International is a for profit Independent Corporation
TranServ International is not affiliated with any Market Participant or Transmission Provider
TranServ International has been structured to meet the criteria for independence under MidAmerican’s OATT Attachment K
TranServ International has a highly qualified team and will also draw upon contractual relationships with expert organizations to provide highly efficient, cost-effective, quality service with low overhead
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Initial Organization
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Role of TranServ as the TSC
TranServ will administer certain elements of MidAmerican Energy's OATT as specified in Attachment K of the MidAmerican Energy tariff, namely:• Calculate TTC and ATC for flowgates and interfaces not otherwise
determined by Midwest ISO• Grant/deny transmission service requests• Approve/deny NERC E-Tags• Receive/process all generator interconnection requests• Manage the generator interconnection queue (transmission
service queue is currently managed through OASIS -- this will not change)
• Perform transmission/generator interconnection feasibility and system impact studies, and
• Participate in MAPP regional coordination and planning processes.
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Role of TranServ as the TSC, cont. TranServ will also perform audits as required by Commission
Orders MidAmerican will remain the Transmission Provider under its
OATT TranServ will not operate the MidAmerican Transmission
System TranServ will not perform any reliability functions or services for
MidAmerican TranServ will not assume responsibility for any of the
transmission and reliability functions that Midwest ISO currently performs on a regional basis for those members of MAPP that are not transmission owning members of Midwest ISO pursuant to a contractual arrangement between MAPP and Midwest ISO
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Changes for Transmission Customers?
MidAmerican Transmission Customers will continue to submit OASIS Requests and Complete E-Tags just as they do today• MEC is still the transmission provider• Midwest ISO is still the reliability coordinator• No changes related to OASIS access
You will change who you call in the case of questions regarding Transmission Service Reservations, E-Tags, and Planning Studies: TranServ instead of MidAmerican• TranServ Support for operational questions
You will find certain information related to TranServ business operations on the TranServ website or on OASIS• www.transervinternational.com or select the links on the MEC OASIS
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Changes for Transmission Customers? You will experience a higher level of automation for
OASIS Request Evaluation and E-Tag Validation• Processes similar to MAPP MMTA • Consistency in processing time and rules for approval• Decreased need for discretion by TranServ staff
You will interact with TranServ staff for System Impact and Generation Interconnection Studies• Study agreements will be executed with TranServ
You will see TranServ staff in addition to MidAmerican staff participating Regional Planning Meetings• TranServ staff will facilitate ad hoc study groups
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
TranServ Value Added Will bring transparency to the administration of MidAmerican
tariff Enhances market confidence in conduct of all activities in a
comparable and non-discriminatory manner Will be independent from all Market Participants/Customers Will align business practices with emerging industry
standards Will facilitate coordination on seams and other related issues Expertise in automation will introduce new standards for cost-
effectiveness, consistency in screening and non-discriminatory treatment, reconciliation of all schedules against reservations, transparency, and customer service
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
TSC Transition Schedule
And when does this happen?• 10:00 a.m., Wednesday, August 30, 2006
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Questions General Discussion
• Questions• Comments
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Stakeholder Process Overview
Paul R. SorensonStakeholder Workshop
July 18, 2006
INDEPENDENT, INNOVATIVE, RELIABLE TRANSMISSION MANAGEMENT SERVICES
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Stakeholder Process Overview
Purpose• The TSC shall establish a stakeholder process to solicit the
views of Market Participants (including the Transmission Provider’s wholesale merchant function) regarding the functions performed by the TSC. The TSC shall, in consultation with the Transmission Provider and Market Participants, develop and post on the Transmission Provider’s OASIS, procedures pursuant to which the Transmission Provider, and interested Market Participants may meet with representatives of the TSC to discuss, among other things, the TSC’s performance of the functions and the division of responsibilities and duties as set forth in MidAmerican’s OATT Attachment K.
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Stakeholder Process Overview
The Process• TranServ’s Process for Conducting the TSC
Stakeholder Process will be Posted on OASIS• Expect this to be an evolutionary process• Customer Driven• Open and Inclusive• Responsive
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Stakeholder Process Overview
The Process• Open Forum for Addressing:– Common Concerns and Issues– Business Process Issues– Operational Improvements– Industry Initiatives– Regulatory Changes
• MAPP RTC Planning Forum recognized as the Stakeholder Forum/Process for Planning Activities
• Will not duplicate or substitute for activities of the Iowa Transmission Working Group, MAPP Planning Committee, etc.
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Stakeholder Process Organization
Participation• Stakeholders– Any Eligible Customers under the MidAmerican OATT,
their designated agents, or regulatory representatives–May participate in any/all activities of the Stakeholder
Process• Stakeholders At-Large– Active Stakeholders participating in the Stakeholder
Process– Direct the Activities, Deliberations and Recommendations
of the Stakeholder Process
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Stakeholder Process Organization
Participation• Ad hoc Stakeholder Working Groups–May be formed or dissolved by the Stakeholders At-Large– Assigned to address a specific issue(s) arising out of the
Stakeholder Process–May have appointed members– No restriction on any Stakeholder’s participation
• Standing Municipal Stakeholder Working Group–Municipal LSEs on the MidAmerican Transmission System
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Stakeholder Process Organization
Participation• Stakeholder At-Large Meetings– Scheduled semi-annually, or– “As needed”, at the request of Stakeholders, the
Transmission Provider, or the TSC• Stakeholder Working Group Meetings– “As needed”, at the request of the Working Group
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Stakeholder Process Communication
MidAmerican OASIS Home Page• Stakeholder Meeting Information– Date, time and location– Agenda and Meeting Materials–Minutes
• Stakeholder Recommendations– Posting of recommendation and request for comments– Posted comments and response– Notification of final resolution/action
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Stakeholder Process Communication
Communication Services• TranServ Stakeholder Contact List
– All designated Service Agreement contacts– Individuals on request– Notification list for all Stakeholder Announcements
• Stakeholder Forum– Self-subscription e-mail list server– [email protected]
• TranServ Contact– [email protected]
• Support Contact– [email protected]
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Stakeholder Process Communication
Stakeholder Meeting Notifications• Notification and call for agenda items• Final agenda and meeting materials• Posting of draft minutes and call for comments
Customer Meetings• Individual Customer Meetings with TranServ as TSC
will be posted
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Stakeholder Process Recommendations
Recommendations for new/changes to:• Business Guidelines – TranServ as TSC• Business Practices – MidAmerican as TP
Initiated through Stakeholder Process by any party
Recommendations developed through the Stakeholder Process
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Stakeholder Process Recommendations
Final Recommendations• Posted for Stakeholder comment for minimum of 30 calendar
days• All comments received to be reviewed and final disposition
posted for notice• If recommendation adopted (as-is or subject to modification),
notification of change to Business Guideline/Practice posted with minimum of 10 business days prior to implementation
• Emergency actions or operational concerns may override notification guidelines – all such actions subject to subsequent Stakeholder review and modification
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Questions
General Discussion• Questions• Comments
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
INDEPENDENT, INNOVATIVE, RELIABLE TRANSMISSION MANAGEMENT SERVICES
MidAmerican Energy
Continuing Roles
Darrel GunstStakeholder Workshop
July 18, 2006
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
MidAmerican Energy Perspectives & Roles
MidAmerican Energy Continuing Roles • NERC Transmission Provider– Transmission Provider and Billing – Darrel Gunst, Manager
Transmission Services, MidAmerican Energy• Transmission Planner– Planning for Reliability - Tom Mielnik, Manager Electric System
Planning, MidAmerican Energy• Transmission Operator & Balancing Authority– Facility operations and legacy control area responsibilities –
Larry VanWyhe, Supervisor Transmission Operations, MidAmerican Energy
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Questions
General Discussion• Questions• Comments
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Transmission Planning
Jagjit Singh, Ph.DStakeholder Workshop
July 18, 2006
INDEPENDENT, INNOVATIVE, RELIABLE TRANSMISSION MANAGEMENT SERVICES
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Transmission Planning
Mission Approach Customer Service Coordination with MidAmerican Energy Regional Participation Planning Criteria Contractors OASIS Posting and Process
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Mission of Planning Team
Participate in the Regional Planning Process Keep open dialogue through Stakeholder Process Manage generator interconnection queue Manage/Perform System Impact Studies (SIS) and
Generator Interconnection Studies (GIS) Provide Independence and Oversight for Base Model
Development, TTC calculation and Facility Studies Keep overall cost low
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Approach
Keep the process simple and a close to what it is today and provide more transparency
Protocols and Criteria Documents will be posted for comments
Qualified Contractors for performing SIS/GIS• Siemens PTI• Excel Engineering
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Customer Service
• Phone/e-mail – 763-205-7099– [email protected]
SIS and GIS Checklists posted Queue Management Automated Issues logging and follow ups
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Planning Process
Participate in Regional Planning Activities• Base Model Validations• Manage Planning Studies
Potential Contractors to Perform Studies• Excel Engineering• Siemens PTI• Utility System Efficiencies, Inc. (USE)
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Study Coordination
Ad hoc Study Groups Approval of Design Review Subcommittee
(DRS) Review Facilities Studies Process Formalize the Model Validation Process
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Planning Criteria
Following Criteria will be posted• TSR Processing• System Impact Study• Generator Interconnection Study• Stakeholder Process and Procedures
Stakeholders to comment on posted Documents
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Regional Participation
Participate in MAPP and Midwest ISO Committees – Including Seams Related Groups
Review Current Reports, Meeting Minutes, Processes, and Procedures
MAPP Planning Process and TranServ Stakeholder Process
OASIS Posting of Stakeholder Information (Question/Answers)
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Committee Role
Keep up with the Regional Planning Issues Report on any changes to Base Model and
Studies SIS/GIS DRS Approval
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
OASIS Postings
Criteria Documents along with Comments SIS and GIS Check-list Interconnection Queue
• Status and link to Studies
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Questions
General Discussion• Questions• Comments
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Tariff Administration & Scheduling
Paul R. SorensonStakeholder Workshop
July 18, 2006
INDEPENDENT, INNOVATIVE, RELIABLE TRANSMISSION MANAGEMENT SERVICES
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Customer Relations and Support
Our Mission• Provide Quality Service & Timely Support on a 24x7x365 Basis
Customer Support Services• TranServ Help Desk – First point of contact for any Customer for
transmission service related or technical support questions• Nondiscriminatory assistance with regard to transmission services
administered by TranServ• Technical Issues
– Initial call screening by TranServ Operations– Automatic escalation to OATI Help Desk
• Business Issues– Initial call screening by TranServ Operations– Automatic escalation to TranServ Management
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Customer Relations and Support
Contact Information• TranServ Help Desk– (763)-205-7099– [email protected]
• Stakeholder Forum– [email protected]
• TranServ Management–[email protected]
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Tariff Administration & Scheduling
Our Mission• Provide independence from all Market Participants• Bring transparency to transmission markets• Conduct all activities in a fair and comparable manner
Tariff Administration & Scheduling Services• OASIS Maintenance and Content Management• ATC Calculations and ATC/AFC Evaluation• Transmission Service Request Evaluation and Queue
Management• Tagging and Scheduling
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Tariff Administration & Scheduling
Open Stakeholder Process• Key to establishing credibility• Enhance transparency of transmission services • Align business processes with emerging Industry
Standards• Active participation in Industry Standards process
Automation• Key to establishing cost-effectiveness• Consistent screening and non-discriminatory treatment
of each transmission service request• Consistent screening and non-discriminatory treatment
of each schedule (tag) request• Reconciliation of all schedules against reservations
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Tariff Administration
Transmission Service Agreements• Managed directly with MidAmerican
– Service Agreement forms accessible from MEC OASIS home page– Procedures posted on MEC OASIS home page– Service deposits
Transmission Billing• Managed directly with MidAmerican
Transmission Service Requests• Managed directly with TranServ via OASIS
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Tariff Administration Transmission Service Request Evaluation
• Transparent process conducted on OASIS in adherence to MidAmerican’s tariff and approved business practices
• Criteria subject to Open Stakeholder Process • Uniform screening process for initiating transmission studies• Administration of:
– Renewal/roll-over rights– Redirection of service– Displacement of lower priority requests
• Automated decision support:– ATC/AFC validation– Service Timing (lead time, duration, etc.)– Price validation and discounting– Approve/Deny
• Manual intervention as required
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Tariff Administration
Transmission Service Queue Transition• Effective 10 am CDT on August 30, 2006• All approve/deny actions taken by TranServ
Transmission Service Request Changes• No immediate changes• Network Service arrangements on OASIS (DNRs, etc.)
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Scheduling
Tagging & Scheduling• TSC functions in role of Transmission Provider• MidAmerican retains its role as Control Area
(Balancing Authority)• Automated decision support:– Reconciliation of tagged transactions with service
reservations– Verification of designated resources serving network
load(s)– Validation of contract path adjacency– Approve/deny
• Manual intervention as required
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Scheduling
Tagging & Scheduling Transition• Effective 10 am CDT on August 30, 2006• All TP approve/deny actions taken by TranServ
Tagging & Scheduling Changes• Encourage use of 7-FN vs. 7-F product codes• Conversion to OASIS assigned identifiers– Grandfathered Agreements– Designated Network Resources
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
OASIS Modifications
OASIS Content• MEC OASIS Home Page
– Pro Forma Agreements and Forms– Business Practices, Processes and Procedures– Stakeholder Information– Standards of Conduct– Transmission and Interconnection Study Queues
• Additional Postings of Interest–MEC Contract Path ATCs– Critical Transmission Facility Outages– TLR Notices– Tag Curtailment and TSR Usage
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
OASIS Modifications
OASIS Operations• Redirect on Non-Firm Basis• Resale and Transfer Process• Network Service Applications• Displacement and Right-Of-First-Refusal Process• OATT Reform NOPR
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Questions
General Discussion• Questions• Comments
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
INDEPENDENT, INNOVATIVE, RELIABLE TRANSMISSION MANAGEMENT SERVICES
TSC Readiness Verification & Cutover
Darrel GunstStakeholder Workshop
July 18, 2006
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
TSC Readiness & Cutover
Verification Plan for TranServ’s Readiness for Cutover • Readiness Criteria Validation• TranServ Shadowing MidAmerican (August)• MidAmerican to Certify TranServ Readiness with FERC
Filing Cutover of TSC Functions 10 A.M., Wednesday,
August 30, 2006• Daily afternoon conference call-ins: Monday, August 28
through Friday, September 1, 2006
Proprietary Information. Do not copy or distribute without permission from TranServ - © TranServ International, Inc.
Questions General Discussion
• Questions• Comments