proposed road by others - donegal ten-t 1... · 2019. 3. 19. · p05 s3 section 1 ballybofey link...

1
00 100 200 280 00 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1861 00 100 200 256 00 100 200 216 ROUTE SELECTION IS INDICATIVE AND SUBJECT TO CHANGE PROPOSED ROAD BY OTHERS LEGEND EMERGING PREFERRED ROUTE EARTHWORKS (IN FILL) EARTHWORKS (IN CUT) ANTICIPATED JUNCTION AREA Rev. Date Description Appr. Model File Identifier: Checked: Drawn: Designed: Approved: Project Title: Drawing Title: Rev: Chk'd Drawn File Identifier: Date: @ A3: Scale @ A1: Sheet: 03 of Status: R:\MGT0337 - Ten-T Priority Route Imp - Donegal\8.0 Drawings\DG\TT_MGT0337-RPS-00-ZZ-DR-D-DG0021 PC Ballybofey Link Road Options.dwg P05 S3 SECTION 1 BALLYBOFEY LINK ROAD OPTION C TT_MGT0337-RPS-00-ZZ-DR-D-DG0022-03 D. Curley S.Sinha T. Patterson E. Cox Feb.2019 1:20 000 1:40 000 04 P01 15/02/19 DC FOR REVIEW & COMMENT EC TP P02 26/02/19 DC FOR REVIEW & COMMENT EC TP P03 06/03/19 SS FOR REVIEW & COMMENT TP TP P04 12/03/19 SS FOR REVIEW & COMMENT TP TP P05 13/03/19 SS FOR REVIEW & COMMENT TP TP TEN-T Priority Route Improvement Project, Donegal Unit 14C, N5 Business Park, Castlebar, Co Mayo, Ireland Phone: +353 94 906 8950 Email: [email protected] T +353 91 400200 W www.rpsgroup.com/ireland E [email protected] Lyrr 2, IDA Business & Technology Park, Mervue, Galway NOTES DO NOT SCALE, use figured dimensions only. All levels are referred to Ordnance Survey Datum, Malin Head. This drawing is the property of the Transport Infrastructure Ireland, Parkgate Business Centre, Parkgate Street, Dublin 8, Ireland. It is a confidential document and must not be copied, used, or its contents divulged without prior written consent. This document should not be relied on or used in circumstances other than those for which it was originally prepared. RPS / Barry Transportation accepts no responsibility for this document to any other party other than the party by whom it was commissioned. Information including topographical survey, geotechnical investigation and utility detail used in the design have been provided by others. ©Ordnance Survey Ireland. All rights reserved. License number 2018/02/NMA/DonegalCountyCouncil SECTION - 1 BALLYBOFEY LINK ROAD OPTION C

Upload: others

Post on 01-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • 0

    0

    1

    0

    0

    2

    0

    0

    2

    8

    0

    0

    0

    1

    0

    0

    2

    0

    0

    3

    0

    0

    4

    0

    0

    5

    0

    0

    6

    0

    0

    7

    0

    0

    8

    0

    0

    9

    0

    0

    1000

    1

    1

    0

    0

    1

    2

    0

    0

    1

    3

    0

    0

    1

    4

    0

    0

    1

    5

    0

    0

    1

    6

    0

    0

    1700

    1800

    1861

    0

    0

    1

    0

    0

    2

    0

    0

    2

    5

    6

    0

    0

    1

    0

    0

    2

    0

    0

    2

    1

    6

    ROUTE SELECTION IS INDICATIVE AND SUBJECT TO CHANGE

    P

    R

    O

    P

    O

    S

    E

    D

    R

    O

    A

    D

    B

    Y

    O

    T

    H

    E

    R

    S

    LEGEND

    EMERGING PRE

    FERRED

    ROUTE

    EARTHWORKS (I

    N FILL)

    EARTHWORKS

    (IN CUT)

    ANTICIPATED JU

    NCTION

    AREA

    Rev. Date

    Description

    Appr.

    Model File Identifier:

    Checked:

    Drawn:

    Designed:

    Approved:

    Project Title:

    Drawing Title:

    Rev:

    Chk'dDrawn

    File Identifier:

    Date:

    @ A3:

    Scale @ A1:

    Sheet: 03 of

    Status:

    R:\M

    GT

    03

    37

    - T

    en

    -T

    P

    rio

    rity R

    ou

    te

    Im

    p - D

    on

    eg

    al\8

    .0

    D

    ra

    win

    gs\D

    G\T

    T_

    MG

    T0

    33

    7-R

    PS

    -0

    0-Z

    Z-D

    R-D

    -D

    G0

    02

    1 P

    C B

    allyb

    ofe

    y L

    in

    k R

    oa

    d O

    ptio

    ns.d

    wg

    P05

    S3

    SECTION 1

    BALLYBOFEY LINK ROAD OPTION C

    TT_MGT0337-RPS-00-ZZ-DR-D-DG0022-03

    D. Curley

    S.Sinha

    T. Patterson

    E. Cox

    Feb.2019

    1:20 000

    1:40 000

    04

    P01 15/02/19 DC FOR REVIEW & COMMENT EC TP

    P02

    26/02/19 DC

    FOR REVIEW & COMMENT EC TP

    P03

    06/03/19 SS

    FOR REVIEW & COMMENT

    TP TP

    P04

    12/03/19 SS

    FOR REVIEW & COMMENT TP TP

    P0513/03/19 SS

    FOR REVIEW & COMMENT TP TP

    TEN-T Priority Route Improvement Project, Donegal

    Unit 14C,

    N5 Business Park,

    Castlebar,

    Co Mayo,

    Ireland

    Phone: +353 94 906 8950

    Email: [email protected]

    T +353 91 400200

    W www.rpsgroup.com/ireland

    E [email protected]

    Lyrr 2, IDA Business &

    Technology Park,

    Mervue, Galway

    NOTES

    DO NOT SCALE, use figured dimensions only.

    All levels are referred to Ordnance Survey Datum, Malin Head.

    This drawing is the property of the Transport Infrastructure Ireland, Parkgate Business Centre, Parkgate

    Street, Dublin 8, Ireland. It is a confidential document and must not be copied, used, or its contents

    divulged without prior written consent. This document should not be relied on or used in circumstances

    other than those for which it was originally prepared. RPS / Barry Transportation accepts no responsibility

    for this document to any other party other than the party by whom it was commissioned.

    Information including topographical survey, geotechnical investigation and utility detail used in thedesign have been provided by others.

    ©Ordnance Survey Ireland. All rights reserved. License number 2018/02/NMA/DonegalCountyCouncil

    SECTION - 1 BALLYBOFEY LINK ROAD OPTION C

    Sheets and Views03