proposed rezoning • open house welcome - edmonton · t ze proposal to rezone t ze mill woods to...
TRANSCRIPT
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
WELCOMEProposed Rezoning • Open House
WELCOME
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
Please sign in
Proposed Rezoning • Open House
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
Where do you Live?
Where do
an Orange
Elsewhere?
here
AGENDA & CONTACT INFO
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
Sean Lee, Planner
City Planning
Phone: 780.496.6121
4:30 – 8:30
Tonight’s Agenda
Proposed Rezoning • Open HouseLDA15-0649
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
Proposed Rezoning • Open HouseLDA15-0649
City Planning:Sean Lee Planner File Lead Sean Con a Planner Madeleine Bald in PlannerMar Harrison Planner Mi elle Ouelle e Senior Planner - Sout eastesse Snider Planning Te ni ian
Hamad Amirie Senior Planning Te ni ianDarbi Kinee Planning Co-op Student
Faisal Saeed General SupervisorGreg Able Senior EngineerOn Street Parking:Brian Murp SupervisorBrian Waddell Par ing Te ni ianEdmonton Transit Service (ETS):Darren Proul Transit Planning EnginnerLRT Delivery:Leslie S mon EngineerNeighbourhood Empowerment Team:Ni ole Nunes Communit Sa et Liasion
Ani a Mu ammed Pro e t Engineer
PROJECT STAFFParioPlan Inc:Armin A Prei sai s Prin ipleMar elo Figueria Senior Planner Urban DesignerDana Bao Planner Urban DesignerMadisen Killings ort Assistant PlannerRioCan:Stuart Craig Vi e President o Planning DevelopmentHeidi Green Senior Development ManagerVaug n Peters Site Manager
Steve Campbell Vi e PresidentCounterpoint Engineering:Patri Turner Senior Pro e t Manager
Mar Huberman Prin ipalNi ole Farn Engineer
Robert H R Labonte Prin ipal
SITE CONTEXT
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
Proposed Rezoning • Open HouseLDA15-0649
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
PLANNING PROCESS
Open House #1
OPPORTUNITY FOR PUBLIC PARTICIPATION & INPUT
to PropertyOwners &
Review by City Departments
EvaluateInput
Development Permit
Zoning
ARP
MDP
CRGPCapital RegionGrowth Plan
MunicipalDevelopment Plan
AreaRedevelopmentPlan (ARP)
Zoning Bylaw
Ongoing
May 5, 2016
Engagement Possible
HearingOpen House
#2
2016
HIERARCHY OF PLANNING POLICIES:
Proposed Rezoning • Open HouseLDA15-0649
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
MILL WOODS STATION ARP - PRECINCTS Proposed Rezoning • Open House
LDA15-0649
Mill Woods Town Centre
Developed Neighbourhood
LRT Stop
Approved LRT Alignment
Possible Future LRT Extension
Plan Boundary
Pipeline Corridor
low to high rise apartments
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
Proposed Rezoning • Open HouseLDA15-0649
plan area.
• Develop two main streets, 28 Avenue and the new north - south street.
MILL WOODS STATION ARP: HEIGHTS
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
Proposed Rezoning • Open HouseLDA15-0649
environment.
liveable urban neighbourhood.
Environmental Design in new development.
private lands.
REZONING SITE OVERVIEW
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
NW on the north, Hewes Way to the east, 23 Avenue NW on the south, and 66 Street NW on the west.
Proposed Rezoning • Open HouseLDA15-0649
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
WHAT HAS CHANGEDProposed Rezoning • Open House
LDA15-0649
T e proposal to rezone t e Mill Woods To n Centre Mall site as rst re eived in De ember 015 T e rst Open House as eld on Ma 5 016 T is Open House introdu ed t e appli a on to t e ommunit and e plained t e ndings o t e te ni al
revie o t e rst dra s o t e rezoning and asso iated reports
Sin e t at me or as progressed T e appli ant and t eir onsultant team as responded to on erns and issues it t e rst dra raised b t e Cit and revie ing agen ies T e Cit as underta en or to relo ate t e e is ng bus Transit Centre to
t e nort o t e e is ng terminal to o er a loser onne on it t e Mill Woods Sta on LRT pla orm T e Development Con ept or t e site as been re ned to ensure a ompa ble a ve pedestrian inter a e it t e LRT sta on t e ne Transit Centre and t e uture urban-standard development on t e site
T e se ond submission o t e appli a on as been re eived and is under revie T e do uments being revie ed b t e Cit and its partner agen ies are
• Dra Mill Woods Sta on Area Redevelopment Plan Amendment • Dra DC1 zoning regula on • Revised Transporta on Impa t Assessment
Do uments i a ompanied t e rst submission and ave alread been revie ed and deemed a eptable and omplete b t e Cit in lude
• Environmental Site Assessment t e site is suitable or t e proposed development T e gas sta on and servi e entre ill re uire urt er e amina on i t ose par els are developed • Muni ipal Servi ing Report on rms t at ater and se er u li es an a ommodate t e proposed development On-site servi ing ill be re uired to meet Cit standards and an upgrades ill be at t e developer s e pense
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
DEVELOPMENT CONCEPTProposed Rezoning • Open House
LDA15-0649
PRECINCT A T e proposal or Pre in t A is mi ed use buildings it eig ts o appro imatel 1 store s Primar uses ill in lude apartment ousing it ommer ial uses at t e base o mi ed use buildings
PRECINCT T e proposal or Pre in t is residen al uses o up to appro imatel 6 store s Primar uses ill in lude lo rise apartments mid-rise apartments ro ousing and or sta ed ro ousing it poten al ommer ial uses or a ve residen al uses at grade Commer ial uses an o up more it in t e ground oor
PRECINCT C T e proposal or Pre in t C is mi ed use residen al ommer ial buildings it eig ts o appro imatel 1 store s Primar uses ill in lude apartment ousing it ommer ial uses at t e base o mi ed use buildings T e uture transit onl and s ared transit and ve i ular onne on areas divide t is pre in t into t o par els
PRECINCT D T e proposal or Pre in t D is mi ed use residen al ommer ial buildings it eig ts o appro imatel 1 store s Primar uses ill in lude apartment ousing it ommer ial uses at t e base o mi ed use buildings Pre in t D a ommodates a transit entre and a al a onne ng t e transit entre to t e LRT sta on lo ated nort o t e site
PRECINCT E T e proposal or Pre in t E is ommer ial and residen al uses up to appro imatel 6 store s Primar uses ill in lude ommer ial lo rise apartment mid-rise apartments ousing and or sta ed ro ousing Commer ial uses ma ta e t e orm o stand-alone ommer ial pads or ommer ial uses at t e base o mi ed use buildings
PRECINCT F T e proposal or Pre in t F is primaril ommer ial it t e poten al or residen al uses up to appro imatel 6 store s Primar uses ill in lude ommer ial lo rise apartment mid-rise apartments ro ousing and or sta ed ro ousing Commer ial uses ma ta e t e orm o ree standing ommer ial pads buildings or ommer ial uses at t e base o mi ed use buildings T e uses in t is area are proposed to be more auto-oriented in
nature and drive-t roug s ould be permi ed
PRECINCT G T e proposal or Pre in t G is a publi l a essible private par or esplanade T e esplanade ill be o ned managed and programmed b t e developer to provide ear-round a ve and passive re rea onal opportuni es In order to ma e it a sa e a ra ve and a ve open spa e it ould allo or uses su as a es and outdoor pa o spa e armers mar ets ea mar ets green ouses mobile atering ood servi es publi l a essible private par restaurants spe ialt ood servi es urban gardens urban indoor and outdoor arms
BUILDING HEIGHTS
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
Proposed Rezoning • Open HouseLDA15-0649
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
PEDESTRIAN PRIORITY ZONEProposed Rezoning • Open House
LDA15-0649
All areas near the future Transit Centre and LRT Station require enhanced pedestrian infrastructure, including improved crosswalks, curb extensions, signals, and wide sidewalks.
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
Proposed Rezoning • Open HouseLDA15-0649
ACTIVE TRANSPORTATION NETWORKMajor streets on-site will require designated bicycle lanes. Pedestrians are prioritized with wider sidewalks, and some upgraded facilities off-site as a requirement of development.
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
MAIN STREETProposed Rezoning • Open House
LDA15-0649
The Main Street running North - South from 28 Avenue
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
MAIN EAST - WEST STREETProposed Rezoning • Open House
LDA15-0649
The main street running East - West across the site, from 66 Street to Hewes Way
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
THE CENTRAL NORTH - SOUTH “ESPLANADE”Proposed Rezoning • Open House
LDA15-0649
A Central boulevard running North - South, from 23 Avenue to the Transit Centre
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
TYPICAL LOCAL STREETProposed Rezoning • Open House
LDA15-0649
The Local Streets shown on the plan will have this format
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
INTERFACE OF THE SITE WITH 66 STREET - SOUTH
Proposed Rezoning • Open HouseLDA15-0649
Improved pedestrian infrastructure and landscaping, along with a Local road, will transition the
site from 66 Street to residential frontages on the site.
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
Proposed Rezoning • Open HouseLDA15-0649
INTERFACE OF THE SITE WITH 66 STREET - NORTHPedestrian-scale mixed-use development will transition the site from 66 Street
to the commercial and high-density residential part of the site.
LRT CORRIDOR & ACCESS PLAN - AREA 1
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
Proposed Rezoning • Open HouseLDA15-0649
PROPOSED LRT/TRANSIT CENTRE STATION
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
Proposed Rezoning • Open HouseLDA15-0649
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
Proposed Rezoning • Open HouseLDA15-0649
TRANSIT CENTRE - NEW LOCATIONThe bus Transit Centre urrentl lo ated b the Mill Woods Librar on the east side o the shopping mall will be relo ated loser to the uture Mill Woods LRT sta on This is ne essar to redu e the distan e passengers must wal to trans er rom the LRT to buses
The Transit Centre will be appro imatel a 1- minute wal 100 m rom the LRT pla orm It has been lo ated in this wa to provide spa e or a uture development whi h would provide pedestrian-oriented ameni es some o whi h ma a e and serve the Transit Centre
The new Transit Centre will provide
• A large heated shelter• Publi Washrooms• Opportuni es or small ios s• Smaller heated shelters lo ated
along the length o the pla orms
The City and the property owner are e ploring the possibility o integra ng the transit entre main shelter with the podium o a private development whi h ould provide be er passenger ameni es shops and servi es In either ase a main transit shelter will be in pla e or opening day o the Transit Centre Both the LRT and Transit Centre will be in opera on by De ember 0 0
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
NEW TRANSIT CENTRE - CONCEPTProposed Rezoning • Open House
LDA15-0649
A new Transit Centre will be built south o the Mill Woods LRT sta on This will eature 0 bus bays a large main heated shelter publi washrooms opportuni es or ios s and smaller heated shelters along the length o the pla orms
A overed wal way will onne t the Transit Centre with the LRT sta on The Transit Centre is appro imately a 1- minute wal rom the LRT and a 1 minute wal to the urrent shopping mall
In the future there will be a dedicated bus lane for access to 66 Street
There is a possibility to integrate bus shelters and ameni es with future private development ne t to the Transit Centre
Shops and services may front the Transit Centre
The Transit Centre will be open for service at the same me or before the LRT sta on in 0 0 It is not dependent upon the private development occurring
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
Proposed Rezoning • Open HouseLDA15-0649
PROPOSED BUS SERVICE TO VALLEY LINE LRT MILL WOODS TRANSIT CENTRE
• Improved bus servi e will provide more onvenient a ess to the Valley Line LRT• Kiss and Ride on Avenue will provide the opportunity or drop o s and pi ups• Dire t servi e will be provided to
- Mill Woods neighbourhoods- Meadows Transit Centre The
Meadows and Silver Berry neighbourhoods
- Southwood and Laurel neighbourhoods- Ellerslie Summerside Charlesworth and Wal er neighbourhoods- Century Par Transit Centre and
South Edmonton Common- Southgate Transit Centre- Capilano and Northeast Edmonton
COMMUNITY SAFETY LIAISONSOUTHEAST DIVISION
CITY OF EDMONTON – Sustainable Development edmonton.ca/rezoning
Proposed Rezoning • Open HouseLDA15-0649
Ni ole Nunes
Communit Sa et Liasion Neighbourhood Empowerment Team
Phone 0 1
Email ni ole nunes edmonton a
EPS Southeast Division