Proposed Granite Mine ( Minor Mineral), M.L.No.316/05, Production Capacity 57,232 MTPA (Marketable), Area 3.0 ha At Near Village Mungeriya, Tehsil- Shiv, District- Barmer (Raj) Sh. Devendra Singh. Pre Feasibility Report 25 1.0 EXECUTIVE SUMMARY The proposed Granite Mine (Minor Mineral) of Lessee Sh. Devendra Singh S/o Sh. Kailash Singh is situated near village Mungeriya, Tehsil - Shiv, District - Barmer, Rajasthan over an area of 3.0 ha. The Lease was sectioned in fevour of Sh. Devendra Singh S/o Sh. Kailash Singh, vide order letter No. SME/JOD/CC/BMR/GREMA/MINORML/316/05/7975 dated 26 Aug. 2007 & Registration on dated 15 Oct 2007 for a period of 50 year. Lease expires on dated 14 Oct 2057. The Mining Plan has been approved by S.M.E. Jodhpur circle, Department of Mines and Geology Jodhpur, Rajasthan, vide letter no. 5118 dated 10.10.2017. The mining will be carried out by open-cast mechanized method as per the approved Mining Plan only. The entire lease area is classified as Govt. Land with no forest land involved. The proposed rate of production is 57232 MTPA (Marketable). The estimated project cost is Rs. 0.30 Crore. Granite is a popular building material. It has been widely used for constructing homes and buildings. It is being used in flooring, because of the hardness of individual grains, uniformity of grain size and friability of their structure. Mining of Granite in the area has brought plenty of employment opportunity to the local people. This will help them to raise their living standards as well as there will be the opportunity for education, health & sanitation, transport and other developments. Mining projects will contribute to Social and Economic development of the area. Table1: Salient Features of the mine site S.NO. Particulars Details A. Nature of the Project Proposed Granite Mining B. Size of the Project 1. Mine area 3.0 ha 2. Proposed Production capacity 57232 MTPA (Marketable) C Location Details 1. Village Mungeriya 2. Tehsil Shiv 3. District Barmer 4. State Rajasthan 5. Latitude & Longitude Pillars Latitude (N) Longitude (E) 1 26°5'34.44" 70°59'21.2" 2 26°5'44.98" 70°59'16.53" 3 26°5'46.19" 70°59'19.87" 4 26°5'38.65" 70°59'23.2" 5 26°5'38.05" 70°59'21.53" 6 26°5'35.04" 70°59'22.86" 6. Toposheet No. 40N/4,40O/1,40J/16,40K/13

Upload: others

Post on 28-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Proposed Granite Mine ( Minor Mineral), M.L.No.316/05 ...€¦ · Devendra Singh. Pre – Feasibility Report 25 1.0 EXECUTIVE SUMMARY The proposed Granite Mine (Minor Mineral) of

Proposed Granite Mine ( Minor Mineral), M.L.No.316/05, Production Capacity – 57,232 MTPA (Marketable), Area – 3.0

ha At Near Village – Mungeriya, Tehsil- Shiv, District- Barmer (Raj) Sh. Devendra Singh.

Pre – Feasibility Report

25

1.0 EXECUTIVE SUMMARY

The proposed Granite Mine (Minor Mineral) of Lessee Sh. Devendra Singh S/o Sh. Kailash

Singh is situated near village – Mungeriya, Tehsil - Shiv, District - Barmer, Rajasthan over an

area of 3.0 ha. The Lease was sectioned in fevour of Sh. Devendra Singh S/o Sh. Kailash

Singh, vide order letter No. SME/JOD/CC/BMR/GREMA/MINORML/316/05/7975 dated 26

Aug. 2007 & Registration on dated 15 Oct 2007 for a period of 50 year. Lease expires on dated

14 Oct 2057.

The Mining Plan has been approved by S.M.E. Jodhpur circle, Department of Mines and

Geology Jodhpur, Rajasthan, vide letter no. 5118 dated 10.10.2017.

The mining will be carried out by open-cast mechanized method as per the approved Mining

Plan only. The entire lease area is classified as Govt. Land with no forest land involved. The

proposed rate of production is 57232 MTPA (Marketable). The estimated project cost is Rs.

0.30 Crore.

Granite is a popular building material. It has been widely used for constructing homes and

buildings. It is being used in flooring, because of the hardness of individual grains, uniformity

of grain size and friability of their structure.

Mining of Granite in the area has brought plenty of employment opportunity to the local

people. This will help them to raise their living standards as well as there will be the

opportunity for education, health & sanitation, transport and other developments. Mining

projects will contribute to Social and Economic development of the area.

Table1: Salient Features of the mine site S.NO. Particulars Details

A. Nature of the Project Proposed Granite Mining

B. Size of the Project

1. Mine area 3.0 ha

2. Proposed Production capacity 57232 MTPA (Marketable)

C Location Details

1. Village Mungeriya

2. Tehsil Shiv

3. District Barmer

4. State Rajasthan

5. Latitude & Longitude Pillars Latitude (N) Longitude (E)

1 26°5'34.44" 70°59'21.2"

2 26°5'44.98" 70°59'16.53"

3 26°5'46.19" 70°59'19.87"

4 26°5'38.65" 70°59'23.2"

5 26°5'38.05" 70°59'21.53"

6 26°5'35.04" 70°59'22.86"

6. Toposheet No. 40N/4,40O/1,40J/16,40K/13

Page 2: Proposed Granite Mine ( Minor Mineral), M.L.No.316/05 ...€¦ · Devendra Singh. Pre – Feasibility Report 25 1.0 EXECUTIVE SUMMARY The proposed Granite Mine (Minor Mineral) of

Proposed Granite Mine ( Minor Mineral), M.L.No.316/05, Production Capacity – 57,232 MTPA (Marketable), Area – 3.0

ha At Near Village – Mungeriya, Tehsil- Shiv, District- Barmer (Raj) Sh. Devendra Singh.

Pre – Feasibility Report

26

D Environmental Settings of the Area

1. Ecological Sensitive Areas No such area is located within 15 Km radius of M.L. area.

2. River / water body/ Mountains Available water bodies and rivers falling within 15 Km radius

Buffer zone as follows:

S. No. River / Water Bodies

Distance & Direction

1. Jalokhari Nadi ~11 Km S 2. Lokadiya Nadi ~11 Km SE 3. Atiya talav ~9 Km NW

(All distance area respect to G.T.Sheet) S. No. Mountains Distance &

Direction 1. Denchiya Dungar ~5.0 km, W 2. Dhola Dungar ~5.0 km, NE 3. Lamba Dungar ~6 km NE

(All distance area respect to G.T.Sheet)

3. Nearest Town / City Shiv – 27.60 km, NE

4. Nearest Railway Station Barmer Railway station – 54.65 Km, SE.

5. Nearest Airport Jodhpur Airport is located at a distance of 204.0 km in E

direction.

6. State Boundary No State boundary passes through the project site

7. Seismic Zone Zone – II [as per IS 1893 (Part-I): 2002]

D Cost Details

1. Total Project Cost Rs. 30.0 Lac

E Requirements of The Project

1. Proposed Water Requirement 3.0 KLD

2. Fuel Requirement 180 LPD

3. Man Power Requirement 5 -Technical Person( contract basis)

6- Skilled and15-20 unskilled persons (day basis)

2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION

2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT

The proposed Granite Mine (Minor Mineral) of Lessee Sh. Devendra Singh S/o Sh. Kailash

Singh is situated near village – Mungeriya, Tehsil - Shiv, District - Barmer, Rajasthan over an

area of 3.0 ha. The Lease was sectioned in fevour of Sh. Devendra Singh S/o Sh. Kailash

Singh, vide order letter No. SME/JOD/CC/BMR/GREMA/MINORML/316/05/7975 dated 26

Aug. 2007 & Registration on dated 15 Oct 2007 for a period of 50 year. Lease expires on dated

14 Oct 2057.

The Mining Plan has been approved by S.M.E. Jodhpur circle, Department of Mines and

Geology Jodhpur, Rajasthan, vide letter no. 5118 dated 10.10.2017.

Page 3: Proposed Granite Mine ( Minor Mineral), M.L.No.316/05 ...€¦ · Devendra Singh. Pre – Feasibility Report 25 1.0 EXECUTIVE SUMMARY The proposed Granite Mine (Minor Mineral) of

Proposed Granite Mine ( Minor Mineral), M.L.No.316/05, Production Capacity – 57,232 MTPA (Marketable), Area – 3.0

ha At Near Village – Mungeriya, Tehsil- Shiv, District- Barmer (Raj) Sh. Devendra Singh.

Pre – Feasibility Report

27

Applicant

Sh. Devendra Singh S/o Sh. Kailash Singh

R/o – Bishangarh, Jalore

The main supply of mineral Granite will be in Barmer, Jalore, Jodhpur and nearby area

and it will be utilized as construction material in buildings.

2.2 BRIEF DESCRIPTION OF THE NATURE OF PROJECT

This is a proposed Granite mining project. As per EIA Notification dated 14th

Sep, 2006

and as amended till date, the project falls under, Category “B2”. It has been proposed to

excavate approximately 57232 MTPA (Marketable) of Granite from this ML No. 316/05

by open - cast mechanized method. The lease area is 3.0 ha. Total mineable reserves are

515655 MT. The expected life of mine will be 10.47 years. There will be generation of OB

/ waste during the five year of plan period and it will be 214445.5cum. The mineral

Granite will be transported by hired trucks.

At the end of lease period, the total excavated area will be 3.0 ha. Out of this, 1.3005 ha.

will be backfilled and remaining area will be used as a water reservoir. Water reservoir

will ultimately help in recharging the water table and also help in cultivation and irrigation

purpose for nearby area. Water requirement of 2.46 KLD for the proposed project activity

will be met by water tankers supply from nearby village source. The depth of water table is

70 m (Pre-Monsoon) to 60 m (Post-Monsoon) below the general ground level. Thus, water

table will not encounter during working of the mine.

2.3 NEED FOR THE PROJECT & ITS IMPORTANCE TO THE COUNTRY/ REGION

Granite can be used for a number of things like and building monuments. Granite is

chiefly used as building materials, construction purpose, slab & tiles manufacturing.

Being a decorative stone, the chief use of is in flooring and wall tiles. . It is used to make

attractive pattern with pleasant color. The stone is naturally durable and water resistant

with antibacterial and stain proof characteristics. Granite is also scratch and heat resistant.

Granite used as an exterior cladding and pavement material, and its inherent strength,

abrasion resistance and superior weathering durability are likely to keep it one of the

preeminent material selections. Thus, due to these requirements, mining of Granite is

necessary and it is an important mineral for the nation to mine. Hence, to fulfill the need

of the construction industry, this project of Granite mining is necessary & important for

the nation.

About 20 local people will be employed for the proposed mining activity which will create

Page 4: Proposed Granite Mine ( Minor Mineral), M.L.No.316/05 ...€¦ · Devendra Singh. Pre – Feasibility Report 25 1.0 EXECUTIVE SUMMARY The proposed Granite Mine (Minor Mineral) of

Proposed Granite Mine ( Minor Mineral), M.L.No.316/05, Production Capacity – 57,232 MTPA (Marketable), Area – 3.0

ha At Near Village – Mungeriya, Tehsil- Shiv, District- Barmer (Raj) Sh. Devendra Singh.

Pre – Feasibility Report

28

employment opportunities to local population. By Granite production, the applicant will pay

revenue in the form of royalty, dead rent, direct and indirect taxes which will contribute and

generate additional revenue to the region, besides this, the project will prove beneficial in

terms of socio - economic development.

2.4 DEMAND – SUPPLY GAP

Granite is one of the important components in infrastructural development in building

construction projects in flooring & wall. So it will be always in demand. It has high

demand in the market due to increased domestic, industrial and other infrastructural

activities.

2.5 IMPORTS VS. INDIGENOUS PRODUCTION

In the current Granite business scenario, import of Granite is not envisaged, but its

indigenous use is in very much in demand.

2.6 EXPORT POSSIBILITY

Not applicable as proposed mine is for indigenous use only.

2.7 DOMESTIC/EXPORT MARKETS

Domestic demand is one of the main reasons for the rapid growth of Granite business in

India. Thus, domestic market for Granite as building material is well established. Granite

produced from the proposed Granite mine will be used to fulfill the domestic demand. No

export is proposed at this stage.

2.8 EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE

PROJECT

A total of 15-20 persons (unskilled) will be required as direct employment for the proposed

mining activity which will be given to local workers. Following staff & workers are

proposed to be employed:-

Table 2: Manpower requirement

1. Mining Engineer / Geologist 1 No.

2. Mines Manager 1 No.

3. Mines Mate 1 No.

4. Time Keeper 1 No.

5. Chowkidar 1 No.

6. Skilled Worker 12 No.

7. Unskilled Worker 15-20

Total 32-37 No.

Page 5: Proposed Granite Mine ( Minor Mineral), M.L.No.316/05 ...€¦ · Devendra Singh. Pre – Feasibility Report 25 1.0 EXECUTIVE SUMMARY The proposed Granite Mine (Minor Mineral) of

Proposed Granite Mine ( Minor Mineral), M.L.No.316/05, Production Capacity – 57,232 MTPA (Marketable), Area – 3.0

ha At Near Village – Mungeriya, Tehsil- Shiv, District- Barmer (Raj) Sh. Devendra Singh.

Pre – Feasibility Report

29

3.0 PROJECT DESCRIPTION

3.1 TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT

PROJECTS, IF ANY

The mining of Granite will be carried out by open-cast mechanized method. This will be

an independent project. No interlinked project is proposed.

3.2 LOCATION (MAP SHOWING GENERAL LOCATION, SPECIFIC LOCATION,

AND PROJECT BOUNDARY & PROJECT SITE LAYOUT) WITH

COORDINATES

The proposed Granite Mine M.L.No.- 316/05 situated at near Village–Mungeriya, Tehsil–

Shiv, District –Barmer, State - Rajasthan over an area of 3.0 Ha. The project site falls in

Survey of India Toposheet No. 40N/4,40O/1,40J/16,40K/13.

The geographical location with respect to boundary pillars of the proposed mine lease

are:-

Pillars Latitude (N) Longitude (E)

1 26°5'34.44" 70°59'21.2"

2 26°5'44.98" 70°59'16.53"

3 26°5'46.19" 70°59'19.87"

4 26°5'38.65" 70°59'23.2"

5 26°5'38.05" 70°59'21.53"

6 26°5'35.04" 70°59'22.86"

The location map is given below:

Page 6: Proposed Granite Mine ( Minor Mineral), M.L.No.316/05 ...€¦ · Devendra Singh. Pre – Feasibility Report 25 1.0 EXECUTIVE SUMMARY The proposed Granite Mine (Minor Mineral) of

Proposed Granite Mine ( Minor Mineral), M.L.No.316/05, Production Capacity – 57,232 MTPA (Marketable), Area – 3.0

ha At Near Village – Mungeriya, Tehsil- Shiv, District- Barmer (Raj) Sh. Devendra Singh.

Pre – Feasibility Report

30

Proposed Granite Mine

N/v- Mungeriya, Teh. Shiv, & Dist. Barmer (Raj.)

Figure-1: Location Map

3.3 DETAILS OF ALTERNATE SITES CONSIDERED AND THE BASIS OF

SELECTING THE PROPOSED SITE, PARTICULARLY THE

ENVIRONMENTAL CONSIDERATIONS GIVEN INTO SHOULD BE

HIGHLIGHTED.

Page 7: Proposed Granite Mine ( Minor Mineral), M.L.No.316/05 ...€¦ · Devendra Singh. Pre – Feasibility Report 25 1.0 EXECUTIVE SUMMARY The proposed Granite Mine (Minor Mineral) of

Proposed Granite Mine ( Minor Mineral), M.L.No.316/05, Production Capacity – 57,232 MTPA (Marketable), Area – 3.0

ha At Near Village – Mungeriya, Tehsil- Shiv, District- Barmer (Raj) Sh. Devendra Singh.

Pre – Feasibility Report

31

No alternative site has been taken into consideration as the mineral (Granite) is available at

this site.

3.4 SIZE OR MAGNITUDE OF OPERATION

Mine area for the Proposed Granite Mine is 3.0 ha and proposed production Capacity is

57232MTPA (Marketable).

3.4.1 REGIONAL GEOLOGY

Geologically, Barmer district is occupied by the Bhilwara and Delhi Super groups, which

have been further divided into several groups and formations.The rock of the area

belonging to eastern part to Barmer district of southwest Rajasthan comprises

predominatly of granites. Rhyolites with patches of agglomerate, basalt, andesite,

porphyries and dolerites are also preent. All these rocks constitute only 25% to 30%

of the total area studied while the remaining parts are covered by a thich blanket of

sand and alluvium. Some metasedimentry rocks belonging to Delhi supergroup

occur only as restricted patches within granites and rhyolites. The generalized

geological succession of the area based on surface of the area based on surface data

is given below:

Recent to Sub-recent - Blown sand and alluvium

Post Malani Intrusive - Dolerite / Norite dykes

Basalt, andesite, granite porphyry,Jalore

granite

Malani Igneous Suite -Siwana granite rhyolite with agglomerate patches

Post-Delhi intrusive - Erinpura granite and aplites

Delhi Supergroup - Quartzite with intercalated

--------------------------------------------------Base not seen--------------------------------------------

Mungeria-Suwala-Lakha area

3.4.2 LOCAL GEOLOGY:-

The granites of this area are broadly of three categories depending upon their

mineral constituents and appearance. The biotite bearing grayish white granite

belongs to Erinpura granite. These granites are intrusive within middle protrerozoic

Delhi Super group of rocks and are tonalitic to alkalifedspar syenitic in composition.

Erinpura granites are spread over a large part of the area in Sirohi district and

Page 8: Proposed Granite Mine ( Minor Mineral), M.L.No.316/05 ...€¦ · Devendra Singh. Pre – Feasibility Report 25 1.0 EXECUTIVE SUMMARY The proposed Granite Mine (Minor Mineral) of

Proposed Granite Mine ( Minor Mineral), M.L.No.316/05, Production Capacity – 57,232 MTPA (Marketable), Area – 3.0

ha At Near Village – Mungeriya, Tehsil- Shiv, District- Barmer (Raj) Sh. Devendra Singh.

Pre – Feasibility Report

32

occurring in the form of isolated outcrops, low-lying hummocks and ground level

exposures. The second category comprises pink coloured graniles consisting of

biotite and/or hornblende. This is called Jalore granite and it covers the major part

of the Jalore district in the form of small plutons (as in Jalor town, Bibalsar and

Jaswantpura) and isolated inselbergs (as in Deon, Muri etc.) Jalore granites have

intruded within Erinpura granites and are younger in age. The third category

granite of the this study area is comprises aegirine-augite and reibibeckite bearing

green coloured, granites. These are alkali granties and known as Siwana granite.

Siwana granite is mostly exposed in eastern part of Barmer district. Both Jalore and

Siwana granites are part of Malani Igneous Suite of rocks which are late proterozoic

in age. The basalt, andesite and granite porphyries a long with some aplitic veins are

the other constituents of Malani Igneous Suite. The extrusive phase of Malani is

represented by rhyolite and agglomerates. Malani rocks are intrusive within

Erinpuras. Finally some dolerite dykes have intruded within the Erinpura as well as

in jalore and Siwana granites.

3.4.3 MINERAL RESERVES

Category Reserves (MT) Proved (111) 343155 Probable (122) 172500 Possible (222) 172500 Mineral Reserves (Proved + Probable) 515655

Life of Mine

Life of

mine

Minable Reserves / Average annual production

515655/ 49245

10.47 years

3.5 PROJECT DESCRIPTION WITH PROCESS DETAILS (A SCHEMATIC

DIAGRAM / FLOW CHART SHOWING THE PROJECT LAYOUT,

COMPONENTS OF THE PROJECT ETC. SHOULD BE GIVEN).

3.5.1 YEAR WISE PRODUCTION DETAILS

During the first five years of plan period, it is proposed to produce 57232 MTPA

(Marketable) production of Granite as per the mining plan. The details of year wise

production for the five years plan period are given below:-

Page 9: Proposed Granite Mine ( Minor Mineral), M.L.No.316/05 ...€¦ · Devendra Singh. Pre – Feasibility Report 25 1.0 EXECUTIVE SUMMARY The proposed Granite Mine (Minor Mineral) of

Proposed Granite Mine ( Minor Mineral), M.L.No.316/05, Production Capacity – 57,232 MTPA (Marketable), Area – 3.0

ha At Near Village – Mungeriya, Tehsil- Shiv, District- Barmer (Raj) Sh. Devendra Singh.

Pre – Feasibility Report

33

Table3: Year Wise Production of Granite for the Five Years Period

Year Marketable Granite

(50%) (Tonne)

Mineral reject

(cum)

I 48675 16225

II 44625 14875 III 44122.5 14707.5

IV 51570 17190

V 57232.5 8448

The working plan is enclosed as Plate No. – V.

3.5.2 PROPOSED METHOD OF MINING

The proposed Granite Mine will be developed by mechanized open-cast mining which

includes drilling, blasting, loading, transport the mineral to end users.

3.5.2.1 OPEN CAST MINING

The mining will be done by open cast mechanized method. In mineral the bench height

will be maintained 5m and the width will be maintained more than 5m. The ultimate

depth of the mine workings is estimated to reach up to 25 m (conceptual Stage) from the

surface level.

3.5.2.2 SALIENT FEATURES OF MINING METHOD

The salient features of proposed mining method are:-

The height of the bench will be maintained at 5.0m.

The width of the bench will be maintained at more than 5m.

The mining will be done from top to bottom.

Considering the stability of rocks the final slope or say ultimate pit slope is proposed

70° from vertical.

Haul road will be developed up to point of loading and will not have gradient at 1:16.

Transportation of the mineral from mine to end users will be done by hired trucks.

3.5.3 EXTENT OF MECHANIZATION

The mining machineries to be used in proposed mining operation are as below:-

Table4: List of Machineries

S. No. Machine Type No. of Items Motive power

1. Jackammer 1 Compressed Air

2. Compressore 1 Diesel

3. Wire saw 1 D.G. set (60 HP)

4. Generator 1 -

5. Excavator 1 Diesel

6. Mobile Crane 1 Diesel

7. Winch / Chain

Pulley Block 1 Diesel

Source -As per Approval M.plan

Page 10: Proposed Granite Mine ( Minor Mineral), M.L.No.316/05 ...€¦ · Devendra Singh. Pre – Feasibility Report 25 1.0 EXECUTIVE SUMMARY The proposed Granite Mine (Minor Mineral) of

Proposed Granite Mine ( Minor Mineral), M.L.No.316/05, Production Capacity – 57,232 MTPA (Marketable), Area – 3.0

ha At Near Village – Mungeriya, Tehsil- Shiv, District- Barmer (Raj) Sh. Devendra Singh.

Pre – Feasibility Report

34

3.5.4 CONCEPTUAL MINING PLAN

The mineral Granite is outcropping throughout the area. The mineable reserves are

estimated to be 57232MT. The annual production is proposed to be 57232 TPA and the

life of the mine will be 10.47 years.

3.5.4.1 LAND USE PATTERN

The land use for mining and allied purposes is given below:-

Table 5: Conceptual Land Use Plan

S. No. Particulars Present Land-use

(ha.)

After five Years Land -Use

(ha.)

At the end of lease period Land - Use

(ha.) 1. Top Soil - - -- 2. Excavation Pit (Voids

Only)

0.3233 0.3233 2.50 Ha. (1.3005ha. will be backfilled and 1.1995 ha. will be used as a water reservoir).

3. Dumps of ore waste & Over Burden

0.0612 0.0612 --

4. Mineral Storage -- - -- 5. Infrastructure

including office Road --- -

0.002 -

6. Afforestation -- 33% (0.150) 33% 7. Undisturbed Area 2.6155 1.8635 --

Total 3.0 3.0 3.0 **Out of total plantation of 0.99 hect., 0.12 hect will be planted on statuary barrier while 0.8679 hect in

outsider area such as Gram Panchayat Bhawan (permission taken by gram panchayt & Sarpanch), School, village Road

3.5.5 DRILLING

The Drilling will be done with the help of compressor and jackhammer. In this mine the

diameter of hole will be 32-34 mm and depth of hole will be kept from 0.8m to 3.3m in a

single hole.

3.5.6 BLASTING

The hole will be blasted by using detonating cords.

SAFETY PRECAUTIONS

Steps will be taken to prevent any person approaching the shot. The safety precautions

like efficient siren will be blown prior to the blasting and at the clearance of blasting.

Page 11: Proposed Granite Mine ( Minor Mineral), M.L.No.316/05 ...€¦ · Devendra Singh. Pre – Feasibility Report 25 1.0 EXECUTIVE SUMMARY The proposed Granite Mine (Minor Mineral) of

Proposed Granite Mine ( Minor Mineral), M.L.No.316/05, Production Capacity – 57,232 MTPA (Marketable), Area – 3.0

ha At Near Village – Mungeriya, Tehsil- Shiv, District- Barmer (Raj) Sh. Devendra Singh.

Pre – Feasibility Report

35

3.5.7 MINERAL TRANSPORTATION

During the first five years mining plan period, the mineral produced will be loaded into

trucks/dumpers of 12 T capacity will be used, for onward transport to the consumers.

Loading of Granite blocks will be done by crane.

3.6 RAW MATERIAL REQUIRED ALONG WITH ESTIMATED QUANTITY,

LIKELY SOURCE, MARKETING AREA OF FINAL PRODUCTS, MODE OF

TRANSPORT OF RAW MATERIAL AND FINISHED PRODUCT

No raw material will be required. The final product will be sent to consuming industries

based on their demand. The mode of transportation of blocks of Granite will be by road.

Hired trucks/Dumpers will be used for transportation of Granite blocks.

3.7 RESOURCES OPTIMIZATION/ RECYCLING AND REUSE ENVISAGED IN

THE PROJECT, IF ANY, SHOULD BE BRIEFLY OUTLINED

The Granite will be mined in the form of blocks so there will be no recycling and reuse

envisaged.

3.8 AVAILABILITY OF WATER ITS SOURCE, ENERGY /POWER REQUIREMENT

AND SOURCE

WATER: The daily water demand for the proposed project is 3.0 KLD. The detailed

breakup of the same is given below:-

Table 6: Water Demand

S. No. Particulars Quantity

(KLD)

1. Domestic Purpose 0.50

2. Dust Suppression / Water Sprinkling 2.0

3. Green belt / Plantation (360plant ) 0.50

Total 3.0

POWER

Power requirement for proposed Granite mine will be about 120 LPD fuel.

3.9 QUANTITY OF WASTE TO BE GENERATED (LIQUID AND SOLID) AND

SCHEME FOR THEIR MANAGEMENT/DISPOSAL

About 60200cum of waste (OB) will be generated during the first five years of plan period

which will be dumped in Eastern part of the lease area and later on filled back in the

excavated pit. At the end of mine life there will be no dump left and all waste material will

be utilized for backfilling.

4.0 SITE ANALYSIS

Page 12: Proposed Granite Mine ( Minor Mineral), M.L.No.316/05 ...€¦ · Devendra Singh. Pre – Feasibility Report 25 1.0 EXECUTIVE SUMMARY The proposed Granite Mine (Minor Mineral) of

Proposed Granite Mine ( Minor Mineral), M.L.No.316/05, Production Capacity – 57,232 MTPA (Marketable), Area – 3.0

ha At Near Village – Mungeriya, Tehsil- Shiv, District- Barmer (Raj) Sh. Devendra Singh.

Pre – Feasibility Report

36

4.1 CONNECTIVITY (Mine Site)

Table No.7: Connectivity

4.2 LAND FORM, LAND USE AND LAND OWNERSHIP

LAND FORM

The mining lease area comprises of hilly terrain with high relief in the Eastern part and

slope towards Western, with highest 133mRL and lowest RL of the area is 97mRL. There is

no water body or nallah within the lease area.

LAND USE

The present land use pattern is as below:-

Table 8: Land Use Pattern

S. No. Particulars Present Land-use (ha.)

1. Excavation Pit (Voids Only) 0.3233 2. Dumps of ore waste & Over Burden 0.0612 3. Mineral Storage --

4. Infrastructure including office Road ---

5. Afforestation --

6. Undisturbed Area 2.6155

Total 3.0

LAND OWNERSHIP

The land as per revenue records is Govt. land (3.0 ha.). The Surface Plan is enclosed as

Plate No.-III

4.3 TOPOGRAPHY

PARTICULARS DISTANCE & DIRECTION ( FROM LEASE BOUNDRY)

Nearest Railway Station Barmer Railway Station 54.65 Km, SE

Nearest Airport Jodhpur Airport is located at a distance of

204 km in E direction.

Nearest Highway MDR-20A, 2.80Km, SE

NH-15, 28.0 Km, NE

NH-12, 56.14 Km, SE

Page 13: Proposed Granite Mine ( Minor Mineral), M.L.No.316/05 ...€¦ · Devendra Singh. Pre – Feasibility Report 25 1.0 EXECUTIVE SUMMARY The proposed Granite Mine (Minor Mineral) of

Proposed Granite Mine ( Minor Mineral), M.L.No.316/05, Production Capacity – 57,232 MTPA (Marketable), Area – 3.0

ha At Near Village – Mungeriya, Tehsil- Shiv, District- Barmer (Raj) Sh. Devendra Singh.

Pre – Feasibility Report

37

Topographically, the lease area comprises of hills of low height. The highest 133mRL in

the Eastern Part of Lease area and lowest 97 mRL is found in the Western part of the lease

area.

4.4 EXISTING LAND USE PATTERN (AGRICULTURE, NON-AGRICULTURE, FOREST,

WATER BODIES (INCLUDING AREA UNDER CRZ)), SHORTEST DISTANCES FROM

THE PERIPHERY OF THE PROJECT TO PERIPHERY OF THE FORESTS, NATIONAL

PARK, WILD LIFE SANCTUARY, ECO SENSITIVE AREAS, WATER BODIES

(DISTANCE FROM THE HFL OF THE RIVER), CRZ. IN CASE OF NOTIFIED

INDUSTRIAL AREA,

Table 9: Existing Land Use Pattern (Ha.)

S. No. Particulars Forest Land

Grazing Land

Govt. waste Land

Private Land

Total

1. Excavation Pit (Voids Only)

- -- 0.3233 -- 0.3233

2. Dumps of ore waste & Over Burden

- 0.0612 -- 0.0612

3. Mineral Storage - -- -- -- --

4. Infrastructure including office Road

- -- ---

--- ---

5. Afforestation - -- -- -- --

6. Undisturbed Area - -- 2.6155 -- 2.6155

Total -- -- 3.0 3.0

Table No.- 10 : ENVIRONMENTAL SETTINGS

S. No. Particulars Details 1. National Park, Wild Life

Sanctuary, Biosphere Reserve, Tiger Reserve, Wildlife Corridor, Reserved Forest

No such area is located within 15 Km radius of M.L. area.

2. River / water body Available water bodies and rivers falling within 15 Km radius Buffer zone as follows:

S. No. River / Water Bodies

Distance & Direction

1. Jalokhari Nadi ~11 Km S 2. Lokadiya Nadi ~11 Km SE 3. Atiya talav ~9 Km NW

(All distance area respect to G.T.Sheet) S. No. Mountains Distance &

Direction 1. Denchiya Dungar ~5.0 km, W

Page 14: Proposed Granite Mine ( Minor Mineral), M.L.No.316/05 ...€¦ · Devendra Singh. Pre – Feasibility Report 25 1.0 EXECUTIVE SUMMARY The proposed Granite Mine (Minor Mineral) of

Proposed Granite Mine ( Minor Mineral), M.L.No.316/05, Production Capacity – 57,232 MTPA (Marketable), Area – 3.0

ha At Near Village – Mungeriya, Tehsil- Shiv, District- Barmer (Raj) Sh. Devendra Singh.

Pre – Feasibility Report

38

2. Dhola Dungar ~5.0 km, SW 3. Lamba Dungar ~6 km SW

(All distance area respect to G.T.Sheet)

4.5 EXISTING INFRASTRUCTURE

Refer the point no. 4.1 of section 4.0

4.5.1 WATER

The total water demand will be as follows:

4.5.2 BASIC AMENITIES

a) School:- Primary school facility is available at village - Mungeriya 1.20 Km towards

SE whereas Senior Secondary School & College facilities are available at Shiv

which is 27.60 Km, NE.

b) Hospital:- Nearest Dispensary is situated at Mungeriya which is about 1.20Km, SE.

4.6 SOIL CLASSIFICATION

The area is generally covered with loamy sand, sandy loam & silt loam in texture. The

soil derived mostly from the weathering of igneous and accumulation of arid brown

sand concealing the possible alluvium desert soil

4.7 CLIMATE

The district experiences arid type of climate. Mean annual rainfall (1971-2005) of the

district is 281.8 mm whereas normal rainfall (1901-1971) is lower than average

rainfall and placed at 277.5 mm. Almost 90% of the total annual rainfall is received

during the southwest monsoon, which enters the district in the first week of July and

withdraws in the mid of September. As the district lies in the desert area, it faces

extremes of heat in summer and cold in winter. Both day and night temperatures

increase gradually and reach their maximum values in May and June. The temperature

varies from 48 degree in summer to 2 degree in winter. Atmosphere is generally dry

Daily Water Demand – 2.46

KLD

Domestic

0.10 KLD

Dust Suppression

2.0 KLD

Plantation

0.36 KLD

Page 15: Proposed Granite Mine ( Minor Mineral), M.L.No.316/05 ...€¦ · Devendra Singh. Pre – Feasibility Report 25 1.0 EXECUTIVE SUMMARY The proposed Granite Mine (Minor Mineral) of

Proposed Granite Mine ( Minor Mineral), M.L.No.316/05, Production Capacity – 57,232 MTPA (Marketable), Area – 3.0

ha At Near Village – Mungeriya, Tehsil- Shiv, District- Barmer (Raj) Sh. Devendra Singh.

Pre – Feasibility Report

39

except during the monsoon period. Humidity is at its highest in August with mean

daily relative humidity of 43%. The annual maximum potential evapotranspiration in

the district is 1850 mm and it is highest (260 mm) in the month of May and lowest (77

mm) in the month of December.

4.8 SOCIAL INFRASTRUCTURE AVAILABLE

Particulars Name Distance (Km) Direction

(From Mine Boundary)

Nearest Habitation Mungeriya 1.20 Km SE

Nearest Town Shiv 27.60 Km NE

Nearest Airport Jodhpur Airport 204.0 Km E

Nearest Highway

MDR-20A, 2.80Km, SE

NH-15 28.0 Km NE

NH-12 56.14 Km SE

Nearest Railway Station Barmer – 54.60 Km, SE

Nearest Dispensary and

Govt. Hospital

Mungeriya, 1.20 Km, SE.

Shiv, 27.60 Km, NE

Educational Facility Mungeriya 1.20 Km SE

5.0 PLANNING BRIEF

5.1 PLANNING CONCEPT (TYPE OF INDUSTRIES, FACILITIES, AND

TRANSPORTATION ETC.) TOWN AND COUNTRY

PLANNING/DEVELOPMENT AUTHORITY CLASSIFICATION

It is a mining project for mining of mineral Granite by open cast mechanized method. The

proposed production capacity will be 68000 TPA (ROM).

5.2 POPULATION PROJECTION

In the Buffer zone, total household is 3679. Total population is 24081in which 13168 are

males and 10913 are female. A total literate person in the surrounding area is 10253 and

total workers population is 11830. The detail demographic profile of villages located in the

study area is given below:-

Table 11: Demographic Profile

S. No. Human Settlement

Total House Hold

Total Population

Total Male

Total Female

Total Literates

Total Illiterates

Total Worker

Total Non-

Worker

Page 16: Proposed Granite Mine ( Minor Mineral), M.L.No.316/05 ...€¦ · Devendra Singh. Pre – Feasibility Report 25 1.0 EXECUTIVE SUMMARY The proposed Granite Mine (Minor Mineral) of

Proposed Granite Mine ( Minor Mineral), M.L.No.316/05, Production Capacity – 57,232 MTPA (Marketable), Area – 3.0

ha At Near Village – Mungeriya, Tehsil- Shiv, District- Barmer (Raj) Sh. Devendra Singh.

Pre – Feasibility Report

40

(Source: Census Data, 2011)

5.3 LAND USE PLANNING (BREAKUP ALONG WITH GREEN BELT ETC.)

The sapling for plantation will be selected on the basis of species suitable for arid climatic

condition and hence it is proposed to plant 20 saplings per year in Mines area. The plantation

will be done at the lease boundary.

Year- wise programme of green-belt development for five years, about saplings 360 will be

planted in an area of 0.15 ha. Up to the conceptual phase 800 saplings will be planted. By the

green belt development it will improve the eco-system and aesthetic beauty of the area. Post

plantation cares including provisions for watering, soil mulching & manuring the plants will

be done.

As DEIAA Barmer Member guide, we are all plantation in done in 2 year & next three

year to these plantation maintain

1 Rawat Ka Gaon 51 304 159 145 140 164 165 139 2 Balasar 94 665 346 319 408 257 378 287 3 Leekari 136 946 504 442 396 550 455 491 4 Jhanphli Kalan 137 889 465 424 215 674 400 489 5 Hathisingh Ka Gaon 113 597 358 239 264 333 354 243 6 Jhanphli Khurd 25 170 101 69 82 88 96 74 7 Kane Ka Gaon 105 715 384 331 130 585 334 381 8 Barsinga 118 678 365 313 386 292 361 317 9 Mungeriya 80 477 279 198 262 215 207 270

10 Laxmipura 115 815 443 372 216 599 469 346 11 Rasaratala 92 589 327 262 334 255 261 328 12 Tibniyar 155 959 535 424 449 510 420 539 13 Tanumanji 105 635 411 224 309 326 173 462 14 Poshma 46 324 168 156 61 263 155 169 15 Phogera 229 1443 868 575 615 828 755 688 16 Phogera Aagor 25 137 90 47 55 82 49 88 17 Doodaberi 117 719 384 335 224 495 288 431 18 Shiv Bhakhri 133 909 471 438 362 547 413 496 19 Suwala 95 606 321 285 275 331 355 251 20 Jhari 52 412 222 190 143 269 217 195 21 Magini 107 756 428 328 389 367 405 351 22 Rooganada 39 258 127 131 95 163 146 112 23 Adarsh Basti 94 586 325 261 218 368 331 255 24 Sarswati Nagar 35 248 145 103 113 135 117 131 25 Matuja 75 559 296 263 171 388 300 259 26 Kotra 126 713 389 324 378 335 341 372 27 Rampura 71 439 230 209 144 295 261 178 28 Junejon Ki Basti 120 1008 522 486 337 671 548 460 29 Sargeelapar 88 587 297 290 234 353 243 344 30 Jalila 113 702 419 283 311 391 268 434 31 Dholkiya 146 1017 544 473 387 630 465 552 32 Nand 65 469 254 215 200 269 247 222 33 Thoombali 157 1052 545 507 676 376 583 469 34 Nimbala 95 621 303 318 250 371 283 338 35 Jase Ka Gaon 78 529 281 248 241 288 306 223 36 Tibniyar 155 959 535 424 449 510 420 539 37. Rasaratala 92 589 327 262 334 255 261 328

Total 3679 24081 13168 10913 10253 13828 11830 12251

Page 17: Proposed Granite Mine ( Minor Mineral), M.L.No.316/05 ...€¦ · Devendra Singh. Pre – Feasibility Report 25 1.0 EXECUTIVE SUMMARY The proposed Granite Mine (Minor Mineral) of

Proposed Granite Mine ( Minor Mineral), M.L.No.316/05, Production Capacity – 57,232 MTPA (Marketable), Area – 3.0

ha At Near Village – Mungeriya, Tehsil- Shiv, District- Barmer (Raj) Sh. Devendra Singh.

Pre – Feasibility Report

41

Table 12: Greenbelt Programme

Year Un-worked Outside Inside (Reclaimed Area)

Top Soil Dumps

Total

Area (Ha.) No. of Trees

No. of Trees

Area (Ha.) No. of Trees Area (Ha.)

No. of Trees Area (Ha.) No. of Trees

Existing -- -- -- Outside of the lease area such as School, Gram Panchayat Bhawan etc.

-- --

-- -- --

I 0.03 20 340 -- -- -- 0.03 360

II 0.03 20 340 -- -- -- 0.03 360

III 0.03 20

Ma

inte

na

nce

0.03 20

IV 0.03 20 -- -- -- 0.03 20

V 0.03 20 -- -- -- 0.03 20

Vth Year Onwards

0.84 (Outsider Area)

20 -- -- -- 0.84

20

Total 0.99 120 680 -- -- -- -- 0.99 800

It is Proposed to Plant 340 Saplings (first & second yeat) will be Planted Out Side of Lease Area, third year to maintenance this Plantation

Maintenance will be done planted by lessee

5.4 ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL AND SOCIAL)

The mine is easily accessible from the State Highway No.15, (19 km, NE), MDR-20A

(2.6Km, N) from the mining lease area. It will be helpful to approach workers to the mine

site as well as transportation of mineral to the nearby areas and end user. Barmer Railway

station is 47.50 Km, SE from the mine site.

The infrastructure demand in the villages will be evaluate on the basis of necessity and

priority. Job opportunities are inadequate and new possibility for incoming generation is

required.

5.5 AMENITIES/FACILITIES

The first aid Station & rest shelter will be established in the mine lease area. The

temporary construction activities like rest shelter will be carried out during the

construction phase and will be sustained up to the conceptual Phase.

1) Site office : A Site office is proposed for technical & clerical staff and keeping

the records

2) Conservancy: The toilets will be provided separately for males and females.

Page 18: Proposed Granite Mine ( Minor Mineral), M.L.No.316/05 ...€¦ · Devendra Singh. Pre – Feasibility Report 25 1.0 EXECUTIVE SUMMARY The proposed Granite Mine (Minor Mineral) of

Proposed Granite Mine ( Minor Mineral), M.L.No.316/05, Production Capacity – 57,232 MTPA (Marketable), Area – 3.0

ha At Near Village – Mungeriya, Tehsil- Shiv, District- Barmer (Raj) Sh. Devendra Singh.

Pre – Feasibility Report

42

3) Water Hut: Potable water in water - hut will be provided for workers at mine

site.

4) Rest shelters: A rest - shelter is proposed at the mine site for the workers.

5) First Aid Facility: A First aid kit will be provided in the office for giving first

aid to the injured persons, if any.

BREAK-UP OF BUGETARY PROVISION FOR

THE FACILITIES PROVIDED FOR THE LABOURS

PARTICULARS CAPITAL COST RECURRING COST (P.A.) (IN RS.)

Facility – Shelter, Safe Drinking water, Sanitation Facility For Safety - Safety shoes , goggles, helmet etc.

20,000 (One Time) Sanitation 20,000 (One Time) -

Drinking water, 15,000 15,000

40,000 30,000

6.0 PROPOSED INFRASTRUCTURE

6.1 INDUSTRIAL AREA (PROCESSING AREA)

The area is well connected by road network to the mine from District headquarter etc. The

area is self sufficient to supply the needs of the project. Hence, no infrastructure is

proposed.

6.2 RESIDENTIAL AREA (NON PROCESSING AREA)

The local people will be given preference for employment, hence no residential area/

housing is proposed.

6.3 GREEN BELT

Refer point no. 5.2.

6.4 SOCIAL INFRASTRUCTURE

The proposed project is situated at Village - Mungeriya, Tehsil - Shiv, District – Barmer

(Rajasthan). Local people will be employed for excavation activity. The project will

provide the indirect means of earnings in the area of vehicle driving, shops, construction

etc. As a result the project will bring a positive impact on the adjacent civilization. The

proponent will spend 1% of profit for the development of the area i.e. medical facilities,

schools, temples and other social work.

Page 19: Proposed Granite Mine ( Minor Mineral), M.L.No.316/05 ...€¦ · Devendra Singh. Pre – Feasibility Report 25 1.0 EXECUTIVE SUMMARY The proposed Granite Mine (Minor Mineral) of

Proposed Granite Mine ( Minor Mineral), M.L.No.316/05, Production Capacity – 57,232 MTPA (Marketable), Area – 3.0

ha At Near Village – Mungeriya, Tehsil- Shiv, District- Barmer (Raj) Sh. Devendra Singh.

Pre – Feasibility Report

43

6.5 CONNECTIVITY (TRAFFIC AND TRANSPORTATION ROAD / RAIL / METRO

/WATER WAYS ETC.)

Given in point No. 4.0

6.6 DRINKING WATER MANAGEMENT (SOURCE & SUPPLY OF WATER)

The total water requirement for the proposed activity is 2.46 KLD. The drinking and other

water demand will be sourced from the nearby village through tanker supply.

6.7 SEWERAGE SYSTEM

Not applicable.

6.8 INDUSTRIAL WASTE MANAGEMENT

No industrial waste will be generated.

6.9 SOLID WASTE MANAGEMENT

Given in point No .3.9

6.10 POWER REQUIREMENT & SUPPLY/SOURCE

Power requirement for proposed Granite mine will be about 180LPD (Fuel). One DG set

is proposed for emergency.

7.0 REHABILITATION AND RESETTLEMENT (R and R PLAN)

7.1 POLICY TO BE ADOPTED (CENTRAL/STATE) IN RESPECT OF THE

PROJECT AFFECTED PERSONS INCLUDING HOME OUSTEES, LAND

OUSTEES AND LANDLESS LABOUR (A BRIEF OUTLINE TO BE GIVEN).

No Rehabilitation and Resettlement plan is required.

8.0 PROJECT SCHEDULE AND COST ESTIMATES

8.1 LIKELY DATE OF START OF CONSTRUCTION AND LIKELY DATE OF

COMPLETION (TIME SCHEDULE FOR THE PROJECT WILL BE GIVEN).

The project will be started once Environmental Clearance and other necessary approvals

from respective departments of state Government are obtained.

Page 20: Proposed Granite Mine ( Minor Mineral), M.L.No.316/05 ...€¦ · Devendra Singh. Pre – Feasibility Report 25 1.0 EXECUTIVE SUMMARY The proposed Granite Mine (Minor Mineral) of

Proposed Granite Mine ( Minor Mineral), M.L.No.316/05, Production Capacity – 57,232 MTPA (Marketable), Area – 3.0

ha At Near Village – Mungeriya, Tehsil- Shiv, District- Barmer (Raj) Sh. Devendra Singh.

Pre – Feasibility Report

44

8.2 ESTIMATED PROJECT COST AND ALONG WITH ANALYSIS IN TERMS OF

ECONOMIC VIABILITY OF THE PROJECT

Project cost

The proposed project cost will be Rs. 0.30 Crore.

Capital Cost: Rs. 0.25 Crore.

Recurring Cost: Rs. 5.0 Lac/Annum.

Expenditure Proposed for Environmental protection activities:

It is proposed to invest an amount of Rs. 0.50 Lac per annum towards environmental

action plan and the details of the same are given below:

Table 12: Expenditure Proposed for Environmental Protection Activities

S. No. Description of Item Recurring Cost (Rs)

1 Air Pollution Control - Water Sprinkling 10,000

2 Environmental Monitoring and Management 15,000

3 Green Belt Development 25000

Total 50,000

ESR S. No. ESR Activity Proposed Budget

( in Rs.) (P.A)

1. Promotion of Education: To promote education, merit

cum need scholarship will be distributed to the student of

village Mungeriya.

10,000

2. Health Check-up Camp: Health check - up Camps for

villagers as well as mine workers

10,000

3. Approachable Road Maintenance 0.50

Total 70,000

9.0 ANALYSIS OF PROPOSAL

Proposed Granite mine project will result in growth of the surrounding areas. Direct and

indirect employment will be generated in nearby villages. Special emphasis on Financial

and Social benefits will be given to the local people. No major adverse effect on

environment is envisaged as the required mitigation measures are inbuilt in the project.

10.0 ENVIRONMENT MANAGEMENT PLAN

PARTICULARS MANAGEMENT Air Quality Excavation, Loading

and Transportation Dust generated due to excavation and vehicular

movements will be suppressed by water spraying on

Page 21: Proposed Granite Mine ( Minor Mineral), M.L.No.316/05 ...€¦ · Devendra Singh. Pre – Feasibility Report 25 1.0 EXECUTIVE SUMMARY The proposed Granite Mine (Minor Mineral) of

Proposed Granite Mine ( Minor Mineral), M.L.No.316/05, Production Capacity – 57,232 MTPA (Marketable), Area – 3.0

ha At Near Village – Mungeriya, Tehsil- Shiv, District- Barmer (Raj) Sh. Devendra Singh.

Pre – Feasibility Report

45

haul road. To avoid the dust generation from the drilling

operations Wet drilling method will be practiced. Drill machines will be fitted with dust collectors. Use of appropriate explosives for blasting. Controlled blasting techniques will be practiced. Dust mask will be provided to the workers. Proper maintenance of vehicles & machineries will be

done. Water sprinkling on the haul road and other road at

regular intervals will be done. Speed of the vehicles will be kept within the prescribed

limits. Trucks will not be over loaded.

Water Quality

No waste water or any effluence as solid or gas there will be generated from mining operation

Garland drains will be made at the top of the quarry to channelize surface run off into natural drainage pit so that it can be utilized for dust suppression.

Mining operations will be at higher levels; therefore there will be no effect on ground water condition due to mining.

Noise Quality Drilling, Blasting, Loading and unloading of Mineral and movement of Trucks.

Adequate silencers in all the diesel engines will be used.

Personal protective equipment will be provided to the workers.

Proper maintenance of machines at regular intervals will be done.

Green belt development and plantation

Solid Waste

Top soil will be stacked at non mineralized area which will be utilized in green belt development.

OB & waste generated during mining operation will be backfilled in the mined out area.

Land Reclamation

The area is almost hilly land. At the end of life of mine, excavated area 2.50 ha Out of this 1.3005ha ha will be backfilled & 1.1995 will be used as water reservoir.

*Environment Management Plan is enclosed as Plate No.6