proposed express route optimization plan ... - go metro• on-line: • e-mail:...

18
Proposed Express Route Optimization Plan February 2018 www.go-metro.com

Upload: others

Post on 08-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Proposed Express Route Optimization Plan ... - Go Metro• On-line: • E-mail: routecomments@go-metro.com • Fax: 513-632-9202 • All comments received by 8 p.m. Feb. 20, 2018 will

Proposed Express Route Optimization Plan

February 2018

www.go-metro.com

Page 2: Proposed Express Route Optimization Plan ... - Go Metro• On-line: • E-mail: routecomments@go-metro.com • Fax: 513-632-9202 • All comments received by 8 p.m. Feb. 20, 2018 will

Welcome

• Today’s plans are just a proposal

• Final decision will not be made until SORTA board approval

• All comments received will be taken into consideration

• Final plans will be communicated through social media, on the bus, etc.

Page 3: Proposed Express Route Optimization Plan ... - Go Metro• On-line: • E-mail: routecomments@go-metro.com • Fax: 513-632-9202 • All comments received by 8 p.m. Feb. 20, 2018 will

Optimize routes based on Key Performance Indicators (KPI)

Four express routes recommended to change based on productivity:

• Rt. 38X Glenway Crossing - Uptown

• Rt. 52X Harrison Express

• Rt. 75X Anderson Express/Anderson Job Connection

• Rt. 81X Mt. Washington Express

Page 4: Proposed Express Route Optimization Plan ... - Go Metro• On-line: • E-mail: routecomments@go-metro.com • Fax: 513-632-9202 • All comments received by 8 p.m. Feb. 20, 2018 will

Route productivity

RoutePass/Trip

(11.4) DeviationCost/Pass ($10.50) Deviation

Farebox Recovery

(18%) Deviation

Total Percentage Deviation

Rank (Worst to Best)

38 10.6 -7% $ 17.11 -63% 8.8% -51% -121% 1

81 12.5 -10% $ 15.50 -48% 11.2% -38% -96% 2

75 10.8 -5% $ 15.09 -44% 13.7% -24% -73% 3

52 15.1 32% $ 17.15 -63% 14.9% -17% -48% 4

72 12.5 10% $ 12.93 -23% 13.8% -23% -36% 5

23 10.9 -4% $ 12.40 -18% 17.1% 5% -17% 6

30 15.1 32% $ 11.95 -14% 12.5% -31% -13% 7

Based on 2017 Data

Page 5: Proposed Express Route Optimization Plan ... - Go Metro• On-line: • E-mail: routecomments@go-metro.com • Fax: 513-632-9202 • All comments received by 8 p.m. Feb. 20, 2018 will

Rt. 38X Glenway Crossing - Uptown

Statistics - 2017

Pass/trip 10.6

Cost $ 352,227

Revenue $ 39,657

Ridership 29,036

Number of weekday trips

6 morning 6 evening

Crosstown express route that serves Westwood, Uptown, and Mt. Auburn

Page 6: Proposed Express Route Optimization Plan ... - Go Metro• On-line: • E-mail: routecomments@go-metro.com • Fax: 513-632-9202 • All comments received by 8 p.m. Feb. 20, 2018 will

Rt. 38X average boardings per trip

Page 7: Proposed Express Route Optimization Plan ... - Go Metro• On-line: • E-mail: routecomments@go-metro.com • Fax: 513-632-9202 • All comments received by 8 p.m. Feb. 20, 2018 will

• Eliminate 2 morning and 2 evening trips

• Operate 4 morning and 4 evening trips

• Several local routes cover the majority of the Rt. 38X (primarily Rt. 51)

Route Net annual cost savings

Net annual ridership chg.

PPT estimate (Weekday)

38X $116,285 -7,841 (27% loss) 11.6 (10.6 in 2017)

Rt. 38X proposed optimization plan

Page 8: Proposed Express Route Optimization Plan ... - Go Metro• On-line: • E-mail: routecomments@go-metro.com • Fax: 513-632-9202 • All comments received by 8 p.m. Feb. 20, 2018 will

Rt. 52X Harrison Express

Statistics - 2017

Pass/trip 15.1

Cost $412,102

Revenue $ 93,314

Ridership 33,868

Number of weekday trips

AM – 5 E PM – 5 E

Serves Harrison residents commuting to downtown Cincinnati

Page 9: Proposed Express Route Optimization Plan ... - Go Metro• On-line: • E-mail: routecomments@go-metro.com • Fax: 513-632-9202 • All comments received by 8 p.m. Feb. 20, 2018 will

Rt. 52X average boardings per trip

Page 10: Proposed Express Route Optimization Plan ... - Go Metro• On-line: • E-mail: routecomments@go-metro.com • Fax: 513-632-9202 • All comments received by 8 p.m. Feb. 20, 2018 will

Route Net annual cost savings

Net annual ridership chg.

PPT estimate (Weekday)

52X $75,616 -4,064 (12.0% loss) 16.6 (15.1 in 2017)

Rt. 52X proposed optimization plan

• Eliminate 1 morning and 1 evening trip

• Operate 4 morning and 4 evening trips

Page 11: Proposed Express Route Optimization Plan ... - Go Metro• On-line: • E-mail: routecomments@go-metro.com • Fax: 513-632-9202 • All comments received by 8 p.m. Feb. 20, 2018 will

Rt. 75X - Anderson Express

Statistics - 2017

Pass/trip 10.8

Cost $ 515,129

Revenue $ 103,437

Ridership 48,144

Number of weekday trips

AM - 7 E, 3 RC PM - 7 E, 3 RC

Serves Anderson Center Station Park & Ride to downtown Cincinnati. The reverse commute serves Belterra Park.

Page 12: Proposed Express Route Optimization Plan ... - Go Metro• On-line: • E-mail: routecomments@go-metro.com • Fax: 513-632-9202 • All comments received by 8 p.m. Feb. 20, 2018 will

Rt. 75X average boardings per trip

Page 13: Proposed Express Route Optimization Plan ... - Go Metro• On-line: • E-mail: routecomments@go-metro.com • Fax: 513-632-9202 • All comments received by 8 p.m. Feb. 20, 2018 will

Rt. 81X – Mt. Washington Express

Statistics - 2017

Pass/trip 12.5

Cost $ 132,276

Revenue $ 21,255

Ridership 12,032

Number of weekday trips

AM – 2 PM – 2

Serves Anderson Center Station Park & Ride and Mt. Washington, Columbia-Tusculum and Downtown communities

Page 14: Proposed Express Route Optimization Plan ... - Go Metro• On-line: • E-mail: routecomments@go-metro.com • Fax: 513-632-9202 • All comments received by 8 p.m. Feb. 20, 2018 will

Rt. 81X avareage boardings per trip

Page 15: Proposed Express Route Optimization Plan ... - Go Metro• On-line: • E-mail: routecomments@go-metro.com • Fax: 513-632-9202 • All comments received by 8 p.m. Feb. 20, 2018 will

Rt. 75X and Rt. 81X proposed optimization plan

Trip Type Pass/Trip

75 Express 14.6

75 RC 1.9

81 Express 12.5

Minimum Benchmark 11.4

Page 16: Proposed Express Route Optimization Plan ... - Go Metro• On-line: • E-mail: routecomments@go-metro.com • Fax: 513-632-9202 • All comments received by 8 p.m. Feb. 20, 2018 will

• Combine 75X and 81X into one route called Rt. 75X and re-route Rt. 75X to

cover Rt. 81X service on Salem Rd.

• Eliminate reverse commute trips to Belterra Park on Rt. 75X

• Eliminate 1 morning and 1 evening trip

• Operate 5 morning and 5 evening trips

• Riders along Salem Rd. will catch bus on opposite side of the street

Route Net annual cost savings

Net annual ridership chg.

PPT estimate (Weekday)

75X $164,251 -1,148 21.0 (10.8 in 2017)

81X $122,861 -12,032 0.0 (12.5 in 2017)

Total $287,112 -13,180 (27.4% loss) 21.0

Rt. 75X and Rt. 81X proposed optimization plan

Page 17: Proposed Express Route Optimization Plan ... - Go Metro• On-line: • E-mail: routecomments@go-metro.com • Fax: 513-632-9202 • All comments received by 8 p.m. Feb. 20, 2018 will

Results of proposed express route optimization plan

Costs reduced by

about $428,000

Reinvent Metro to prepare for significant budget deficits in 2019 and beyond

Ridership reduced by about

25,000 rides per year

Page 18: Proposed Express Route Optimization Plan ... - Go Metro• On-line: • E-mail: routecomments@go-metro.com • Fax: 513-632-9202 • All comments received by 8 p.m. Feb. 20, 2018 will

We want to hear from you

• Digital: record comments at back of room

• Written: complete comment form today

• On-line: www.go-metro.com

• E-mail: [email protected]

• Fax: 513-632-9202

• All comments received by 8 p.m. Feb. 20, 2018 will become part of the official public meeting record and will be considered by the SORTA board