Project Title:
PROPOSED CONSTRUCTION OF REFERRALHOSPITAL IN BALCAD DISTRICT, MIDDLE
SHABELLE REGION
GSPublisherVersion 0.0.100.100
Sheet No. Content01/2502/25
Master planFloor Plan
Roof Plan
Truss layout
Truss detail
Foundation layout
Ring beam layout
Elevations 3&4
Section views
Elevations 1&2
OCTOBER 2018DRAWING INDEX
Septic tank
Washrooms
3D Projection 01
3D Projection 02
3D Projection 033D Projection 04
Electrical layout
3D Projection 05
3D Projection 06
3D Projection 07
03/25
04/25
05/25
06/25
07/25
08/25
09/22
10/25
11/25
12/25
13/25
14/25
15/25
16/25
17/25
18/25
19/25
20/25
21/25
3D Projection 0822/25
Elevated water tank
Guard house
23/253D Projection 0924/253D Projection 1025/25
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
26,300
5,80
0
12,050
3,40
03,
000
3,40
0
5,000
3,500
16,400
11,0
00
15,000 5,000 15,000
100,000
200,
000
4,050
7,00
0
Inpatient male ward Inpatient female ward
Passage
Staff room
Emergency roomManager office
Pharmacy
LabDoctor office
Reception Nurse room
Waiting area Waiting area Medical store
Doctor officeDoctor office
Doctor office
Passage
Ram
p
Passage
Public sitting Public sitting
w.c
w.c
w.c
Ladies
Gents.
P.V
P.V
P.V
P.V
P.V
P.V
P.V
w.cP.V
MAIN ROAD
Proposed Elevatedtank
ProposedWashrooms
Proposed Guardhouse
Existing Boundarywall to be remained
Existing Boundarywall to be remained
Courtyard
MASTER PLAN
01/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
1
1
A A
2
2
3
3
4
4
5
5
8
8
9
9
10
10
11
11
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
6
6
7
7
B B
C C
D D
E E
D D
C C
B B
A A
1,8001,200
8,200 3,700 8,2001,200
1,800
4,500200
4,500200
3,600 8,600 3,600200
4,500200
4,500
1,700 1,500 3,200 1,500 5,350900
2,350 2,000 2,350900
5,350 1,500 3,200 1,500 1,700
900 9003,200
1,60
0
400
1,60
04,500
4,700 4,700 1,900 1,900 3,200 2,000 3,200 3,800 4,700 4,700
4,700 4,700 1,900 1,900 3,200 2,000 3,200 3,800 4,700 4,700
4,500 4,500 1,700 1,700 3,000 1,800 3,000 3,600 4,500 4,500
1,700 1,500 3,200 1,500 2,250 1,300 1,6501,200 1,400 1,200 1,400 1,200
2,150 1,500 2,750 1,500 3,200 1,500 1,700600600
1,600
2,200600 1,200
1,500950
1,500950
1,500 2,000 1,500 2,000 1,500950
1,500950
1,5001,200 600
2,200
8,0003,5008,0001,000
1,6001,000
1,40
01,
400
1,40
01,
400
1,20
0200 1,
20020
0 1,20
0200 1,
200
50060
0 80060
0 80060
0 80060
0 500
1,40
01,
400
1,40
01,
400
1,20
0 2001,
200 20
01,20
0 2001,
200
500 60
0800 60
0800 60
0800 60
0500
1,8001,200
1,6001,000
8,000 3,500 8,0001,000
1,600
2,200600
1,850 1,500 2,100 1,500 2,8001,200
2,900 1,500 1,900 1,500 1,950600
2,200
8,200 3,700 8,2001,200
1,800
4,30
02,
000
4,50
0
4,10
04,
300
1,80
0
1,60
01,
500
4,80
01,
500
1,60
0
4,30
02,
000
4,50
0
4,10
020
01,
800
200
4,30
0
1,60
01,
500
1,70
01,
200
1,90
01,
500
1,60
0
9,80
0
3,00
02,
200
3,00
0
3,00
0
1,80
0
4,600
X-X X-X
Y-Y
Y-Y
E01
E04
E03
E02
Inpatient male ward Inpatient female ward
Passage
Staff room
Emergency roomManager office
Pharmacy
Lab.Doctor office
Reception Nurse room
Waiting area Waiting area Medical store
Doctor officeDoctor office
Doctor office
Passage
Ram
p
Passage
Floor Plan
Porch
U P
U P
U P
U P
U P
Reception desk
Vent blocks Ram
p
Ram
p
Ram
p
FLOOR PLAN
02/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
A
A
B
B
C
C
D
D
A
A
B
B
C
C
D
D
E
E
4,700 4,700 1,900 1,900 3,200 2,000 3,200 3,800 4,700 4,700
900
200
2,800
200
3,20
0
1,10
01,
100
1,500
1,20
0
1,80
0
900
4,500
450
4,522
2,000
35,000
4,300 2,000 4,500 1,400 1,400 1,400 1,400
11,000 5,8009,800
3,00
0
3,00080
0
1,20
0
1,200
1,500
2,20
0
3,000
600800
600800
600800
600
1,60
0
+0.00(G.Level)
+0.45(G.Floor Level)
+3.85(Roof Level)
Elevation E-01
+0.00(G.Level)
+0.45(G.Floor Level)
+3.85(Roof Level)
Elevation E-02
ELEVATIONS
03/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
E
E
E
E
E
E
E
E
D
D
D
D
D
D
D
D
C
C
C
C
C
C
C
C
B
B
B
B
B
B
B
B
A
A
A
A
A
A
A
A
D
D
D
D
D
D
D
D
C
C
C
C
C
C
C
C
B
B
B
B
B
B
B
B
A
A
A
A
A
A
A
A
10
10
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
11
11
9
9
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
26,30035,000
4,700 4,700 3,800 3,200 2,000 3,200 1,900 1,900 4,700 4,700
1,400 1,400 1,400 1,400 4,500 2,000 4,3005,800 11,0009,800
3,000200
3,000200
3,000
3,00
02,20
0
800
400600 800 600 800 600 800 600
600
1,60
0
1,500
1,20
0
1,600
4,800
+0.00(G.Level)
+0.45(G.Floor Level)
+3.85(Roof Level)
+0.00(G.Level)
+0.45(G.Floor Level)
+3.85(Roof Level)
Elevation E-03
Elevation E-04
ELEVATIONS
04/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
A B C D A B C D E
1 2 3 4 5 6 78
9 10
4,300 2,000 4,500 10,000 1,400 1,400 1,400 1,400
1,800
3,40
01,800
400
2,20
0
3,000
900
4,700 4,700 1,900 1,900 3,200 2,000 3,200 3,800 4,700
3,40
0
1,200
1,20
0
2,30
0
3,200
2,500
1,20
0
PassagePorchWaiting area
Passage Staff room
10cm thick Ground floor slabwith 6mm bars @ 20cm centres in bothdirections on 1000 gauge polythenedamp proof membrane (dpm ) on 5cmthick sand blinding on 15cm thick wellcompacted hardcore all to Eng's approva
Corrugated GI sheets gauge 28, fixed oncelcurised cypress structure: 50x50mmBattens on 200X50mm Rafters @700mm,on 100X50mm Wall-plate bolted @1200mm centres; structure to SE details. GIlining on ridges and cut-outs
12mm thick chip-board ceiling on50X50mm cypress brandering at 600mm centres
Aluminum window to theinside to schedule
200x200mm RCCcolums started fromGrade beam
900mm high parapetwall
50mm diameter,900mm high GIpipe handrail on each side of the rampto site Eng's approval
Timber door toschedule Timber door to
schedule
200x200mm RCCLintel beam
200x200mm RCCLintel beam
200mm thick masonary blockwall with exterior qualityemulsion paint on wood - floatrender to approval.
Docotr'soffice
Docotr'soffice
Laboratoryroom
Medicalstore
ReceptionPharmacy Passage
10cm thick Ground floor slabwith 6mm bars @ 20cm centres in bothdirections on 1000 gauge polythenedamp proof membrane (dpm ) on 5cmthick sand blinding on 15cm thick wellcompacted hardcore all to Eng's approva
Timber door toschedule
Vent blocks 400x400mm RCCcolums started fromGrade beam
Aluminum window to theinside to schedule
200x200mm RCCLintel beam
200x200mm RCCRoof beam
200mm thick masonary blockwall with exterior qualityemulsion paint on wood - floatrender to approval.
Corrugated GI sheets gauge 28, fixed oncelcurised cypress structure: 50x50mmBattens on 200X50mm Rafters @700mm,on 100X50mm Wall-plate bolted @1200mm centres; structure to SE details. GIlining on ridges and cut-outs
12mm thick chip-boardceiling on 50X50mm cypressbrandering at 600 mmcentres
50mm diameter,900mmhigh GI pipe handrail oneach side of the rampto site Eng's approval
1200x2500mmhigh open window
SECTION X-X
SECTION Y-Y
RAMP
400x400mm RCCcolums started fromGrade beam
SECTION VIEWS
05/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
A A
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
B B
C C
D D
E E
D D
C C
B B
A A
1
1
2
2
3
3
4
4
5
5
8
8
9
9
10
10
11
11
6
6
7
7
1,8001,200
8,200 3,700 8,2001,200
1,800
1,40
01,
400
1,40
01,
400
4,700 4,700 1,900 1,900 3,200 2,000 3,200 3,800 4,700 4,700
4,30
02,
000
4,50
0
Corrugated GI sheets gauge 28, fixed oncelcurised cypressstructure: 50x50mm Battens on200X50mm Rafters @700mm, on100X50mm Wall-plate bolted @1200mm centres; structure to SE details.GI lining on ridges and cut-outs
ROOF PLAN
Gauge 28, 250mm girth bent twiceGI gutters fixed with andincluding brackets on 150X25mmHW facia (painted)
FALL FALLFALLFALL FALL
FALL FALLFALLFALL FALL
FALL
FALL
FALL
FALL
FALL
FALL
FALL FALLFALL FALLFALL
FALL FALLFALL FALLFALL
FALL
FALL
FALL
FALL
FALL
FALL
ROOF PLAN
06/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
1,200 1,200650
1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,850 1,200
1,16
01,
240
1,20
01,
200
1,200 1,810 1,240 1,200 1,200 1,200 1,200 1,200
1,20
01,
200
1,20
01,
200
1,20
01,
200
1,20
01,
200
1,20
01,
200
1,20
01,
200
1,20
01,
200
1,20
01,
200
1,16
01,
240
1,20
01,
200
1,200 1,200 1,200 1,200 1,200 1,200650
1,200 1,200
1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200
1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200
1,000 1,200 1,200 1,200 1,200 1,200 1,200 1,200 2,400 1,200 1,200 1,200 1,000
1,000 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200
1,00
01,
200
1,20
01,
200
1,20
01,
200
1,20
01,
200
1,20
01,
000
1,00
01,
200
1,20
01,
200
1,20
01,
200
1,20
01,
200
1,20
01,
000
2,416 2,416
Trass layout
TRUSS LAYOUT
07/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
750
750
75075
0
125250
125
125
250
125
125250 250
12512525
025
0 125
12525
025
0 125
125250
250 125
800
200
400100100
850
450
DETAIL 'A'(SCALE 1:20)
2/100x50mm OR100x50mm THICKCOLLAR PLATE EACHFACE
NAILING AREA
12mm DIA. M.S HOLD DOWNBOLTS @ 1500 C/C
RING BEAM
(SCALE 1:20)
DETAIL 'B'
2/100x50mm THICK COLLAR PLATE
100x100x2mmx100 LONG ANGLECLEAT NAILED TO TRUSS ANDWALL PLATE (E.F.)
NAILING AREA
EACH FACE(SCALE 1:20)
DETAIL 'C'
100x50mm THICK COLLAR PLATEEACH FACE
NAILING AREA
150x50mm
TYPICAL NAILING PATTERN(SCALE 1:20)
150x50mmTRUSS MEMBER B
TRUSS MEMBER
TRUSS MEMBER150x50mm
COLLAR PLATE50mm THICK
B
COLLAR PLATE50mm THICK
TRUSS MEMBER
3Y12-01
2Y12-02R8-03-200
300x200 RB1(SCALE 1:25)
G.L
40X20ground beam
400X200Strip footing
Foundation detail
STRUCTURALDETAILS
08/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
1
1
A A
2
2
3
3
4
4
5
5
8
8
9
9
10
10
11
11
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
6
6
7
7
B B
C C
D D
E E
D D
C C
B B
A A
1,400400 800 400
7,800400
3,300400
7,800400 800 400
1,400
1,8001,200
8,200 3,700 8,2001,200
1,800
26,500
1,00
0400 1,
00040
0 1,00
0400 1,
000
1,40
01,
400
1,40
01,
400
6,00
0
1,00
0400 1,
00040
0 1,00
0400 1,
000
1,40
01,
400
1,40
01,
400
6,00
0
4,300400
4,300400
1,500400
1,500400
2,800400
1,600400
2,800400
3,400400
4,300400
4,300
4,700 4,700 1,900 1,900 3,200 2,000 3,200 3,800 4,700 4,70035,200
12,050 12,050
12,05012,050 1,800
1,600
3,90
040
01,
600
400
4,10
040
040
04,
300
2,00
04,
500
11,2
00
3,90
040
01,
600
400
4,10
040
040
0
4,30
02,
000
4,50
0
11,2
00
4,300400
4,300400
5,200400
4,400400
5,200400
4,300400
4,300400400
4,700 4,700 1,900 1,900 3,200 2,000 3,200 3,800 4,700 4,700
15,000 5,200 15,000
2,80
0
2,00
0
1,60
0
Ram
p
Foundation Plan
Porch
U P
A142
BRC MESH
A142
BRC MESH
A142
BRC MESHA142
BRC MESH
A142
BRC MESH
A142
BRC MESH
A142
BRC MESH
A142
BRC MESH
A142
BRC MESH
A142
BRC MESH
A142
BRC MESH
A142
BRC MESH
A142
BRC MESH
A142
BRC MESH
A142
BRC MESH
A142
BRC MESH
Ram
p
U P
U P
Ram
p
U P
U P
Ram
p
FOUNDATION PLAN
09/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
1
1
A A
2
2
3
3
4
4
5
5
8
8
9
9
10
10
11
11
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
6
6
7
7
B B
C C
D D
E E
D D
C C
B B
A A
1,600
5,40
0
3,00
0
2,20
0
5,40
0
5,40
0
1,20
0
1,20
01,
200
1,20
0
8,0001,000
3,500 8,0001,000
1,600
1,800
9,80
0
4,500200
4,500200
1,700200
1,700200
3,000200
1,800200
3,000200
3,600200
4,500200
4,500
4,30
01,
800
4,10
0
4,500 4,500 15,800
3,700 7,600 3,700
1,80
0
4,500
4,10
04,
300
4,30
04,
100
4,10
04,
3003,
000
3,20
0
3,00
02,20
01,
900
4,30
0
4,700 4,700 1,900 1,900 3,200 2,000 3,800 4,7003,200
16,400 16,400
9,80
0
5,80
0
26,300
5,80
0
1,40
01,
400
1,40
01,
400
1,8001,200
8,200 3,700 8,2001,200
1,800
1,8001,200
8,200 3,700 8,2001,200
1,800
12,050 12,050
1,40
01,
400
1,40
01,
400
4,600
1,80
0
15,000 15,0005,0004,700 4,700 1,900 1,900 3,200 2,000 3,200 3,800 4,700 4,700
4,30
02,
000
4,50
0
11,0
00
11,0
00
4,30
02,
000
4,50
0
RING BEAM 01 RING BEAM 01 RING BEAM 01 RING BEAM 01 RING BEAM 01RING BEAM 01
RING BEAM 01 RING BEAM 01 RING BEAM 01 RING BEAM 01 RING BEAM 01RING BEAM 01
RING BEAM 02
RING BEAM 02
RING BEAM 02
RING BEAM 02
RING BEAM 02
RING BEAM 02
RING BEAM 03
RING BEAM 04 RING BEAM 04 RING BEAM 04 RING BEAM 04 RING BEAM 04 RING BEAM 04 RING BEAM 04RING BEAM 04
RING BEAM 04 RING BEAM 04 RING BEAM 04 RING BEAM 04 RING BEAM 04 RING BEAM 04 RING BEAM 04RING BEAM 04
RING BEAM 04 RING BEAM 04 RING BEAM 04 RING BEAM 04 RING BEAM 04 RING BEAM 04 RING BEAM 04RING BEAM 04
RING BEAM 04 RING BEAM 04 RING BEAM 04 RING BEAM 04 RING BEAM 04 RING BEAM 04RING BEAM 04
RING BEAM 05
RING BEAM 06 RING BEAM 06
RING BEAM 07
RIN
G B
EAM
08
RIN
G B
EAM
08
RIN
G B
EAM
08
RIN
G B
EAM
08
RIN
G B
EAM
08
RIN
G B
EAM
08
RIN
G B
EAM
08
RIN
G B
EAM
08
RIN
G B
EAM
09
RIN
G B
EAM
09
RIN
G B
EAM
10
RIN
G B
EAM
10
RIN
G B
EAM
10
RIN
G B
EAM
11
RIN
G B
EAM
11
RIN
G B
EAM
11
RIN
G B
EAM
11
RIN
G B
EAM
09
RIN
G B
EAM
09
RIN
G B
EAM
11
RIN
G B
EAM
11
RIN
G B
EAM
11
RIN
G B
EAM
10
RIN
G B
EAM
10
RIN
G B
EAM
10
RIN
G B
EAM
11
RIN
G B
EAM
11
RIN
G B
EAM
11
RIN
G B
EAM
11
RIN
G B
EAM
12
RIN
G B
EAM
12
RING BEAM LAYOUT PLAN
RING BEAM
10/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
IOMMOG114
516-AAZ-MOG114
PROPOSED REHABILITATIONOF LOWYA CADE WARD -ABDUL AZIZ DISTRICT.
-ABDUL AZIZ DISTRICT-
JULY 2013
AHMED KIRISH
ALI HUSSEIN
PETER M.M.
N.T.S
IOM GRANT NO:A3
PROJECT. CLIENT. IMPLEMENTING AGENCY. SCALE
DATE
DRAWN BY:
DRAWING TITLE:
DRAWING NO:
PROJECT NO:SHEET NO:
DAN GUUD
REVIEWED AND APPROVED BY:
ECOTECH LIMITED
P.O. Box 5527-00100,Nairobi - KenyaTel: +254 712 388815Fax: +254 20 250809Email: [email protected]: www.ecotech.co.keLocation: Ecotech House, Woodlands Road, off Lenana Road, Nairobi - Kenya
BENADIR REGIONALADMINISTRATION,MOGADISHU,SOMALIA
CONSULTANT:-
IOM GRANT NO:
NOTES.
All drawings and concepts remain the propertyof ecotech limited
- All dimensions are in mm unless stated otherwise
- Any discrepancies in the drawings should be reported to the consultants before the contractor commences work on site.
ss
wp
s
SYMBOL MEANING
CEILING MOUNTEDLIGHT FIXTURE.CEILING MOUNTEDLIGHT FIXTURE (PENDANT)
WALL MOUNTED LIGHT FIXTURE
RECESSED SPOT LIGHT
FLUORESCENT LIGHT FIXTURE
FLUORESCENT LIGHT FIXTUREUNDER FALSE CEILING
WIRING CONNECTION
SINGLE PLEX RECEPTACLE
DUPLEX RECEPTACLE
SPECIAL RECEPTACLE & OUTLET(WITH PILOT LIGHT)
FLUORESCENT LIGHT FIXTURE WITHSHAVER SOCKET & LOCALISED SWITCHFLUORESCENT LIGHT FIXTURE WITHLOCALISED SWITCH
WATER PROOF RECEPTACLE (SINGLE)
CONSUMER UNIT
TELEPHONE/TV JACK
ALARM KEYPAD
DOORBELL PUSH BUTTON
DOORBELL TRANSFORMER
S3
S2
S
3 gang switch
2 gang switch
Single pole switch
Flood lamp
S SS
OFFICE 01 OFFICE 02 OFFICE 03 OFFICE 04 OFFICE 05
N E W C A N O P Y
SS
T-1 T-2
S3
31371-516-ELEC-09
ELECTRICAL DETAILS ELECTRICAL
09/09
1,60
0
15,000 15,0005,000
11,0
00
9,80
0
12,050
5,80
0
26,300
Electrical Plan
Inpatient male ward Inpatient female ward
Passage
Staff room
Emergency roomManager officePharmacy
Lab.Doctor office
Reception
Nurse room
Waiting areaWaiting area
Medical store
Doctor officeDoctor office
Doctor office
Passage
Ram
p
Passage
Porch
U P
U P
U P
U P
U P
Ram
p
Ram
p
Ram
p
S S
SS S S
SS
S S
S
S2
S2
S3
S
S
S
S2 S2
S
S2 S2S S
S2
S2
S
S2
S2
S
ELECTRICAL PLAN
11/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
200
600
200
300
100F1
(150
0)
F2
100
E
200 50
0
200 800 200 D 200 800 200
E
A B C
10 mm waterproof rendering150 mm base concrete
slab reinforced with BRC142 on well compacted
hardcore to S.E . approval
To sub-soil irrigation
T W L
Invert level ofincoming drain
G.L
190 mm masonry with10 mm rendering on bothsides .
G.L G.L G.L
OutletMH
600x450mm mh cover & frame1200 mm R.C. Cover Slab
InletMH
PLAN
H
G
H
SECTION G - G SECTION H -H
G
TYPEDIMENSIONS IN MM
ACAPACITYIN LITRES
No. OFPERSONS
DESLUDGINGINTERVAL
(YRS ) B C D E F1 F2
A
B
E
D
C
800
4000
3000
6000
9000
800
12000
800
15000
1200
10 1000
1600
1600
1000
20
30
40
50
2
2
2
2
2
800
800
1400
1400
800
1200
1400
1400
3000
3600
3600
4000
1400
1800
2000
2400
1200
1500
1500
1500
1500
1400
1400
1400
1300
1200
1 . Cover slab to be reinforced with 10 mm dia. bar at100 mm c/c ( conc. 20 / 20 mix 1 :2:4)
2. Base slab to be conc . class mix 1 :3:63. Outlet and inlet pipes to be 100 mm dia. cast iron.4. Scum buffle to be 100 mm thick reinforced with 2 No.
100 mm at both ends conc 80(20)5. Dividing wall to be 100 mm thick conc. class 20(20)
reinforced with weld mesh No. 65.
NOTES,
SEPTIC TANK
12/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
C
C
B
B
A
A
C
C
B
B
A
A
C
C
B
B
A
A
1
1
2
2
3
3
4
4
5
5
AA
BB
CC
1
1
2
2
3
3
4
4
5
5
1
1
2
2
3
3
4
4
5
5
AA
BB
CC
1,80
045
0
2,200 1,650
1,800
450
1,700
400200
700
1,700 1,700 1,700 1,700
1,500200
1,500200
1,500200
1,500
1,65
02,
200
1,45
020
02,
000
1,00
0
1,700 1,700 1,700 1,700
7,000
3,200200
3,200
4,05
0
7,000
4,05
0
1,65
02,
200
650
1,00
02,
400
450
1,80
01,
600
1,700 1,700 1,700 1,700
7,000
1,000 650
2,200 1,650 1,650 2,200
1,6502,400650
1,000 2,400
3,00
0
1,80
0
Elevation 03Elevation 02
FOUNDATION SPECIFICATION100mm thick plain concrete slab40cm width foundation wallinghardcore fill consolidated at 300mm level
200x200 R.C lintelbeam to S.E details
12.0 deg Roof with five boxprofile G.I sheets
+0.45m
+3.00m
+0.00m
110mm dia. pvcstack vent pipe
Section view
Foundation depth to bedetermined on site
200mm thick block walling
Elevation 01
Fall
Roof PlanFloor Plan
WASHROOMS
13/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
1
1
2
2
B B
A A
1
1
2
2
400
400
800
DET
ERM
INED
ON
SITE
MIN
.120
0
8Y16-03
GRD. LEVEL
4Y16-05-200 B2
Y16-03-200 B1
SCALE 1:25
SECTION
R8-03-200 LINKS
3,000
3,00
0
3,400
2,60
0
3,0003,400
3,4003,000
2,600
2,80
0
8,30
0
6,00
015
02,
000
2,80
040
0
800
800
2,20
040
0
EWT
E E
Elevated WaterTank
ELEVATED TANK
14/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
1
1
2
2
B B
A A
B
B
A
A
B
B
A
A
3,200
3,20
03,
400
1,10
01,
200
1,10
0
3,400
3,000
3,200
3,400
3,000
3,20
03,
400
1,60
01,
800
2,10
0
1,100 1,200 1,100
3,4003,200
3,00
0
2,000
300
1,600
450
1,20
0
1,200
3,00
0
3,2003,200
5,000
3,500
3,00
0
2,16
0 4,600
2,600
2,16
0
Room
Corrugated GI sheets gauge 28, fixedon celcurised cypress structure:50x50mm Battens on 200X50mmRafters @700mm, on 100X50mmWall-plate bolted @ 1200mmcentres; structure to SE details. GIlining on ridges and cut-outs
Elevation 02Elevation 01
Floor Plan
Guard house
Public sitting
Public seating floor Plan
Public seating elevation
Public seating elevation
GUARD HOUSE &PUBLIC SEATING
15/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
3D 01
15/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
3D 02
15/25
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
3D 03
18/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
3D 04
19/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
3D 05
20/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
3D 06
21/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
3D 07
22/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
3D 08
23/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
3D 09
24/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
3D 10
25/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
3D 11
26/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
3D 12
27/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
3D 13
28/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
3D 14
29/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
3D 15
30/31
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED CONSTRUCTION OFREFERRAL HOSPITAL IN BAL'AD
DISTRICT, MIDDLE SHABELLE REGION
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
OCTOBER 2018
ENG. D. Wanja
HIRSHABELLE STATE,BALCAD DISTRICT
3D 16
31/31