A-1
SHEET NO.SUBMITTED BY:
APPROVED BY:
RECOMMEND APPROVAL:
CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION:
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
PROPOSED CONSTRUCTION OF
Kidalapong, Malita, Davao Occidental
MAIN ENTRANCE GATE
Director, ES
Police Chief Superintendent
PHILIP LAWRENCE S ABAPO III
Police Senior Inspector
ANTONIO A TAYLAN, JR
Deputy Chief, RPMU
MARIA DEOVINA G SEVILLANO
Police Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANO
Police Senior Superintendent
Deputy Director, ES
MANUEL G FABROS
Police Senior Superintendent
Acting Chief, ID, ES
HONORIO R AGNILA
Police Superintendent
Chief of Staff, ES
PERSPECTIVE1A 1
P
D
's
Q
U
A
R
T
E
R
S
C
H
A
P
E
L
E
N
T
R
A
N
C
E
G
A
T
E
O
U
T
P
O
S
T
P
O
W
E
R
M
O
T
O
R
P
O
O
L
O
U
T
P
O
S
T
F
L
A
G
P
O
L
E
S
E
C
U
R
IT
Y
S
E
C
U
R
IT
Y
O
U
T
P
O
S
T
S
E
C
U
R
I
T
Y
P
A
R
A
D
E
G
R
O
U
N
D
G
R
A
N
D
S
T
A
N
D
P
P
S
C
B
U
IL
D
IN
G
R
A
N
G
E
F
IR
IN
G
H
P
U
C
I
D
U
P
C
L
O
P
I
U
P
I
A
S
A
D
M
I
N
B
P
O
B
U
I
L
D
I
N
G
C
O
V
E
R
E
D
B
A
S
K
E
T
B
A
L
L
C
O
U
R
T
P
N
C
O
F
U
T
U
R
E
F
U
T
U
R
E
O
N
-
B
A
S
E
H
O
U
S
I
N
G
F
U
T
U
R
E
O
N
-B
A
S
E
H
O
U
S
IN
G
E
X
P
A
N
S
I
O
N
F
U
T
U
R
E
C
O
N
C
E
S
S
I
O
N
A
I
R
E
&
O
T
H
E
R
F
A
C
I
L
I
T
I
E
S
H
O
U
S
E
N
S
EW
G
A
T
E
2
O
U
T
P
O
S
T
S
E
C
U
R
IT
Y
P
A
R
K
I
N
G
A
R
E
A
P
A
R
K
I
N
G
A
R
E
A
P
A
R
K
I
N
G
A
R
E
A
P
A
R
K
I
N
G
A
R
E
A
P
A
R
K
I
N
G
P
A
R
K
I
N
G
B
A
R
R
A
C
K
S
W
A
T
E
R
R
E
S
E
R
V
O
I
R
E
X
I
S
T
I
N
G
R
O
A
D
THIS SITE
CAMP DEVELOPMENT PLAN1A 1
E
N
T
R
A
N
C
E
G
A
T
E
M
O
T
O
R
P
O
O
L
P
I
A
S
B
P
O
P
A
R
K
I
N
G
A
R
E
A
E
X
I
S
T
I
N
G
R
O
A
D
SITE DEVELOPMENT PLAN1A 1
GROUND FLOOR PLANSCALE 1:150M
GUARD
HOUSE
1
2
3
ENTRANCE GATEEXIT GATE
W1
W2W2
W1
1.70
1.20
1.70 6.00 2.50 1.706.00
2.90
17.90
A B E FC DC
C
2 2
D1 D1
SECOND FLOOR PLANSCALE 1:100M
H A L L W A Y1
2
3
1.70
1.20
1.70 6.00 2.50 1.706.00
2.90
17.90
A B E FC DC
C
2 2
W3 W3
D1 D1
FRONT ELEVATIONSCALE 1:150M
A B E F
EXIT GATE ENTRANCE GATE
C D
W1
Kidalapong, Malita, Davao Occidental
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
1.70 6.00 2.50 6.00 1.70
17.90
4.50
4.50
7.80
0.50
BEAM
1.80
2.80
2nd FFL
SPECIFICATIONS
DESCRIPTIONMARK
EXTERIOR WALLPAINTED FIN. (PNP GRAY)
A5
A1 A6
A4
COLUMNWALLPAINTED FIN. (PNP BLUE)
SEE DETAIL @ S5
PAINTED FIN. (PNP WHITE)
A3A2
PAINTED FIN. (WHITE)
PAINTED FIN. (PNP BLUE)
REAR ELEVATIONSCALE 1:150M
ABF
EXIT GATEENTRANCE GATE
E ED C
W1
T H A N K Y O U F O R V I S I T I N GDAVAO OCCIDENTAL PPO
1.70 6.00 2.50 6.00 1.70
17.90
D1 D1
W3 W3
4.5
0
7.8
0
0.50
BEAM
2.8
0
2nd FFL
4.5
0
1.8
0
A5
A1 A6
A4A3A2
SPECIFICATIONS
DESCRIPTIONMARK
EXTERIOR WALLPAINTED FIN. (PNP GRAY)
COLUMNWALLPAINTED FIN. (PNP BLUE)
SEE DETAIL @ S5
PAINTED FIN. (PNP WHITE)
PAINTED FIN. (WHITE)
PAINTED FIN. (PNP BLUE)
A-2
SHEET NO.SUBMITTED BY:
APPROVED BY:
RECOMMEND APPROVAL:
CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION:
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
PROPOSED CONSTRUCTION OF
Kidalapong, Malita, Davao Occidental
MAIN ENTRANCE GATE
Director, ES
Police Chief Superintendent
PHILIP LAWRENCE S ABAPO III
Police Senior Inspector
ANTONIO A TAYLAN, JR
Deputy Chief, RPMU
MARIA DEOVINA G SEVILLANO
Police Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANO
Police Senior Superintendent
Deputy Director, ES
MANUEL G FABROS
Police Senior Superintendent
Acting Chief, ID, ES
HONORIO R AGNILA
Police Superintendent
Chief of Staff, ES
SHEET NO.APPROVED BY:
Director, ES
Police Chief Superintendent
ANTONIO A TAYLAN, JRABELARDO C MATILLANO
Police Senior Superintendent
Deputy Director, ES
LONGITUDINAL SECTIONSCALE 1:150M
W1
CEILING LINE
W3W3
0.40
0.50
5.00
2.80
A B E FC D
1.70 6.00 2.50 6.00 1.70
17.90
D1 D1
D1 D1
4.50
1.80
CROSS SECTIONSCALE 1:150M
1.50
4.50
1.80
TYPICAL ELEVATIONSCALE 1:150M
1.50
7.80
W2
0.50
W1
0.25
0.10
0.90
1.20
0.35
W2
0.25
0.10
0.90
1.20
0.35
1.50
0.60
1.200.20 0.20
W3
D1
D1
STEEL CASEMENT WINDOW
5mm THK. CLEAR GLASS
W CONCRETE CANOPY
(2.38M X O.40M X 0.10M Thk)
STEEL CASEMENT WINDOW
5mm THK. CLEAR GLASS
W CONCRETE CANOPY
(1.70M X O.40M X 0.10M Thk)
SLIDING WINDOW
5mm THK. CLEAR GLASS
W CONCRETE CANOPY
(1.60M X O.40M X 0.10M Thk)
ALUMINUM SWING DOOR
POWDER COATED
W TINTED FIXED GLASS
W CONCRETE CANOPY
(1.40M X O.40M X 0.10M Thk)
2.10
0.20 0.20
0.20
0.10
1.00
DOOR DETAILSCALE 1:150M
WINDOW DETAILSCALE 1:150M
123 123
A-3
SHEET NO.SUBMITTED BY:
APPROVED BY:
RECOMMEND APPROVAL:
CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION:
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
PROPOSED CONSTRUCTION OF
Kidalapong, Malita, Davao Occidental
MAIN ENTRANCE GATE
Director, ES
Police Chief Superintendent
PHILIP LAWRENCE S ABAPO III
Police Senior Inspector
ANTONIO A TAYLAN, JR
Deputy Chief, RPMU
MARIA DEOVINA G SEVILLANO
Police Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANO
Police Senior Superintendent
Deputy Director, ES
MANUEL G FABROS
Police Senior Superintendent
Acting Chief, ID, ES
HONORIO R AGNILA
Police Superintendent
Chief of Staff, ES
SIZE OF WIRE & CONDUITS
3.5 MM2 THHN WIRE15 MM DIA PVC PIPE3.5 MM2 THHN WIRE15 MM DIA PVC PIPE
LIGHTING OUTLET
LOAD DESCRIPTION
4
CKT
23
1
PB-1NUMBER OF
LIGHTINGCONVENIENCEVOLTS
230 VS1 S2 S3
SWITCHESCIRCUIT BREAKERVOLT-AMP AMPERE
No.16
S C H E D U L E O F L O A D S
1230 V
1 20 A, 2P1600 6.9620 A, 2P600 2.60
CONVENIENCE OUTLET
TOTAL
7201440
3.136.26
28.95 8.0 MM2 THHN WIRE20 MM DIA PVC PIPE
AUTHORITIES CONCERNED IN THE ENFORCEMENT OF RULES AND REGULATION OF ALL LOCAL AND NATIONAL
OF THE PHILIPPINE ELECTRICAL CODE (PEC), THE
1. ALL ELECTRICAL WORKS HEREIN SHALL BE DONE IN
REQUIREMENTS OF THE MANILA ELECTRIC COMPANY, THE
STRICT CONFORMITY WITH THE LATEST APPROVED EDITION
2. THE SUPPLY TO THE BUILDING SHALL BE SINGLE PHASE
SUPPORTS AND FITTINGS.
AGENCY FOR EVERY INTENDED LOCATION AND PURPOSES.NEW AND OF THE APPROVED TYPE BY THE PHIL. STANDARD4. ALL MATERIALS AND EQUIPMENT TO BE USED SHALL BE
POLYVINYL CHLORIDE (PVC) SCHED. 40 WITH PROPER BOXESAND FOR POWER AND LIGHTING LAYOUT SHALL BE DONE IN FEEDER LINE SHALL BE DONE IN RIGID STEEL CONDUIT (RSC),3. NATURE OF WORKS FOR SERVICE ENTRANCE AND MAIN
3-WIRE, 240VOLTS AND 60HZ.
GENERAL NOTES & SPECIFICATION
ELECTRICAL LAWS.
THREE GANG SWITCH
LIGHTINGPOWER PANEL BOARD
CIRCUIT HOMERUN, IND. CKT. NO.
SINGLE PHASESERVICE ENTRANCE
5. SMALLEST SIZE OF WIRE AND CONDUIT DIAMETER TO BE
8. MOUNTING HEIGHTS SHALL BE AS FOLLOWS:
LIGHT SWITCHES - 1.40M ON CENTER TO FIN. GRD. FLR. LN.DUPLEX CONV. OUTLET - 0.30M.O.C. TO FIN. GRD. FLR. LN.PANEL BOARD - 1.50M.O.C. TO FIN. GRD. FLR. LN.
USED UNLESS SPECIFIED IN THE PLAN SHALL SHALL BE3.5MMSQ. (NO. 12 AWG) AND 15 MMØ (1/2"Ø) ELECTRICAL
6. WIRES AND CABLES TO BE USED SHALL BE PURE COPPER WITH 600VOLTS HEAT RESISTANT THERMOPLASTIC WITH NYLON
STANDARD SIZE RESPECTIVELY.
TYPE "THHN"" THW " OR APPROVED EQUAL.
AND SHALL BE UNDER THE DIRECT SUPERVISION FROM A DULYLICENSED, REGISTERED ANDOR PROFESSIONAL ELECTRICAL ENGR.
7. ALL WORKS HEREIN SHALL BE DONE IN WORKMAN-LIKE-MANNER
S
DOWNLIGHT
DUPLEX CONV. OUTLETMETER
TWO GANG SWITCH
M
SabSabc
PB
LEGEND:
ONE GANG SWITCHaCFL LAMP
SINGLE-LINE RISER DIAGRAM
1
3
LIGHTING 2 LIGHTING4
TO
20 A 20 A
60 A MAIN C.B.
NOT
M
SCALE
PANEL BOARD
SINGLE PHASESERVICE ENTRANCE
C.0.
@ 20 MM DIA RSC PIPE2- 8 MMSQ. THHNTHW COPPER WIRE
SPARE
1
CONVENIENCE OUTLET
LIGHTING OUTLET 624
5 10.00SPARE
20 A, 2P20 A, 2P
230 V230 V
23006300
3.5 MM2 THHN WIRE15 MM DIA PVC PIPE3.5 MM2 THHN WIRE15 MM DIA PVC PIPE
20 A
LIGHTING LAYOUT PLANGROUND FLOOR PLAN SCALE 1:150M
a a a bbb
c
c
d d
d d
Sab
LIGHTING LAYOUT PLANSECOND FLOOR PLAN SCALE 1:150M
e e f f
PB1
PB2
Se Sf
w x
y y
z z
Swx
ScdSyz
POWER LAYOUT PLANGROUND FLOOR PLAN SCALE 1:150M
POWER LAYOUT PLANSECOND FLOOR PLAN SCALE 1:150M
PB3
PB3
wp
wp wp
E-1
SHEET NO.SUBMITTED BY:
APPROVED BY:
RECOMMEND APPROVAL:
CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION:
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
PROPOSED CONSTRUCTION OF
Kidalapong, Malita, Davao Occidental
MAIN ENTRANCE GATE
Director, ES
Police Chief Superintendent
PHILIP LAWRENCE S ABAPO III
Police Senior Inspector
ANTONIO A TAYLAN, JR
Deputy Chief, RPMU
MARIA DEOVINA G SEVILLANO
Police Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANO
Police Senior Superintendent
Deputy Director, ES
MANUEL G FABROS
Police Senior Superintendent
Acting Chief, ID, ES
HONORIO R AGNILA
Police Superintendent
Chief of Staff, ES
SANITARY LAYOUT PLANSCALE 1:150M
1
2
3
A B E FC D
FLOOR DRAIN
100MMØ PVC
FLOOR DRAIN
100MMØ PVC
1
2
3
1.70
1.20
1.70 6.00 2.50 1.706.00
2.90
17.90
A B E FC D
2
W3 W3
FLOOR DRAIN
100MMØ PVC
FLOOR DRAIN
100MMØ PVC
FLOOR DRAIN
100MMØ PVC
SANITARY LAYOUT PLANSCALE 1:150M
P-1
SHEET NO.SUBMITTED BY:
APPROVED BY:
RECOMMEND APPROVAL:
CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION:
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
PROPOSED CONSTRUCTION OF
Kidalapong, Malita, Davao Occidental
MAIN ENTRANCE GATE
Director, ES
Police Chief Superintendent
PHILIP LAWRENCE S ABAPO III
Police Senior Inspector
ANTONIO A TAYLAN, JR
Deputy Chief, RPMU
MARIA DEOVINA G SEVILLANO
Police Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANO
Police Senior Superintendent
Deputy Director, ES
MANUEL G FABROS
Police Senior Superintendent
Acting Chief, ID, ES
HONORIO R AGNILA
Police Superintendent
Chief of Staff, ES
SECOND FLOOR FRAMING PLANSCALE 1:150M
A B C D E F
1
2
3
1.20
1.70
2.90
1.70 2.50 1.706.006.00
B1
B1
B1
B1B2
B2
B2 B2
B2
B2
B2 B2
B3
B3
B2B2
B4 B4
B5
17.90
S1 S1S2
S3
FOUNDATION PLANSCALE 1:150M
A B C D E F
1
2
3 C1F1 C1F1
C2F2
C2F2
C3F3 C3F3C2F2
C2F2
TIE BEAM
TIE BEAM
TIE BEAMTIE BEAM
TIE BEAM
TIE BEAM
TIE BEAM
TIE
B
EA
M
TIE
B
EA
M
TIE
B
EA
M
TIE
B
EA
M
TIE
B
EA
M
TIE
B
EA
M
TIE
B
EA
M
TIE
B
EA
M
1.20
1.70
2.90
1.70 2.50 1.706.006.00
17.90
C3F3 C3F3
TIE BEAM
TIE BEAM
C3F3C3F3
C3F3C3F3
TIE BEAM
TIE BEAM
ROOF BEAM PLANSCALE 1:150M
A B C D E F
1
2
3
1.20
1.70
2.90
1.70 2.50 1.706.006.00
RB RB
RB
RB
RB RB
RB
RB
17.90
S4 S4
THE LONG SPAN
TOP BARS ALONG
ALONG THE LONG SPAN
TOP BARS DISCONT
10mm
10mm
10mm
SCHEDULE OF SLABS ( 2ND TO ROOFDECK LEVEL )
3. NO FOOTING SHOULD REST ON BACKFILL MATERIALS
TO INVESTIGATE SUB-SURFACE CONDITION.
4. INCASE THE SOIL CONDITION AT THE FOUNDING LEVEL OF THE FOOTING
CANNOT BE ASCERTAINED THE EXPERT OR A GEOTTHECNICAL ENGINEER
10-16MMØ B.W.
8-16MMØ B.W.
6-16MMØ B.W.
2. 16MM° AND LARGER BARS FY=276MPA (40,000 PSI)
1. 12MM° AND SMALLER BARS FY=228MPA (33,000 PSI)
BOTTOM BARS
SCHEDULE OF FOOTINGS
BAR 'S'
( L X W )
SIZE (MM)
1.20 X 1.20
1.50 X 1.50
0.80 X 0.80
THICKNESS
T1 (M)
NOTES:
0.30
0.40
0.30F1
MARK
F3
F2
D (M)
1.20
1.20
1.20
BAR 'L'
ISOLATED
ISOLATED
ISOLATED
REMARK
10-16MMØ B.W.
8-16MMØ B.W.
6-16MMØ B.W.
THKSLAB
100
100
100
(+)MARK
S3
S2
S1
3-16mm dia
4-16mm dia
3-16mm dia
TOP BARS
REMARKS
TWO-WAY
TWO-WAY
TWO-WAY
TOP BARS CONTBOTTOM BARSTOP BARS CONT
BAR
TOP BARS DISC BOTTOM BARS TOP BARS DISC
EDGE (TBD)
150
150
-
EDGE (TBC)
-
200
175
(BB)EDGE (TBD)
(dia)
200
200
150
200
175
150
200
200
175
EDGE (TBC)(BB)
175
200
-
TYPICAL FRAMING PLAN OF ONE-WAY SLAB
THE SHORT SPAN
TOP BARS CONT ALONG
SHORT SPAN (S) SHORT SPAN (S)
THE SHORT SPAN
BOT BARS ALONG
SHORT SPAN (mm)
SCALE 1:150M
S4S2S4
SHORT SPAN (S)
LONG SPAN (mm)
LEFT SUPPORT
3-16mm dia
4-16mm dia
3-16mm dia
depth
TOP BARS
width
MARK
BEAM
BEAM CROSS
SECTION
SCHEDULE OF BEAMS
500
500
500300
300
300
B1
B2
B3
SECOND FLOOR BEAM
TOP BARS
MIDSPAN
BOTTOM BARSBOTTOM BARS
3-16mm dia
4-16mm dia
3-16mm dia
2-16mm dia
2-16mm dia
2-16mm dia2-16mm dia
2-16mm dia
2-16mm dia
RIGHT SUPPORT
BOTTOM BARS (10mm dia)
STIRRUPS
2-16mm dia
2-16mm dia
2-16mm dia
Rest @0.2CL
[email protected], 2@ 0.10, [email protected]
Rest @0.2CL
[email protected], 2@ 0.10, [email protected]
Rest @0.2CL
[email protected], 2@ 0.10, [email protected]
QTY
4
10
3
3-16mm dia3-16mm dia250200RB1
ROOF BEAMS3-16mm dia2-16mm dia2-16mm dia 2-16mm dia
Rest @0.2CL
[email protected], 2@ 0.10, [email protected]
8
4-10MMØ
@0.20 M.0.C.
LONGITUDINAL BARS
WF-1 (EXTERIOR WALL)
VERIF
Y
6"THK. CHB
NGL
GROUND FLR LN.
10MMØ REBARS
EARTH FILL
M.O.C.E.W.
COMPACTED
10MMØ VERT. &
HOR. BARS @ 0.60
DETAIL OF WALL-FOOTINGNOT TO SCALE
1. 12mmØ and smaller bars fy=228Mpa (33,000 Psi)
2. 16mmØ and longer bars fy=276Mpa (40,000 Psi)
NOTES:
SIZE:
0.20 M. O.C
10mm Ø Lateral Ties,
,[email protected] REST @
4-16mmØ VERT.
0.30 X 0.30 M.
SCHEDULE OF COLUMN
TO
FOUNDATION
SECOND FLOOR
C2C1
[email protected],[email protected]
SIZE:
0.20 M. O.C
10mm Ø Lateral Ties,
,[email protected] REST @
8-16mmØ VERT.
0.30 X 0.30 M.
[email protected],[email protected]
10-16mmØ VERT.
0.20 M. O.C
10mm Ø Lateral Ties,
,[email protected] REST @
[email protected],[email protected]
3-16mm dia3-16mm dia250200B4 3-16mm dia2-16mm dia2-16mm dia 2-16mm dia
Rest @0.2CL
[email protected], 2@ 0.10, [email protected]
2
12mm100S4
TWO-WAY-200 200 200200-
3-16mm dia3-16mm dia250200B5 3-16mm dia2-16mm dia2-16mm dia 2-16mm dia
Rest @0.2CL
[email protected], 2@ 0.10, [email protected]
2
S-1
SHEET NO.SUBMITTED BY:
APPROVED BY:
RECOMMEND APPROVAL:
CHECKED BY:PREPARED BY:PROJECT TITLE:
LOCATION:
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE
Camp Quintin M Merecido, Davao City
ENGINEERING SERVICE
REGIONAL PROJECT MANAGEMENT UNIT 11
PROPOSED CONSTRUCTION OF
Kidalapong, Malita, Davao Occidental
MAIN ENTRANCE GATE
Director, ES
Police Chief Superintendent
PHILIP LAWRENCE S ABAPO III
Police Senior Inspector
ANTONIO A TAYLAN, JR
Deputy Chief, RPMU
MARIA DEOVINA G SEVILLANO
Police Chief Inspector
Acting Chief, RPMU
ABELARDO C MATILLANO
Police Senior Superintendent
Deputy Director, ES
MANUEL G FABROS
Police Senior Superintendent
Acting Chief, ID, ES
HONORIO R AGNILA
Police Superintendent
Chief of Staff, ES