Page 1: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Project Title:

PROPOSED CONSTRUCTION OF LANDBORDER POST IN RASKAMBONI,JUBALAND STATE OF SOMALIA

Page 2: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Sheet No. Content01/2202/22

CoverSheet Index

Section views

Roof plan

Truss layout

Truss details

Foundation layout

Elevations 1&2

Elevations 3&4

Site layout

June 2019DRAWING INDEX

Electrical layout

Septic tank

Boundary wall details

3D Projection 01

3D Projection 023D Projection 03

Ring beam layout

3D Projection 04

3D Projection 05

3D Projection 06

3D Projection 07

03/22

04/22

05/22

06/22

07/22

08/22

09/22

10/22

11/22

12/22

13/22

14/22

15/22

16/22

17/22

18/22

19/22

20/22

21/223D Projection 0822/22

Page 3: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

JUBALAND STATE,GARBAHREY DISTRICT

Project Title:

Sheet No.

PROPOSED CONSTRUCTION OFRASKAMBONI LAND PORDER POST

JUBALAND STATE OF SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:Ali Mahdi

REVIEWED BY:

A3

AS SHOWN

JUNE 2019

Proposed Main building

Proposed Septic tankProposed External toilets

Proposed Elavated watertank

Plan layout

MASTER PLAN

01/25

Page 4: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

JUBALAND STATE,GARBAHREY DISTRICT

Project Title:

Sheet No.

PROPOSED CONSTRUCTION OFRASKAMBONI LAND PORDER POST

JUBALAND STATE OF SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:Ali Mahdi

REVIEWED BY:

A3

AS SHOWN

JUNE 2019

E E

2

2

A A

B B

C C

D D

5

5

4

4

3

3

1

1

9,20

0

2,00

01,

000

4,00

01,

200

2,20

01,

200

1,20

01,

200

19,800

4,300

1,000

2,500 2,500 2,500 2,500 4,300

1,000 1,000 1,000 1,0001,200

4,500 5,300 5,300 4,500

4,20

01,

400

Meeting Room

Passportcollection

ScreeningRoom

ScreeningRoom

Passportcollection

Boo

th1

Boo

th4

Boo

th2

Boo

th3

WC

Fem

ale

WC

Mal

e

WC

Mal

e

WC

Fem

ale

Sto

rage

Sto

rage

Office

PassagePassage

Floor Plan

FLOOR PLAN

02/25

Page 5: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

JUBALAND STATE,GARBAHREY DISTRICT

Project Title:

Sheet No.

PROPOSED CONSTRUCTION OFRASKAMBONI LAND PORDER POST

JUBALAND STATE OF SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:Ali Mahdi

REVIEWED BY:

A3

AS SHOWN

JUNE 2019

1

1

2

2

3

3

4

4

5

5

6

6

7

7

8

8

9

9

10

10

11

11

12

12

13

13

14

14

14

14

13

13

12

12

11

11

10

10

9

9

8

8

7

7

6

6

5

5

4

4

3

3

2

2

1

1

1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500

1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500

Front Elevation E-01

Roof pitch = 25˚

+0.00(G.Level)

+0.45(G.Floor Level)

+3.20(Roof Level)

+0.00(G.Level)

+0.45(G.Floor Level)

+3.20(Roof Level)

Rear Elevation E-02

ELEVATIONS

03/25

Page 6: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

JUBALAND STATE,GARBAHREY DISTRICT

Project Title:

Sheet No.

PROPOSED CONSTRUCTION OFRASKAMBONI LAND PORDER POST

JUBALAND STATE OF SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:Ali Mahdi

REVIEWED BY:

A3

AS SHOWN

JUNE 2019

A

A

B

B

C

C

D

D

E

E

F

F

G

G

I

I

I

I

G

G

F

F

E

E

D

D

C

C

B

B

A

A

H

H

H

H

1,2001,2001,2001,2001,2001,200

1,200 1,200 1,200 1,200 1,200 1,200 1,200826

8261,200

+0.00(G.Level)

+0.45(G.Floor Level)

Left side Elevation E-03

+0.00(G.Level)

+0.45(G.Floor Level)

Right side Elevation E-04

ELEVATIONS

04/25

Page 7: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

JUBALAND STATE,GARBAHREY DISTRICT

Project Title:

Sheet No.

PROPOSED CONSTRUCTION OFRASKAMBONI LAND PORDER POST

JUBALAND STATE OF SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:Ali Mahdi

REVIEWED BY:

A3

AS SHOWN

JUNE 2019

8

8

A

A

P

P

A

A

B

B

O

O

C

C

D

D

N

N

3

3

5

5

N

N

D

D

N

N

D

D

D

D

N

N

D

D

2

2

4

4

6

6

7

7

7

7

1

1

1,00

0

1,200

200 1,200

2,13

7

774

1,500 1,500 1,5001,5001,5001,500 1,500 1,500 1,500 1,5001,500 1,5001,609

1,200 1,200 1,200 1,200 1,200 1,200 974974

10cm thick Ground floor slabwith 6mm bars @ 20cm centres in bothdirections on 1000 gauge polythenedamp proof membrane (dpm ) on 5cmthick sand blinding on 15cm thick wellcompacted hardcore all to Eng's approval

200x200mm RCCLintel beam

200mm thick masonary blockwall with exterior qualityemulsion paint on wood - floatrender to approval.

Aluminum window to theinside to schedule

12mm thick chip-board ceiling on50X50mm cypress brandering at 600mm centres

200mm ventilation

400mm thick rubble stonefoundation (depth to bedetermined on site)

SECTION Y-Y

10cm thick Ground floor slabwith 6mm bars @ 20cm centres in bothdirections on 1000 gauge polythenedamp proof membrane (dpm ) on 5cmthick sand blinding on 15cm thick wellcompacted hardcore all to Eng's approva

200mm thick masonary blockwall with exterior qualityemulsion paint on wood - floatrender to approval.

200x200mm RCC Lintel beam

Timber door toschedule

12mm thick chip-board ceiling on50X50mm cypress brandering at 600mm centres

3no. stepsT=300mmR=150mm

SECTION X-X

SECTION VIEWS

05/25

Page 8: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

JUBALAND STATE,GARBAHREY DISTRICT

Project Title:

Sheet No.

PROPOSED CONSTRUCTION OFRASKAMBONI LAND PORDER POST

JUBALAND STATE OF SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:Ali Mahdi

REVIEWED BY:

A3

AS SHOWN

JUNE 2019

1

1

2

2

3

3

4

4

5

5

6

6

7

7

8

8

9

9

10

10

11

11

12

12

13

13

14

14

1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500

ROOF PLAN

FALLFALL

FALL

FALL

FALL

FALL FALL

FALL

FALL FALL

ROOF PLAN

06/25

Page 9: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

JUBALAND STATE,GARBAHREY DISTRICT

Project Title:

Sheet No.

PROPOSED CONSTRUCTION OFRASKAMBONI LAND PORDER POST

JUBALAND STATE OF SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:Ali Mahdi

REVIEWED BY:

A3

AS SHOWN

JUNE 2019

1,20

01,

200

1,4001,200

1,20

01,

200

1,20

01,

200

1,20

01,

200

1,20

01,

200

1,20

01,

400

1,20

01,

200

1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500

1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,5001,500

Trus

s T0

1

Trus

s T0

2

Trus

s T0

2

Trus

s T0

2

Trus

s T0

3

Trus

s T0

3

Trus

s T0

3

Trus

s T0

3

Trus

s T0

2

Trus

s T0

3

Trus

s T0

1

Trus

s T0

2

Trus

s T0

2

TRUSS LAYOUT

TRUSS LAYOUT

07/25

Page 10: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

JUBALAND STATE,GARBAHREY DISTRICT

Project Title:

Sheet No.

PROPOSED CONSTRUCTION OFRASKAMBONI LAND PORDER POST

JUBALAND STATE OF SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:Ali Mahdi

REVIEWED BY:

A3

AS SHOWN

JUNE 2019

750

750

75075

0

125250

125

125

250

125

125250 250

12512525

025

0 125

12525

025

0 125

125250

250 125

800

DETAIL 'A'(SCALE 1:20)

2/100x50mm OR100x50mm THICKCOLLAR PLATE EACHFACE

NAILING AREA

12mm DIA. M.S HOLD DOWNBOLTS @ 1500 C/C

RING BEAM

(SCALE 1:20)

DETAIL 'B'

2/100x50mm THICK COLLAR PLATE

100x100x2mmx100 LONG ANGLECLEAT NAILED TO TRUSS ANDWALL PLATE (E.F.)

NAILING AREA

EACH FACE(SCALE 1:20)

DETAIL 'C'

100x50mm THICK COLLAR PLATEEACH FACE

NAILING AREA

150x50mm

TYPICAL NAILING PATTERN(SCALE 1:20)

150x50mmTRUSS MEMBER B

TRUSS MEMBER

TRUSS MEMBER150x50mm

COLLAR PLATE50mm THICK

B

COLLAR PLATE50mm THICK

TRUSS MEMBER

3Y12-01

2Y12-02R8-03-200

300x200 RB1(SCALE 1:25)

TRUSS DETAIL

08/25

Page 11: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

JUBALAND STATE,GARBAHREY DISTRICT

Project Title:

Sheet No.

PROPOSED CONSTRUCTION OFRASKAMBONI LAND PORDER POST

JUBALAND STATE OF SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:Ali Mahdi

REVIEWED BY:

A3

AS SHOWN

JUNE 2019

5

5

4

4

D D

C C

A A

1

1

3

3

B B

20,000

4,300 5,100 5,100 4,300

4,901 4,900 5,300 4,900

9,80

0

2,40

0

3,01

5

1,00

0

1,18

51,

400

4,20

0

4,00

01,

200

FOUNDATIONPLAN

A142

BRC MESH

A142

BRC MESHA142

BRC MESH

A142

BRC MESH

A142

BRC MESHA142

BRC MESHFOUNDATION

09/25

Page 12: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

JUBALAND STATE,GARBAHREY DISTRICT

Project Title:

Sheet No.

PROPOSED CONSTRUCTION OFRASKAMBONI LAND PORDER POST

JUBALAND STATE OF SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:Ali Mahdi

REVIEWED BY:

A3

AS SHOWN

JUNE 2019

E E

A A

D D

1

1

B B

2

2

3

3

4

4

5

5

7

7

8

8

6

6

C C

9,20

0

2,20

01,

200

19,800

4,500 5,300 5,300 4,500

5,100200200

5,100

4,20

01,

400

RING BEAM 01 RING BEAM 02 RING BEAM 02 RING BEAM 01

RING BEAM 01 RING BEAM 01

RING BEAM 03RING BEAM 03 RING BEAM 04

RIN

G B

EAM

05

RIN

G B

EAM

05

RIN

G B

EAM

06

RIN

G B

EAM

06

RING BEAM 03

RING BEAM 03

RIN

G B

EAM

07

RIN

G B

EAM

07

RIN

G B

EAM

08

RIN

G B

EAM

08

RIN

G B

EAM

09

RING BEAM 03RING BEAM 03 RIN

G B

EAM

09

RIN

G B

EAM

10

RIN

G B

EAM

10

RING BEAM 04RING BEAM 03

RING BEAM 04

RING BEAM 04

RING BEAM LAYOUT PLAN

RING BEAM

10/25

Page 13: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

JUBALAND STATE,GARBAHREY DISTRICT

Project Title:

Sheet No.

PROPOSED CONSTRUCTION OFRASKAMBONI LAND PORDER POST

JUBALAND STATE OF SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:Ali Mahdi

REVIEWED BY:

A3

AS SHOWN

JUNE 2019

IOMMOG114

516-AAZ-MOG114

PROPOSED REHABILITATIONOF LOWYA CADE WARD -ABDUL AZIZ DISTRICT.

-ABDUL AZIZ DISTRICT-

JULY 2013

AHMED KIRISH

ALI HUSSEIN

PETER M.M.

N.T.S

IOM GRANT NO:A3

PROJECT. CLIENT. IMPLEMENTING AGENCY. SCALE

DATE

DRAWN BY:

DRAWING TITLE:

DRAWING NO:

PROJECT NO:SHEET NO:

DAN GUUD

REVIEWED AND APPROVED BY:

ECOTECH LIMITED

P.O. Box 5527-00100,Nairobi - KenyaTel: +254 712 388815Fax: +254 20 250809Email: [email protected]: www.ecotech.co.keLocation: Ecotech House, Woodlands Road, off Lenana Road, Nairobi - Kenya

BENADIR REGIONALADMINISTRATION,MOGADISHU,SOMALIA

CONSULTANT:-

IOM GRANT NO:

NOTES.

All drawings and concepts remain the propertyof ecotech limited

- All dimensions are in mm unless stated otherwise

- Any discrepancies in the drawings should be reported to the consultants before the contractor commences work on site.

ss

wp

s

SYMBOL MEANING

CEILING MOUNTEDLIGHT FIXTURE.CEILING MOUNTEDLIGHT FIXTURE (PENDANT)

WALL MOUNTED LIGHT FIXTURE

RECESSED SPOT LIGHT

FLUORESCENT LIGHT FIXTURE

FLUORESCENT LIGHT FIXTUREUNDER FALSE CEILING

WIRING CONNECTION

SINGLE PLEX RECEPTACLE

DUPLEX RECEPTACLE

SPECIAL RECEPTACLE & OUTLET(WITH PILOT LIGHT)

FLUORESCENT LIGHT FIXTURE WITHSHAVER SOCKET & LOCALISED SWITCHFLUORESCENT LIGHT FIXTURE WITHLOCALISED SWITCH

WATER PROOF RECEPTACLE (SINGLE)

CONSUMER UNIT

TELEPHONE/TV JACK

ALARM KEYPAD

DOORBELL PUSH BUTTON

DOORBELL TRANSFORMER

S3

S2

S

3 gang switch

2 gang switch

Single pole switch

Flood lamp

S SS

OFFICE 01 OFFICE 02 OFFICE 03 OFFICE 04 OFFICE 05

N E W C A N O P Y

SS

T-1 T-2

S3

31371-516-ELEC-09

ELECTRICAL DETAILS ELECTRICAL

09/09

19,800

9,20

0

Electrical PlanElectrical Plan

S S S

S2

S S S

S S

S2S2 S2

S S S

S2

S S S

S S

S2S2 S2

ELECTRICALPLAN

11/25

Page 14: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

JUBALAND STATE,GARBAHREY DISTRICT

Project Title:

Sheet No.

PROPOSED CONSTRUCTION OFRASKAMBONI LAND PORDER POST

JUBALAND STATE OF SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:Ali Mahdi

REVIEWED BY:

A3

AS SHOWN

JUNE 201920

060

020

0

300

100F1

(150

0)

F2

100

E

200 50

0

200 800 200 D 200 800 200

E

A B C

10 mm waterproof rendering150 mm base concrete

slab reinforced with BRC142 on well compacted

hardcore to S.E . approval

To sub-soil irrigation

T W L

Invert level ofincoming drain

G.L

190 mm masonry with10 mm rendering on bothsides .

G.L G.L G.L

OutletMH

600x450mm mh cover & frame1200 mm R.C. Cover Slab

InletMH

PLAN

H

G

H

SECTION G - G SECTION H -H

G

TYPEDIMENSIONS IN MM

ACAPACITYIN LITRES

No. OFPERSONS

DESLUDGINGINTERVAL

(YRS ) B C D E F1 F2

A

B

E

D

C

800

4000

3000

6000

9000

800

12000

800

15000

1200

10 1000

1600

1600

1000

20

30

40

50

2

2

2

2

2

800

800

1400

1400

800

1200

1400

1400

3000

3600

3600

4000

1400

1800

2000

2400

1200

1500

1500

1500

1500

1400

1400

1400

1300

1200

1 . Cover slab to be reinforced with 10 mm dia. bar at100 mm c/c ( conc. 20 / 20 mix 1 :2:4)

2. Base slab to be conc . class mix 1 :3:63. Outlet and inlet pipes to be 100 mm dia. cast iron.4. Scum buffle to be 100 mm thick reinforced with 2 No.

100 mm at both ends conc 80(20)5. Dividing wall to be 100 mm thick conc. class 20(20)

reinforced with weld mesh No. 65.

NOTES,

SEPTIC TANK

12/25

Page 15: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

JUBALAND STATE,GARBAHREY DISTRICT

Project Title:

Sheet No.

PROPOSED CONSTRUCTION OFRASKAMBONI LAND PORDER POST

JUBALAND STATE OF SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:Ali Mahdi

REVIEWED BY:

A3

AS SHOWN

JUNE 2019

D.O.S

200200

2,500

D.O.S

200200

2,800

2,00

0

2,40

0

400x400mm thickRCC grade beam

400mm thickrubble stone

G.L

200mm thick hallowblock walling

400x200mm thickRCC grade beam

400mm thickrubble stone

G.L

400x400mm RCC columnsstarted from grade beam

4000x2500 mmhigh steel gate

SECTION A-A

SECTION B-B

D.O.S.DETERMINED ON SITE MINIMUM 1000MM DEEP

B

B

400x200mm thickRCC grade beam

400x400mmx2,800 mmheight Hallowblock pillars jointed with cement sandmorter

BOUNDARY WALL-FOUNDATION LAYOUT-

400x400mm RCCcolumns to supportmain gate

400x200mmx2,000mm heightmechine cut stone pillars jointedwith cement sand morter50mm thick pc coping

dotted line showing200mm thick Stonewalling

400x400mm RCC columns tosupport main gate

ACCESS GATE2,500mm high masonry block wallwith plastered andpainted to approval

A

A

BOUNDARY WALL-ELEVATION-

BOUNDARY WALL

13/25

Page 16: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

JUBALAND STATE,GARBAHREY DISTRICT

Project Title:

Sheet No.

PROPOSED CONSTRUCTION OFRASKAMBONI LAND PORDER POST

JUBALAND STATE OF SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:Ali Mahdi

REVIEWED BY:

A3

AS SHOWN

JUNE 2019

3D 01

14/25

Page 17: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

JUBALAND STATE,GARBAHREY DISTRICT

Project Title:

Sheet No.

PROPOSED CONSTRUCTION OFRASKAMBONI LAND PORDER POST

JUBALAND STATE OF SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:Ali Mahdi

REVIEWED BY:

A3

AS SHOWN

JUNE 2019

3D 02

15/25

Page 18: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

JUBALAND STATE,GARBAHREY DISTRICT

Project Title:

Sheet No.

PROPOSED CONSTRUCTION OFRASKAMBONI LAND PORDER POST

JUBALAND STATE OF SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:Ali Mahdi

REVIEWED BY:

A3

AS SHOWN

JUNE 2019

3D 03

16/25

Page 19: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

JUBALAND STATE,GARBAHREY DISTRICT

Project Title:

Sheet No.

PROPOSED CONSTRUCTION OFRASKAMBONI LAND PORDER POST

JUBALAND STATE OF SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:Ali Mahdi

REVIEWED BY:

A3

AS SHOWN

JUNE 2019

3D 04

17/25

Page 20: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

JUBALAND STATE,GARBAHREY DISTRICT

Project Title:

Sheet No.

PROPOSED CONSTRUCTION OFRASKAMBONI LAND PORDER POST

JUBALAND STATE OF SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:Ali Mahdi

REVIEWED BY:

A3

AS SHOWN

JUNE 2019

3D 05

18/25

Page 21: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

JUBALAND STATE,GARBAHREY DISTRICT

Project Title:

Sheet No.

PROPOSED CONSTRUCTION OFRASKAMBONI LAND PORDER POST

JUBALAND STATE OF SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:Ali Mahdi

REVIEWED BY:

A3

AS SHOWN

JUNE 2019

3D 06

19/25

Page 22: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

JUBALAND STATE,GARBAHREY DISTRICT

Project Title:

Sheet No.

PROPOSED CONSTRUCTION OFRASKAMBONI LAND PORDER POST

JUBALAND STATE OF SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:Ali Mahdi

REVIEWED BY:

A3

AS SHOWN

JUNE 2019

3D 07

20/25

Page 23: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

JUBALAND STATE,GARBAHREY DISTRICT

Project Title:

Sheet No.

PROPOSED CONSTRUCTION OFRASKAMBONI LAND PORDER POST

JUBALAND STATE OF SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:Ali Mahdi

REVIEWED BY:

A3

AS SHOWN

JUNE 2019

3D 08

21/25

Page 24: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

JUBALAND STATE,GARBAHREY DISTRICT

Project Title:

Sheet No.

PROPOSED CONSTRUCTION OFRASKAMBONI LAND PORDER POST

JUBALAND STATE OF SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:Ali Mahdi

REVIEWED BY:

A3

AS SHOWN

JUNE 2019

3D 09

22/25

Page 25: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

JUBALAND STATE,GARBAHREY DISTRICT

Project Title:

Sheet No.

PROPOSED CONSTRUCTION OFRASKAMBONI LAND PORDER POST

JUBALAND STATE OF SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:Ali Mahdi

REVIEWED BY:

A3

AS SHOWN

JUNE 2019

3D 10

23/25

Page 26: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

JUBALAND STATE,GARBAHREY DISTRICT

Project Title:

Sheet No.

PROPOSED CONSTRUCTION OFRASKAMBONI LAND PORDER POST

JUBALAND STATE OF SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:Ali Mahdi

REVIEWED BY:

A3

AS SHOWN

JUNE 2019

3D 11

24/25

Page 27: PROPOSED CONSTRUCTION OF LAND BORDER POST IN … blueprint.pdf · DRAWING INDEX Electrical layout Septic tank Boundary wall details 3D Projection 01 3D Projection 02 3D Projection

GSPublisherVersion 0.1.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

JUBALAND STATE,GARBAHREY DISTRICT

Project Title:

Sheet No.

PROPOSED CONSTRUCTION OFRASKAMBONI LAND PORDER POST

JUBALAND STATE OF SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:Ali Mahdi

REVIEWED BY:

A3

AS SHOWN

JUNE 2019

3D 12

25/25