Proposed Changes to UNC Section O Peter Mills-Baker Commercial Frameworks

Upload: idona-armstrong

Post on 30-Dec-2015

32 views

Category:

Documents


0 download

DESCRIPTION

Proposed Changes to UNC Section O. Peter Mills-Baker Commercial Frameworks. Contents. History of Previous Modification Proposal (0557) Industry Consultation New Proposal Benefits of Proposal. Modification Proposal (0557) History. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Proposed Changes to UNC Section O

Proposed Changes to UNC Section O

Peter Mills-Baker

Commercial Frameworks

Page 2: Proposed Changes to UNC Section O

Contents

History of Previous Modification Proposal (0557)

Industry Consultation

New Proposal

Benefits of Proposal

Page 3: Proposed Changes to UNC Section O

Modification Proposal (0557) History

Modification Proposal 0557 “Revision to Section O – System Planning” was raised in 2002. This proposed;

Transco would no longer be required to publish the Base Plan Assumptions document.

The requirement for Users to provide estimates of gas supply availability would continue, the requirement for them to provide estimates of demand would not be retained.

Proposal 0557 was rejected by Ofgem due primarily to concerns about the requirement on Transco to publish the BPA information;

“Ofgem does not consider that either the proposal or the revised drafting reflects the need to ensure that the detailed assumptions continue to be published, if only within the TYS.”

Page 4: Proposed Changes to UNC Section O

Industry Consultation

The Base Plan Assumptions (BPA) document was last published by Transco in 1999 for 2000

The Transporting Britain's Energy (TBE) consultation process initiates Transco’s annual planning process and culminates in the publication of the Ten Year Statement

The information previously contained in the BPA can now be found in the Ten Year Statement (10YS)

The consultation process includes the circulation of targeted questionnaires for Shippers, Producers, Consumers, Terminal Operators, Storage Operators, Gas Importers and Transporters.

The Shipper questionnaire covers the requirements of UNC Section O Chapter 3

Page 5: Proposed Changes to UNC Section O

New Proposal

“Revision to Section O – Removal of Base Plan Assumption”

References to Base Plan Assumptions to be removed or replaced by Transporting Britain’s Energy (TBE) where appropriate

Move references in the Base Plan Assumptions section to the Ten Year Statement section

Retain all current requirements for Users to provide estimates of demand and to publish this information

Page 6: Proposed Changes to UNC Section O

Benefits of Proposal

This Proposal seeks to align the UNC with the current TBE process and will improve the efficient operation of the planning process by;

Removing the obligation to publish duplicate information Streamlining the gathering of data for planning purposes

The process of gathering and publishing planning information will be better coordinated

This proposal will not have any systems impact

Addresses Ofgem’s concerns regarding Modification Proposal 0557 by maintaining the current requirements for information provision