proposed attenuation depression. - coventry · p25 p25 28 32 p33 33 p33 close board fence with...

11

Upload: others

Post on 12-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Proposed attenuation depression. - Coventry · P25 P25 28 32 P33 33 P33 Close board fence with shrub planting buffer such as berberis, heather or approved alternative species. Adopted
Page 2: Proposed attenuation depression. - Coventry · P25 P25 28 32 P33 33 P33 Close board fence with shrub planting buffer such as berberis, heather or approved alternative species. Adopted

050m

10 20 30 40

1:500

N

WE

LLING

TON

722 sqftW

ELLIN

GTO

N722 sqft

WE

LLING

TON

722 sqftW

ELLIN

GTO

N722 sqft

WE

LLING

TON

722 sqftW

ELLIN

GTO

N722 sqft

WE

LLING

TON

722 sqftW

ELLIN

GTO

N722 sqft

WE

LLING

TON

722 sqft

WE

LLING

TON

722 sqftW

ELLIN

GTO

N722 sqft

WE

LLING

TON

722 sqft

WELLINGTON722 sqft

WELLINGTON722 sqft

WELLINGTON722 sqft

WELLINGTON722 sqft

WE

LLING

TON

722 sqftW

ELLIN

GTO

N722 sqft

WE

LLING

TON

722 sqft

WE

LLING

TON

722 sqftW

ELLIN

GTO

N722 sqft

WE

LLING

TON

722 sqft

WE

LLING

TON

722 sqftW

ELLIN

GTO

N722 sqft

WE

LLING

TON

722 sqftW

ELLIN

GTO

N722 sqft

WE

LLING

TON

722 sqftW

ELLIN

GTO

N722 sqft

MA

RLB

OR

OU

GH

882 sqftM

AR

LBO

RO

UG

H882 sqft

MA

RLB

OR

OU

GH

882 sqftM

AR

LBO

RO

UG

H882 sqft

MA

RLB

OR

OU

GH

882 sqftM

AR

LBO

RO

UG

H882 sqft

MA

RLB

OR

OU

GH

882 sqftM

AR

LBO

RO

UG

H882 sqft

HEATHER ROAD

ALM

ON

D TR

EE A

VEN

UEA

LMO

ND

TREE

AVE

NUE

31

30

29

27

26

25

24

22

21

20

17

16

5

3

2

1

P1

P1

P2

P4

P16 P16

P17P17

P18 P18

P20P20

P21P21

P22 P22

P23 P23

P24 P24

P

2

7

P

3

2

4

6

23

P25 P25

28

32

P

3

3

33

P

3

3

Close board fence with shrub planting

buffer such as berberis, heather or

approved alternative species.

Adopted Highway Riverwalk.

Sign to be relocated.

Trees proposed for removal

to allow build/construction.

Existing sewer easement.

HILLMORTON ROAD

P

3

5

P

3

4

Lamp post to be relocated.

P

3

6

P

3

6

34

35

36

P

3

4

P

3

5

All signs to be relocated.

Tree proposed for removal to allow

build/construction.

Existing footpath to be upgraded into a

3m footpath/cycle way.

P

3

2

P4

Junction boxes to remain.

P2

All goal posts to be repositioned on the

Roseberry Avenue.

V

P3 P3

V

P

2

8

P

2

8

P

3

0

P

3

0

P

2

9

P

2

9

P

2

7

Existing Knee Rail to be removed and

reused by Coventry City Council and

as return leg for proposed

development along Hilmorton Road.

Proposed attenuation depression.

1m gap provided for hedge line maintenance

from close board.

P12P12

P14P14

7

9

P13P13

P15P15

11

15

12

13

14

18

19

P19 P19

P26 P26

P

3

1

P

3

1

V

P10

P10

P9

P9

P8

P8

8

P11

P11

P5P5

P7 P7

P6 P6

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

S

h

e

d

S

h

e

d

S

h

e

d

S

h

e

d

S

h

e

d

S

h

e

d

S

h

e

d

S

h

e

d

V

V

Shed

Shed

Shed

Shed

S

h

e

d

S

h

e

d

S

h

e

d

10

Shed

Accommodation Schedule

Type Area (sqm/sqft) No.

Wellington 2b4p 2 storey house 67sqm/722sqft 28

Marlborough 3b5p 2 storey house 82sqm/882sqft 08

TOTAL 36

Trees

Existing Trees to be retained

Existing Trees to be removed

Extent of Planning Line boundary

WM Ownership line boundary

'Black Top' Tarmac

Block Paving

450mm x 450mm Concrete Paving

Electric car charging points

600mmx600mm Hardstanding for bin storage

Proposed Hedges

Sheds

Shed

DRAWN / CHECKED DATE SCALE

DRAWING PURPOSE

PLANNING

© Lovell Partnerships Ltd 2018

|18 Ridgeway | Quinton Business Park |

| Birmingham |

B32 1AF | Tel : 0121 4218300 |

PROJECT TITLE

DRAWING TITLE

CLIENT

DATE DESCRIPTION DRN CHK

GROSS ACREAGE

NET ACREAGE

PROJECT PLUS

STATUSJOB No REVISIONDRAWING No STATUSJOB No REVISIONDRAWING No

FM 01/06/18 1:500

Lovell and WM Housing

Almond Tree Avenue Coventry

Planning Layout

0000

2.2

--

---- SP01 -- M

DO NOT SCALE

H 03.06.19 Proposed attenuation depression added. FM - J 18.06.19 Boundaries updated. FM -

K 09.09.19 A new 3m footpath/cycle way introduced opposite to Heather Road, the existing footpath FM - omitted. Plots 8 - 11 rotated and updated accordingly. Plots 1-5 and 12-15 and 16-19 amended into terraced plots. 2bed units to plots 26 and 27 removed and replaced with 3bed units. All footpaths and parking spaces amended.

L 10.09.19 Annotations amended. Sheds and electric car charging points updated. FM - M 11.09.19 Boundaries, sheds and bins updated. FM -

Page 3: Proposed attenuation depression. - Coventry · P25 P25 28 32 P33 33 P33 Close board fence with shrub planting buffer such as berberis, heather or approved alternative species. Adopted
Page 4: Proposed attenuation depression. - Coventry · P25 P25 28 32 P33 33 P33 Close board fence with shrub planting buffer such as berberis, heather or approved alternative species. Adopted
Page 5: Proposed attenuation depression. - Coventry · P25 P25 28 32 P33 33 P33 Close board fence with shrub planting buffer such as berberis, heather or approved alternative species. Adopted

Kitchen/

Dining

Lounge

WC

15.54 sq.m

13.64 sq.m

1.72 sq.m

GROUND FLOOR

WASHER/DRYER SPACE

rwp

rwp

sofa-2 seat850x1300

visitorchair450x450

sofa-3 seat850x1850

dining table - 5p

800x1350

visitorchair450x450

ADDITIONALAPPLIANCE

SPACE

BROOMCUPBOARD

occasionaltable450x450

St

Kitchen workspacezone1500x1000

Boiler

FRIDGEFREEZERSPACE

FRONT ELEVATION REAR ELEVATION SIDE ELEVATION

FIRST FLOOR

Bed 1

9.94 sq.m

Bed 3

6.4 sq.m

Bed 2

11.86 sq.m

Bathroom

4.27 sq.m

L

Landing

rwp

rwp

Dressing activityzone700x1100

double wardrobe600x1200

double bed2000x1500

Single bed2000x900

double wardrobe600x1200

chest of drawers750x450

Dressing activityzone700x1100

Dressing activityzone700x1100

Dres

sing

act

ivit

yzo

ne70

0x11

00

MARLBOROUGH882 sqft

ROOF PLAN

rwp

rwp

NOTE

Plots: 6, 22, 24 & 26 (AS)

7, 23, 25 & 27 (OPP)

For chimney positions please

check the MP01 Materials Plan

DRAWN / CHECKED DATE SCALE

DRAWING PURPOSE

PLANNING

© Lovell Partnerships Ltd 2018

|18 Ridgeway | Quinton Business Park |

| Birmingham |

B32 1AF | Tel : 0121 4218300 |

PROJECT TITLE

DRAWING TITLE

CLIENT

#### DATE DESCRIPTION DRN CHK

GROSS ACREAGE

NET ACREAGE

PROJECT PLUS

STATUSJOB No REVISIONDRAWING No STATUSJOB No REVISIONDRAWING No

FM 22.03.19 1:100 @ A3

Lovell and WM Housing

Almond Tree Avenue Coventry

Planning Plans and Elevations

Malrborough

0000

2.2

--

---- PL02 -- H

DO NOT SCALE

D 08.05.19 Rwp added, minor amendments completed to the internal spaces to

match design requirements. FM -

E 16.05.19 Amendments as per WM design specifications. FM -

F 31.05.19 Amendments as per WM comments. FM -

G 18.06.19 Window sizes updated to the rear elevation. FM -

H 12.09.19 Boiler size and plot numbers updated. FM -

Page 6: Proposed attenuation depression. - Coventry · P25 P25 28 32 P33 33 P33 Close board fence with shrub planting buffer such as berberis, heather or approved alternative species. Adopted

NOTE

Plots: 16, 20, 28, 31 & 34 (AS)

5, 15, 19, 21, 30 & 33 (OPP)

For chimney positions please

check the MP01 Materials Plan

WELLINGTON722 sqft

rwp

rwp

ROOF PLAN

Kitchen

7.67 sq.m

Lounge

14.68 sq.m

rwp

rwp

sofa-3 seat850x1850

armchair850x850

storage unit500x1050

stor

age

unit

500x

1500

visitorchair450x450

Acti

vity

zon

e -

2000

x 2

500

elli

pse

WASHER/DRYER SPACE

FRIDGEFREEZERSPACE

Kitc

hen

work

spac

ezo

ne15

00x1

000

Cl'ks

1.82 sq.m

dining table - 4p800x1200

Living space LTH1700x1400

L

Bath

Bed 2

11.56 sq.m

Bed 1

9.92 sq.m

3.97 sq.m

Landing

rwp

rwp

doub

le b

ed20

00x1

500

chest of drawers450x750

St

Dres

sing

act

ivit

yzo

ne70

0x11

00

St

visitorchair450x450

Boiler

double wardrobe600x1200

Dressing activityzone700x1100

Dres

sing

act

ivit

yzo

ne70

0x11

00

chest of drawers450x750

GROUND FLOOR PLAN FIRST FLOOR PLAN

SIDE ELEVATIONREAR ELEVATION

FRONT ELEVATION

Feature

brick

DRAWN / CHECKED DATE SCALE

DRAWING PURPOSE

PLANNING

© Lovell Partnerships Ltd 2018

|18 Ridgeway | Quinton Business Park |

| Birmingham |

B32 1AF | Tel : 0121 4218300 |

PROJECT TITLE

DRAWING TITLE

CLIENT

#### DATE DESCRIPTION DRN CHK

GROSS ACREAGE

NET ACREAGE

PROJECT PLUS

STATUSJOB No REVISIONDRAWING No STATUSJOB No REVISIONDRAWING No

FM 20.03.19 1:100 @ A3

Lovell and WM Housing

Almond Tree Avenue Coventry

Planning Plans and Elevations

Wellington V1

0000

2.2

--

---- PL01 -- H

DO NOT SCALE

D 08.05.19 Amendments as per design team comments. (RWP's/Furniture, etc.) JB FM

E 15.05.19 Amendments as per WM design specifications. FM -

F 31.05.19 Amendments as per WM comments. FM -

G 18.06.19 Window sizes updated to the rear elevation. FM -

H 12.09.19 Plot numbers amended. Boiler position and windows to front

elevation updated. FM -

Page 7: Proposed attenuation depression. - Coventry · P25 P25 28 32 P33 33 P33 Close board fence with shrub planting buffer such as berberis, heather or approved alternative species. Adopted

WELLINGTON722 sqft

rwp

rwp

ROOF PLAN

Kitchen

7.67 sq.m

Lounge

14.68 sq.m

rwp

rwp

sofa-3 seat850x1850

armchair850x850

storage unit500x1050

stor

age

unit

500x

1500

visitorchair450x450

Acti

vity

zon

e -

2000

x 2

500

elli

pse

WASHER/DRYER SPACE

FRIDGEFREEZERSPACE

Kitc

hen

work

spac

ezo

ne15

00x1

000

Cl'ks

1.82 sq.m

dining table - 4p800x1200

Living space LTH1700x1400

L

Bath

Bed 2

11.56 sq.m

Bed 1

9.92 sq.m

3.97 sq.m

Landing

rwp

rwp

doub

le b

ed20

00x1

500

chest of drawers450x750

St

Dres

sing

act

ivit

yzo

ne70

0x11

00

St

visitorchair450x450

Boiler

double wardrobe600x1200

Dressing activityzone700x1100

Dres

sing

act

ivit

yzo

ne70

0x11

00

chest of drawers450x750

GROUND FLOOR PLAN FIRST FLOOR PLAN

no window

to plot 12.

NOTE

Plots: 1, 12 (AS) & 36 (OPP) only

For chimney positions please

check the MP01 Materials Plan

Feature

brick

FRONT ELEVATION SIDE ELEVATION SIDE ELEVATION

Plot 12 only

REAR ELEVATION

DRAWN / CHECKED DATE SCALE

DRAWING PURPOSE

PLANNING

© Lovell Partnerships Ltd 2018

|18 Ridgeway | Quinton Business Park |

| Birmingham |

B32 1AF | Tel : 0121 4218300 |

PROJECT TITLE

DRAWING TITLE

CLIENT

#### DATE DESCRIPTION DRN CHK

GROSS ACREAGE

NET ACREAGE

PROJECT PLUS

STATUSJOB No REVISIONDRAWING No STATUSJOB No REVISIONDRAWING No

FM 16.04.19 1:100 @ A3

Lovell and WM Housing

Almond Tree Avenue Coventry

Planning Plans and Elevations

Wellington V2

0000

2.2

--

---- PL01_1 -- E

DO NOT SCALE

A 08.05.19 Amendments as per design team comments. (RWP's/Furniture, etc.) JB FM

B 15.05.19 Amendments as per WM design specifications. FM -

C 31.05.19 Amendments as per WM comments. FM -

E 12.09.19 Boiler position updated. Plot numbers and window sizes to front FM -

elevation amended.

D 18.06.19 Window sizes updated to the rear elevation. FM -

Page 8: Proposed attenuation depression. - Coventry · P25 P25 28 32 P33 33 P33 Close board fence with shrub planting buffer such as berberis, heather or approved alternative species. Adopted

722 sqft

rwp

rwp

ROOF PLAN

WELLINGTON

REAR ELEVATION SIDE ELEVATION

7.67 sq.m

14.68 sq.m

rwp

rwp

sofa-3 seat850x1850

armchair850x850

storage unit500x1050

stor

age

unit

500x

1500

visitorchair450x450

Acti

vity

zon

e -

2000

x 2

500

elli

pse

WASHER/DRYER SPACE

FRIDGEFREEZERSPACE

Kitc

hen

work

spac

ezo

ne15

00x1

000

1.82 sq.m

dining table - 4p800x1200

Living space LTH1700x1400

11.56 sq.m

9.92 sq.m

3.97 sq.m

Landing

rwp

rwp

doub

le b

ed20

00x1

500

chest of drawers450x750

St

Dres

sing

act

ivit

yzo

ne70

0x11

00

St

visitorchair450x450

Boiler

double wardrobe600x1200

Dressing activityzone700x1100

Dres

sing

act

ivit

yzo

ne70

0x11

00

chest of drawers450x750

GROUND FLOOR PLAN FIRST FLOOR PLAN

Lounge

Kitchen

Cl'ks

Bed 2

Bath

Bed 1

L

NOTE

Plots: 8 (AS) & 11 (OPP) only

For chimney positions please

check the MP01 Materials Plan

FRONT ELEVATION

Feature

brick

DRAWN / CHECKED DATE SCALE

DRAWING PURPOSE

PLANNING

© Lovell Partnerships Ltd 2018

|18 Ridgeway | Quinton Business Park |

| Birmingham |

B32 1AF | Tel : 0121 4218300 |

PROJECT TITLE

DRAWING TITLE

CLIENT

#### DATE DESCRIPTION DRN CHK

GROSS ACREAGE

NET ACREAGE

PROJECT PLUS

STATUSJOB No REVISIONDRAWING No STATUSJOB No REVISIONDRAWING No

FM 12.09.19 1:100 @ A3

Lovell and WM Housing

Almond Tree Avenue Coventry

Planning Plans and Elevations

Wellington V3

0000

2.2

--

---- PL01_2 -- -

DO NOT SCALE

Page 9: Proposed attenuation depression. - Coventry · P25 P25 28 32 P33 33 P33 Close board fence with shrub planting buffer such as berberis, heather or approved alternative species. Adopted

7.67 sq.m

14.68 sq.m

rwp

rwp

sofa-3 seat850x1850

armchair850x850

storage unit500x1050

stor

age

unit

500x

1500

visitorchair450x450

Acti

vity

zon

e -

2000

x 2

500

elli

pse

WASHER/DRYER SPACE

FRIDGEFREEZERSPACE

Kitc

hen

work

spac

ezo

ne15

00x1

000

1.82 sq.m

dining table - 4p800x1200

Living space LTH1700x1400

11.56 sq.m

9.92 sq.m

3.97 sq.m

Landing

rwp

rwp

doub

le b

ed20

00x1

500

chest of drawers450x750

St

Dres

sing

act

ivit

yzo

ne70

0x11

00

St

visitorchair450x450

Boiler

double wardrobe600x1200

Dressing activityzone700x1100

Dres

sing

act

ivit

yzo

ne70

0x11

00

chest of drawers450x750

GROUND FLOOR PLAN FIRST FLOOR PLAN

Lounge

Kitchen

Cl'ks

Bed 2

Bath

Bed 1

L

NOTE

Plots: 2, 4, 9, 13, 17, 29, 32 & 35 (AS)

3, 10, 14 & 18 (OPP) only

For chimney positions please

check the MP01 Materials Plan

722 sqft

rwp

rwp

ROOF PLAN

WELLINGTON

FRONT ELEVATION

REAR ELEVATION

Feature

brick

DRAWN / CHECKED DATE SCALE

DRAWING PURPOSE

PLANNING

© Lovell Partnerships Ltd 2018

|18 Ridgeway | Quinton Business Park |

| Birmingham |

B32 1AF | Tel : 0121 4218300 |

PROJECT TITLE

DRAWING TITLE

CLIENT

#### DATE DESCRIPTION DRN CHK

GROSS ACREAGE

NET ACREAGE

PROJECT PLUS

STATUSJOB No REVISIONDRAWING No STATUSJOB No REVISIONDRAWING No

FM 12.09.19 1:100 @ A3

Lovell and WM Housing

Almond Tree Avenue Coventry

Planning Plans and Elevations

Wellington V4

0000

2.2

--

---- PL01_3 -- -

DO NOT SCALE

Page 10: Proposed attenuation depression. - Coventry · P25 P25 28 32 P33 33 P33 Close board fence with shrub planting buffer such as berberis, heather or approved alternative species. Adopted

2.1m Close board fence and trellis with thorny hedge and shrubs.Rear garden boundary treatment

1.8m concrete posts and gravel board with slot in panels.Division boundary treatment

0.60m existing Knee Rail post to be reused along the sides of Plot 1 and 36. 2.1m Feather edge fencing fixed to brick pillars

PROJECT TITLE

DRAWING TITLE

DRAWN / CHECKED DATE SCALE

STATUSJOB No REVISIONDRAWING No

DRAWING PURPOSE

CLIENT

DATE DESCRIPTION DRN CHK

PLANNING

© Lovell Partnerships Ltd 2019

|18 Ridgeway | Quinton Business Park |

| Birmingham |

B32 1AF | Tel : 0121 4218300 |

GROSS ACREAGE

NET ACREAGE

PROJECT PLUS

Lovell and WM Housing

Almond Tree Avenue Coventry

Boundary Treatment Elevation

FM 03.04.19 1:20 @ A2

---- BT02 -- D

0000

2.2

DO NOT SCALE

A 06.05.19 Boundary treatment fence updated. FM

B 22.05.19 Closeboard fencing updated, concrete post fence and knee rail detail

added. FM

C 19.06.19 Boundary titles updated to align with the latest planning layout. FM

D 11.09.19 2.1m Feather edge fencing added. FM

Page 11: Proposed attenuation depression. - Coventry · P25 P25 28 32 P33 33 P33 Close board fence with shrub planting buffer such as berberis, heather or approved alternative species. Adopted

050m

10 20 30 40

1:500

N

WE

LLING

TON

722 sqftW

ELLIN

GTO

N722 sqft

WE

LLING

TON

722 sqftW

ELLIN

GTO

N722 sqft

WE

LLING

TON

722 sqftW

ELLIN

GTO

N722 sqft

WE

LLING

TON

722 sqftW

ELLIN

GTO

N722 sqft

WE

LLING

TON

722 sqft

WE

LLING

TON

722 sqftW

ELLIN

GTO

N722 sqft

WE

LLING

TON

722 sqft

WELLINGTON722 sqft

WELLINGTON722 sqft

WELLINGTON722 sqft

WELLINGTON722 sqft

WE

LLING

TON

722 sqftW

ELLIN

GTO

N722 sqft

WE

LLING

TON

722 sqft

WE

LLING

TON

722 sqftW

ELLIN

GTO

N722 sqft

WE

LLING

TON

722 sqft

WE

LLING

TON

722 sqftW

ELLIN

GTO

N722 sqft

WE

LLING

TON

722 sqftW

ELLIN

GTO

N722 sqft

WE

LLING

TON

722 sqftW

ELLIN

GTO

N722 sqft

MA

RLB

OR

OU

GH

882 sqftM

AR

LBO

RO

UG

H882 sqft

MA

RLB

OR

OU

GH

882 sqftM

AR

LBO

RO

UG

H882 sqft

MA

RLB

OR

OU

GH

882 sqftM

AR

LBO

RO

UG

H882 sqft

MA

RLB

OR

OU

GH

882 sqftM

AR

LBO

RO

UG

H882 sqft

HEATHER ROAD

ALM

ON

D TR

EE A

VEN

UEA

LMO

ND

TREE

AVE

NUE

31

30

29

27

26

25

24

22

21

20

17

16

5

3

2

1

P1

P1

P2

P4

P16 P16

P17P17

P18 P18

P20P20

P21P21

P22 P22

P23 P23

P24 P24

P

2

7

P

3

2

4

6

23

P25 P25

28

32

P

3

3

33

P

3

3

HILLMORTON ROAD

P

3

5

P

3

4

P

3

6

P

3

6

34

35

36

P

3

4

P

3

5

P

3

2

P4

P2

V

P3 P3

V

P

2

8

P

2

8

P

3

0

P

3

0

P

2

9

P

2

9

P

2

7

P12P12

P14P14

7

9

P13P13

P15P15

11

15

12

13

14

18

19

P19 P19

P26 P26

P

3

1

P

3

1

V

P10

P10

P9

P9

P8

P8

8

P11

P11

P5P5

P7 P7

P6 P6

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

Shed

S

h

e

d

S

h

e

d

S

h

e

d

S

h

e

d

S

h

e

d

S

h

e

d

S

h

e

d

S

h

e

d

V

V

Shed

Shed

Shed

Shed

S

h

e

d

S

h

e

d

S

h

e

d

10

Shed

Boundary Treatment Key

1.8m Division Boundary Treatment - Concrete post and gravel

board with slot in panels.

2.1m Close board fence and trellis with thorny hedge and shrubs.

0.60m existing Knee rail post to be reused.

2.1m Feather edge fencing fixed to brick pillars

DRAWN / CHECKED DATE SCALE

DRAWING PURPOSE

PLANNING

© Lovell Partnerships Ltd 2018

|18 Ridgeway | Quinton Business Park |

| Birmingham |

B32 1AF | Tel : 0121 4218300 |

PROJECT TITLE

DRAWING TITLE

CLIENT

DATE DESCRIPTION DRN CHK

GROSS ACREAGE

NET ACREAGE

PROJECT PLUS

STATUSJOB No REVISIONDRAWING No STATUSJOB No REVISIONDRAWING No

FM 03.04.19 1:500

Lovell and WM Housing

Almond Tree Avenue Coventry

Boundary Treatment Plan

0000

2.2

--

---- BT01 -- F

DO NOT SCALE

A 17.04.19 Boundary treatment location updated. FM - B 07.05.19 Site layout updated. FM -

C 22.05.19 Site layout updated, concrete fence post created to the south side FM - of the development.

D 03.06.19 Site layout updated. FM - E 19.06.19 Boundaries updated. FM - F 10.09.19 Site layout updated and 2.1m feather edge fencing added. FM -