Page 1: Proposals of Annual Plan 2013-14  for the State of Tripura  Under NLRMP

1

Proposals of Annual Plan 2013-14 for the State of Tripura

Under NLRMP

TRIPURA STATE NLRMP MANAGEMENT SOCIETY

Page 2: Proposals of Annual Plan 2013-14  for the State of Tripura  Under NLRMP

2

RoR : More then 10,02,621 Khatian has been computerized

and uploaded in website. CLR: Online Computerization completed in all 32

Revenue Circles. Digitization of CS Map completed for all 5278 sheets. Land Administration is regulated through operational

website- http://www.tsu.trp.nic.in.jami Sub-divisional Data Center: 17 completed out of 23. District Level Data Center – 4 completed out of 8. Survey training in modern methodology has

commenced at RSTI. Updation survey with modern technique and ground

truthing method has been taken up in 45 villages having 1175.39.Sq. Km. in area.

PROGRESS OF WORK UNDER PROGRESS OF WORK UNDER CLRCLR

Page 3: Proposals of Annual Plan 2013-14  for the State of Tripura  Under NLRMP

PROGRESS OF WORK PROGRESS OF WORK UNDER SROsUNDER SROs

• Online Integrated Computerization process completed in all 15 SROs of the State.

• Deeds are executed through web based operational site – http://www.tsu.trp.nic.in.jami

• Executed deeds are delivered within 3 days on scanning.

• Data entry and scanning of old deeds completed for more than 6 lakh of deeds.

• Exhaustive MIS on SROs displayed.

Page 4: Proposals of Annual Plan 2013-14  for the State of Tripura  Under NLRMP

BEST PRACTICESBEST PRACTICES -CLR -CLR

1. Date of hearing for mutation proceeding is time framed within 60 days.

2. On the application for mutation, SMS is generated twice through mobile to the transferee and transferor on issuing of notice and creation of new RoR.

3. Transfer transaction of land is recorded on the RoR with the option of removal at the end of mutation.

4. RoR is issued instantly under digital signature of the officials in field and HQ with option to seek signature of HQ official in case of absence of field level authorized official in time.

Page 5: Proposals of Annual Plan 2013-14  for the State of Tripura  Under NLRMP

BEST PRACTICESBEST PRACTICES - -SROSRO

1. On the execution of deed, SMS is generated twice through mobile to the transferee and transferor on execution of deed and on scanning of deed.

2. Compulsory delivery of deed within 3 (three) days.

3. Incorporation of the record of transfer in the original RoR with option of removal on mutation.

4. Inbuilt auto-regulation of the quantum of land within a plot after execution.

Page 6: Proposals of Annual Plan 2013-14  for the State of Tripura  Under NLRMP

ROAD MAP- CLRROAD MAP- CLR

1. Modern Record Room in 32 Revenue circle offices along with net-enable computerization of 187 field level revenue offices.

2. Sub-Divisional Data Center in 6 reorganized sub-divisions and 4 District Data Centers in 4 reorganized districts.

3. Preservation and scanning of old RoR of the 1st Settlement operation as reference, estimated to 7.06 lakh,

4. Digitization of old CS Map of the 1st Settlement operation as reference, estimated to 4800 sheet.

5. Updation survey with modern technique and ground truthing method in 361 villages having 3819.11 Sq Km in area.

Page 7: Proposals of Annual Plan 2013-14  for the State of Tripura  Under NLRMP

ROAD MAP-SROROAD MAP-SRO• Data entry and scanning of old deeds, estimated

to 15 lakh and data entry of valuation details.• Procedure to be adopted for e-stamping.• Issuing of non-encumbrance particulars by the

SROs to the Advocates for the issue of non-encumbrance certificate.

• Issuing of land valuation certificate and certified scanned copy of old deeds by the SROs.

Page 8: Proposals of Annual Plan 2013-14  for the State of Tripura  Under NLRMP

ANNUAL PLAN 2013-14ANNUAL PLAN 2013-14Name of component Status Fund (Rs. in lakh) Remarks

PMU Cont. 39.20 2nd year

Modern Record Room

Cont. 288.00 2nd Installment

Computerization of SROs

Addl. 318.66 DPR on 08.08.12

Survey/Resurvey Addl. 824.92 3819.11 Sq.Km.

Sub-Div. Data Center

Addl. 6.00 6 Nos. DPR on 04.05.12

Distt. Data Center Addl. 34.00 4 Nos. DPR on 04.05.12

Total 1510.78

Page 9: Proposals of Annual Plan 2013-14  for the State of Tripura  Under NLRMP

9