The Energy conservation Center Japan PROMEEC 3 Projects for 2006- 2007 - Achievement and Future Plan – ASEAN EE&C SSN June 6, 2007 Yoshitaka Ushio General Manager, International Engineering Dept. The Energy Conservation Center, Japan ECCJ ECCJ

Upload: trinh

Post on 10-Jan-2016

22 views

Category:

Documents


0 download

DESCRIPTION

ECCJ. PROMEEC 3 Projects for 2006-2007 - Achievement and Future Plan – ASEAN EE&C SSN. June 6, 2007 Yoshitaka Ushio General Manager, International Engineering Dept. The Energy Conservation Center, Japan. ECCJ. Confirmation of Target and Basic Approach for Phase - 2. ECCJ. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

The Energy conservation Center Japan

  PROMEEC 3 Projects for 2006-2007 - Achievement and Future Plan –

ASEAN EE&C SSN

June 6, 2007

Yoshitaka UshioGeneral Manager, International Engineering Dept.

The Energy Conservation Center, Japan

ECCJECCJ

Page 2: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

2

The Energy conservation Center Japan

1. Confirmation of Target and Basic Approach for Phase - 2

ECCJECCJ

Page 3: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

3

The Energy conservation Center Japan

Importance of Self Effort

ECCJECCJTime

LearningFrom ECCJ

UnexpectedConditions

Various C

hanges

Energy Situations

Economy

Policy

Energy / B

usiness

Market

Sustainable BasisTo Be Built By

“Continued SELF EFFORT”Le

vel o

f c

apa

bili

ty t

o P

rom

ote

EE

&C

Phase - 1 Phase - 2

Page 4: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

4

The Energy conservation Center Japan

Target for Phase - 2Effective Digestion and Ensured Sustainability to

Implement / Disseminate What ASEAN Learned

ECCJECCJ

1. Enhanced OJT Based on(1) Well Organized Local Core Team for Survey / Energy Audit / Seminar (2) Better Preparation for Survey / Energy Audit(3) Preparatory Activities (Pre-survey, etc.)

2. Preparation of Tools for Implementation(1) Accumulation of Achievements / Experiences (2) Standardized Data, Information and Guideline(3) Easier Access and User-friendliness

3. Effective & Harmonized Inter-Project Activities

Page 5: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

5

The Energy conservation Center Japan

Member Status

Focal Point & ACE Leader with

ACE to coordinate

Available Local* Expert

ECCJ

Assistance

Phase – 2 : Formation to Implement Local Activities Based on “Enhanced OJT”

FutureCore Team

ForImplementation &

Dissemination

(*) “Local” means “National” and/or “Regional “.

Basic Required Scheme for Site Activities withFlexible Assistance by ECCJ

ECCJECCJ

Page 6: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

6

The Energy conservation Center Japan

“ASEAN Energy Management System” Developing to Sustain Phase-2 Activity

Sustainable System Provision of Tools& Information for E.M.

Achievement and Experience BasedProject Activities

Regist.Experts

ECCJECCJ

InformationService

AdvisoryService

TrainingService

“ASEAN EnergyManagement System”

Coordination

Campaign/Award System

EnergyAuditOne-Stop

to System

ECCJECCJ

ASEANCustomers

ASEAN Network ofCooperators

Page 7: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

7

The Energy conservation Center Japan

2. Achievement in 2006 - 2007

Page 8: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

8

The Energy conservation Center Japan

Project Team of ECCJ

Mr. T. Nuibe

Major IndustriesMr. T. Kawase (L)Mr. H. Tanaka (L)Mr. K. TakedaMr. F. Ogawa *

BuildingsMr. Y. Ushio (L)Mr. A. Kobayashi**Mr. H. Amano

Energy ManagementMr. K. Yoshida (L)Mr. T. SatoMr. F. Ogawa *Mr. A. Kobayashi**

CoordinationK. Yoshida

Page 9: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

9

The Energy conservation Center Japan

Country Lao PDR Thailand Myanmar

Industrial Sub-sector

Cement (2) Iron & Steel (1) Oil Refinery (1)

Cement (1)

Focal Point

Local Expert 24 Participants

With Ptm & ACE

17 Participants

With ACE

14 participants

With Ptm & ACE

ECCJ

Features of Activities

Concentrated on “Cement

Ind.”

Concentrated on “Steel Ind.”

Follow-up (Oil Refinery) &

“Cement Ind.”

Actual Team Formation & Features- Major Industries for 2006 – 2007 -

ECCJECCJ

Page 10: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

10

The Energy conservation Center Japan

ECCJECCJ

Host Country + ASEAN + ACE + ECCJ = TotalCountry

Seminar-Workshop

Brunei

Indonesia

Cambodia

Philippines

Thailand

Lao PDR

Myanmar

49 + 5 + 2 + 3 = 60

41 + 4 + 2 + 3 = 50

49 + 3 + 2 + 3 = 57

92 + 3 + 2 + 3 = 100

52 + 4 + 1 + 3 = 60

48 + 4 + 5 + 3 = 60

34 + 3 + 1 + 3 = 41

Summary of Seminar-WorkshopSummary of Seminar-Workshop

2006Ave. = 56

2005Ave. = 65

Numbers of Seminar Participants, 2005 & 2006

Page 11: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

11

The Energy conservation Center Japan

ECCJECCJ

Presentation Items from ASEAN Countries

Cement Ind.

IndustryCountry EE&C Activities

MalaysiaIron/Steel Ind

Thailand

Lao PDR Hydro-power Same presentation done in 2005

General

2-stg recuperator, VSD for water pump, Screw air compressor

Overview of MIEEIP project (PTM), Food, Glass, Textile, Iron/Steel

Philippines

Food Ind.

Iron/Steel Ind

Vietnam

Indonesia

Myanmar

Cement Ind.

Ceramics Ind

Iron/Steel Ind.Pulp/Paper Ind.

Oil Refining

Iron/Steel Ind

Same presentation done in 2005

VRM, 5-stg NSP, Damper→VSD, Process A/M, Air leak repair (Kiln), O2 meter for Air leak, Air press 7Bar→6.8

Insulation, cond.recovery, steam leak, Solenoid valves, etc

Daylight, cooling tower fan blade, air compressor replace, etc

Slab preheat, slab hot charge, billet insulation cover, etc

Same presentation done in 2004

Same presentation done in 2004

Lower tower pressure, tower off gas recovery

Page 12: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

12

The Energy conservation Center Japan

Country Brunei Darussalam

Philippines Vietnam

Building Category

Hotel (1)

Office (1)

Office (2) Hospital (1)

Supermarket (1)

Focal Point

Local Expert 20 Participants

With ACE

11 Participants

With ACE

15 Participants

With ACE

ECCJ

Features of Activities

Great Progress in Improvement

Pre-Audit by DOE

Pre-Audit by ECC-HCC

Actual Team Formation & Features- Buildings for 2006 – 2007 -

ECCJECCJ

Page 13: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

13

The Energy conservation Center Japan

Seminar-Workshop (1) Number of the Participants  

Brunei Philippines Vietnam

Date of S-W 2006.9.09 2006.10.11 2006.11.09

Number of Participants

60 60 85

No. of Presentation by Host Countries

2 3 1

No. of Presentation by Other ASEAN

4 4 3

No. of Presentation by ECCJ & ACE

4 4 4ECCJECCJ

Page 14: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

14

The Energy conservation Center Japan

Seminar-Workshop Presentations by the Guests from ASEAN

ECCJECCJ Thank you very much for the supports

Page 15: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

15

The Energy conservation Center Japan

Country

Activity

BD CM ID LP ML MY PH SP TH VN

Intensive Seminar-Workshop

42 28 57 38 46 26 30

Visits to Factories & Buildings etc.

3 4 3 4 2 2 4

Activities for Award System

1st BOJ (EM) 1 1 1 1 1 1 1 1 1

Research Forum in Japan

1 1 1 1 1 1 1 1 1

Actual Activities & Number of Participants and Visits to Companies

- Energy Management for 2006 – 2007 -

ECCJECCJ

Page 16: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

16

The Energy conservation Center Japan

Actual Schedule of PROMEEC for2006 – 2007 (3 Projects) (As of Feb. 27, 2007)

ECCJECCJ

Project / Activities 2006 2007 RemarksApril May June July August September October November December January February March

(Overall)A. Development of Detailed Project Plans / Preparatory WorkB. Contract with ACEC. Inception WorkshopD. Implantation of ProjectsE. Post WorkshopF. Preparation of Report

(3-Project Management)

(1) Planning / Preparation / Evaluation(2) Coordination Meeting in Indonesia or Japan(3) Inception Workshop 2/27-2/28 3/14-3/16

(4) Post Workshop 7/6&7/7

1. PROMEEC (Major Industries)Lao PDR

(1) Preparation : Detailed Plan / Arrangement for 1st Site Activity Myanmar(2) 1st Site Activity (Follow-up Survey (1) / Local Workshop (1)) 10/2 10/6 Thailand(3) 2nd Site Activity (Follow-up Survey (2) / Local Workshop (2)) Lao PDR 11/13 11/25 2/27-2/28

(4) Summary and Post Workshop Thailand

(5) Preparation of Report Myanmar

2. PROMEEC (Buildings)Brunei Darussalam

(1) Preparation : Detailed Plan / Arrangement for 1st Site Activity Philippines(2) 1st Site Activity (Follow-up Survey (1) / Local Workshop (1)) BOJ(5/23&24) 9/4 9/9 10/9 10/13 Vietnam(3) 2nd Site Activity (Follow-up Survey (2) / Local Workshop (2)) Lao PDR Brunei Phlippines 11/6-11/10 2/27-2/28

(4) Summary and Post Workshop Vietnam

(5) Preparation of Report

3. PROMEEC (Energy Management)Brunei Darussalam

(1) Preparation : Detailed Plan / Arrangement for 1st Site Activity Cambpdia(2) 1st Site Activity (Intensive Workshop, etc.) (1) 9/11 9/22 Malaysia/Phlippines/Brunei/Indonesia Indonesia(3) 2nd Site Activity (Intensive Workshop, etc.) (2) Cambodia/Lao PDR/Vietnam 11/20 12/1 Lao PDR(4) 1st BOJ on Award System Malaysia(5) 2nd Research Forum in Japan on Award System Hanoi (9/20-21) 2/27-2/28 Philippines(6) Summary and Post Workshop 12/12-12/14 Vietnam(7) Preparation of Report

(Nomination of BOJ Members for Award System) (9 countries)

ASEAN Award System of Best Practice in E.M.

Page 17: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

17

The Energy conservation Center Japan

Summary of Achievement in 2006 – 2007 (1)

1. Main SuccessSuccessful Progress in Local Activities Based on Organized

Local Team with Their Efforts and in Preparation of Tools for Energy Management

(1) Teams Consisted of National & Regional Engineers(2) Pre-Audit in Building Project(3) Actual Improvements Realizing in Factories and Buildings

Energy-Audited in The Past(3) Preparation of Tools for E.M. with The Target to Establish

“ASEAN E.M. System”(4) Start-up The 1st ASEAN Award of Best Practices in Energy

Management

ECCJECCJ

Page 18: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

18

The Energy conservation Center Japan

Summary of Achievement in 2006 – 2007 (2)

2. Required Future Improvement IdentifiedEnsured basis of actual implementation through the following

with some specific targets(1) Further enhance OJT in site Activities with more

involvement of local persons(2) Deepen understanding of process principle for industries(3) Proceed with in-depth analyses having wider viewpoints

based understanding of the concept on environmentally friendly sustainable buildings

(4) Introduce training & workshop to disseminate / improve In-

house Database and Technical Directory

ECCJECCJ

Page 19: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

19

The Energy conservation Center Japan

3. Proposed Future Plans after 2007

ECCJECCJ

Page 20: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

20

The Energy conservation Center Japan

ECCJECCJ

1. Follow-up survey / Energy Audit / Workshop under Enhanced OJT at 3 Countries (max):

(Purpose) Enhanced implementation & dissemination of improvements

Country A - Industry 1     

Country B - Industry 2 Country C - Industry 3 - One country one industry. Audit place should be conveniently

within or near the capital city for saving of time. - Industry is to be proposed, but preferably selected from rather

light industry, for example, textile, food, ceramics and plastics.

2. Preparation of “Technical Directory for major industry” (with ECCJ/ACE – EE&C-SSN)

- Successful cases resulted from PROMEEC activities should be registered.

PROMEEC (Major Industries)Proposed Activities in 2007-2008 (1)

Page 21: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

21

The Energy conservation Center Japan

ECCJECCJ

2. Preparation of “Technical Directory for major industry” (continued)

- Revise web-page so that readers can access more easily to the subjects.

Expansion with Inputs from PROMEEC activities and from Invited “Technology Suppliers”

3. Discussion and study to develop In-house Database including Benchmark / Guideline for individual industries

- Strengthen PR activity on every opportunity so as to make industry recognize a significance of DB/BM/GLthrough Training / Workshop for Participants of Activities

PROMEEC (Major Industries)Proposed Activities in 2007-2008 (2)

Page 22: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

22

The Energy conservation Center Japan

1. Follow-up Survey / Additional Energy Audit in 4 ASEAN Countries (Singapore and other 3 countries)

- OJT for the local engineers (More involvement of the local engineers and giving the opportunity for the engineers from other ASEAN countries to join the audits)

- Identification of the present energy consumption and their own benchmark (Target)

- Identification of the barriers and the actual implemented measures recommended by their own team or the Japanese experts through the energy audit

- Recommendations for EE & C - Identification of Barrier and Measures <Each country to propose how to implement these activities or the other

alternatives> 2. Local Seminar-Workshop for dissemination in Singapore and other 3

countries (Inviting the presenters from the host Country (at least 2 successful cases) and other ASEAN Countries (4 cases))

ECCJECCJ

PROMEEC (Buildings)Proposed Activities in 2007-2008 (1)

Page 23: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

23

The Energy conservation Center Japan

3. Development of Technical Directory by all the ASEAN countries(Previous PROMEEC audit results, the information and data from the ASEAN Energy Award, etc.) including information from Invited “Technology Suppliers”

4. Improvement / Utilization of In-house Database / Benchmark / Guideline for Building by all the ASEAN countries (Previous PROMEEC audit results, the information and data from the ASEAN Energy Award, etc.)

5. Continued Joint Activities with “ASEAN Benchmarking”

6. Continued activities for the support to the evaluation by BOJ for ASEAN EE & C Award System of Best Practice and Energy Management for Buildings

ECCJECCJ

PROMEEC (Buildings)Proposed Activities in 2007-2008 (2)

Page 24: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

24

The Energy conservation Center Japan

Basic Direction of Activities(1) Smooth Operation of “ASEAN Award System of Best

Practices in Energy Management for Industries and Buildings

(2) Start-up The System to Utilize The Existing Implementing Organizations

(3) Preparation / Development of Handbooks and Directories as Follows

1) “Energy Management Handbook” (Completion) 2) Preparation for Trial Use of The E.M. Handbook with In-

House Database and Technical Directory at Cooperation Factories and Buildings

3) Development of e-Directory and Other Handbooks(4) Preparation of One-Stop Guidance, etc.

ECCJECCJ

PROMEEC (Energy Management)Proposed Activities in 2007-2008 (1)

Page 25: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

25

The Energy conservation Center Japan

The Following Activities at 6 Countries (Max.)1. Intensive Seminar-Workshop(1) Introduce and Discuss Functions / Programs of “ASEAN E.M.

System” with Training and Advice to Utilize Tools(2) Encourage Participants to Join Programs / Activities of

PROMEEC and “PROMEEC Family Network” 2. Visit to Factories and Buildings(1) Same Purpose as Item 1(2) Advice on Trial Use of E.M. Handbook or Follow-up at Awarded

Companies3. Research Forum in Japan(1) Improvement in Operation and Evaluation Guideline of The

Award System by Analyses of Results of The 1st Competition(2) Improvement in Functions, Programs and System of “ASEAN

E.M. System” Considering User-friendliness

ECCJECCJ

PROMEEC (Energy Management)Proposed Activities in 2007-2008 (2)

Page 26: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

26

The Energy conservation Center Japan

Proposed Procedures & Conditions to Apply to the Countries for Local ActivitiesPurposeTo ensure the Building Local Core Teams for enhanced implementation and dissemination of the activities in future

Proposed Procedures as Follows1. Proposal by Focal Points with Requests for - Specific Project(s), and - Specific Industries (Major Industries), or - Specific Buildings (Buildings)2. The proposal to be submitted to ACE until May 31st,

2007 (with clarification of requests and compliance with PROMEEC required Conditions)

ECCJECCJ

Page 27: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

27

The Energy conservation Center Japan

Required Conditions to Call Application of Countries for Local Activities

ECCJECCJ

Proposed Procedures as Follows (Continued)3. Selection of the countries & project categories) (Avoid to select the same country & project as

implemented in 2006 – 2007 for Major Industries and Buildings)

4. Discussion/Finalization (Inception Workshop)

Required Conditions for Proposal1. Ensured Organization of Local Core Teams - With clarification of the expected organization and roles of core Members - Local restrictions to discuss, if any2. Ensured Preparation for Follow-up Survey / Energy Audit and Seminar-Workshop

Page 28: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

28

The Energy conservation Center Japan

Basic Plan and Schedule of PROMEECfor 2007 – 2008 (3 Projects)

ECCJECCJ

Project / Activities 2007 2008 RemarksApril May June July August September October November December January February March

(Overall)A. Development of Detailed Project Plans / Preparatory WorkB. Contract with ACEC. Preparation to Start ProjectsD. Inception WorkshopE. Implantation of ProjectsF. Post WorkshopG. Preparation of Report

(3-Project Management)

(1) Planning / Preparation / Evaluation(2) Coordination Meeting in Indonesia or Japan(3) Inception Workshop(4) Post Workshop

1. PROMEEC (Major Industries)

(1)

(2)

(3)

(4)(5)

2. PROMEEC (Buildings)

(1)

(2) (Ceremony)* ( ) ( ) * AMEM

(3)

(4)

(5)(6)

3. PROMEEC (Energy Management)

(1)

(2) (Ceremony)* ( ) ( ) * AMEM

(3)

(4)

(5)

(6)(7)

3rd Site Activity (Summary&Post Workshop)Preparation of Report

BOJ for Award System (Energy Management)1st Site Activities (Intensive Seminar-Workshop / Visits toCompanies)2nd Site Activities (Intensive Seminar-Workshop / Visitsto Companies)Research Forum in JP (Improvement in Award System /ASEAN EM System)

2nd Site Activity (Follow-up Survey & Audit / LocalWorkshop)3rd Site Activity (Summary&Post Workshop)Preparation of Report

Develop Detailed Plan / Arrange for Site Activity / DevelopSystem & Handbooks

Preparation of Report

Develop Detailed Plan, In-house DB/BM/GL / Arrange forSite ActivityBOJ for Award System (Buildings)1st Site Activity (Follow-up Survey & Audit / LocalWorkshop)

Develop Detailed Plan, In-house DB/BM/GL / Arrange forSite Activity1st Site Activity (Follow-up Survey & Audit / LocalWorkshop)2nd Site Activity (Follow-up Survey & Audit / LocalWorkshop)3rd Site Activity (Summary&Post Workshop)

Page 29: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

29

The Energy conservation Center Japan

The Second East Asia Summit was convened in Cebu, the Philippines, on January 15, 2007

1. Promotion of Energy Efficiency and Conservation - Receive 1,000 trainees and dispatch 500 experts in five years. - Establish Asia Energy Conservation Collaboration Center.- Make full use of yen loan and JBIC loan facility.2.   Promotion of Biomass Energy

3.   Clean Use of Coal

4. Eradication of Energy Poverty

Japan’s initiative entitled ”Fueling Asia –Japan’s Cooperation Initiative for Clean Energy and Sustainable Growth” proposed by Prime Minister Abe

Page 30: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

30

The Energy conservation Center Japan

Asia Energy Efficiency and Conservation Collaboration Center

Asia Energy Efficiency and Conservation Collaboration Center contributes to promoting the efficiency use of energy in Asian counties through international cooperation on information service and One-stop window service for a variety of inquiries related to energy efficiency and conservation.

Contact  Us : http://www.asiaeec-col.eccj.or.jp/

Page 31: PROMEEC 3 Projects for 2006-2007  - Achievement and Future Plan – ASEAN EE&C SSN

31

The Energy conservation Center Japan

The Energy Conservation Center, JapanThe Energy Conservation Center, Japan

Thank You Very Much

New !! http://www.eccj.or.jp (“English” – “Reference”)Reports & Useful Tools developed through ECCJ’sInternational Cooperation