prolist april 11, 2005 slide 1 device data exchange between supplier and customer pelc 2005, the...
Post on 21-Dec-2015
213 views
TRANSCRIPT
PROLISTApril 11, 2005Slide 1Project Group “Lists of Characteristics“
PROLIST
Device data exchange
between supplier and customer
PELC 2005, The Hague, The Netherlands
PROLISTApril 11, 2005Slide 2Project Group “Lists of Characteristics“
PROLIST PELC 2005, The Hague, The Netherlands
Contents
1. Advantages through use of lists of characteristics (LOC)
2. NAMUR Recommendation 100 (NE 100)
3. Project Group “Lists of characteristics” (PROLIST)
4. Pilot projects
PROLISTApril 11, 2005Slide 3Project Group “Lists of Characteristics“
PROLIST Can we still afford the costs of this expenditure?
Questions to the equipment users:• Do you still type in your inquiry data for process control equipment into your
purchasing system by hand?
• Do you still send your inquiry to your suppliers by fax?
• Do you still enter the equipment data from the manufacturer’s catalog into your CAE system laboriously by hand?
Questions to the equipment manufacturers:• Do you still receive inquiries by paper (letter or fax) from each customer and
in a different form?
• Do you still have to enter the inquiry data into your systems manually for offer generation?
• Do you still send your offers away by fax or letter?
PROLISTApril 11, 2005Slide 4Project Group “Lists of Characteristics“
PROLIST
Internet
Advantages through use of Device Specifications
Customer b
Supplier y
XML
XMLXML
XML
CustomerCustomer a
Power supply
Inquiry:
Ambient conditions
Device spec. Loca- tion – . . .
– . . .
– . . .
– . . .
Devicecharac. – . . .
– . . .
– . . .
– . . .
– . . .. . .
Installation sheetWiring diagram.
Loop sheet
+ -
21
65
43
Devicedata
– . . . – . . . – . . . – . . .
CAE systemFunction
Production or process tech-nology data
SupplierSupplier x
automatic or semiautomatic
(with CAE related data)
Technical offer:
Devicedescription
– . . .
– . . .
– . . .
– . . .
– . . .
Inquiry:Device spec. Loca- tion – . . .
– . . .
– . . .
– . . .
Devicecharac. – . . .
– . . .
– . . .
– . . .
– . . .
PROLISTApril 11, 2005Slide 5Project Group “Lists of Characteristics“
PROLIST The most important features of NE 100
Device specification (Specification form) =
Requirements LOC (Location) +
Device LOC (Device description)
with use of blocks
with use of blocks
Advantage for all users:
- Allocation of the requirement characteristics to the characteristics of a described device
PROLISTApril 11, 2005Slide 6Project Group “Lists of Characteristics“
PROLIST NE 100A device list of characteristics
Deviceidentification
Blocks:
Function and
system design
Device list of characteristics of flowmeter (mass, Coriolis)Device data
Equipment labeling/tagIdentification
ManufacturerSupplierProduct nameProduct typeManufacturer's order codeArticle numberEAN codeERP system inventory numberSoftware versionHardware versionSerial numberElectronic insertDevice labeling/tagNameplate language
Function and system designMeasuring principleSystem architectureParameterization softwareCommunication and data processingDigital communication
Protocol typeCommunication interfaceMaximum signal cable length mSignal cable shielding
PROLISTApril 11, 2005Slide 7Project Group “Lists of Characteristics“
PROLIST
NE 100
The NAMUR Recommendation NE 100
• Version 1.0 (2003) contained 41 device specifications for– measuring instruments: pressure, flow, level and temperature.
• Version 2.0 (2004/2005) contains 62 device specifications for– measuring instruments (50): pressure, flow, level, temperature
and density,– electrical motors (2) and– actuators (10).
• The lists of characteristics of NE 100 conform to the relevant standards for characteristics (properties) and lists of characteristics (classes): IEC 61360 and ISO 13584.
PROLISTApril 11, 2005Slide 8Project Group “Lists of Characteristics“
PROLIST
Fields of activity
The Project Group “Lists of Characteristics” (PROLIST) deals
- with characteristics (properties) and lists of characteristics (classes)
- for electrical, process control and automation technology
- devices and systems.
The Project Group “Lists of Characteristics” (PROLIST) deals
- with characteristics (properties) and lists of characteristics (classes)
- for electrical, process control and automation technology
- devices and systems.
for specific areas:• LV Switchgear• Sensors
(Temperature/Pressure/Level/Flow/Density) • Control Valves• Signal Adjustment• Electric Drives• Fieldbuses• Scales• . . .
Working Groups:
with cross-sectional tasks :• Data Model• CAE Applications
PROLISTApril 11, 2005Slide 9Project Group “Lists of Characteristics“
PROLIST
PROLIST database
• The results of the activities for the NE 100, i.e. the device specifications, are entered into a database.
• This database was created and is financed as well as maintained by the Project Group “Lists of Characteristics” (PROLIST).
• The device specifications (specification forms) of the NE 100 beginning with Version 2.0 can be seen in and downloaded from the PROLIST database (without IDs and definitions).
• The unrestricted access to the PROLIST database have only the paying members of PROLIST.
PROLISTApril 11, 2005Slide 10Project Group “Lists of Characteristics“
PROLIST Standardization of the Device Specifications
• The created lists of characteristics are include in NE 100 (in German and in English).
NE 100
IEC 6xxxx
• The lists of characteristics of NE 100 conform to the relevant standards for characteristics and lists of characteristics: IEC 61360 and ISO 13584.
• The contents of NE 100 will be channeled into the international standardization process.
PROLISTApril 11, 2005Slide 11Project Group “Lists of Characteristics“
PROLIST Who stands behind PROLIST today?
Associations
Members
Project Group “Lists of Characteristics“
PROLIST
VDI/VDE-GMA
PROLISTApril 11, 2005Slide 12Project Group “Lists of Characteristics“
PROLIST Who stands behind PROLIST today?
MembersCompanies and
universities
Project Group “Lists of Characteristics“
PROLIST
PROLISTApril 11, 2005Slide 13Project Group “Lists of Characteristics“
PROLIST
PROLIST Contacts
• Chairman of the Steering Committee
Dr. Günter LöffelmannTel.: +49 214 30 25366E-Mail: [email protected]
• Project Office Manager
Dr. Peter ZgorzelskiTel.: +49 214 30 57852E-Mail: [email protected]@namur.de
PROLISTApril 11, 2005Slide 14Project Group “Lists of Characteristics“
PROLIST
PROLIST in Internet
• Internet address:
www.prolist.org
• or through:www.namur.de -> [language choice] -> Project Group 6
„Lists of Characteristics“