Power Rail Overhead Line ( PROL )
Håkan NorlingBentley Professional Services
![Page 2: PROL Power Rail Overhead Line](https://reader034.vdocuments.mx/reader034/viewer/2022042508/55370dba4a7959191d8b4b9c/html5/thumbnails/2.jpg)
© 20
10 B
entle
y Sys
tems,
Incor
pora
ted
2 | WWW.BENTLEY.COM
Agenda, 11th of November 2010
• Bentley’s Power Rail Overhead Line solution• Overview of features• Status and plans
• Demo – Key features, PROL• Layout and design of catenary systems• Structures and reports
• Q&A
![Page 3: PROL Power Rail Overhead Line](https://reader034.vdocuments.mx/reader034/viewer/2022042508/55370dba4a7959191d8b4b9c/html5/thumbnails/3.jpg)
© 20
10 B
entle
y Sys
tems,
Incor
pora
ted
3 | WWW.BENTLEY.COM
Power Rail Overhead Line
A comprehensive solutionfor the design and maintenanceof traction power supply systems
![Page 4: PROL Power Rail Overhead Line](https://reader034.vdocuments.mx/reader034/viewer/2022042508/55370dba4a7959191d8b4b9c/html5/thumbnails/4.jpg)
© 20
10 B
entle
y Sys
tems,
Incor
pora
ted
4 | WWW.BENTLEY.COM
It’s Configurable – built-in design rules
![Page 5: PROL Power Rail Overhead Line](https://reader034.vdocuments.mx/reader034/viewer/2022042508/55370dba4a7959191d8b4b9c/html5/thumbnails/5.jpg)
© 20
10 B
entle
y Sys
tems,
Incor
pora
ted
7 | WWW.BENTLEY.COM
• A network model is created from Bentley Rail Track geometry– Horizontal, Vertical, Cant &
Turnouts
• Update– ALG– OLE objects
according to updated ALG
Network Model
![Page 6: PROL Power Rail Overhead Line](https://reader034.vdocuments.mx/reader034/viewer/2022042508/55370dba4a7959191d8b4b9c/html5/thumbnails/6.jpg)
© 20
10 B
entle
y Sys
tems,
Incor
pora
ted
8 | WWW.BENTLEY.COM
• A zone is an area where you can not place overhead line structures– A road crossing– A utility crossing– Other objects that you need to avoid
Zones
![Page 7: PROL Power Rail Overhead Line](https://reader034.vdocuments.mx/reader034/viewer/2022042508/55370dba4a7959191d8b4b9c/html5/thumbnails/7.jpg)
© 20
10 B
entle
y Sys
tems,
Incor
pora
ted
9 | WWW.BENTLEY.COM
• A surface is an obstruction, like a bridge above the track, where a wire run may need to be lowered to provide clearance between the wire and the structure.
Surfaces
![Page 8: PROL Power Rail Overhead Line](https://reader034.vdocuments.mx/reader034/viewer/2022042508/55370dba4a7959191d8b4b9c/html5/thumbnails/8.jpg)
© 20
10 B
entle
y Sys
tems,
Incor
pora
ted
10 | WWW.BENTLEY.COM
• Overlaps are where wire runs go in and out of service, one wire ends and a new wire starts
• Reference lines are working lines upon which structures will be placed– Placement is based upon design rules for a specific catenary
system• Look up tables• User defined algorithms
– Placement may need to be adjusted to avoid obstructions– Placement is interactive
Overlaps & Reference Lines
![Page 9: PROL Power Rail Overhead Line](https://reader034.vdocuments.mx/reader034/viewer/2022042508/55370dba4a7959191d8b4b9c/html5/thumbnails/9.jpg)
© 20
10 B
entle
y Sys
tems,
Incor
pora
ted
11 | WWW.BENTLEY.COM
• Place reference lines relative to a turnout– Uses look tables related to the turnout’s style– User define lengths
Turnout Reference Lines
![Page 10: PROL Power Rail Overhead Line](https://reader034.vdocuments.mx/reader034/viewer/2022042508/55370dba4a7959191d8b4b9c/html5/thumbnails/10.jpg)
© 20
10 B
entle
y Sys
tems,
Incor
pora
ted
12 | WWW.BENTLEY.COM
• Adjustment of reference lines– Normally by small amounts– Adjusting span lengths– Updates entire model
• Reference lines• Overlaps• Wire Runs• Span Bonding• Structures• Other wires
– And all annotation
Reference Line Editing
![Page 11: PROL Power Rail Overhead Line](https://reader034.vdocuments.mx/reader034/viewer/2022042508/55370dba4a7959191d8b4b9c/html5/thumbnails/11.jpg)
© 20
10 B
entle
y Sys
tems,
Incor
pora
ted
13 | WWW.BENTLEY.COM
• Wire runs consist of– Contact wire– Carrier wire– Droppers
• Utilizes design rules
Wire Runs
![Page 12: PROL Power Rail Overhead Line](https://reader034.vdocuments.mx/reader034/viewer/2022042508/55370dba4a7959191d8b4b9c/html5/thumbnails/12.jpg)
© 20
10 B
entle
y Sys
tems,
Incor
pora
ted
14 | WWW.BENTLEY.COM
• Height will adjust the vertical position of the wires– Incl. a gradient algorithm (under development)
• Stagger will adjust the horizontal position of wires– Incl. design checking– …. per wirerun
Height & Stagger
![Page 13: PROL Power Rail Overhead Line](https://reader034.vdocuments.mx/reader034/viewer/2022042508/55370dba4a7959191d8b4b9c/html5/thumbnails/13.jpg)
© 20
10 B
entle
y Sys
tems,
Incor
pora
ted
15 | WWW.BENTLEY.COM
• Used to transition the wire height from the normal height to a height exception, for example, transitioning under a bridge
Wire Gradient
![Page 14: PROL Power Rail Overhead Line](https://reader034.vdocuments.mx/reader034/viewer/2022042508/55370dba4a7959191d8b4b9c/html5/thumbnails/14.jpg)
© 20
10 B
entle
y Sys
tems,
Incor
pora
ted
16 | WWW.BENTLEY.COM
• Utilizes equipment defined in a database– Components (i.e. Nuts, bolts, brackets…)
– Assemblies (i.e. 3d cells of poles, cantilevers, etc.)
– Templates• Combination of components and assemblies
Structures
![Page 15: PROL Power Rail Overhead Line](https://reader034.vdocuments.mx/reader034/viewer/2022042508/55370dba4a7959191d8b4b9c/html5/thumbnails/15.jpg)
© 20
10 B
entle
y Sys
tems,
Incor
pora
ted
17 | WWW.BENTLEY.COM
• Components (i.e. nuts and bolts)• Assemblies (i.e. cantilevers)
– 3D Cells
• Hierarchies• Templates
Equipment
![Page 16: PROL Power Rail Overhead Line](https://reader034.vdocuments.mx/reader034/viewer/2022042508/55370dba4a7959191d8b4b9c/html5/thumbnails/16.jpg)
© 20
10 B
entle
y Sys
tems,
Incor
pora
ted
18 | WWW.BENTLEY.COM
• Creates span bonding between adjacent wires
Span Bonding
![Page 17: PROL Power Rail Overhead Line](https://reader034.vdocuments.mx/reader034/viewer/2022042508/55370dba4a7959191d8b4b9c/html5/thumbnails/17.jpg)
© 20
10 B
entle
y Sys
tems,
Incor
pora
ted
19 | WWW.BENTLEY.COM
• Naming of,– Reference Lines– Wire Runs– Span Bondings– Other Wires– Structures
• Lots of customer variation
• Interactive naming
Naming Utility
![Page 18: PROL Power Rail Overhead Line](https://reader034.vdocuments.mx/reader034/viewer/2022042508/55370dba4a7959191d8b4b9c/html5/thumbnails/18.jpg)
© 20
10 B
entle
y Sys
tems,
Incor
pora
ted
20 | WWW.BENTLEY.COM
Plan Viewing
![Page 19: PROL Power Rail Overhead Line](https://reader034.vdocuments.mx/reader034/viewer/2022042508/55370dba4a7959191d8b4b9c/html5/thumbnails/19.jpg)
© 20
10 B
entle
y Sys
tems,
Incor
pora
ted
21 | WWW.BENTLEY.COM
Profile Viewing
![Page 20: PROL Power Rail Overhead Line](https://reader034.vdocuments.mx/reader034/viewer/2022042508/55370dba4a7959191d8b4b9c/html5/thumbnails/20.jpg)
© 20
10 B
entle
y Sys
tems,
Incor
pora
ted
23 | WWW.BENTLEY.COM
• Graphical data and• Non-graphic data
Cross Sections
![Page 21: PROL Power Rail Overhead Line](https://reader034.vdocuments.mx/reader034/viewer/2022042508/55370dba4a7959191d8b4b9c/html5/thumbnails/21.jpg)
© 20
10 B
entle
y Sys
tems,
Incor
pora
ted
24 | WWW.BENTLEY.COM
• As always - XML / XSL based
Reporting
![Page 22: PROL Power Rail Overhead Line](https://reader034.vdocuments.mx/reader034/viewer/2022042508/55370dba4a7959191d8b4b9c/html5/thumbnails/22.jpg)
© 20
10 B
entle
y Sys
tems,
Incor
pora
ted
25 | WWW.BENTLEY.COM
Continuing to Enhance and CreateGlobal Rail Solutions!
![Page 23: PROL Power Rail Overhead Line](https://reader034.vdocuments.mx/reader034/viewer/2022042508/55370dba4a7959191d8b4b9c/html5/thumbnails/23.jpg)
© 20
10 B
entle
y Sys
tems,
Incor
pora
ted
26 | WWW.BENTLEY.COM
• First beta version is released• Commercial release is planned to pre Xmas• First service release planned to Q1/2 2011
Status and planning
![Page 24: PROL Power Rail Overhead Line](https://reader034.vdocuments.mx/reader034/viewer/2022042508/55370dba4a7959191d8b4b9c/html5/thumbnails/24.jpg)
© 20
10 B
entle
y Sys
tems,
Incor
pora
ted
27 | WWW.BENTLEY.COM
Demo…..