projects while working for bombardier transportation...

18
Projects while working for Bombardier Transportation, Canada APTA Passenger seat BART contract Existing Vs New Passenger seat BART contract, 775 trains for Bay Area Rapid Transit, US$1.5B. Responsible for mechanical integration of APTA passenger seats: Challenged strategic passenger seat suppliers to provide technical recommendation before contract award Worked with seat supplier and industrial designer to develop existing seat to meet BART’s specification (APTA, modularity, comfort, aesthetic) and integrated them within the train Liaised with seat supplier and prototype center to build soft and hard mock up, part of an extensive passenger outreach Supplier management from engineering side during contract execution New seat advantages compared to existing seat: http://www.bart.gov/about/projects/cars/customer-feedback

Upload: lexuyen

Post on 04-Mar-2018

225 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Projects while working for Bombardier Transportation ...d2oqb2vjj999su.cloudfront.net/users/000/082/894/665/attachments... · Projects while working for Bombardier Transportation,

Projects while working for Bombardier Transportation, Canada

APTA Passenger seat – BART contract

Existing Vs New Passenger seat

BART contract, 775 trains for Bay Area Rapid Transit, US$1.5B. Responsible for mechanical integration of APTA

passenger seats:

• Challenged strategic passenger seat suppliers to provide technical recommendation before contract award

• Worked with seat supplier and industrial designer to develop existing seat to meet BART’s specification (APTA,

modularity, comfort, aesthetic) and integrated them within the train

• Liaised with seat supplier and prototype center to build soft and hard mock up, part of an extensive passenger

outreach

• Supplier management from engineering side during contract execution

• New seat advantages compared to existing seat: http://www.bart.gov/about/projects/cars/customer-feedback

Page 2: Projects while working for Bombardier Transportation ...d2oqb2vjj999su.cloudfront.net/users/000/082/894/665/attachments... · Projects while working for Bombardier Transportation,

Schedule of finishes – BART contract

Full scale mock up of two-thirds of a train

Responsible for Schedule of finishes:

• Managed industrial designer to define finishes of all visible surfaces inside, outside the train and cab area

• Worked with supply management to ensure sourcing of the finishes

• Supported prototype center to build a full scale mock up of two-thirds of a train for public outreach

• Unveiling of the mock up to the public:

http://www.youtube.com/watch?v=DrNyHvyb59A&list=PL5C1619308424340A

https://www.youtube.com/watch?v=n83PSQF1ycs

Page 3: Projects while working for Bombardier Transportation ...d2oqb2vjj999su.cloudfront.net/users/000/082/894/665/attachments... · Projects while working for Bombardier Transportation,

Schedule of finishes – R179 NYCT contract

R179 NYCT contract, 300 subway cars for Metropolitan Transportation Authority, US$ 599MM. Lead schedule of

finishes:

• Worked with suppliers to define finishes of all visible surfaces inside, outside the train and cab area (paint,

powder coat, anodizing, HPL, melaminium…) to meet MTA ‘s specification

• Worked with supply management to ensure sourcing of the finishes

• Got approval of every single finishes by liaising with customer

• Supported prototype center to build full scale mock up car with finishes as per production car

• Liaised with design center so finishes are properly defined on manufacturing drawings

• Defined the process to become a Bombardier’s standard

Full scale mock up of a cab car

Page 4: Projects while working for Bombardier Transportation ...d2oqb2vjj999su.cloudfront.net/users/000/082/894/665/attachments... · Projects while working for Bombardier Transportation,

Passenger seat – BiLevel contract

Make-Existing seats Vs Buy-New passenger seats

BiLevel train contract, 60 trains for GoTransit, CAD$ 200MM. Responsible for mechanical integration of:

• Passenger seats

- Seat supplier selection during bidding phase

- Supplier management from engineering side during contract execution

- Business case Make Vs Buy to convince internal customers (PM and Finance) and GoTransit

• Floor heaters from Notice To Proceed (NTP) to Preliminary Design Review (PDR)

• Stanchions, from NTP to PDR

• Plywood floor, from NTP to PDR

• Finished floor (carpet and Baultar embedded with High Performance Photoluminescent marking) from NTP to

PDR

Page 5: Projects while working for Bombardier Transportation ...d2oqb2vjj999su.cloudfront.net/users/000/082/894/665/attachments... · Projects while working for Bombardier Transportation,

Projects while working for LPA Niphan Systems, UK

Crocodile cable carrier for the Airbus A380

Triple Crocodile in use at London Heathrow airport

Quad Crocodile cable carrier

modeled with Catia V5R19

Responsible for the entire aircraft product range: business worth £1.3M/Year

• 3D Catia V5 assembly made of +1 200 parts

• Aluminium structure (H frame, trolley)

• Sheet metal folding (junction boxes, U channels, cover lids, connector holster)

• Water cutting (pivot arms, pivot plates)

• CNC machining (mounting blocks, packers)

• Welding (H frame, trolley, junction boxes, basket, stop post)

• Bonding (labels, door sealings)

• Anti corrosion painting

• Standard parts (thrust washers, bearings, castor wheels, fasteners, crimp tags, bump stops, terminal rails…)

• Packaging (transport frame, wiring diagram)

CROCODILE

Page 6: Projects while working for Bombardier Transportation ...d2oqb2vjj999su.cloudfront.net/users/000/082/894/665/attachments... · Projects while working for Bombardier Transportation,

Aircraft power supply connector

200V AC, 400Hz aircraft power supply connectors , equipped with PCB, pushbuttons, LED’s and insertion switch

Project ownership : from design through to product delivery

• 3D Catia V5 assembly made of 113 parts

• Plastic injection molding (main body, inner connection, switch plates)

• Rubber injection molding (front detachable, handle, cable bungs)

• Stamping (gasket)

• Sealing (filler, switch gasket ,“O” rings)

• CNC Machining (power and control tubes)

• Silver plating (power and control tubes)

• Standard parts (switches, LEDs and fasteners)

• Packaging (specially made box, assembly instruction sheet, health and safety data sheet)

Power supply connector designed

with Catia V5R17

Power supply connector used at airports in the UK

and overseas

Page 7: Projects while working for Bombardier Transportation ...d2oqb2vjj999su.cloudfront.net/users/000/082/894/665/attachments... · Projects while working for Bombardier Transportation,

Created winning conceptual design of

helicopter ground power supply connector

Confidential work not allowed to be shown to the public as the product is still under

development

Project for the National Defence and the Canadian Forces

Page 8: Projects while working for Bombardier Transportation ...d2oqb2vjj999su.cloudfront.net/users/000/082/894/665/attachments... · Projects while working for Bombardier Transportation,

Shore supply receptacle for Bombardier Transportation UK

Contract worth £1.4M

Project ownership : from design through to product delivery

• 3D Catia V5 assembly made of 162 parts

• Compression molding (mounting plate, cover lid, insulators)

• CNC Machining (back plate, contact pins, cover lid hinges, hinges,

switch shaft, switch shaft housing, handle)

• Sheet metal folding (switch bracket)

• Sand casting (handle)

• Sealing (“O” rings, foam gasket)

• Bonding (labels)

• Standard parts (3 positions switch, fasteners and crimp tags)

• Maintenance manual and technical manual

Shore Supply Receptacle designed

with Catia V5R19

Shore Supply Receptacle fitted on train

Victoria Line Upgrade and Sub Surface

lines Shore Supply Receptacle for

London Underground

Page 9: Projects while working for Bombardier Transportation ...d2oqb2vjj999su.cloudfront.net/users/000/082/894/665/attachments... · Projects while working for Bombardier Transportation,

Junction Box for Rhaetian Railway in Swizerland

UNESCO World Heritage Site

Contract worth £0.5M

Project ownership: from design brief through to product delivery

• 3D Catia V5 assembly made of 141 parts

• Sand casting (junction box, terminal block and cable gland)

• Sheet metal folding (lid cover)

• CNC Machining (junction box, terminal block, insulating plates,

cable gland)

• Stamping (gasket to achieve IP rating)

• Bonding and riveting (labels)

• Standard parts (crimp tags and fasteners)

• Anti corrosion painting painting

Junction box installed on train

Junction box designed with

Catia V5R17

Page 10: Projects while working for Bombardier Transportation ...d2oqb2vjj999su.cloudfront.net/users/000/082/894/665/attachments... · Projects while working for Bombardier Transportation,

Secondary locking mechanism for battery raft

Victoria Line Upgrade project, London underground

Bombardier Transportation UK

Battery raft with sliding tray modeled by the engineer in charge of the project

Project ownership : manufacturing and assembly drawings

• 3D Catia V5 assembly made of 18 parts

• CNC Machining (support plate, lead screw)

• Laser cutting (locking plate)

• Water jet cutting (locking arm)

• Welding (support sub assembly)

• Assembly (mechanism mounted to the frame with hugh bolts)

• Standard parts (torsion spring, fasteners, lead screw and trapezoidal

nut)

Secondary locking mechanism modeled with Catia V5R19

Page 11: Projects while working for Bombardier Transportation ...d2oqb2vjj999su.cloudfront.net/users/000/082/894/665/attachments... · Projects while working for Bombardier Transportation,

Projects while working for Compagnie Deutsch Orléans,

France

Jumper coil cable for trucks

Work accomplished:

• Carried out GD&T study

• Stack dimensioning study

• Created Assembly instruction

Page 12: Projects while working for Bombardier Transportation ...d2oqb2vjj999su.cloudfront.net/users/000/082/894/665/attachments... · Projects while working for Bombardier Transportation,

Automatic connection for Renault Laguna 3, FEA Compression test done with Cosmos Works

Connector fitted underneath rail of front seat:

• Plastic injection molding (connector molding,

upper and lower locking plate)

• Sheet metal folding (strengthening plate)

• Stamping and folding (hermaphrodite contacts)

Connector fitted on chassis, under front seat:

• Plastic injection molding (connector molding,

upper and lower locking plate, supporting plate)

• Flat spring

• Stamping and folding (hermaphrodite contacts)

Automatic connector installed Connector fitted underneath rail of front seat

Connector fitted on chassis, under front seat

Hermaphrodite contacts

Page 13: Projects while working for Bombardier Transportation ...d2oqb2vjj999su.cloudfront.net/users/000/082/894/665/attachments... · Projects while working for Bombardier Transportation,

F1 of Scuderia Ferrari used for the Canadian grand prix, June 2002

Modeling work done with Catia V5R15

Work done at university and during spare time

Modeling work achieved using the following modules:

•Generative Shape design

•Free style shape • Part design

• Assembly design

• Photo studio

Page 14: Projects while working for Bombardier Transportation ...d2oqb2vjj999su.cloudfront.net/users/000/082/894/665/attachments... · Projects while working for Bombardier Transportation,

Bachelor of Engineering Final year project : Tether car

• Defined and modeled the engine required (over square

engine, engine speed)

• Sized the front and rear axles (axles diameter,

bearings, tires and rims)

• Investigated the most suitable type of transmission

and calculated the bevel gear ratio

• Designed the fuel tank and sketched the chassis

• Modeled the bridle according to technical regulations

• DMU Kinematics (engine, universal joint, bevel gear)

Engine and universal joint transmission Bevel gear and rear axle

Tether car designed with Catia V5R13

Tether car

Page 15: Projects while working for Bombardier Transportation ...d2oqb2vjj999su.cloudfront.net/users/000/082/894/665/attachments... · Projects while working for Bombardier Transportation,

M.S in Automotive Engineering

Thesis: SAE Formula student car_path follower model

Characteristic of car

•Alloy steel pipes space frame chassis, TIG

welded, with engine mounted at the back

(increasing chassis’s rigidity)

•Front suspension: independent double wishbone

with push rod and bell crank mechanism and anti-

roll bar

• Rear suspension: independent double wishbone

with push rod and bell crank mechanism

•Rack and pinion steering system

•Fully locked differential

•Glass fiber bodywork (master model made of full

scale clay model, vacuum injection molded)

MSC.Adams/View model

• Car modeled as a linkage model

• Model equipped with a dummy engine and a locked limit

slip differential

• Fiala tire model

• PID controller

• The model is able to follow the racing line

3D Track under MSC.Adams/View

• Car driven around track to capture GPS data

• GPS data to create track on Microsoft Excel

• Excel-Adams software to generate road data file

SAE Formula student car 3D Track of Leeds, UK MSC.Adams model

Page 16: Projects while working for Bombardier Transportation ...d2oqb2vjj999su.cloudfront.net/users/000/082/894/665/attachments... · Projects while working for Bombardier Transportation,

Analysis of Aston Martin Vanquish’s double wishbone front suspension

Aston Martin

Vanquish’s double

wishbone front

suspension

MSC.Adams/View analysis

• 3G Bump load cases

• 1G braking load cases • 0,75G cornering load cases

ANSYS analysis

• 3G Bump load cases

• 1G braking load cases

• 0,75G cornering load cases

MBS: MSC.Adams/View analysis FEA: ANSYS analysis

Page 17: Projects while working for Bombardier Transportation ...d2oqb2vjj999su.cloudfront.net/users/000/082/894/665/attachments... · Projects while working for Bombardier Transportation,

Analysis on 2005 SAE Formula student car

2005 SAE Formula student car Bending stress of roll over bar

Frontal impact, at 30g, of

space frame chassis Torsional stiffness of space

frame chassis

Page 18: Projects while working for Bombardier Transportation ...d2oqb2vjj999su.cloudfront.net/users/000/082/894/665/attachments... · Projects while working for Bombardier Transportation,

Rong Vo

B.Eng & M.Sc.

Design/System Engineer

Cell: (438) 401-0000

Email: [email protected]