PROJECTS INDEX May 2013 ~ today JP Contractors Nig. Ltd Project: “The expansion of the MGBEE Road” The Project’ title was the “Expansion of the MGBEE road from “Orlu” to “Ideato South” including the anti-erosion works. The budget of the Project was 2.602.414.000 ₦ (12.333.715,00€) My responsibility was the organization of the group of labors & the machines, in order to achieve the maximum productivity. Brief Project Description: Construction of the drainage system (1m width & 1m height) on both sides of the road

Upload: charalambos-dimitrakopoulos

Post on 12-Apr-2017

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROJECTS index updated

PROJECTS INDEX

May 2013 ~ todayJP Contractors Nig. Ltd

Project: “The expansion of the MGBEE Road”

The Project’ title was the “Expansion of the MGBEE road from “Orlu” to “Ideato South” including the anti-erosion works. The budget of the Project was 2.602.414.000 ₦ (12.333.715,00€)

My responsibility was the organization of the group of labors & the machines, in order to achieve the maximum productivity.

Brief Project Description: Construction of the drainage system (1m width & 1m height) on both sides of the road Connection of the drainage system to the river. Excavation of the extension of the road (double side expansion) Backfilling with laterite. Construction of the infrastructure of the road (30 cm of stone base)

Page 2: PROJECTS index updated

Construction of the road demarcation Construction of the asphalt layer (5cm compacted)

Page 3: PROJECTS index updated

Project: “Construction of underground intersections”

The Project’ title is the “The construction of the underground intersections along Owerri ~ Port-Harcourt Federal National Highway”.

The budget of the Project is 1.000.000.000,00 ₦ (4.347.826,00€)

The construction method used was the open trench method (CUT & COVER)

My responsibility was the organization of the subcontractors, the quantity surveying, the implementation of the Project according to the Ministry’s specifications, the guidance of the Company’s labor, the accomplish of the construction deadline.

Brief Project Description: Excavation of the tunnel & the wing-walls RC works Construction of the drainage system on the main road (Owerri ~Port-Harcourt) Construction of the service roads including the drainage system Construction of anti-flood system Backfilling with laterite. Construction of the infrastructure of the service roads Construction of the asphalt layer (5cm compacted)

Page 4: PROJECTS index updated

Project: “Renovation of Company’s Estate buildings”

Page 5: PROJECTS index updated

Brief Project Description: This is an ongoing Project considering the renovation of 9 houses. The target is the modification & the transformation to a mixed (Nigerian – European) modern style.

My responsibility was the planning of the works, the organization of the subcontractors, the quantity surveying, & the guidance of the Company’s labor.

The Cost estimation of the Project is 90.000.000,00 ₦ (360.000,00 €).

The Project’s deadline is on December 2016.

Project: “Asphalt Plant”

The Company owes an asphalt drum mix plant bought from the Indian Company Capious Roadtech Pvt. LtdThe model of the plant is the DM 60The capacity of the plant is lower 60tph & higher 90tph.

My responsibility was the planning of the infrastructure works, the montage of the plant’s elements & the setting according to the Capious instructions, as long as the running of the installation and the daily cost control.

Total cost of Company’s investment: 100.000,00 $

Page 6: PROJECTS index updated

December 2009 ~ May 2013(stuff)Municipality of Pyrgos – Greece

As Lead Engineer of Urban & Rural Road works, I was responsible of evaluating the citizen’s requests, scheduling & monitoring the daily plan using the Municipality’s fleet of heavy machinery (1 loader, 1 Crawler Excavator, 6 JCB loader backhoes, 8 trucks, 2 graders )

As Supervisor Engineer I was responsible for the onsite construction of the Public Projects financed by the Municipality. My additional role was to monitor the implementation of the quality tests and the inspection of the safety measures. I was also responsible for the Cost Control of the Projects & for the compliance with the Time-Schedule.

Major Public Projects 1. Solid Waste Management Budget: 550.000€2. Erosion Control project at St. Georgios Budget: 203.000€3. Erosion control project at Skafidia Budget: 300.000€4. Restoration of the old hospital “Manolopoulio”

after the earthquakes on 1993 & 2008 Budget: 1.200.000€5. 2nd project of permanent Traffic interventions

at Pyrgos town. Budget: 320.000€

Page 7: PROJECTS index updated

6. Construction of the Skourochori – SkafidiaIntersection Budget: 114.000€

7. Redevelopment of the old square at EleonasBudjet: 128.000€8. Construction of 5th Primary School access

Road Budjet: 250.000€9. Urban Ecology Reformation total Plan – Construction

of the 1st GreenWay Budjet: 900.000€

Page 8: PROJECTS index updated
Page 9: PROJECTS index updated

As site Engineer, I was charged of the construction of multiples urban road works executed by the labors and the machinery of the Municipality of Pyrgos. The projects were supervised by the Technical Department of the Municipality. The budget was ~ 750.000€

Page 10: PROJECTS index updated

July 2008 ~ December 2009 (contract)Theodosis Constructions S.A.

Construction Engineer , Cost Engineer & Quantity Surveyor for Private Building Projects (turn keyluxurious houses & blocks of flats) & Public Projects (retaining walls – optical fiber- schools- churchesPublic buildings - earthworks-infrastructure)

Site superintendent on frameworks & reinforced concrete works.

Page 11: PROJECTS index updated
Page 12: PROJECTS index updated
Page 13: PROJECTS index updated

August 2005 ~ July 2008 (contract)Egnatia Odos S.A.

The 1st Project’ subject was: the expansion of the old National road from Komotini to Alexandroupoli ,

Subsector Mesti~Makri (17Km) the expansion of the Motorway from Komotini to Alexandroupoli ,

Subsector Mesti – Makri (14.7 Km) The Project’ budget was 21.000.000€

The 2nd Project subject was: The construction of the slip resistance asphalt layer from New Karvali to Xrisoupoli (14.5 Km) >> >> >> of the Alexandroupolis Ring Road (20,5 Km) >> of the remaining asphalt works from New Karvali to Alexandroupolis

The Project’ budget was 24.000.000€

My role, as a member of the supervising team, considering the field works, was the daily monitoring of the executed earthworks & the concrete works (extensions of existing culverts & retaining walls), the monitoring of the explosions, the inspection of the safety measures, the control of the infrastructure construction, the implementation of the quality tests , the monitoring of the asphalt works & the control of the safety barrier installation works.

Considering the office job, I was the Lead Quantity Surveyor with extra duties as Cost Controller assistant.

Page 14: PROJECTS index updated
Page 15: PROJECTS index updated

September 2004 ~ August 2005 (contract)Ergodomiki S.A.

The Project’ subject was the construction of the concrete structure of: The main work-shop of Kosmocar S.A. (2.200 m2 surface, 2 floors + 1 basement) at Elefsina The construction of EUROBANK ERGASIAS S.A. main office(4.300 m2 surface, 6 floors + 4 basements +

treasury) in Athens

My salary agreement was 1.800€ monthly

My responsibility as site Engineer was the daily scheduling of the works (frameworks setting – concrete casting – frameworks striping), the guidance of the craftsmen and the labors, the quality tests, the monitoring of the work progress.Considering the paper work, I was in charge of the Quantity Surveillance and the verification of the subcontractors payrolls.

Page 16: PROJECTS index updated
Page 17: PROJECTS index updated

December 2002 ~ September 2004 (staff)Olympic Village 2004 S.A.

The Project’ subject was: The construction of the athletes’ houses in the Olympic Village for the Olympic Games of 2004 in

Athens The construction of the roads and the roads infrastructure inside the Olympic Village The construction of the connecting roads

The project’ Budget was 100.000.000€

Additional projects: The construction of the athletic compound (1 football stadium, 2 indoor multipurpose gymnasiums, 1

swimming pool constructed according to the Olympic standards, 4 tennis playgrouns). Budget: 4.500.000 €

The construction of the main Fire Station of Parnitha Mountain. Budget: 600.000€

My responsibility as Site Engineer – Foreman, was to monitor the works progress, to ensure the safety & the quality, and make sure that everything was executed according to the regulations and the instructions of the Olympic Committee.Considering the office work, my duty was the Quality and the Quantity surveillance.

Athletic compoun

Main Fire Station

Olympic village

Page 18: PROJECTS index updated
Page 19: PROJECTS index updated
Page 20: PROJECTS index updated

September 2001 ~ September 2002 (contract)ERGODRAGAGE S.A.

This is my first attempt to work abroad, so I came to an agreement with a Greek Contractor who was planning to construct a quarry.

My responsibilities in Greece: I was responsible to choose the appropriate machinery, (1 crawler crane Hitachi of 40tn, 1 truck

Mercedes 2626, 1 vibrating screen). I was monitoring the construction of the screen, & the maintenance of the crane and the truck. I was trained to operate the crawler crane as drag-line I organized the custom-clearance, the shipping and the expedition.

My responsibilities in Chad I organized the custom clearance and the transport from Duala (the Cameroonian harbor) to

N’Djamena. I assembled the vibrating screen and I trained the mechanic, the operators & the labors.

Page 21: PROJECTS index updated

June 2000 ~ September 2001 (staff)KLEARXOS ROUTSIS S.A.

Brief Project description: Silt dredging from the sea bottom Underwater drilling and placement of the explosives Underwater explosions Underwater excavations with clamshells and floating excavator Construction of the concrete blocks Construction of the underwater infrastructure Positioning of the blocks Construction of the upper structure

The budget of the Project was 16.727.806€

My responsibility as naval Engineer was the daily measurement of the depth of the sea bottom, the scheduling and the monitoring of the underwater blasts, the guidance of the clamshells and the floating excavator,, the scheduling of the blocks positioning and the surveillance of the immersion.

Page 22: PROJECTS index updated
Page 23: PROJECTS index updated

March 1997~June 2000 (contract)ELTER S.A.

The Project was the construction of natural gas pipe-line (PE) basic network of 4bars pressure, in the sectors 16,17,18,21,22,68,71,73 & 83 of Attika

The budget of the Project was 5.282.465€

My responsibility as junior site Engineer was the daily scheduling of the works (machines & labors), the inspection of the safety measures, the quality tests & the monitoring of the pipe welders.Considering the paper work, I was in charge of the Quantity & Cost Surveillance as well as the time-scheduling using Primavera software.

Page 24: PROJECTS index updated

February 1995 ~ March 1997 (staff)ANTONIOS ZACHAROPOULOS S.A. & KRUGER A.S.

I started working on 1995 at a reputed Contractor, specialized on water treatment plants, during my early years as a student. I had the chance to work side by side with very experienced Engineers and that was the source of my passion for the constructions. Slowly from a shy office assistant I was transformed to a useful cadre and I took in charge the office support of the working sites. The support was:

Correspondence with the authorities Control of the subcontractors payrolls Detailed construction drawings according to tech. specifications

Sincerely yours

Lambis DimitrakopoulosCivil & infrastructure Engineer

Projects certifications officially translated, available upon requestAdditional documentary (Passport – BC degree - Yellow Cart e.c.t) available upon request